ML20211E985

From kanterella
Jump to navigation Jump to search
Partial Response to FOIA Request.Documents in Apps A-I Available in PDR
ML20211E985
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 09/30/1986
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Garde B
GOVERNMENT ACCOUNTABILITY PROJECT
Shared Package
ML20150F241 List:
References
FOIA-85-378 NUDOCS 8610310010
Download: ML20211E985 (32)


Text

PDLU UNITED STATES

[pnegg]o NUCLEAR REGULATORY COMMISSION

[ f c o

W ASHINGTON, D. C. 20555

,a- E

  • e g %.

/ SEP 30 1986 Di11le Pi ener Ga rde, Esquir-Government A ~un Lability Proj et Mi d we.s t. O f f l e.-

3424 Maceon Lane Apid et.on, WE 54901 IN RESFONSE REFEi-TO F0I 4 - 8.G - J 7 8 D:.:a r Ms . Ga t d.-:

This is in recard to your request, pursuant to the Freedom of I nf o rma !.j un Ac t. , t.o which t.he NRC as sign.-d the above-- n umbe2-

._ Z _ _. This is a partial response to your reuutst We will no t.l fy you upon compl e t i on er s ea rch for an-J review 3

i of any additi.onal reeordu <ubject t.o your r - ques t.

Th- Staff har <omp]eted the uesrch for nd r vi~w of reeerds subject to your request, and this 1.r. t.he final response to your request.

The NRC has no records subject to your requet.t.

Reevrds subject to your request a rt avalloble for publ14 inspection and copying at the NRC Fublic Document, Room (PDR), 1717 H Street, NW, Washington, DC 29555, ac_noted en the enclosure (s). The PDR accession number is identified besido each record description.

_. L. _ Reevede cubject te your requeet cre being mode availsble f er public inepect ion and copying a t the NRC Public Document. Room (PDE), 1717 H Street, NW, Washington, DC 205b5, in the FDR file fvIder under the above number and your name.

These records are listed un t.he enclosure (s).

- W. are ewflosing a natier that providee information about charges ar.d procedures for obtaining reevrds frum the FDF

Sincerely, g

'ose }

Donnie H. Grimsley, Di reet or Division < f Ruler- and Recorde OffLee of Administrativu Enalesurefs). As dLated 8610310010 860930 PDR FOIA GARDE 85-37B PDR i

F01A-85-378 (FirstPartial)

APPENDIX A Ross List Ross Landsman Exhibits and C% position

1. Undated Draft Notice of Violation for period of 11/10/79 - 2/7/80, non compliance with conditions of NRC Construction Permits for South Texas Project Units 1 and 2, Dockets 50 -

498 and 50 - 499 (35 pages).

2. 4/1/80 Draft South Texas Project Investigation Report

& Proposed Enforcement, w/ Appendix A, Draft Notice of Violation (22 pages), and Notice of Proposed Imposition of Civil Penalties (186 pages).

3. 1/14/80 Interoffice Memorandum from C. B. Pettersson, Brown & Root, Inc., to Distribution re: Trip Report 1/10/80, Meeting with NRC, STP Site (3 pages).
4. 11/6/80 Letter from W. C. Seidle, RIV, NRC to G. W. Oprea, Jr., Houston Lighting & Power Company, re: Inspection of 8/18 - 22, 9/2 - 5 and 9/16 - 19, 1980, South Texas Project, Units 1 and 2 (2 pages), w/ copy of Inspection Report (18 pages).
5. 5/8/81 Handwritten Note from D. W. Hayes, NRC to J. Gutierrez, NRC re: Review of testimony on structural backfill (1 page) w/ handwritten notes of Hayes and Landsman re: Investigation team concerns and position on the structural backfill (6 pages).
6. 7/10/80 Memorandum from R. B. Landsman, Reactor Inspector, NRC, to D. W. Hayes NRC re: STP Report No. 50-498/80-17., 50-499/80-17 (1 page), w/ Attachment 1, Report No.

50-498/80-17., 50-499/80-17 re: inspection of 6/23-26/80 South Texas Units 1 and 2 (9 pages),

and Attachment 2, Document Change Notice re:

Structural backfill (1 page).

7. December Handwritten Memorandum from R. B. Landsman, 1980 NRC, to C. C. Williams, NRC, re: STP Report 50-498/79-19; 50-499/79-19, synopsis of the issues (5 pages).

Ross Landsman Exhibits 2

8. 5/29/81 Memorandum from E. J. Gallagher, Mechanical Structural and Metallurgical Section, DRR, IE, NRC to H. A. Wilber, DRRRI, IE, re: Summary of 4/26-27, 1980 Meeting on Structural Backfill at South Texas Project Units 1 and 2 (Docket No.

50-498, 50-499) (9 pages).

9. Undated Unauthored Handwritten Notes re: 4/27/81 meeting in HQ on STP (2 pages).
10. Undated Unauthored Handwritten Notes re: 2/27/81 Review of Final Report by Consultants (8 pages).
11. Undated Unauthored Chronological Listing of Events re:

inspections and reports from 12/17/79 to 1981 on structural backfill (handwritten 8 pages; typewritten (26 pages).

12. 8/7/80 Handwritten, Outgoing Transmission Service Request from R. B. Landsman, Region III, NRC, to W. Reissmuth, IE, HQ, re: HL & P's Response (21 pages).
13. 5/3/84 Letter from T. J. Jordon, HL & P to L.

W. Hurst, Bechtel Energy Corporation; re:

South Texas Electric Generating Station Project Audit Report SOS-401 (2 pages), w/ copy of the Report (112 pages).

14. 09/25/84 Letter from Morris to Berkovitz (2 pages)
15. 07/25/84 Oral Deposition of Ross Landsman, Volume I (162 pages)
16. 07/26/84 Oral Deposition of Ross Landsman, Volume II (120 pages)
17. Undated Changes to Deposition (5 pages)

F0IA-85-378 (First Partial)

. APPENDIX B Karl Seyfrit Exhibits and Npositions

1. 5/21/79 Memorandum from J. J. Cummings, OIA, NRC, to J. G. Davis, IE re: Allegations of harassment and intinidation, South Texas Nuclear Project (1 page).
2. 5/24/79 Memorandum from J. J. Cummings, OIA, NRC, to J. G. Davis, IE, NRC re: Allegations of harassnent and intimidation - South Texas Nuclear Projects (1 page)
3. 6/19/79 Memorandum from H. D. Thornburg, HQ, NRC to K. V. Seyfrit, RIV, NRC re: Accelerated quality assurance inspection - South Texas construction site (1 page)
4. 10/5/79 Letter from W. C. Seidle, RIV, NRC to E. A. Turner --HL&P re: Inspection conducted by Hubacek, Aug. 6-10, 1979, CPPR-128 and 129 South Texas, Units 1 and 2 (2 pages) w/ Appendix A, Notice of Violations (3 pages),

and copy of IE Inspection Report No.

50-498/79-13 and 50-499/79-13 (31 pages) ,

5. 6/25/79 Note from W. C. Seidle, RIV, NRC to K. V. Seyfrit, RIV, NRC re: Inspection team and 7/19/79 deadline (1 page)
6. 7/26/79 Letter from K. V. Seyfrit, RIV, NRC to Representative J. J. Pickle re: 7/9/79 Pickle inquiry concerning the discovery of new voids in the concrete containment building at South Texas (2 pages)
7. 7/3/84 Letter from J. B. Hamlin, Shaw, Pittman, Potts

& Towbridge to D. Berkovitz, OGC, NRC re:

Houston Lighting & Power Co., et al., v. Brown

& Root, Inc., et al., and use of Seyfrit transcript as a basis for questioning rather than the Seyfrit tape recording (2 pages),

w/ copy of Shaw, Pittman Transcript of Karl V. Seyfrit tape recording of CBS Magazine Interview with Mr. Seyfrit 8-10-79 to be aired 10/4/79 (49 pages)

8. 9/7/79 Transcription of special agents, Federal Bureau of Investigation, interview with >

K.V. Seyfrit, RIV, NRC re: South Texas investigation,(2 pages)

Seyfrit Exhibits 2

9. 9/17/79 Letter from K. V. Seyfrit, RIV, NRC to B. G. Neill, Motor Equipment Services Division, Forth Worth, TX re: Request for vehicle for South Texas Project residen; inspector (2 pages)
10. 10/79 Newspaper article from Houston Post: " FBI involved in S. Texas N-project probe" (2 pages)
11. 11/4/79 Statements from Recent Allegers (7 pages)
12. 12/7/79 Note from K. V. Seyfrit, RIV, NRC to H. D. Thornburg, HQ, re: Forwarding of letter from Senator Tower to HQ for response (1 page)
13. 12/28/79 Letter from G. W. Oprea, HL&P to Director, Region IV, OI, NRC re: Meeting of 12/28/79 and implementation of 9 action items (2 pages)
14. 4/15/80 Closed Commission Meeting Transcript re:

Briefing On Investigation of QA-QC Problems at South Texas Nuclear Project (155 pages)

15. 06/24/80 Memorandum from Thornburg to Seyfrit re: Followup Activities Associated with the S. Texas Order (3 pages)
16. 04/21/80 Memo to William Dircks from Samuel Chilk re: Briefing on Investigation of QA-QC Problems at South Texas Nuclear Project (1 page)
17. 12/31/79 Letter to G. Oprea from Karl Seyfrit re: Inspection at South Texas Construction Site (1 page)
18. 08/10/84 Certification sheet from Elizabeth Shelborne w/ enclosures Ltr. dtd.1/28/81 to W. Rice from K. Seyfrit w/ enclosures Notice of Deviation and Inspection Report No. 99900502/81-01 (27pages)
19. 08/10/84 Certification sheet from Elizabeth Shelborne w/ enclosures Ltr. dtd. 5/18/81 to W. Rice from John Collins w/ enclosures Notice of Violation, Notice of Nonconformance Inspection Report No. 99900502/81-02 (19 pages)
20. 08/10/84 Certification sheet from Elizabeth Shelborne w/ enclosures Ltr. dtd. 8/19/81 to W. Rice from Karl Seyfrit w/ enclosures l

Notice of Nonconfonnance and Inspection Report No. 1 99900502/81-03 (23 pages) )

l I

~ - - - _ - . _ - _ _ _ , ,

. .. _. .. - - - . . - . . .. . _ - - _ _ . _ _ ~ _ _ - . _ - _. . ..

Seyfrit Exhibits 3

21. 08/16/84 Oral Deposition of Karl Seyfrit - Volume I (168 pages)
22. 08/17/84 Oral Deposition of Karl Seyfrit - Volume II (67 pages) l i

i 4

j 4

i 1

'l l

F01A-85-378 (FirstPartial)

APPENDIX C Dudley Thompson Exhibits and Deposition

1. 11/8/79 Memorandun from L. J. Strickler, OIA, NRC, to R. A. Fortuna, OIA, re: Attached 11/7/79 Sinclair memorandum and Thompson request for OIA's assessment of Region IV's inspections / investigations and the adequacy of Region IV'c efforts to address allegations effecting quality assurance at the STNP, (1 page) w/ attachment, Memo from Sinclair (1 page).
2. 11/4/79 Statements from Recent Allegers (7 pages).
3. 5/14/81 Memorandun from D. Thompson, IE, NRC, to B. H. Grier , RI; J. P. O'Reilly, RII; J. G.

Keppler, RIII; K. V. Seyfrit, RIV, and R. H.

Engelken, RV re: Appeal Board Decision in South Texas Project case and protection of confidentiality of informants and allegers. (1 page)

4. Undated Draft NRC Staff Proposal to Fine H. L. & P. for noncompliance with NRC requirements associated

. with the construction of the South Texas Nuclear Power Station (2 pages)

5. 9/18/80 Memorandun from C. Kammerer, OCA, HRC, to Chairman Ahearne, and Comm:ssioners Gilinsky, Hendrie and Bradford, NRC re: Attached copy of draft addendum to be added to V. Stello's testimony for the South Texas hearing (1 page),

w/ copy of addendum (3 pages).

6. 8/26/80 Memorandum from K. V. Seyfrit, RIV, IE, NRC, to D. Thonpson, EDO, IE, re: Investigation Report No. 50-498/80-21, 50-499/80-21, South Texas Project, Investigation of Falsification of Maintenance Records (1 page).
7. 4/28/83 Answers and Objections of Brown & Root, Inc.,

to Houston Lighting & Power Company's Second Set of Interrogatories to Brown & Root (71 pages).

8. 08/20/84 Oral Deposition of Dudley Thompson, Volume I (190 pages)

FOIA-85-378 (First Partial)

APPENDIX D Victor Stello Exhibits and Depositions

1. 7/2/84 NRC pleading to certify copy of document in

, Houston Lighting & Power Co., et al v. Brown &

Root, Inc., et al. (1 page), w/ copy of document: 10 C.F.R. 50, Appendix B as it existed on 10/31/72 (9 pages).

2. 6/14/84 NRC pleading to certify copy of document in 4 Houston Lighting & Power Co., et al. v. Brown &

~

Root, Inc., et al. (1 page), W/ copy of document: List of Office of Inspection and Enforcement Documents (2 pages).

3. 8/2/77 Letter from W. C. Seidle, RIV, NRC, to G. W. Oprea, Jr., H. L. & P re: Investigation conducted by Foster & Taylor of NRC during

, July 6-8, 1977 of activities authorized by NRC Construction Permit No. CPPR-128, South Texas, Unit 1 (2 pages), w/ copy of Investigation Report No. 50-498/77-08 (8 pages).

i

4. 1/4/78 Letter from W. C. Seidle, RIV, NRC, to G. W. Oprea, Jr., H. L. & P. re: Inspection conducted by Taylor & Gilbert of NRC during December 19-21, 1977 of activities authorized by NRC Construction Permit Nos. CPPR-128 and 129, South Texas, Units 1 and 2 (2 pages),

i w/ copy of Inspection Report No. 50/498/77-13 &

50/499/77-08.

5. 12/28/77 Letter from W. C. Seidle, RIV, NRC, to G. W. Oprea, Jr., HL&P re: Investigation 4 conducted by Ward & Taylor, NRC, during period of December 15-16, 1977 of activities authorized by NRC Construction Permit Nos. CPPR-128 and 129, South Texas Units 1 and 2 concerning alleged existence of radiographs showing faulty welds in equipment of site (2 pages), w/ copy of Inspection Report No.

50-498/77-14, 50-499/77-09 (4 pages).

6. 4/11/78 Letter from W. C. Seidle, RIV, NRC, to G. W. Oprea, Jr., HL&P re: Inspection conducted by Hubacek during March 21 - 23, 1978 of activities authorized by NRC construction >

O 1

~

Fong -ts-3 73 (FOts4 Par 4lc)

Victor Stello Exhibits 2 permit Nos. CPPR 128 and 129, South Texas, Units 1 and 2 (2 pages) w/ Appendix A, Notice of

Violation (1 page) and copy of Inspection
Report No. 50-498-78-04 and 50-499/78-04 (11 pages).
7. 4/3/78 Letter from W. C. Seidle, RIV, URC, to G. W. Oprea, Jr., HL&P re: Investigation conducted by Ward & Hubacek on March 21, 1978 of activities authorized by NRC Construction Permit Nos. CPPR-128 and 129, South Texas, Units 1 and 2 concerning allegation by Brown &

Root employees (2 pages), w/ copy of Investigation Report No. 50-498/78-05 and 50-499/78-05 (3 pages).

8. 6/6/78 Letter from W. C. Seidle, RIV, NRC, to E. A. Turner, HL&P re: Investigation by Ward during May 16-18, 1978 of activities authorized by NRC Construction Permit Nos. CPPR-128 & 129, South Texas, Units 1 and 2 concerning allegation by a Brown & Root employee (2 pages), w/ copy of Investigation Report No.

50-498/78-09 and 50/499/78-09. (5 pages)

9. 9/22/78 Letter from W. C. Seidle, RIV, NRC, to E. A. Turner, HL&P re: Investigation conducted by Ward during period July 25-28, 1978 of activities authorized by NRC Construction Permit Nos. CPPR-128 and 129, South Texas, Units 1 and 2 concerning an allegation by a Brown & Root employee (2 pages), w/ copy of Inspection Report 50-498/78-12 and 50/499/78-12 (13 pages),

i'

10. 8/25/73 Letter from W. C. Seidle, RIV, NRC, to E. A. Turner, HL&P re: Meeting of 8/15/78 concerning activities authorized by NRC Construction Permit Nos. CPPR-128 and 129, South Texas, Units 1 and 2 (2 pages), w/ copy of Inspection Report No. 50-498/78-13, and 50-499/78-13 (3 pages).
11. 9/15/78 Letter from W. C. Seidle, RIV, NRC to E. A. Turner, HL&P re: Investigation by Ward, August 22-25, 1978, activities authorized by NRC Construction Permit Nos. CPPR-128 and 129, South Texas, Units 1 and 2 concerning an allegation by a Brown & Root employee (2 pages), w/ copy of Investigation Report No. 50-498/78,14 and 50-499/78-14 (11 pages).

F0IA-85-378 (First Partial)

Victor Stello Exhibits 3

12. 10/6/78 Letter from W. C. Seidle, RIV, NRC, to E. A. Turner, HL& P re: Investigation by Hall

& Rosenberg, Sept. 11-14, 1978, activities authorized by NRC Construction Permit Nos. CPPR-128 and 129 for South Texas, Units 1 and 2 concerning allegation by a South Texas employee (2 pages), w/ Appendix A, Notice of Violation (2 pages), and Investigation Report No. 50-4981 78-15 and 499/78-15 (14 pages) 13.2/16/79 Letter from W. C. Seidle, RIV, NRC, to E. A. Turner, HL&F re: Investigation conducted by W. G. Hubacek, Jan. 23-26, Jan. 30-Feb. 2, 1979, activities authorized by NRC Construction Permit Nos. CPPR-128 and 129, South Texas, Units 1 and 2 concerning an allegation by a former South Texas Project employee (2 pages),

w/ Appendix A, Notice of Violation, and copy of Investigation Report No. 50-498/79-01 and 50-499/79-01 (10 pages)

14. 4/11/79 Letter from W. C. Seidle, RIV, NRC, to E. A. Turner, HL&P re: Inspection by Hubacek, March 20-23, 1979, CPPR-128 and 129 activities, South Texas Units 1 and 2 concerning findings of inspection (2 pages), w/ Appendix A, Notice of Violation (2 pages), and Inspection Report No. 50-498/79-04 and 50-499/79-04 (8 pages)
15. 6/8/79 Letter from W. C. Seidle, RIV, NRC, to E..A. Turner, HL&P, re: Investigation by Hubacek during May 15-18 and 22-23, 1979, CPPR-128 and 129 activities, South Texas, Units 1 and 2 concerning allegation by former South Texas Project employee (2 pages), w/ Inspection Report No. 50-498/79-09 and 50-499/79-09 (8 pages)
16. 10/5/79 Letter from W. C. Seidle, RIV, NRC, to E. A. Turner, HL&P re: Inspection by Hubacek, August 6-10, 1979, CPPR-128 and 129 activities, South Texas, Units 1 and 2 concerning findings (2 pages) w/ Appendix A, Notice of Violation (3 pages), and copy of Inspection Report 50-498/79-13 and 50-499/79-13 (31 pages)

foIA 85478 (First Partial)

Victor Stello Exhibits 4

17. 10/16/79 Letter from W. C. Seidle, RIV, NRC, to E. A. Turner, HL&P re: Investigation by Hubacek and Phillips, Sept. 4-7 nnd 11-14, 1979, CPPR-128 and 129 activities, South Texas, Units 1 and 2 concerning allegation by a former South Texas Project employee (2 pages),

w/ Appendix A, Notice of Violation (1 page),

Appendix B, Notice of Violation (1 page), and Investigation Report No. 50-498/79-14 and 50-499/79-14 (13 pages)

18. 9/14/78 Letter from K. V. Seyfrit, RIV, NRC, to E. A. Turner, HL&P re: Telephone conversations of 9/13/78 concerning code welding activities at South Texas Project site (1 page)
19. 5/1/79 Letter from K. V. Seyfrit, RIV, NRC, to E. A. Turner, HL&P, re: Telephone conversations between R. A. Frazar and W. C. Seidle, RIV, on April 26 and 27, 1979 concerning improper storage of reinforcing steel at South Texas Project (2 pages) 20, 6/22/79 Letter from K. V. Seyfrit, RIV, NRC, to E. A. Turner, HL&P, re: Telephone conversation between Turner & Seidle on 6/22/79 concerning voids in concrete discovered in lift 8 of South Texas Project, Unit 1 containment wall and the impact of the presence of the voids on other safety-related concrete placements at the site (2 pages) 21, 6/29/79 Letter from K. V. Seyfrit, RIV, NRC, to E. A. Turner, HL&P re: Letter of 6/28/79 concerning stopwork notice of 6/22/79 (1 page)
22. 9/G/79 Letter from K. V. Seyfrit, RIV, NRC, to E. A. Turner, HL&P re: Meeting of 9/5/79 and telephone conversation of 9/6/79 concerning plans to resume the placement of concrete in the exterior shell wall of the STP Reactor containment Building on or about 9/6/79.

(1 page)

23. 12/31/79 Letter from K. V. Seyfrit, RIV, NRC, to G. W. Oprea re: fpecial inspection at South Texas construction site, meetings of Dec. 21-28, 1979 and letter of 12/28/79 concerning problems associated with placement of concrete (1 page) 5

--- , ,-.- , , --- -,,e

foth-06-sn (First Partigt) l 1

l Victor Stello Exhibits 5

24. 4/17/79 Letter from K. V. Seyfrit, RIV, NRC, to E. A. Turner, HL&P re: Telephone conversation of 4/15/80 between D. G. Barker (HL&P) and U. A. Crossmen (NRC) concerning stop-work order placed on ASME Code welding and other safety-related welding at the site on 4/11/80 (2 pages)
25. 4/30/80 Letter from V. Stello, HQ, NRC, to G. W. Oprea, Jr., HL&P, re: Special investi-gation of construction activities at South Texas Project Units 1 and 2 (2 pages)
26. 4/30/80 Appendix A to Stello letter of 4/30/80, Notice of Violation, South Texas Units 1 and 2 (19 pages)
27. 4/30/80 Appendix B to Stello letter of 4/30/80, Notice of Proposed Imposition of Civil Penalties, South Texas Units 1 and 2 (1 page)
28. 4/30/80 Appendix C to Stello letter of 4/30/80, Cross

References:

Noncompliances To Report Details (1 page)

29. 4/22/80 Appendix D to Stello letter of 4/30/80, Investigation Report 50-498/79-19; 50-499/79-19 (198 pages)
30. Undated Draft NRC Order To Show Cause to HL&P licensee, holder of CPPR-128 and 129 to sho9 why safety-related construction activities on the South Texas Project Units 1 and 2 should not be stopped
31. 6/29/84 NRC Pleading certifying that Staff Requirements Memorandum from S. J. Chilk, Secretary of the Commission to William J. Dircks, dated 4/21/80 regarding Briefing on Investigation of QA/QC Problems at South Texas Project on 4/15/80 is a true copy (1 page), and w/ copy of Memorandum (1 page)
32. 8/10/84 NRC Certification re: Attached 22 pages which contain true copy of letter of 8/19/81 from K. V. Seyfrit to Brown & Root, Inc., concerning the LCVIP inspection by D. F. Fox on 7/20-24, 1981 and letter's attachments (23 pages)

fotA 85 318 (first. PartiaO Victor Stello Exhibits 6

33. 8/10/84 NRC Certification re: Attached 18 pages containing true copy of letter dated 5/18/81 from J. T. Collins to Brown & Root Co., Inc.,

concerning LCVIP inspection by D. F. Fox on 4/13-17, 1981 and letter's attachments (19 pages)

34. 8/10/84 NRC Certification re: Attached 26 pages containing true copy of letter dated 1/28/81 from K. V. Seyfrit to Brown & Root Co., Inc.,

concerning LCVIP audit conducted by D. F. Fox on Jan. 5-8, 1981 and letter's attachments (26 pages)

35. 8/10/84 NRC Certification re: Attached 350 pages containing true copy of Partial Initial Decision (Operating License) (Phase I), dated March 14, 1984 by the ASLB in Houston Lighting

& Power Co., Docket 50-498 and 50-499 (351 pages)

36. 8/14/84 Letter from H. H. Glasspiegel, Shaw, Pittman, Potts & Trowbridge to D. Berkowitz, NRC, re:

Enclosed copy of deposition notice from V. Stello (2 pages)

37. 12/14/79 - NRC calendar pages with notes, re: South Texas 10/29/80 meetings (21 pages) 38, 10/1/80 Newspaper article from The Energy Daily entitled: "NRC's Vic Stello: The Man Who Makes Utilities Suffer" (3 pages)
39. Undated Chronological listing of NRC correspondence re:

South Texas supplied to Senate and House (3 pages) 40.~4/3/79 Letter from Representative Gonzalez to Chairman Hendrie re: Review of safety of South Texas nuclear project (3 pages)

41. 4/5/79 Letter from Representative Gonzalez to Chairman Hendrie re: Assuring that inspections are carried out by independent individuals who are insulated from the financial interests and pressures involved with the construction of nuclear power plants (2 pages)

,e-

F01A-85-378 (FirstPartial)

Victor Stello Exhibits 7

42. 1979 Letter from J. J. Graham, DOJ to R. Fortuna, (date NRC, re: Enclosed copy of 4/5/79 letter from deleted) Representative Gonzalez containing allegations of possible violations in connection with the construction of the South Texas Nuclear Project (1 page), w/ copy of 4/5/79 DOJ response (1 page), and copy of 4/5/79 Gonzalez letter (2 pages)
43. 10/10/79 Memorandum from P. A. Bradford, NRC, to V. Stello, NRC, re: Attached newspaper article (1 page), w/ copy of article re: South Texas (1 page)
44. 4/23/79 Letter from Representative Gonzalez to Attorney General Bell re: Response to Gonzalez 4/5/79 letter and addressment of DOJ concerning NRC's inspection and safety program at South Texas (2 pages)
45. 5/21/79 Memorandum from J. Cummings, OIA, NRC, to J. G. Davis, IE, NRC, re: Allegations of harassment and intimidation, South Texas Nuclear Project (1 page)
46. 7/26/79 Letter from K. V. Seyfrit, RIV, NRC, to Representative J. J. Pickle, re: Pickle inquiry of 7/9/79 concerning the discovery of new voids in the concrete containment building at South Texas (2 pages)
47. 11/21/79 Letter from V. Stello, IE, NRC, to Senator Bentsen re: Referral of Gage letter concerning construction practices at the South Texas project (1 page)
48. 12/7/79 Note from K. V. Seyfrit, RIV, NRC, to H. D. Thornburg, re: Letter from Senator Tower received from the Dept. of Energy (1 page)
49. Undated Letter from L. V. Gossick, EDO, NRC, to Senator Tower re: Referral of Gage letter concerning construction practices at the South Texas nuclear project (1 page)
50. Undated Letter from L. V. Gossick, EDO, NRC, to Senator Dole re: Referral of Mullen letter concerning recommendations that the owner or NRC directly employ inspectors on nuclear power 1 plant construction sites (2 pages, l l

l l

I

For&85-378 (First PartiaQ Victor Stello' Exhibits 8 51, 4/8/80 Letter from W. J. Dircks, EDO, NRC, to Senator Bentsen re: Reply to letter of 3/14/80 referencing letter of 10/19/79 concerning the reopening of investigations at South Texas Project (1 page)

52. 6/19/79 Memorandum from H. D. Thornburg, IE, NRC, to K. V. Seyfrit, RIV, NRC, re: Accelerated quality assurance inspection, South Texas site (3 pages)
53. 6/25/79 Memorandum from R. T. Kennedy, NRC, to L. V. Gossick, NRC, re: Request for staff news on the adequacy of the QA/QC program for South Texas (1 page)
54. 7/31/79 Memorandum from V. Stello, IE, NRC, to Commissioner Kennedy re: Reply to inquiry concerning the adequacy of the QA/QC program for South Texas Project (2 pages)
55. 4/25/80 Memorandum from V. Stello, IE, NRC, t o-W. J. Dircks, NRC, re: Concrete voiding at South Texas plant (3 pages)
56. 10/26/80 Memorandum from W. G. Hubacek, RIV, NRC, to G. W. Reinmuth, RIV, NRC, re: Response to Commissioner Bradford's inquiry concerning newspaper article about South Texas (2 pages)
57. 11/9/79 Memorandum from V. Stello, IE, NRC, to T. A. Rehm, NRC, re: New allegations in South Texas case and proceeding with further investigation independent of the effort by DOJ (1 page)
58. 11/4/79 Statements from Recent Allegers (7 pages)
59. 11/16/79 Letter from V. Stello, IE, NRC, to D. D. Jordan, HL&P, re: Enclosed copy of enforcement action against Consumers Power Co.,

being forwarded to the chief executives of all utilities with a power reactor operating license or a construction permit, to notify licensees that NRC will use the limit of enforcement authority whenever circumstances warrant to obtain safer operation of licensed facilities (1 page) 4

FotA M -378 (First Partial)

Victor Stello Exhibits 9

60. 12/4/79 Letter from J. A. " Tony" Canales, U.S. Attorney, S. D. Texas to L. Bickwit, OGC, NRC, re: Decline of prosecution in South Texas Nuclear Proj)?ct matter (1 page)
61. 12/4[79 Letter from R. A. Fortuna, OI, NRC, to J. J. Graham, DOJ, re: Progress on the investigation of allegations of possible violations connected with the construction of the South Texas Nuclear Project (2 pages)
62. 4/11/80 Letter from L. Sinkin, San Antonio, TX, to H. J. McGurren, ELD, NRC, re: Enclosed letter sent to Anthony Canales, U.S. Attorney, Houstonc TX., concerning the actions of K. Seyfrit, RIV, NRC (1 page)
63. 4/15/80 Closed Commission Transcript re: Briefing on Investigation of QA-QC Problems at South Texas Nuclear Project (72 pages)
64. 3/26/80 Memorandum from H. S. Phillips, Resident Reactor Inspector - STP, to W. C. Seidle, RIV, NRC, re: Conmunications with STP management  !

supervision (9 pages)

65. 4/11/80 Memorandum from V. Stello, IE, NRC, to Chairman Ahearne and Commissioners Gilinsky, Kennedy, Hendrie and Bradford re: Enclosed draft of South Texas Investigation Report, 50-498/79-19 and 50-499/79-19 (1 page)
66. 4/18/80 Memorandum from Commissioner Bradford to W. J. Dircks, EDO, re: Voids in concrete at South Texas site (1 page) 67 . 6 / 3 / 8 0 Memorandum from H. D. Thornburg, HQ, NRC, to K. V. Seyfrit, RIV, NRC, re: Meeting with Houston Power and Light Mar.agement of 5/30/80 (2 pages) 68 . 6/4/80 Handwritten unauthored note re: Turning note I over to RIV for for resolution of the oil issues at South Texas (1 page) 6$. 6/11/80 Letter from V. Stello, IE, NRC, to G. W. Oprea, HL&P, re: Acknowledgement of receipt of HL&P responses to NOV, Appendix A dated 4/30/80,Section VI of the Show Cause Order dated 4/30/80 and check constituting payment of imposed civil, penalties (2 pages)

RiA4E-37:

(First Partm)

Victor Stello Exhibits 10

70. 11/21/80 Letter from V. Stello, IE, NRC, to G. W. Oprea, HL&P, re: HL&P response of 7/28/80 filed pursuant to Section V of NRC Order to Show cause issued 4/30/80 (3 pages)
71. 6/23/81 Note from J. J. Cummings, OIA, NRC, to V. Stello, NRC, re: Attached exchange of correspondence between Schwalb, Donnenfeld, Bray & Silbert (HL&P attorneys) and DOJ concerning recent STP referal to DOJ, w/ attachments as stated: 6/2/81 letter from E. J. Silbert (Schwalb Donnenfeld) to L. Lippe, DOJ, and 6/19/81 Lippe response (6 pages -

total)

77. 5/1/84 Remarks by Victor Stello, Jr., Deputy EDO and Generic Requirements, NRC, at the Conference on Nuclear Services McGraw Hill / Nucleonics Week, Wash., DC (27 pages)
73. 8/81 Copy of NUREG-0839, a Survey by Senior NRC Management to Obtain Viewpoints on the safety Impact of Regulatory Activities from Representative Utilities Operating and Constructing Nuclear Power Plant (55 pages) 74 . Undated Summary of NRC Proposed Civil Penalties as of 12/1/83 (39 pages) 75 . Undated Summary of NRC meeting dates re: South Texas for 1984 and NRC calendar pages from 1981 -

1984 re: South Texas (18 pages)

76. 08/23/84 Oral Deposition of Victor Stello, Jr. (Volume I) (_235 pages)
77. 08/24/84 Oral Deposition of Victor Stello, Jr. (Volume II) (214 pagesl t

F0!A-85-378 (First Partial)

APPENDIX E Joseph Tapia Exhibits and [kposition

1. Undated Inspection Plan (3 pages)
2. 10/5/79 Letter from W. C. Seidel, RIV, NRC to E. A. Turner, HL&P re: Inspection conducted by Hubacek Aug. 6 - 10, 1979 of activities l authorized by CPPR-128 and 129, South Texas  !

Units 1 and 2 (2 pages) w/ Appendix A, Notice of Violation (3 pages) and copy of IE Inspection Report No. 50-498/79-13 and 50/499/79-13 (34 pages)

3. 12/12/79 Letter fron W. C. Seidel, RIV, NRC to E. A. Turner, HL&P re: Inspection by Gilbert of Nov. 13 - 16, 1979, CPPR-128 and 129 activities South Texas Units 1 and 2 . (2 pages), w/ Appendix A, copy of Notice of Deviation (1 page) and copy of IE Inspection Report, 50/498/79-20 and 50-499/79/20 (8 pages)
4. 7/1G/80 Letter from W. C. Seidel, RIV, NRC to E. A. Turner, HL&P re: Inspection by Hall of June 23-26, 1980, CPPR-128 and 129 activities South Texas, Units 1 and 2 (2 pages), w/ copy of IE Inspection Report No. 50-498/80-17, 50-499/80-17 (7 pages)
5. 8/8/80 Letter from W. C. Seidel, RIV, NRC to G. W. Oprea, HL&P re: Inspection conducted by J. T. Tapia of July 22-24, 1980, CPPR-128 and 129 activities, South Texas, Units 1 and 2 (2 pages), w/ copy IE Inspection Report No.

50-498/80-19 and 50-499/80-19 (5 pages)

6. 11/6/80 Letter from W. C. Seidel, RIV, NRC to G. W. Oprea, HL&P re: Inspection conducted by J. T. Tapia and D. P. Tomlinson, August 18-22, Sept.2-5 and 16-19, 1980, CPPR-128 and 129 activities, South Texas, Units 1 and 2 (2 pages), w/ copy of IE Inspection Report No.

50-498/80-24 and 499/80-24 (19 pages)

7. 12/3/80 Letter from W. C. Seidel, RIV, NRC to G. W. Oprea, HL&P re: Inspection conducted by Hubacek, Gilbert and Tapia, October 21 - 24 and 27-31, 1980, CPPR-128 and 129, South Texas Units 1 and 2 (2 pages), w/ copy of IE Inspection Report No. 50-498/80-30 and 50-499/80-30 (8 pages) ,

t

Fot A 85-378 '

(First Partsa0 Joseph Tapia Exhibits 2

8. 5/29/81 Menorandum from E. J. Gallagher, REIB, DRR, IE, NRC to H. A. Wilber, DRRRI, IE, NRC re:

Summary of April 26-27, 1980 meeting on structural backfill at South Texas Units 1 and 2 (5 pages), w/ attachment A, List of References (1 page), and Attachment B, Summary of Soils Investigation Findings, HL&P Responses and Inspection Following (3 pages) 9, 2/9/82 NRC, LB Hearing Transcript in Houston Lighting and Power Co., et al. matter, Docket Nos.

50-4980L and 50-4990L-(214 pages)

10. 12/19/79 Office Memorandum fron L. D. Wilson, NRC, to T. D. Stanley, NRC re: South Texas Electric Generating Station Diesel Generator Mat Pour (2 pages)
11. 1/27/78 Letter fron W. C. Seidle, RIV, NRC to G. W. Oprea, HL&P re: Inspection by Taylor &

Tapia, Jan. 10-13, 1978, CPPR-128 and 129 activities, South Texas, Units 1 and 2 (2 pages), w/ Appendix A, Notice of Violation (1 page) and copy of IE Inspection Report No.

50-498/78-01 and 50-499/78-01 (34 pages)

12. 1/17/78 Telephone minutes from T. K. Logan, HL&P to H. L. Key, HL&P re: conversation with Tapia, RIV, NRC of 1/17/78 concerning Tapia concrete placement questions from Tapia observation on 1/13/78 (2 pages)
13. 8/16/78 Office memorandum from W. N. Phillips, HL&P to E. A. Turner, HL&P re: Meeting with the NRC on 8/15/78 (3 pages)
14. 8/19/80 Transcript pages from transcript of South Texas Project Public Meeting of 8/19/80 (3 pages) ,

15, 5/07/81 Copy of IE Inspection Report 50-498/81-10 and 50-499/81-10, South Texas Project Units 1 and 2, inspection conducted 3/30-April 2 and April 6-9. 1981 (5 pages)

16. 6/20/78 Transmittal letters from W. C. Seidle, RIV, NRC, to E. A. Turner, HL&P re: Inspection by Hubacek & Tapia, 5/30 - 6/2/78, activities authorized by NRC construction permit Nos.

CPPR-128 and 129, South Texas, Units 1 and 2, i

(2 pages) w/ copy of IE Inspection Report

' 50-498/78-10 and 50/499/78-10 (9 pages)

{

t

l l

Joseph Tapia Exhibits 3

17. 09/11/84 Oral / Video / Audio Dopisition of Joseph Isaac Tapia, Volume I (108 pages) 4
18. 09/12/84 Oral / Video / Audio Deposition of Tapia (119 pages)
19. Undated Changes to Deposition (25 pages) 1 f

,,- -,--y .-w- ,~,w ,,- -w-, - --

~, - -:=-- ----u-- -

-~ - ~ -- -- w

F0IA-85-378 (First Partial) l Willian G. Hubacek Exhibits and Depositions

1. 9/10/84 Letter from H. H. Glasspiegel, Shaw Pittman, Potts & Towbridge to W. G. Hubacek re:

Arrangements for Hubacek deposition (2 pages),

w/ enclosure, 9/7/84 letter from E. T. Stockbridge, Vinson and Elkins, to P. Hatchett, District Clerk, Matogorda County Texas, concerning filing of Notice of Video Deposition for W. G. Hubacek (1 page) and copy of Hotice of Video Deposition (3 pages)

2. 4/3/78 Letter from W. N. Phillips, HL&P to W. G. Hubacek, RIV, NRC re: April 1978 South Texas surveillance schedule and list of najor construction activities planned or continuing in April 1978 (1 page)
3. 8/30/79 Letter from T. D. Stanley, Project QA Supervisor, HL&P to W. G. Hubacek, RIV, NRC re:

September 1979 surveillance schedule and list of major construction activities planned for Sept. 1979 (1 page)

4. 8/25/78 Memorandum from W. C. Seidle, RIV, NRC, to file re: Allegations of misconduct (QC- civil problems) concerning South Texas Project (1 page)
5. 6/20/79 Telephone minutes page from L. D. Wilson, HL&P, to D. G. Barker, HL&P, re: Reclassification of item in 79-10 audit to unresolved item (discrepancy on the polar crane load test sign off sheet) (1 page)
6. 6/12/79 ~ Memorandum from W. C. Seidle, RIV, NRC to G. W. Reinmuth, NRC, re: Tape concerning South Texas allegations (deficiencies in South Texas construction and quality control programs (1 page)
7. 6/25/79 Handwritten note from W. C. Seidle, RIV, NRC, to K. V. Seyfrit re: Inspection team and 7/19/79 deadline (1 page), w/ attachment, Memorandum from H. D. Thornburg, HQ, NRC, to K. V. Seyfrit, RIV, NRC, re: Accelerated quality assurance inspection, South Texas .

construction site (1 page)

8. 10/5/79 Transmittal letter from W. C. Seidle, RIV, NRC to E. A. Turner, HL&P, re: Inspection conducted by W. G. Hubacek, August 6-10, 1979, CPPR-128 and 1,29, activities South Texas Units

FOUL-@-3MB (First Pertial)

William G. Hubacek Exhibits 2 1 and 2 (2 pages), w/ attachment as follows:

Appendix A, Notice of Violation (3 pages), IE Inspection Report No. 50-498/79-13 and 50-499/79-13 (31 pages), copy of 11/2/79 letter from E. A. Turner, HL&P to W. C. Seidle, RIV, NRC re: HL&P's response to items of noncompliance identified in IE Inspection Report Nos. 50-498/79-13 and 50-499/79-13 dated 10/5/79 (5 pages); copy of 1/31/80 letter from W. C. Seidle, RIV, NRC to E. A. Turner re:

HL&P response to NRC letter of 10/5/79 and Nov.

(2 pages)

9. 10-5-79 Memorandum from W. G. Hubacek, RIV, NRC, to file re: Classification of Item 5 " Failure to '

Destroy or Stamp a Deleted QA Procedure" in STP Inspection Report 50-498/79-13 and 50-499/79-13 as a deficiency (severity level 3) rather than an infraction (severity level 2) (1 page)

10. 7/3/79 Letter from W. G. Hubacek, RIV, NRC to filo re:

Allegation of Brown & Root employee of QC irregularities at the South Texas project (2 pages)

11. 8/8/79 Sanitized FBI Airticket transmission from SAC Dallas to SAC Houston re: Investigations at South Texas Nuclear Project in Metagorda County (1 page)
12. 9/18/79 Memorandum from W. G. Hubacek, RIV, NRC, to W. C. Seidle, RIV, NRC, re: Review of article

" Toil and Trouble at the South Texas Nuke" in the Texas observer of 7/13/79 (1 page) w/ copy of article (8 pages) i 13, 10/10/79 Memorandum from P. A. Bradford, NRC to V. Stello, IE, NRC re: Attachei newspaper Article (1 page), w/ copy of article (1 page)

14. 10/26/79 Memorandum from W. G. Hubacek, HIV, NRC, to G. W. Reinmuth, NRC re: Response to Commissioner Bradford's inquiry concerning newspaper article about South Texas (2 pages)
15. 10/31/79 Draft memorandum from V. Stello, NRC to Commissioner Bradford, NRC re: 7/13/79 news-paper article on South Texas (4 pages)
16. 11/7/79 Draft memorandum from V. Stello, NRC, to Cormissioner Bradford, NRC re: 7/13/79 news-

, paper article 'on South Texas (2 pages)

1 foIA-$5s378 l (HrstPartiAO William G. Hubacek Exhibits 3

17. 11-7-79 Draft memorandum from V. Stello, URC, to Commissioner Bradford, NRC re: 7/13/79 l newspaper article on South Texas (3 pages)
18. Date. Draft memorandum from V. Stello, IE, NRC, to illegible Commissioner Bradford, NRC re: Newspaper article and Enforcement Action on South Texas Project (2 pages)
19. 11/27/79 Memorandum from W. C. Seidle, RIV, NRC to Pile re: Telephone call from magazine reporter concerning South Texas. (1 page)
20. 11/9/79 Draft letter from RIV, NRC to Senator Bentsen re: Incidents of alleged threats, harassment and assault by Brown & Root construction personnel of QC inspectors at South Texas (2 pages) r
21. 2/21/80 Letter from W. C. Seidle, RIV, NRC to E. A. Turner, HL&P re: Inspection by Hubacek &

Tomlinson, February 5-8, 1980, CPPR-128 and 129 activities, South Texas (2 pages), w/ copy of IE Inspection Report No. 50-498/80-02 and 50-499/80-02 (7 pages) 22.04/29 /80 Memorandum from W. C. Seidle, RIV, URC to file re: Telephone call from Houston Post Reporter concerning South Texas, Units 1 and 2 (1 page)

23. 3/13/80 Memorandum from W. G. Hubacek, RIV, NRC to file re: Meeting with HL&P management concerning nine point action plan for resumption of placement of safety-related complex concrete, South Texas, Units 1 and 2 (2 pages)
24. 6/4/80 Memorandum from W. G. Hubacek, RIV, NRC to W. C. Seidle, RIV, NRC, Re: Meeting with HL&P management to discuss HL&P responses to IE Investigation Report 19-19, and related Show Cause Order, South Texas, Units 1 and 2 (3 pages)
25. 12/19/80 Harsdwritten Note from W. C. Seidle, RIV, NRC to K. Sdyfrit, NRC re: South Texas testimony (2 pages)
26. 1/20/82 Pages from hearing transcript of 1/20/82 re:

South Texas (5 pages) l

. . - . x ., ~ n _ - - - . - ~ . . . , _ . - - -

ANA- +378 (6 Phrt:30 William G. Hubacek Exhibits 4 1

, 27. 4/23/81 NRC Staff Testimony of W. C. Seidle, e

W. A. Crossman, W. G. Hubacek, R. G. Taylor and l H. S. Phillip's Relative to the history of construction activity leading up to Show Cause Order of 4/30/80 (82 pages)

28. 1/14/77 Memorandum from W. A. Crossman, RIV, NRC to W. G. Hubacek, R. G. Taylor, R. C. Stewart, C.

R. Oberg re: Licensee Performance Trend Analysis (2 pages) i 29. Undated Trend Analysis, South Texas, Units 1 and 2 (3 pages)

30. 4/2/75 Letter from G. L. Madsen, RIV, NRC to G. W. Oprea, HL6P rc: Inspection of Hubacek and Stewart of March 17-20, 1975 of implementation of quality assurance program for construction activities concerning South Texas, Units 1 and 2 (2 pages), w/ copy of IE Inspection Report No. 50-498/75-02 and 50/499/75-02 (13 pages)
31. 4/23/81 NRC Staff Testimony of W. A. Crossman, R. E. Hall, W. G. Hubacek, H. S. Phillips, D.

1 P. Tomlinson and I. I. Tapier relative to the Inspection and Enforcement Activity Following The Show cause Order of 4/30/80 (59 pages)

32. 3/3/78 Letter from W. C. Seidle, RIV, NRC to G. W. Oprea, HL&P re: Inspection'by Hubacek, Feb. 21-24, 1978 South Texas activities (2

'" pages), w/ copy of IE Inspection Report No.

50-498/78-03 and 50-499/78-03 (7 pages) 33, 2/24/78 Office memorandum from W. N. Phillips, HL&P, to R. A. Frazar, HL&P re: NRC exit interview summary concerning South Texas (1 page)

34. 5/8/78 Letter from W. C. Seidle, RIV, NRC to G. W. Oprea, HL&P re: Inspection by Hubacek of April 17-20, 1978 South Texas activities (2 pages), w/ Appendix A, Notice of Violation (1 page), and IE Inspection Report No.

50-498/78-07 and 50/499/78-07 (9 pages)

35. 8/22/70 Letter from W. C. Seidle, RIV, NRC to E. A. Turner, HL&P re: Investigation by Ward, i

July 25-28, 1978, of activities authorized by

! CPPR-128 and 129, South Texas, Units 1 and 2 and allegation by a Brown & Root employee (2

! ,pages), w/ copy'of IE Investigation Report No.

50-498/78-12 and 50-499/78-12. (13 pages)

F0IA-85-378 (FirstPartial)

William G. Hubacek Exhibits 5

36. 8/25/78 Letter from W. C. Seidle, RIV, NRC to E. A. Turner, HL&P re: Meeting of 8/15/78 concerning activities authorized by CPPR-128 and 129, South Texas Units 1 and 2 (2 pages),

w/ copy of IE Inspection Report No. 50-498/78-13 and 50-499/78-13 (3 pages)

37. 10/6/78 Letter from W. C. Seidle, RIV, NRC to HLSP re: Investigation by Hall and Rosenberg of Sept. 11-14, 1978 of activities authorized by CPPR-128 and 129, South Texas, Units 1 and 2 concerning an allegation by a South Texas project employee (2 pages), w/ Appendix A, Notice of Violation (2 pages), and copy of IE Investigative Report No. 50-499/78-15 and 50-499/78-15 (15 pages)
38. 11/15/78 Letter from W. C. Seidle, RIV, NRC to E. A. Turner, HL&P re: Inspection by Hubacek, October 24-27, 1978, activities authorized by CPPR-128 and 129, South Texas, Units 1 and 2 (2 pages), w/ copy of IE Inspection Report No.

50-498/78-16 and 50-499/78-16 (10 pages) and Appendix A, Notice of Violation (2 pages)

39. 12/21/78 Letter from W. C. Seidle, RIV, NRC to r E. A. Turner, HL&P re: Inspection by Hubacek, and Tomlinson, Dec. 5-8, 1978 of activities authorized by CPPR-128 and 129 for South Texas, Units 1 and 2 (2 pages), w/ Appendix A, Hotice of Deviation (1 page), and copy of IE Inspection Report No. 50-498/78-17 and 50-499/78-17 (8 pages)
40. 1/9/79 Letter from W. C. Seidle, RIV, NRC to E. A. Turner, HL&P re: Inspection by Hubacek, and Crossman of Dec. 19-22, 1978 of CPPR-128 and 129 activities, South Texas, Units 1 and 2 (2 pages), w/ copy of IE Inspection Report No. ,

50-498/78-18 and 50-499/78-18 (5 pages)

41. 2/16/79 Letter from W. C. Seidle, RIV, NRC to -

E. A. Turner, HL&P re: Investigation by Hubacek, January 23-26 and January 30-Feb. 2, 1979 of CPPR-128 and 129 activities, South Texas, Units 1 and 2 (2 pages), w/ Appendix A, Notice of Violation, and copy of IE Investigations Report No. 50-498/79-01 and 50-499/79-01 (12 pages) 6 5

FOIA-85-S?8 (ftest Perttaf)

William G. Hubacek Exhibits 6 42, 3/14/79 Letter from W. C. Seidle, RIV, NRC to E. A. Turner, HL&P re: Inspection by Hubacek, February 21-23, 1979 of CPPR-128 and 129 activitics, South Texas, Units 1 and 2 (2 pages), w/ Appendix A, Notice of Violation, and copy of IE Inspection Report No. 50-498/79-03 and 50-499/79-03 (15 pages)

43. 4/30/79 Letter from W. C. Seidle, RIV, NRC to E. A. Turner, HL&P re: Inspection by Hubacek, of April 2-6, 1979 of CPPR-128 and 129 activities, South Texas, Units 1 and 2 (2 pages), w/ Appendix A, Notice of Violation (2 pages), and copy of IE Inspection Report No.

50-498/79-05 and 50-499/79-05 (9 pages)

44. 10/16/79 Letter from W. C. Seidle, RIV, NRC to E. A. Turner, HL&P re: Investigation by Hubacek and Phillips, Sept. 4-7, and 11-14, 1979 of CPPR-128 and 129 activities, South Texas, Units 1 and 2 (2 pages), w/ Appendix A, Notice of Violation (1 page), Appendix B, Notice of Deviation (1 page), and copy of IE Investigation Report No. 50-498/79-14 and 50-499/79-14 (18 pages)
45. 1/10/60 Letter from W. C. Seidle, RIV, NRC to E. A. Turner, HL&P re: Inspection by Hubacek; Dec. 11-14, 1979, CPPR-128 and 129 activities, South Texas, Units 1 and 2 (2 pages), w/ copy of IE Inspection Report No. 50-498/79-22 and 50-499/79-22 (5 pages)
46. 4/4/80 Letter from W. C. Seidle, RIV, NRC to E. A. Turner, HL&P re: Inspection by Crossman and Hubacek, March 4-7 and 11-14, 1980, CPPR-128 and 129 activities, South Texas, Units 1 and 2 (2 pages), w/ copy of IE Inspection Report No. 50-498/80-04 and 50-499/80-04 (12 pages)
47. 1/4/80 Report re: Implementation of the Brown & Root Quality Assurance Program at the South Texas Project Jobsite (11 pages)
48. 4/30/80 Letter from W. C. Seidle, RIV, NRC to Hubacek, April 8-11, 1980 CPPR-128 and 129 activities, South Texas, Units 1 and 2 (2 pages),

w/ Appendix A, Notice of Violation (1 page), and copy of IE Inspection Report No. 50-498/80-07 and 50-499/80-07 (7 pages)

10lh-85-3*l8 (First Partd)

William G. Hubacek Exhibits 7

49. 4/17/81 Letter from K. V. Seyfrit, RIV, NRC to G. W. Oprea, HL&P re: Meeting of March 23, 1981 to discuss status of Show cause Order items concerning resumption of ASME safety-related welding on a

, regular production basis (1 page) w/ copy of IE Inspection Report Nos. 50-498/81-13 and 50-499/81-13 (4 pages)

50. 4/29/82 Report re: Systematic Assessment of Licensee Performance South Texas, Units 1 and 2, appraisal period 7/1/80-6/30/81 (13 pages)
51. 8/3/78 Office Menorandum from T. D. Stanley, HL&P to W. N. Phillips, HL&P, re: South Texas NRC Exit Interview Summary of 7/28/78 (2 pages)
52. 8/23/78 Office Memorandum from S. A. Visclovsky, HL&P to T. D. Stanley, HL&P re: South Texas and comments concerning NRC opinions (2 pages)
53. 6/20/82 Letter from J. M. Gutierrez, Counsel for NRC staff to Administrative Judges Bechhoefer, Lamb

& Hill re: Docket Nos. 50-498 and 50-499, enclosed copy Systematic Assessment of Licensee Performance Board Report (1 page), w/ copy of Report cover letter to HL&P (2 pages), and Report (14 pages!

54. Undated Professional Qualifications of Hubacek (1 page)
55. Undated Page 22 (1 page) -
56. 09/20/84 Deposition of William Hubacek, Volume I (170 pages)
57. 09/21/84 Deposition of William Hubacek, Volume II (161 pages)

l F01A-85-378 (First Partial) i Appendix G

{

i

1. 07/10/84 Oral Deposition of Ramon E. Hall, Volume I (165 pages)
2. 07/11/84 Oral Deposition of Hall, Volume II.(133 pages) s 1

i 1

.'t l

i j

i n

I i

'l l

l 4 +

3 i

F01A-85-378 Appendix H

1. 07/18/84 Oral Deposition of Harry Shannon Phillips, Volume I (199pages)
2. 07/19/84 Oral Deposition of Phillips, Volume II (203 pages) i

F01A-85-387 Appendix I

1. 07/16/84 Oral Deposition of William C. Seidel, Volume I (190 pages)
2. 07/17/84 Oral Deposition of Seidle, Volume II (184 pages)
3. Undated Chaliges to Deposition (54 pages) t i

f f

j

F01A-Ud-3/8 (First Partial)

APPENDIX A Ross List ,.

Ross Landsman Exhibits and Deposition

1. Undated Draft Notice of Violation for period of 11/10/79 - 2/7/80, non compliance with conditions of NRC Construction Permits for South Texas Project Units 1 and 2, Dockets 50 -

498 and 50 - 499 (35 pages).

2. 4/1/80 Draft South Texas Project Investigation Report

& Proposed Enforcement, w/ Appendix A, Draft Motice of Violation (22 pages), and Notice of Proposed Imposition of Civil Penalties (186 pages).

3. 1/14/80 Interoffice Memorandum from C. B. Pettersson, Brown a Root, Inc., to Distribution re: Trip Report 1/10/80, Meeting with URC, STP Site (3 pages).
4. 11/6/80 Letter from W. C. Seidle, RIV, NRC to G. W. Oprea, Jr., Houston Lighting & Power Company, re: Inspection of 8/18 - 22, 9/2 - 5 and 9/16 - 19, 1980, South Texas Project, Units 1 and 2 (2 pages), w/ copy of Inspection Report (18 pages).
5. 5/8/81 Handwritten Hote from D. W. Hayes, NRC to J. Gutierrez, NRC re: Review of testimony on structural backfill (1 page) w/ handwritten notas of Hayes and Landsman re: Investigation team concerns and position on the structural backfill (6 pages).
6. 7/10/80 Memorandum from R. B. Landsman, Reactor Inspector, NRC, to D. W. Hayes NRC re: STP Report No. 50-498/80-17., 50-499/80-17 (1 page), w/ Attachment 1, Report No.

50-498/80-17., 50-499/80-17 re: inspection of 6/23-26/80 South Texas Units 1 and 2 (9 pages),

and Attachment 2, Document Change Notice re:

Structural backfill (1 page).

7. December Handuritten Memorandum from R. B. Landsman, 1980 NRC, to C. C. Williams, NRC, re: STP Report 50-498/79-19; 50-499/79-19, synopsis of the issues (5 pages).

e C

Ross Landsman Exhibits 2

8. 5/29/81 Memorandum from E. J. Gallagher, Mechanical
  • Structural and Metallurgical Section, DRR, IE, NRC to H. A. Wilber, DRRRI, IE, re: Summary of 4/26-27, 1980 Meeting on-Structural Backfill at South Texas Project Units 1 and 2 (Docket No.

50-498, 50-499) (9 pages).

9. Undated Unauthored Handwritten Notes re: 4/27/81 meeting in HQ on STP (2 pages).
10. Undated Unauthored Handwritten Notes re: 2/27/81 Review of Final Report by Consultants (8 pages).
11. Undated Unauthored Chronological Listing cf Events re:

inspections and reports from 12/17/79 to 1981 on structural backfill (handwritten 8 pages; typewritten (26 pages).

12. 8/7/80 Ilandwritten, Outgoing Transmission Service Request from R. B. Landsman, Region III, NRC, to W. Reissmuth, IE, HQ, re: HL & P's Response (21 pages).
13. 5/3/84 Letter from T. J. Jordon, HL & P to L.

W. Hurst, Bechtel Energy Corporation; re:

South Texas Electric Generating Station Project Audit Report SOS-401 (2 pages), w/ copy of the Report (112 pages).

14. 09/25/84 Letter from Morris to Berkovitz (2 pages)
15. 07/25/84 Oral Deposition of Ross Landsman, Volume I (162 pages)
16. 07/26/84 Oral Deposition of Ross Landsman, Volume II (120 pages)
17. Undated Changes to Deposition (5 pages) i L