3/0/
CELATED CORRE5PO@f,NCA December 10,$hfffC E C' Filed:
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION OFFICE Of HCRL TIA t hj'g}PVICE Before The ATOMIC SAFETY AND LICENSING BOARD In the Matter of
)
Docket Nos. 50-445-OL
)
50-446-OL TEXAS UTILITIES ELECTRIC CO.,
et al.
)
)
(Application for an
)
Operating License)
(Comanche Peak Steam Electric Station,
)
Units 1 and 2)
)
J
)
i NOTICE OF AVAILABILITY In accordance with the Atomic Safety and Licensing Board's ("ASLB" or " Board") Memorandum and Order of November 18, I
1987, Texas Utilities Electric Company ("TU Electric") hereby provides notice that the following Project Status Reports
("PSR") and the reports and documents relied on in each such PSR are available for review:
l Publication Project Status Report Date j
Large Bore Piping and Pipe Supports (Rev. 0) 11/2/87 Small Bore Piping and Pipe Supports (Rev. 0) 11/2/87 Cable Tray and Cable Tray Hangers (Rev. 0) 11/6/87 8712170048 871210 PDR ADOCK 05000445 G
Conduit Supports Train C 2-inch Diameter and Less (Rev. 0) 11/11/87 Conduit Supports Trains A and B and Train C Larger Than 2-inch Diameter (Rev. 0) 11/18/87 Copies of each of the above-referenced PSR's have been previously provided to the parties to this proceeding and to the Board.
Although Interveners have already been provided copies of a large number of the documents relied on (referenced) in the five PER's issued to date, 1/ nonetheless, for the convenience of the Interveners, Applicants have, with minor exceptions, placed copies of documents referenced in each PSR in the Document Room at TU Electric's offices in Dallas, Texas. 2/
In addition to making available for review the reports and documents referenced in each PSR, TU Electric, 1/
Attached hereto is a list of all documents referenced in the five issued PSR's which have previously been provided to Interveners.
2/
The only documents referenced in the PSR's and not placed in the Document Room in Dallas are pleadings filed in this proceeding, NRC Regulatory Guides, and publicly available industry codes and standards such as ASME code.
In addition, due to the sheer volume of material included in reference 39, Section 6.0 in the Cable Tray and Cable Tray Hangers PSR, those materials have not been placed in the Document Room in Dallas, but will be made available for review upon request.
Finally, the FSAR and the S-910 series of drawings both of which are referenced in various PSR's will also be made available for review upon request.
. )
in an effort to assist Interveners in the discovery process and to insure that the process works smoothly, has developed j
a system for identifying, locating, and retrieving the raw data underlying each PSR.
As of the date of this Notice J
of Availability, TU Electric has placed in the Document Room in Dallas, indexes of the calculations, drawings, Discrepancy Issue Reports, and where applicable Audit Reports and Surveillance underlying each PSR.
These various indexes are intended to provide a means for comprehensively organizing, identifying, and making promptly retrievable the massive volume of raw data for each PSR.
These indexes will be maintained and periodically updated by TU Electric in the Document Room in Dallas.
In addition to the indexes described above, TU Electric is in the process of developing a computer link between its Document Room in Dallas and the data base maintained by TU Electric Document Control Center ("DCC") on site. 3/
Once operational, TU Electric believes the computer link will assist Interveners in refining their document requests and will permit TU Electric to ensure that Interveners are provided with the identity of the most current version of drawings, design changes, Design Basis Locuments, Field Verification Methods, specifications, and Task Descriptions.
I 3/
TU expects the computer link to be operational in the next few weeks and will so notify the Interveners.
l
)
Upon 5 days notice to the TU Electric contact referenced
)
below, TU Electric will provide Interveners with a trained computer operator to access the DCC data base.
)
All arrangements for reviewing the reports, documents, i
and indexes and for access to the DCC data base in the Document-Room should be made directly by Interveners through TU Electric's i
point of contact, Debra Anderson,. Texas Utilities Electric Company, Telephone No. (214) 812-4379.
TEXAS UTILITIES ELECTRIC COMPANY For The Owners of CPSES h
- 1 Ed gr Vf Mgeg& ~ Holtzinger, P.C.
Newman 1615 L Street, N.W.
Washington, D.C.
20036 (202) 955-6644 1
Attorneys for TEXAS UTILITIES ELECTRIC COMPANY I
1
')
- An asterisk on the service list indicates service by hand or overnight courier.
i
PSR REFERENCE DOCUMENTS PREVIOUSLY PROVIDED "LARGE BORE PIPING AND PIPE SUPPORTS" TV Electric Comanche Peak Response Team Action Plan, DSAP IX, Piping and i
Supports Discipline Specific Action Plan, Revision 2, June 18,1987.
SWEC-PSAS CPSES Generic Technical Issue Report, Revision 0, June 27, 1986.
SWEC-PSAS CPSES Generic Technical Issue Report, Revision 0, June 27,1986.
i SWEC-PSAS Comanche Peak Project Procedure CPPP-7, Design Criteria for Pipe Stress and Pipe Supports, Revision 3, February 23, 1987.
SWEC-PSAS Comanche Peak Project Procedure CPPP-8, Piping and Support System Engineering Walkdown Procedure, Revision 1, April 25,1986.
SWEC-PSAS Piping and Support System Engineering Walkdown Final Report, CPSES Unit 1, June 4, 1986.
l CPSES ASME 00ality Procedure AQP-12.1, Pressure Testing Inspection, Revision 0, July 10, 1987.
SWEC-PSAS Comanche Peak Project Procedure CPPP-5, Field Walkdown Procedure -
Unit 1, Revision 2, March 12, 1986.
SWEC-PSAS Comanche Peak Unit 1, Large Bore Field Walkdown Report, October 10, 1985.
Civil-Structural Review Issues List, Revision 0, July 21,1987; transmitted from N. H. Williams (CYGNA) to W. G. Counsil (TV Electric) on July 22, 1987.
SWEC-PSAS Comanche Peak Project Procedure CPPP-10, Procedure for Review of Plant Operating Mode Conditions, Revision 1, April 1, 1986.
Comanche Peak Response Team Program Plan and Issuo-Specific Action Plans, Appandix D, CPRT Sampling Policy, Applications and Guidelines, Revision 1, January 31, 1986, and Appendix E Resolution of Discrepancies Identified by the CPRT, Revision 3, June 18, 1987.
CPSES Quality Control Procedure CP-QAP-12.1, Mechanical Component Installation Verification, Revision 20, July 10, 1987.
SWEC-PSAS CPSES Large Bore Pipe Stress and Pipe Support Generic Issues Report,
-Revision 1, July 24, 1987.
CPSES Piping Erection Specification No. 2323-MS-100, Revision 9, August 17, 1987.
CPSES Structural Embedments Specification No. 2323-SS-30, Revision 2, June 13, 1986.
Tenera, L. P., Discipline Specific Results Report, Piping and Supports, DAP RR-P-001, Revision 1, August 27, 1987.
{
1 Page No. 2 SWEC-PSAS CPSES Field Verification Method, Clearance Walkdown, CPE-SWEC-FVM-PS-080, Revision 0, July 29, 1987.
SWEC-PSAS CPSES Field Verification Method, Hardware Validation and Supplements"'I Inspection Programs, CPE-SWEC-FVM-PS-081, Revision 0, July 29, 1987.
SWEC-PSAS CPSES Field Verification Method, Validation of Seismic Category II
.Large Bore Pipe Support Designs, CPE-SWEC-FVM-PS-082, Revision 0, July 29, 1987.
TV Electric Field Verification Method CPE-EB-FVM-SI-40, Seismic /Nonseismic Walkdowns, System Interaction Program, Revision 0, June 15, 1987.
TV Electric Letter No. TXX-6631, W. G. Counsil to U. S. Nuclear Regulatory Commission, Comanche Peak Programs, August 20, 1987.
TV Electric Letter No. TXX-6500, W. G. Counsil to V. S. Nuclear Regulatory Commission, Comanche Peak Programs, June 25, 1987.
SWEC-PSAS Project Memorandum 141, Unequal Shear Loading Effect on Richmond Insert and Threaded Rods Used in Conjunction with Tube Steel.
CPRT Action Plan II.b Results Report, Concrete Compression Strength, Revision 1, February 28, 1986.
CPRT Action Plan V.d Results Report, Plug Welds, Revision 1, December 18, 1986.
CPRT Action Plan V.e Results Report, Installation of Main Steam Pipes, Revision 1, October 15, 1986.
CPRT Action Plan V.a Results Report, Inspection for Certain Types of Skewed Welds in NF Supports, Revision 1, October 22, 1986
~
TV Electric Letter No. TXX-4831, (SDAR-CP-86 Interim Report).
TV Electric Letter No. TXX-6025, (SDAR-CP-86 Final Report).
TV Electric Letter No. TXX-4844, (SDAR-CP-86 Interim Report).
TV Electric Letter Nn. TXX-6027, (SDAR-CP-86 Interim Report),
TV Electric Letter No. TXX-6072, (SDAR-CP-86 Preoperational Vibration Test Criteria.
TV Electric Letter No. TXX-6104, (SDAR-CP-86-73).
PSR REFERENCE DOCUMENTS FOR WHICH EARLIER REVISIONS HAVE BEEN PREVIOUSLY PROVIDED
'LARGE 80RE PIPING AND PIPE SUPPORTS" SWEC-PSAS Comanche Peak Project Procedure CPPP-1, Management Plan for Project Quality (Piping System Qualification /Requalification).
i SWEC-PSAS Comanche Peak Project Procedure CPPP-6, Pipe Stress / Support Requalification Procedure - Unit 1.
SWEC-PSAS Comanche Peak Project Procedure, CPPP-18, Procedure for Evaluation of ERC Deviation Reports.
SWEC-PSAS Report No. IS4S4-N(C)-010, Impact of Construction Deviations on Stress Requalification Program.
CPSES Quality Assurance Procedure QI-QAP-11.1-28, Fabrication and Installation Inspection of Safety Class Component Supports.
SWEC-PSAS Comanche Peak Project Memorandum PM-39, Administrative Procedure for Qualifying Wall-to-Wall, Floor-to-Floor, and Corner Pipe Supports.
CPSES ASME Quality Procedure, AQP-11.2, Fabrication and Installation Inspection of Pipe and Equipment.
SWEC-PSAS Comanche Peak Project Procedure CPPP-20, Pipe Break / Crack Postulation Analysis Procedure.
SWEC-PSAS Comanche Peak Project Procedure CPPP-4, Project Records Management Procedure.
SWEC-PSAS Comanche Peak Project Procedure CPPP-11, Administrative Control of Calculations.
i SWEC-PSAS Project Procedure CPPP-14, Procedure for the Preparation and Control of Project Procedures.
)
I PSR REFERENCE DOCUMENTS PREVIOUSLY PROVIDED "SMALL BORE PIPING AND PIPE SUPPORTS" TV Electric Comanche Peak Response Team Action Plan, DSAP IX, Piping and Supports Discipline Specific Action Plan, Revision 2, June 18, 1987.
SWEC-PSAS CPSES Generic Technical Issue Report, Revision 0, June 27, 1986.
SWEC-PSAS CPSES Generic Technical Issue Report, Revision 0, June 27, 1986.
SWEC-PSAS Comanche Peak Project Procedure CPPP-7, Design Criteria for Pipe Stress and Pipe Supports, Revision 3, February 23, 1987.
SWEC-PSAS Comanche Peak Project Procedure CPPP-8, Piping and Support System Engineering Walkdown Procedure, Revision 1, April 25,1986.
SWEC-PSAS Piping and Support System Engineering Walkdown Final Report, CPSES Unit 1, June 4, 1986.
CPSES ASME Quality Procedure AQP-12.1, Pressure Testing Inspection, Revision 0, July 10, 1987.
SWEC-PSAS Comanche Peak Project Procedure CPPP-5, Field Walkdown Procedure -
Unit 1, Revision 2, March 12, 1986.
SWEC-PSAS Comanche Peak Unit 1, Large Bore Field Walkdown Report, October 10, 1985.
Civil-Structural Review Issues List, Revision 0, July 21,1987; transmitted from N. H. Williams (CYGNA) to W. G. Counsil (TV Electric) on July 22, 1987.
SWEC-PSAS Comanche Peak Project Procedure CPPP-10, Procedure for Review of Plant Operating Mode Conditions, Revision 1, April 1,1986.
Comanche Peak Response Team Program Plan and Issue-Specific Action Plans, Appendix D, CPRT Sampling Policy, Applications and Guidelines, Revision 1, January 31, 1986, and Appendix E, Resolution of Discrepancies Identified by the CPRT, Revision 3, June 18, 1987.
CPSES Quality Control Procedure CP-QAP-12.1, Mechanical Component Installation Verification, Revision 20, July 10,1987.
SWEC-PSAS CPSES Large Bore Pipe Stress and Pipe Support Generic Issues Report,
" Revision 1, July 24, 1987.
CPSES Piping Erection Specification No. 2323-MS-100, Revision 9, August 17, 1987.
CPSES Structural Embedments Specification No. 2323-SS-30, Revision 2, June 13, 1986.
Tenera, L. P., Discipline Specific Results Report, Piping and Supports, DAP-RR-P-001, Revision 1, August 27, 1987.
l Page No. 2
)
SWEC-PSAS CPSES Field Verification Method, Clearance Walkdown, CPE-SWEC-FVM-PS-080, Revision 0, July 29, 1987.
SWEC-PSAS CPSES Field Verification Method, Hardware Validation and
{
Supplement 11 Inspection Programs, CPE-SWEC-FVM-PS-081, Revision 0,
{
July 29, 1987.
SWEC-PSAS CPSES Field Verification Method, Validation of Seismic Category II Large Bore Pipe Support Designs, CPE-SWEC-FVM-PS-082, Revision 0,
~ July 29, 1987.
TV Electric Field Verification Method CPE-EB-FVM-SI-40, Seismic /Nonseismic Walkdowns, System Interaction Program, Revision 0, June 15,1987.
TV Electric Letter No. TXX-6631, W. G. Counsil to U. S. Nuclear Regulatory Commission, Comanche Peak Programs, August 20, 1987.
TV Electric Letter No. TXX-6500, W. G. Counsil to U. S. Nuclear Regulatory Commission, Comanche Peak Programs, June 25, 1987.
SWEC-PSAS Project Memorandum 141, Unequal Shear Loading Effect on Richmond Insert and Threaded Rods Used in Conjunction with Tube Steel.
CPRT Action Plan II.b Results Report, Concrete Compression Strength, Revision 1, February 28, 1986.
CPRT Action Plan V.d Results Report, Plug Welds, Revision 1, December 18, 1986.
CPRT Action Plan V.e Results Report, Installation of Main Steam Pipes, Revision 1, October 15, 1986.
CPRT Action Plan V.a Results Report, Inspection for Certain Types of Skewed Welds in NF Supports, Revision 1, October 22, 1986.
TV Electric Letter No. TXX-4831, (SDAR-CP-86 Interim Report).
TV Electric Letter No. TXX-6025, (SDAR-CP-86 Final Report).
TV Electric Letter No. TXX-4844, (SDAR-CP-86 Interim Report).
TV Electric Letter No. TXX-6027, (SDAR-CP-86 Interim Report),
TV Electric Letter No. TXX-6072, (SDAR-CP-86 Preoperational Vibration Test Criteria.
TV Electric Letter No. TXX-6104, (SDAR-CP-86-73).
)
Page 3 SWEC-PSAS Comanche Peak Unit 1, Small Bore Field Walkdown Report, June 19, 1986.
4 TV Electric CPSES Unit I and Common, SWEC-PSAS Large Bore Piping and Pipe Supports Project Status Report, Revision 0, October 1, 1987.
SWEC-PSAS CPSES Small Bore Piping and Pipe Supports Generic Issues Report, Revision 0. December 5, 1986.
TV Electric letter No. TXX-6042, SDAR-CP-86-72 (Interim Report).
4
PSR REFERENCE DOCUMENTS FOR WHICH EARLIER REVISIONS HAVE BEEN PREVIOUSLY PROVIDED
"$ MALL BORE PIPING AND PIPE SUPPORTS" SWEC-PdxS Comanche Peak Project Procedure CPPP-1, Management Plan for Project Quality (Piping System Qualification /Requalification).
SWEC-PSAS Comanche Peak Project Procedure CPPP-6, Pipe Stress / Support Requalification Procedure - Unit 1.
SWEC-PSAS Comanche Peak Project Procedure, CPPP-18, Procedure for Evaluation of ERC Devierbn Reports.
SWEC-PSAS Report No. 15454-N(C)-010, Impact of Construction Deviations on Stress Requalification Program.
CDSES Quality Assurance Procedure QI-QAP-ll.1-28, Fabrication and Installation Inspection of Safety Class Component Su,9 ports.
SWEC-PSAS Comanche Peak Project Memor.ndum PM-39, Administrative Procedure for Qualifying Wall-to-Wall, Floor-to-Floor, and Corner Pipe Supports.
CPSES ASME Quality Procedure, AQP-II.2, Fabrication and Installation Inspection of Pipe and Equipment.
SWEC-PSAS Comanche Peak Project Procedure CPPP-20, Pipe Break / Crack Postulation Analysis Procedure.
SWEC-PSAS Comanche Peak Project Procedure CPPP-4, Project Records Management Procedure.
SWEC-PSAS Comanche Peak Project Procedure CPPP-11, Administrative Control of Calculations.
SWEC-PSAS Project Procedure CPPP-14, Procedure for the Preparation and Control of Project Procedures.
SWEC-PSAS Comanche Peak Project Procedure CPPP-15, Small Bore Stress / Support Requalification - Unit 1.
O
___-__-_______.--___---_.m
l PSR REFERENCE DOCUMENTS PREVIOUSLY PROVIDED
]
" CABLE TRAY AND CABLE TRAY HANGERS" Impe11 Report 09-0210-0017, "CPSES Cable Tray Analysis / Test Correlation Final Report," Rev. O, February,1987.
Comanche Peak Response Team Action Plan, DSAP VIII, " Civil / Structural Discipline and Issue Specific Action Plan," Rev.1, January 24, 1986.
" Test Plan - Dynamic Testing of Typical Cable Tray Support Configurations,"
^
Document No. A-000150 Rev.1, December 1985 by ANCO Testing Laboratory.
CYGNA Cable Tray Supports Review Issues List, Revision 14, 07/31/87 transmitted to TU Electric by CYGNA letter No. 84056.114 dated 08/10/87.
Ebasco Document SAG.CP9 " Instruction for Re-Evaluation of Cable Tray Hangers Affected by the Longitudinal Tie of Transverse Hangers to the Tray for CPSES Unit 2," Revision 0, March 17, 1986.
TV Electric CPSES, " Generic Issues Report (GIR)
" Evaluation and Resolution of Generic Technical Issues for Cable Tray Hangers," Rev. 2, March 13,1987.
l TV Electric Procedure TE-FVM-CS-003, " Field Verification Method Unit 2 Cable Tray Hanger As-Builting and Design Adequacy Verification Program,," Rev. 2, November 21, 1986.
Ebasco Document SAG.CP5 " Specification for Dynamic Test of Cable Tray Hanger System for Comanche Peak Steam Electric Station," Rev. 3, April 21, 1986.
TENERA, L. P. Discipline Specific Results Report; Civil / Structural - Cable Trays and Supports, DAP-RR-C/S-001 Rev. 1, September 25, 1987.
TV Elactric Procedure TE-FVM-CS-048 " Field Verification Method Unit 1 Cable Tray Selected Attributes As-Built Program," Rev. O December 31, 1986.
TU Electric Procedure TE-FVM-CS-050 " Field Verification Method T. J. Cope Flat Ladder Tee Fitting Selected Attributes Data Collection," Rev. O, January 5, 1987.
TU Electric Letter No. TXX-6631, W. G. Counsil to U. S. Nuclear Regulatory Commission, Comanche Peak Programs, August 20, 1987.
Comanche Peak Response Team Program Plan and Issue-Specific Action Plans, Appendix D, CPRT Sampling Policy, Applications and Guidelines, Revision 1, January 31, 1986, and Appendix E, Resolution of Discrepancies Identified by the CPRT, Rev. 3, June 18, 1987.
TU Electric Letter No. TXX-6500, W. G. Counsil to U. S. Nuclear Regulatory Commission, Comanche Peak Programs, June 25, 1987.
Impell Calculation M-25, " Base Plate Prying Action Factors " Rev. 3, August 25, 1986.
Ebasco Comanche Peak SES Cable Tray Hanger Volume I, Book 3, " Prying Action,"
Rev. 1, April 24, 1986.
4 Page 2 Ebasco Comanche Peak SES Cable Tray Hanger Volume I, Book II, " Concrete Compressive Stresses Under CTH Anchorage Shims and Base Plates," Rev. O, May 30, 1986.
Ebasco Comanche Peak SES Cable Tray Hanger Volume I, Book 12. "CTH Anchorage Base Plate Flexibility Study," Rev. O, June 16, 1986.
CPSES Structural Embedments Specification No. 2323-SS-30, Rev. 2, June 13, 1986.
NCIG-01, " Visual Weld Acceptance Criteria," Rev. 2, May 7,1985.
Impell Report 01-0210-1470, " Effective-Length Factors for Buckling of Cable Tray Supports," Rev. 1, May, 1986.
Impell Report 09-0210-0018, " Slenderness Ratio Limits for CPSES Cable Tray Supports," Rev. O, May, 1986.
Ebasco Comanche Peak SES Cable Tray Hanger, Volume I, Book 9 Part 2, "Multimode Response Multiplier - Studies," Rev.1, June 16,1986.
Ebasco Comanche Peak SES Cable Tray Hanger, Volume I, Book 9, Part 3, "Multimode Response Multiplier - Studies," Rev. O, June 16, 1986.-
)
Ebasco Comanche Peak SES Cable Tray Hanger, Volume I, Book 9, Part 5, "Multimode Response Multiplier - Studies," Rev. O, April 10, 1986.
Ebasco Comanche Peak SES Cable Tray Hanger, Volume I, Book 9, Part 6, "Multimode Response Multiplier at Stress Level," Rev. O, June 16, 1986.
j Ebasco Comanche Peak SES Cable Tray Hanger, Volume I, Book 25, " Reduced Section Properties for Channels," Rev. O, February 24, 1987.
Ebasco Comanche Peak SES Cable Tray Hanger, Volume I, Book 2, " Computer Related Information," Rev. 3, July 11,1986.
Ebasco Comanche Peak SES Cable Tray Hanger, Volume I, Book 7, " Tray Hanger Load Application Studies," Rev. 1, February 20, 1986.
Impell Calculation M-19, " Clip Stiffness Production Values," Rev. 2, November 7, 1986.
)
Impell Calculation M-03, " Cable Tray Properties," Rev. 4, November 11, 1986.
Ebasco Comanche Peak SES Cable Tray Hanger, Volume I, Book 1, " Cable Tray Properties and Qualification":
Part 1, Rev. 3, January 15, 1987 Part 2, Rev. O, January 15, 1987 Part 3, Rev. O, January 15, 1987
___-_J
Page 3 Ebasco Comanche Peak SES Cable Tray Hanger, Volume I, Book 12. "CTH Anchorage Base Plate Flexibility Study," Rev. O, June 16, 1986.
Joint Impell/Ebasco Approach Towards Design Verification of Inaccessible Attributes, IM-T-0210-040-238, May 15, 1987.
Impell Calculation B-04, " Effective Length Factors for Longitudinal Cable Tray Supports," Rev. O, July 23, 1987.
Impe11 Calculation M-65, " Evaluation of Potential Bolt Holes in Tier Members,"
Rev. 2, July 16, 1987.
Impell-Position Paper IM-P-013, " Justification for the Use of Rigid Clamp Stiffnesses," Rev. O, September 11, 1987.
9 i
l i
,)
_~
PSR REFERENCE DOCUMENTS FOR WHICH EARLIER REVISIONS HAVE BEEN PREVIOUSLY PROVIDED
" CABLE TRAY AND CABLE TRAY HANGERS" Impe11 Instruction PI-II, " Cable Tray System Anulysis and Qualification Closeout"._
Impell Instruction PI-02, " Dynamic Analysis of Cable Tray Systems".
Impell Instruction PI-03, " Qualification of Cable Tray Supports".
Impell Instruction PI-06, " Tray and Clip Qualification".
Impe11 Instruction PI-07, " Design Verification of Base Plates, Angles, and Embedment Plates".
TV Electric Procedure CPE-FVM-CS-001, " Field Verification Method Unit 1 Cable Tray Hanger As-Builting and Design Adequacy Verification Program".
Ebasco Document SAG.CP4 " Seismic Design Criteria for Cable Tray Hangers for Comanche Peak SES Unit 1".
Ebasco Document SAG.CP34 " General Instructions for Cable Tray Hanger Analysis for Comanche Peak SES No. I and 2".
TV Electric Procedure, QI-QP-11.10-9, " Modification, Rework and 'As-Built' Inspection / Verification of Cable Tray Hangers in Unit 1".
TU Electric Procedure, QI-QP-ll.10-2A, " Inspection of Unit II Cable Tray Supports".
ANCO, " Final Summary Report - Comanche Peak Cable Tray Tests".
Ebasco Document SAG.CP11
" System Analysis for Cable Tray and Hanger Assembly for CPSES Units I and 2".
Impe11 Calculation No. M-27 " Thermal Load Evaluation".
Ebasco Document SAG.CP3 " Seismic Design Criteria for Cable Tray Hangers for Comanche Peak SES Unit 2".
Impell Calculation M-04, " Base Angle Stiffness".
Ebasco Comanche Peak SES Cable Tray Hanger, Volume I, Book 6, " Buckling Study".
1 Ebasco Comanche Peak SES Cable Tray Hanger, Volume I, Book 16, " Dimensional Tolerance".
Impell Calculation M-12, " Qualification Procedures for Cable Tray Support 4
Evaluations".
I
Page 2 Ebasco Comanche Peak SES Cable Tray Hanger, Volume I, Book 9 " Organization and Original Scope Summary Report for MRM and Related Load Distribution Studies".
Ebasco Comanche Peak SES Cable Tray Hanger, Volume I, Book 9, Part 1, "Multimode Response Multiplier - Studies".
Ebasco Comanche Peak SES Cable Tray Hanger, Volume I, Book 9, Part 4,
" Multitude Response Multiplier - Studies".
Ebasco Comanche Peak SES Cable Tray Hanger, Volume I, Book 9, Part 7, "Multimode Response Multiplier for Cable Tray Clamps".
Ebasco Comanche Peak SES Cable Tray Hanger, Volume I, Book 10, "Multimode Response Multiplier - Studies".
Ebasco Comanche Peak SES Cable Tray Hanger, Volume I, Book 15, " Cable Tray Dynamic Load Redistribution Effects".
Ebasco Comanche Peak SES Cable Tray Hanger, Volume I, Book 6, " Buckling Study".
Impell Calculation M-12, " Qualification Procedures for Cable Tray, Support Evaluation".
Impell Calculation M-10. " Cable Tray Clip Angle Stiffness".
Impell Calculation M-2B, " Justification of Clip Modeling Procedure Tray Clamp Behavior".
Impell Calculation M-39, " Side Rail Extensions Study".
Ebasco Comanche Peak SES Cable Tray Hanger, Volume I, Book 1, " Cable Tray Properties and Qualification", Part 4.
Ebasco Comanche Peak SES Cable Tray Hanger, Volume I, Book 15, " Cable Tray Dynamic Load Redistribution Effects".
Ebasco Comanche Peak SES Cable Tray Hanger, Volume I, Book 8, " Cable Tray
' Hanger Geometry Grouping".
Impell Calculation M-13, " Development of Seismic Overlap Procedures".
l
PSR REFERENCE DOCUMENTS PREVIOUSLY PROVIDED
" CONDUIT SUPPORTS TRAIN C 2-INCH DIAMETER AND LESS"
)
TENERA, L. P., "Results Report - ISAP I.c -- Train C Conduit and Conduit Supports," Revision 1, October 28, 1987, Berkeley, CA.
Letter No. 84056-095, " Review Issue List (RIL), Texas Utilities Generating Company, CPSES, Independent Assessment Program - All Phases", from N. H. Williams (Cygna) to W. G. Counsil (TUGCO) dated November 26, 1985.
j CCL Test Report No. A-720-86, Project No. 85-1903.23/24, " Test Report for Static Testing of Train C Beam Clamps and Unistrut Hangers for CPSES",
l July 1986.
Impell Calculation No. ROTC-06, " Multi-Mode Factor Evaluation for Train C Conduit Supports", Rev. 1, Job No. 0210-052-1355, September 1986.
TU Electric Letter No. TXX-6500, W. G. Counsil to US Nuclear Regulatory Commission, Comanche Peak Programs, June 25, 1987.
TV Electric Letter No. TXX-6631, W. G. Counsil to US Nuclear Regulatory Commission, Comanche Peak Programs, August 20, 1987.
PSR REFERENCE DOCUNENTS PREVIOUSLY PROVIDED
" CONDUIT SUPPORTS TRAINS A AND 8 AND TF.AIN C LARGER THAN 2-INCH DIANETER" Generic Technical Issues Report (GIR), " Evaluation and Resolution of Generic Technical Issues for Conduits and Conduit Supports", Revision 2, dated March 30,1987.
CCL Report No. A699-85, " Conduit Clamp Test Report", Phase I, December 17, 1985.
CCL Report No. A-702-86, " Conduit Clamp Test Report", Phase II, April 7, 1986.
I TV Electric CPSES Unit I and Common, Impe11 Conduit Supports Train C Two Inch Diameter and Less Project Status Report, Revision 0.
TV Electric CPRT Program Plan, DSAP VIII, Appendix B and Appendix C, Revision 1, January 24, 1986.
CPE-EB-FVM-CS-014, " Design Control of Electrical Conduit Raceways for Unit 2 Installation in Unit 1 & Common Areas", Revision 4, February 2, 1987.
TU Electric Letter No. TXX-6631, W G. Counsil to U.S. Nuclear Regulatory Commission, Comanche Peak Programs, August 20, 1987.
TU Electric Letter No. TXX-6500, W. G. Counsil to U.S. Nuclear Regulatory i
Commission, Comanche Peak Programs, June 25, 1987.
TENERA, L. P., Discipline Specific Result Report:
Civil / Structural - Train A & B Conduit and Supports, Revision 1.
TU Electric CPRT Program Plan, Appendix E.
Ebasco Comanche Peak SES Cable Tray Hanger, Volume I, Book 3, Prying Action, Revision 1, April 24, 1986.
Comanche Peak Steam Electric Station, Project Status Report, " Cable Tray and Cable Tray Hangers", Revision 0.
i l
PSR REFERENCE DOCUMENTS FOR WHICH EARLIER REVISIONS HAVE BEEN PREVIOUSLY PROVIDED
" CONDUIT SUPPORTS TRAINS A AND B AND TRAIN C LARGER THAN 2-INCH DIAMETER" TV Electric Specification No. 2323-SS-30, " Structural Embedments".
Ebasco Procedure No. SAG.CP10, " Unit 1 Design Criteria for Seismic Category I Electrical Conduit System".
Ebasco Procedure No. SAG.CP.17, " Unit 1 Design Criteria for Junction Boxes for Seismic Category I Electrical Conduit System".
Ebasco Procedure No. SAG.CP20, " Unit 1 Technical Guidelines for System Analysis of Conduit Span Configuration".
CPE-EB-FVM-CS-033, " Design Control of Electrical Conduit Raceways for Unit 1 Installations in Unit I and Common Areas".
Ebasco CPSES Unit 1, Conduit Calculation Book No. 0246, " Support Verification for CYGNA Issue No. 5, Bolt Hole Tolerance and Edge Distance Violation".
Ebasco Procedure No. SAG.CP21, " Unit 1 Technical Guidelines for Thermal Analysis of Seismic Category I Electrical Conduit System".
Ebasco Calculation No. TNE-CS-CA-CA-la, " Design of Conduit Support Capacities for CA-la and CA-2a type UNISTRUT Supports".
s D0LMETED USHHC CERTIFICATE OF SERVICE 17 DB: 10 P3:53 I,
George L. Edgar, hereby certify that on December 10, OFFICE 6F Si ueiArp 1987, I made service of the " Notice of Availability"Il9fMEi6lidifVlCl.
i enANCH copies thereof, postage prepaid, first class, or where indicated by an asterisk by hand delivery or by Federal Express to:
- Peter B.
Bloch, Esquire William S. Eggeling, Esquire Chairman Ropes & Gray
(
Atomic Safety and Licensing 225 Franklin Street Board Boston, Massachusetts 02110 1
U.S.
Nuclear Regulatory Commission
- Juanita Ellis Washington, D.C.
20555 President, Case 1426 South Polk Street
- Chairman Dallas, TX 75224 Atomic Safety and Licensing Appeal Panel William R.
Burchette, Esquire U.S. Nuclear Regulatory Heron, Burchette, Ruckert, l
Commission
& Rothwell Washington, D.C.
20555 Suite 700 1025 Thomas Jefferson St.,
N.W.
- Chairman Washington, D.C.
20007 Atomic Safety and Licensing Board Panel Joseph Gallo, Esquire U.S. Nuclear Regulatory Isham, Lincoln & Beale Commission 1150 Connecticut Ave.,
N.W.
Washington, D.C.
20555 Suite 1100 Washington, D.C.
20036
- William L.
Clements Docketing & Service Branch
- Billie Pirner Garde
{
U.S.
Nuclear Regulatory Government Accountability Project
]
Commission Midwest Office Washington, D.C.
20555 104 E.
Wisconsin Avenue - B Appleton, WI 54911-4897 I
Assistant Director for Inspection Programs Renea Hicks, Esquire Comanche Peak Project Division Assistant Attorney General U.S.
Nuclear Regulatory Environmental Protection Division Commission Capitol Station P.O.
Box 1029 P.O.
Box 12548 Granbury, TX 76048 Austin, Texas 78701 1
. i l
Robert A. Jablon, Esquire
- Anthony Roisman, Esquire Spiegel & McDiarmid 1401 New York Avenue, N.W.
1350 New York Avenue, N.W.
Suite 600 Washington D.C.
20005-4798 Fashington, D.C.
20005 Elizabeth B. Johnson Lanny A.
Sinkin Oak Ridge National Laboratory Christic Institute P.O.
Box X Building 3500 1324 North Capitol Street Oak Ridge, Tennessee 37830 Washington, D.C.
20002
- Dr.
Walter H.
Jordan Nancy Williams Administrative Judge Cygna Energy Services, Inc.
881 West Outer Drive 2121 N. California Blvd.
Oak Ridge, Tennessee 37830 Suite 390 Walnut Creek, CA 94596 Robert D.
Martin Regional Administrator, David R.
Pigott Region IV Orrick, Herrington & Sutcliffe U.S.
Nuclear Regulatory 600 Montgomery Street Commission San Francisco, CA 94111 611 Ryan Plaza Drive Suite 1000 Robert A. Wooldridge, Esquire Arlington, Texas 76011 Worsham, Forsythe, Sampels
& Wooldridge
- Dr.
Kenneth A. McCollom 2001 Bryan Tower, Suite 3200 l
Administrative Judge Dallas, Texas 75201 1107 West Knapp Stillwater, Oklahoma 74075 W.
G. Counsil i
Executive Vice President Janice E. Moore, Esquire TU Electric - Generating Division Office of the General Counsel 400 N. Olive, L.B.