ML20147H728

From kanterella
Jump to navigation Jump to search
Ack Receipt of 880126 Petition Requesting Commission Delay Vote on Full Power OL Until Investigation of Allegations Completed & Rept Disposing Allegations Released to Public. Petition Treated Per 10CFR2.206
ML20147H728
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 02/29/1988
From: Murley T
Office of Nuclear Reactor Regulation
To: Condit R, Garde B
GOVERNMENT ACCOUNTABILITY PROJECT
Shared Package
ML20147H733 List:
References
CON-#188-5743 2.206, NUDOCS 8803090056
Download: ML20147H728 (5)


Text

- - _ _ _ _. -

7-  ;

, 3.# i h.s 'r,b' U N

,N  % . . lt t

.,u February 29, 1988 '

o, ?g b

.Doci No. #],5j-498

' 7)('

ide .!G rde 2 ,

?-

Mr.y (chard I. ,,Condil 4 ? % '

. \- h\ ' '

y ,. movshhept A{countab51Ry P'roje'ct 1

> 1 ' 25, F_Atreet , {4.k .' ' . ..

e W Suits'700; 7 'hiN's '

Wal,hingtci d, . S 001 .

r m .N , 9 (

Dear-s h M de h N TrY Condit: ~

. ., m <.

SUts0ECT: aP2PE1PK 0F PEJITICH FILED BY THE GOVERNMENT ACCOUNTABILITY

$. PROJEC1.\f 0 0h Hw TEXAS,P_ROJFCT, -

r  ; UNIT 1 Thie 1cYter is to ac!'r.cwlqdge [eyipNot kPetition dated January 26, 1988,

' filed Q the.Coverrmant necur6tiility Project (GAP) requesting that the Cer.issOin o'eby votVg en a%!1-poWr opertthg license for the South Texas Proj4ct (STP), Unit.1 inti'l thpre has Laen-a complete investigation of all '

allegatio# rrgir3 Dig de STP'and public rtlieese of a r?oort disposing of m each all gation) )AP asgrn as bases for tM5xrcquest'that: (1) the results N

of the &{C's limited fovutigation into allegations were predetermined, in

% (. that the 14RC A spection team had prepared a draft of its findings before

' leaving thi rite after its site inspectinn; (2) in.an on-site inspection with one of-the hitegers, the alleger was :Totspermitted to show the NRC tcan any of lhis allegatict.s relatty to Urt 1 IW,J) the NRC revbzei was subjected to over-(A whelming scheduling pressurel, resulting Ir disposition of most of the alleca-i ,.tisns without interviewint* Die allegers arAin c failure to thoroughly address the 60 selected-aijajations :that+ere tha focus of the tean's review; and (4) sane .of the allegations of wrongdoing hava been investigated by the NRC.

'?

  • m, .

Ihe GtP Petitihimsfrg treated rursuant to 10 CFR 2.206 of the Conriission's 4

'+J ' *'s &" regulations. As pro?ided by 10 ChJ 2.206, actinr will be taken on your request a within a reastn9. ole Gme. I have enclosed for your information a copy of the

, notice thdt 1pheing filed with the Office of the Federal Register for publi-Cdtion..

n  %

ncereh, 8803090056 880229 PDR ADOCK 05000498 Thom/,$/ as E. Murky,. Director p PDR '

^

Office of Nuclear Reactor Regulation Encloadren As stwd x cc w/ enclosure: s

'See next Dage

, , ,m,

.; D I STid Docket. FileBUM d  %) tncomi ngi.l MC t r_PDR ogly,:: ,

Local PDR E00 i

<1 ED0 Reading o ,

7. Murley/J. Sniezek F. Miraglia O. Crutchfield DR44 ,J.Chlvo P. Noonan P. radambi GPA/P/J ?O. Hnssburg, PMAS (ED0g 3447 )

r

'$ PD4 Reading O. Hagan W Stallo B. Clements, SECY OGC (w/ incoming) s J. Lieberman, 00C ASLAB ASLBP

'AS8S (10) 'J.Resner(2)(W-501)

  • See previous concurrences: s PD4/LA* .PD4/Ph* PD4/D* Tech. Ed.*0GC DR4A* DRSP:D*

PNoonan s.4Xadambi:sr JCalvo DCrutchfield 02/11/88 W 11/88 02/11/88 02/11/88 02/ /88 02/ /88 02/ /88 ADP* bfkR FMiraglia )1Murley 02/22/88 02 f88 i t

g; '

s

Cocket No. 50-498 Ms. Billie P. Garde Mr. Richard.E. Condit Government Accountability Project 25 E Street, N.W.

Suite 700 Washington, DC 20001

Dear Ms. Garde and Mr. Condit:

\

SUBJECT:

RECEIPT OF PETITION FILED BY THE GOVERNMENT ACCOUNTABILITY PROJECT - SOUTH TEXAS PROJECT, U IT 1

\

This letter is to acknowledge receipt of a P,etition dated January 26, 1988, filed by the Government Accountability Project (GAP) requesting that the Commissiondelayvotingonafull-poweroper(tinglicensefortheSouthTexas Project (STP), Unit I until there has been a complete investigation of all allegations regarding the STP and public relehse of a report disposing of each allegation. GAP asserts as bases for thf request that: (1) the results of the NRC's limited investigation into allega ions were predetermined, in that the NRC inspection team had prepared a dr ft of its findings before leaving the site after its site inspection; (2)\in an on-site inspection with oneoftheallegers,theallegerwasnotpermitjedtoshowtheNRCteamanyof his allegations relating to Unit 1; (3) the NRC review was subjected to over-whelming scheduling pressures, resulting in dispbsition of most of the allega-tions without interviewing the allegers and in a\ failure to thoroughly address the 60 selected 611egations that were the focus o none of the allegations of wrongdoing have been i,f the by nvestigated team's review; and (a) the NRC.

GAP's Petition has been referred to the staff for action pursuant to 10 CFR 2.206 of the Commission's regulations. As provided by 10 CFR 2.206, action will be taken on your request within a reasonable time. Ilhave enclosed for your infor-mation a copy of the notice that is being filed with the Office of the Federal Register for publication.

Sincerely, ThomasE.Mur; ley, Director Office of Nuc, lear Reactor Regulation

Enclosure:

\

As stated i cc w/ enclosure: i See next page DISTRIBUTION Docket File w/ incoming ltr only NRC PDR Local PDR ECO #

ED0 Reading T. Murley/J. Sniezek F. Miraglia D. Crutchfield DR4A J. Calvo P. Noonan P. Kadambi GPA/PA D. Mossburg, PMAS (E00f )

PD4 Reading D. Hagan V. Stello B. Clements, SECY J. Liebeman, 0GC

OGC(w/ incoming) ASLAB ASLBP ACRS (10) J. Resner (2) (H-501) l *See previous concurrences:

PD4/LA* PD4/PM* PD4/D* Tech. Ed *0GC DR4A* DRSP:D*

PNoonan PKr.dambi:sr JCalvo DCrutchfield 02/11/8 02/11/88 02/11/88 02/11/88 02/ /88 02/ /88 02/ /88

% g/ DONRR r gli TMurley 02pg/88 02/ /88

Dockst.No. 50-498 Ms. Billie P. Garde

- Mr. Richard E. Condit

.- cGovernment Accountability Project 25 E Street. N.W.

I' Suite 700 Washington. DC 20001

Dear Ms. Garde and Mr. Condit:

-\

l-

SUBJECT:

RECElPT OF PETITION FILED BY THE GOVERNMENT ACCOUNTABILITY PROJECT - SOU'TH TEXAS PROJECT, UNIT 1 This letter is to acknow edge receipt of a Petition cated January 26, 1988.

filed by the Government Ac' countability Project (GAP) requesting that the Comission delay voting on k full-power operating license for the South Texas Project (STP) Unit 1 until there has been a co.nplete investigation of all allegations regarding th1 STP\and public release of a report disposing of each allegation. GAP asserts bs bases for this request that: (1) the results of the NRC's limited investigat' ion into allegations were predetermined, in that the NRC inspection team had'\ prepared a draf t of its findings before leaving the site after its site ihspection; (2) in an on-site inspection with one of the allegers the alleger w'as not permitted to show the NRC team any of his allegations relating tc Unit 1;\(3) the NRC review was subjected to over-whelming scheduling pressures. resulting in disposition of most of the allega-tions without interviewing the allege (s and in a failure to thoroughly address the 60 selected allegations that were the focus of the team's review; and (4) none of the allegations of wrongdoing has been investigated by the NRC.

\

GAP's Petition has been referred to the staf f for action pursur.nt to 10 CFR 2.206 of the Comission's regulations. As prov taken on your request within a reasonable}ded time. I have by enclosed 10 CFRfor 2.206. action will be your infor-mation a copy on the notice that is being filed with the Of fice of the Federal Register for publication.

Sincerely.

x \

Thomas Es Murley. Director Office ofqNuclear Reactor Regulation

Enclosure:

s As stated \

ec w/ enclosure: -

See next page DISTRIBUTION hi Docket File w/ incoming ltr only NRC POR LocalTDR E00 f ED0 Reading T. Murley/J. Sniezek \ F. Mireglia D. Crutchfield DR4A J. Calvo, P. Noonan P. Kadambi GPA/PA D. Mossburo. PMAS (EDOW )

PD4 Reading D. Hagan V. Stello\ S. Clements. SECY OGC (w/ incoming) J. Lieberman. OGC '. ASLAB ASL8P ACR5 (10) J. Resner (2) (W-501)

  • See previous concurre  : , g,x 2 PD4/LA* PD4/FM* gg PD4/D* Tech.Ed.*0G0M'ehR4 a di[S- b PNoonan PKadambi: JCalvo f4 c m DCru t ield 02/11/88 02/11/88 02/11/88 02/11/88 02/gi88 02/18/88 02pA8 ADP 00hRR FMiraglia TMurley 02/ /88 02/ /88

Docket No. 50-498 Ms. Billie P. Garde Mr. Richard E. Condit Government Accountability _ Project 25 E Street, N.W.

Suite 700 Washington, DC 20001

Dear Ms. Garde and Mr. Condit:

\

SUBJECT:

RECEIPT DE PETITION FILED BY THE GOVERNMENT ACCOUNTABILITY' PROJECT - SOUTH TEXAS PROJECT, UNIT 1

\

This letter is to acknowledge receipt of a Petition dated January 26, 1988, filed by the Government Accountability Project (GAP) requesting that the Comission delay voting on a full power operating license for the ' South Texas Project (SThP). Unit I until there has been a complete investigation of all allegations regarding the\STP, and public release of a report disposing of each allegation. GAP asse'rts as bases'for this request that (1) the results s

of the NRC's limited investigation into allegations were predetermined, in thattheNRCinspectionteam\haapreparedadraftofitsfindingsbeforemaking its site inspection; (2) in an on-site inspection with one of the allegers. the alleger was not permitted to show the NRC team any of his allegations relating to Unit 1; (3) the NRC review Eas subjected to overwhelming scheduling pressures, resulting in disposition of most\of the allegations without interviewing the allegers, and failure to thorough'ly address the 60 selected allegations which s

were the focus of the team's review; and (4) none of the allegations of wrongdoing has been investigated by the NRC.

GAP's Petition has been referred to the staff for action pursuant to 10 C.F.P.

52.206 of the Commission's regulations \ As provided by $2.206 action will be taken on your request within~a reasonable time. I have enclosed for your information a copy of the notice that is\being filed with the Office of the Federal Register for publication.

Sincerely.

Thoma E. Murley, Director Office o'f Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure:

See next page \

DISTRIBUTION bocket File w/ incoming ltr only .RC PDR Loca\l DR EDO f EDO Reading T. Murley/J. Sniezek F. Miraglia D. Crutchfield DR4A J. Calvo P. Noonan P. Kadambi GPA/PA D. Mossbu , PMAS (E00# )

PD4 Reading D. Hagan V. Stello B. Clements SECY OGC (w/ incoming) a. Lieberman, OGC ASLAB ASLBP ACRS (10) J. Resner (2) W-501)

PD4/L PD4/PM PXadambi:sr PD4/D /,%

JCalvo Tech.

/t, M p//t 0Gb 8 fgA DRSP:D OCrutchfiela PNoon 02/// /8 02/ ll /88 02/// /88 02/// /88 02/( f 2/ /88 02/ /88 ADP DONRR FMiraglia TMurley 02/ /88 02/ /88

pgW l% ,s e

.h  %' UNITED STATES

).

! i i

{ I NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20066 /

s

/

gkd ouv ersncipal Correspondence Control V , 'h' C FROM: .

CUE: 02/10/88 EDO CONTROL: 0003447 DOC DTr 01/26/88 Billie P. Garde, Richard E. Condit, FINAL REPLY:

cnd Edna F. Ottney, GAP (Rec *d by memo Chilk to Stallo, 1/28/88)

TO:

NRC FOR SIGNATURE OF ** GRN ** -

CRC NO:

DESC: .

, ROUTING:

2.206 PETITION REQUESTING NRC DELAY VOTING ON A Stello FULL POWER OPERATING LICENSE FOR SOUTH TEXAS UNTIL Taylor INVESTIGATION OF ALL ALLEGATIONS Rehm DATE: 01/28/88

, Murley RMartTn ASSIGNED TO: CONTACT:

OGC Murray -

SPECIAL INST ONS OR REMARKS:

1. Prepare memo to SECY for EDO's signature.

2.

Prepare 1tr to GAP for Murley's signature.

l .

-.v l

1 .

O ~9%

, ~.ffy -

'f.

  • ~ >

,-4;,]k'p' ,~ ' " '

.l '.,*."

Y; q '

. j.:/E4 ' 4 i'

', jj;h{ h , . :q 5,' '

'g4.r}

.. ....,v'...

s ,. ,- .

WGif

-Q. ]

a.c s.h!k 'W y' ,

n

-Y:pd %g; ,

,:. . ~ ,

. a . ,.

.,Y

.u ', _
  • ..y,*

t

u .x y Tf) -

j , y- .

. -.. - ~.- ... y...---

E :._ _h _ _ _ _

r t,k 'h,a

.,s.

__