ML20212K541

From kanterella
Revision as of 08:10, 5 May 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notice of Availability of Results Repts & Working Files.* Comanche Peak Response Team/Senior Review Team Approved & Published Listed Repts.Working Files Available for Insp at Util Ofcs.Certificate of Svc Encl.Related Correspondence
ML20212K541
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/20/1987
From: Selleck K
ROPES & GRAY, TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
References
CON-#187-2311 OL, NUDOCS 8701290104
Download: ML20212K541 (5)


Text

i '

2 3//

,' es 6

00LKETED Filed: January b"f1987

'87 JtJ4 27 P3 :09

^

f UNITED STATES OF AMERICA [0hb'i . i i:F n NUCLEAR REGULATORY COMMISSION before the ATOMIC SAFETY AND LICENSING BOARD

)

In the Matter of )

)

TEXAS UTILITIES ELECTRIC ) Docket Nos. 50-445-OL COMPANY, et al. ) 50-446-OL

)

(Comanche Peak Steam ) (Application for an Electric Station, ) Operating License)

Units 1 and 2) )

)

)

NOTICE OF AVAILABILITY OF RESULTS REPORTS AND WORKING FILES To: Anthony Z. Roisman, Esquire Executive Director Trial Lawyers for Public Justice 2000 P Street, N.W., Suite 611 Washington, D.C. 20036 Please take notice that the Comanche Peak Response Team Senior Review Team has approved and published the following reports:

i I.a.1 Heat-Shrinkable Cable Insulation Sleeves - Rev.

1 I.b.4 Barrier Removal - Rev. 1 II.c Maintenance of Air Gap Between Concrete Structures - Rev. 1 8701290104 870120 PDR ADOCK 05000445 O PDR 3

])$ d

6' l

l VII.a.3 Document Control - Rev. 1 V.d Plug Welds - Rev. 1 The Results Reports were issued to the parties listed on the service list by letter dated January 16, 1987.

Distribution of copies of these Result Reports is being made in accordance with the controlled distribution of the CPRT Program Plan; if you have not received copies as of this date or within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after your receipt of this notice, please contact the undersigned.

The Working Files for these ISAPs are now available for inspection and copying at the offices of Texas Utilities Generating Company, Skyway Tower, 400 North Olive Street, Dallas, Texas, upon 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />' notice of your intention to inspect the same.

For your convenience, a summary of completed ISAPs, DSAPs, and Results Reports is attached.

By their attorneys,

~

i Thomas G. Dignan, Jr.

R. K. Gad III William S. Eggeling Kathryn A. Selleck ROPES & GRAY 225 Franklin Street Boston, MA 02110 (617) 423-6100

- - - ..- .- . -_ . .~

STHlUS OF COMPLETED'15APS, DSAPS AND PESULIS PEPORTS 01-20-87 AT 2:41 p.m. Page !

AP No. Name Rev Date P.T. Leader Fk5 tat SRT App' CASE Not Board 14 IV Sur<eillance Pro. f or Coatings Deleted .

0+1eted Vll.b.5 Elec. Paceuay Support inspect' Deleted Deleted ll.b Concrete Compressive Strength 3 01/24/86 H. Levin SPT. Approved 02/20/86 04/04/06 10/10/86 03/13/06 04/04/06 06/05/86 1.a.4 Dugs / Terminations 4 01/24e86lJ. Mallanda SP1 Approved Ill.d Preop Testing 4 02427/86 J. Rushuack SRT Approved U3/13/e6 04/04/36 08/i4/06 Vll.b.2 Valve Dissssembly 1 01/24/36 J. Hansel SPT Hpproved 03/19/06 04/04/86 08/14/86 1.b.3 Conduit / Cable Trag Separotion 4 01/24/86 J. Mallanda SRT Approved 03./26/86 04/04/86 09/30/86 Vll.a.4 Audit Pro. & Auditor Qual's 1 01/24<86 J. Hansel SRI Approved 04/10/06 06/04/86.08/14/86 1.a.3 Butt Splace Qualification 4 '01/24/86 J. Mallanda SRT Approved 04/30/86 06/04/06 08/14/86 1.a.4 Dugs /Terminstions - Pevised 4 01/24/86 J. Mallanda SP1 Approved 06/25/36 08/14/06 00/00/00 1.a.5 NCR's on AMP Terminal Lugs 4 01/24/86 J. Mallanda $P1 Hpproved 07/24/86 08/14/86 09/14/36 VII.a.5 Periodic Ro<i+u of 0A Program 1 01/24/86 J. Hansel SRT Approved 07/28/36 08/14/86 10/10/86 III.a.4 Traceability of Test Inst.s 4- 02/27/86 J. Rushuack SPT Approved 08/06/86 08/21/06 12/05/86 l

l 1.d.3 Craft Personnel Training 0 01/24/86 J. Hansel SRT Approved 08/27/06 09/16/86 11/10/86 i 1.d.2 Admin. ol Inspector Tests 2 01/24/86 J. Hansel SPT Appro,od 09/17/06 10/14/86 12/10/86 I Ill.a.2 JT6 6pproval of lest Dato 34 07/30/06 J. Pushuick SRT Approved 10/15/86 11/20/86 111.4.3 Tech specs f or Deferred Teats 3s 07/30/86 J. Rushuick CPT Approved 10/15/06 11/20/86 Y.e Install. of Hain Stesa Piping 2 01/24/86 H. Levin SRT Approv-d 10/15/06 11/20/86 V.a skeued Helds in NF Supports 2 01/24/86 H. Levin SRT Appro<+d 10/22/86 11/20/86

, V.c Piping Between Buildings 2 01/24/86 H. Levin SRT Appro;<ed 10/29/06 11/20/86 VII.a.6 Exit Intorvieus 1 01/24/86 J. Hansel SRT Approved 10/29/86 11/20/86 Vll.a.8 Fuel Pool Liner 1 01/24/86 J.-Hansel SPI APkroved il/04/A6 11/20/86 Vll.a.7 IlouseLeaping and 595. Clean. 1 01/24/86 J. Hansel SRT Hpproved 11/21/86 01/05/87 f.b.! Flor /Fles Sap nalimi 4 Ol/24c i .i . M alinda SRT Approved 12/09/06 01/05/07 1.b.2 Flex /Coule Sepacate,n 4 01/24/06 J. Mallanda SRT Approved 12/09/86 01/05/87 1.b.4 Darrier Removal 4 01/24/86 J. Hallando SRT Approved 12/09/06 01/20/87~

II.c Air Gap 3 01/24/86 H. Le<in SRT Approved 12/10/86 01/20/87 V.d Plug Hulds . 2 01/24/86 H. Levin SRT Approved' 12/10/86 01/20/8?

1.a.1 Heat shrinkable Sleeves 4 01/24/86 J. Mallanda SRT Approved 12/17/86 01/20/87 Vll.a.3 Docume.t Control 1 01/24/86 J. Hansel SRT Approved 12/17/86 01/20/07 i

4

)

j .

j

i CERTIFICATE OF SERVICE I, Kathryn A. Selleck, one of the attorneys for the Applicants herein, hereby certify that on January 20, 1987, I made service of the within document by mailing copies thereof, postage prepaid, to:

2

~

Peter B. Bloch, Esquire Mr. James E. Cummins Chairman Resident Inspector Acministrative Judge Comanche, Peak S.E.S.

Atomic Safety and Licensing c/o U.S. Nuclear Regulatory Board Commission U.S. Nuclear Regulatory P.O. Box 38 Commission Glen Rose, Texas 76043 Washington, D.C. 20555

~

Dr. Walter H. Jordan Ms. Billie Pirner Garde

- Adminis:rative Judge Midwest Office 881 W. Outer Drive 3424 N. Marcos Lane

,- Oak Rid.ge, Tennessee 37830 Appleton, WI 54911 i

Chairman Chairman Atomic Safety and Licensing Atomic Safety and Licensing Appeal Panel Board Panel U.S. Nuclear Regulatory U.S. Nuclear Regulatory Commission Comrission Washington, D.C. 20555 Washir.gton, D.C. 20555 Stuart A. Treby, Esquire Mrs. Juanita Ellis Office of the Executive President, CASE Legal Director 1426 S.. Polk Street  !

U.S. Nuclear Regulatory Dallas, Texars 75224 Commission Washington, D.C. 20555 1

Renea Hicks, Esquire Ellen Ginsberg, Esquire Assistant Attorney General Atomic Safety and Licensing Environmental Protection Division Board Panel P.O. Box 12548, Capitol Station U.S. Nuclear Regulatory Commission Austin, Texas 78711 Washington, D.C. 20555 Anthony Roisman, Esquire Mr. Lanny A. Sinkin Executive Director Christic Institute Trial Lawyers for Public Justice 1324 North Capitol Street 2000 P Street, N.W., Suite 611 Washington, D.C. 20002 Washington, D.C. 20036 Dr. Kenneth A. McCollom Mr. Robert D. Martin Administrative Judge Regional Administrator 1107 West Knapp Region IV Stillwater, Oklahoma 74075 U.S. Nuclear Regulatory Commission Suite 1000 611 Ryan Plaza Drive Arlington, Texas 76011 i Elizabeth B. Johnson Geary S. Mizuno, Esq.

Administrative Judge Office of the Executive

  • Oak Ridge National Laboratory Legal Director P.O. Box X, Building 3500 U.S. Nuclear Regulatory Commission Oak Ridge, Tennessee 37830 Maryland National Bank Bldg.

Room 10105 7735 Old Georgetown Road Bethesda, Maryland 20814 Nancy Williams Cygna Energy Services, Inc. '

101 California Street Suite 1000 San Francisco, California 94111

/j\,

t q

K(thryn A. Selleck i

l i

l l

l

- - - . - . - -