Applicant Eleventh Progress Rept.* Rept Covers Period Mar-Apr 1988,per ASLB 860606 Order.Next Rept Will Be Submitted by 880630.W/Certificate of Svc.Related Correspondence
ML20154E525
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/03/1988
From: Edgar G
NEWMAN & HOLTZINGER, TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Atomic Safety and Licensing Board Panel
References
CON-#288-6305 OL, NUDOCS 8805200242
Download: ML20154E525 (42)


Text

,

h30b i

gELAIED CORRESPONDF,NSA riled:

May 3, 19

'N

.b l

~i QM SS MN 4 UNITED STATES OF AMERICA 1

NUCLEAR REGULATORY COMMISSION d

ERA CH before the N

ATOMIC SAFETY AND LICENSING BOARD In the Matter of

)

)

Docket Nos. 50-445-OL TEXAS UTILITIES ELECTRIC

)

50-446-OL COMPANY et al.

)

)

(Application for an (Comanche Peak Steam Electric

)

Operating License)

Station, Units 1 and 2)

)

)

APPLICANTS' ELEVENTH PROGRESS REPORT Pursuant to the Board's "Memorendum and Order (Progress Report and Notice of Available Documents)" entered June 6, 1986, the Applicants submit herewith their eleventh "Progress Report."

This Progress Report covers the period March 1, 1988 through April 30, 1988.

1.

CPRT Progress '

The SRT has published Results Reports for all of the 47 Issue Specific Action Plans as well as for three Discipline Specific Action Plans.

The notice to CASE of the availability of the Working Files for Results Report VII.a.9 was filed on April'21, 1988.

The notice of availability for the Collective Significance 8805200242 880503 PDR ADOCK 05000445 G

PDR

e.

Report was filed on April 22, 1988.

Notices of Availability for all Results Reports, the Collective Evaluation Report, and the Collective Significance Report have now been filed.

Responses to the Board's 14 questions have been submitted for all of the published Fesults Reports.

The completed External Issues Matrix, Appendix D to the Collective Evaluation Report was published during the reporting period.

SRT approved errata pages to the Collective Evaluation Report were also published during the reporting period.

2.

Corrective Action Program With the issuance of the notice of availability for the HVAC Project Status Report on March 3, 1988, notices of availability for all Project Status Reports have now been issued.

Errata pages for the following Project Status Reports were issued during the reporting period Electrical Large Bore Piping and Pipe Supports Small Bore Piping and Pipe Supports Cable Tray Hangers Conduit Supports, Trains A, B, and C > 2" j

Conduit Supports Train C < 2" Equipment Qualification Mechanical Supplement A - Systems Interaction Mechanical Supplement B - Fire Protection I

L i

.6 i !

L i

During the public meeting between the NRC Staff l

l and TU Electric on. December 9, 1987 and in a letter from the NRC Staff to TU Electric dated January 22, 1988, the l

NRC Staff requested additional information relating to the j

CPRT and CAP programs.

In addition to previous responses, on March 16, 1988 (TXX-88254) and April 14, 1988 (TXX-88373)

TU Electric provided further responses to the NRC Staff's requests.

TU Electric's responses to the Staff's requests l

were provided to the Board on March 29, 1988 and April 21, l

1988.

The NRC Staff issued Supplement 14 (Suppi: ent) i to the Safety Evaluation Report for Comanche Peak Steam Electric Station on March 9, 1988.

The Supplement presented i

the staff's evaluation of Corrective Action Program efforts l

l associated with large and small bore piping and pipe supports.

1 l

Under the litigation schedule established pursuant to the Board's Memorandum and order of November 18, 1987 the discovery period for large and small bore piping and pipe supports expired on April 7, 1988.

On April 11, 1988 i

Intervenor CASE requested a ten day extension, until and i

including April 26, 1988, of the time period to specify the issues CASE is interested in and the basis for its interest in regard to the Project Status Reports dealing with large and small bore piping and pipe supports.

Applicants and NRC Staff stated that they had no objections to this extension, l

P

as documented in a letter to Ms. Ellis dated April 12, 1988.

On April 28, 1988 CASE filt.d CASE's Identification of Piping / Pipe Support Issues."

Pursuant to the Board's Order discovery of CASE commenced on April 28, 1988.

Several public meetings related to the Comanche Peak Steam Electric Station were held during this reporting C

period as follows:

March 16-17, 1988

- Technical meeting between TU Electric and NRC Staff (Electrical)

March 17-18, 1988

- Technical meeting between TU Electric and NRC Staff (Fire Protection and Other Topics) 4 March 21, 1988

- Technical meeting between TU Electric and NRC Staff (High Energy Line Breaks)

April 12, 1988

- Technical meeting between TU Electric and NRC Staff (Technical Specifications)

The next Progress Report is scheduled for June 30, 1388.

TEXAS UTILITIES ELECTRIC COMPANY For the owners of CPSES George E. Edgar '

Newman & Holtzinger, P.C.

1615 L Street, N.W.

Washington, D.C.

20036.

(202) 955-6644 Attorneys for i

TEXAS UTILITIES ELECTRIC COMPANY

,,--,y

r 4

s i

ANNOTATED BIBLIOGRAPHIES Pursuant to the Board's Order of June 6,1986, Applicants submit the attached AnnotattJ Bibliographies of documents for the time period of February 26, 1988 thru April 25, 1988. The principles that were utilized, the documents that are annotated and the document sources are consistent with the guidelines and procedures that were used by Applicants in previous Annotated Bibliographies.

[

6 4

)

b 1

l r

ne, --- --, - --

.n

,,-.a_..,,---,

4

'A 1Q_GfR 50.55 (e)

During the period of February 26, 1987 to April 25, 1988, Applicants issued 126 letters to the NRC concerning items which had previously been identified as potentially reportable under the provisions of 10 CFR 5n.55 (e).

The letters are categorized as follows:

A.

18 letters - Interim Reoort - Evaluation to determine reportability is continuing.

(No listing provided)

B.

30 letters - Interim Recori - Item determined to be reportable and evaluation / corrective action is continuing.

1.

Interim Reports submitted to status evaluation / corrective action concerning specific deficiencies:

Qalg Letter No.

1DAR No.

Subiect 8/28/87 TXX 6689 CP 85-31 Electrical Raceway Support System i

11/3/87 TXX 6914 CP 87-01 Static Computer Model for Safeguards Building 11/4/87 TXX 6913 CP 85-53 Seismic Design of Conduit i

11/6/87 TXX 6918 CP 86 83 Separation Barrier Material on Power Cables and Raceways 11/18/87 TXX-6986 CP 86-40 Application of Non-Qualified Agastat Relays 11/20/87 TXX-6969 CP 86 82 Cable Tray Hanger Splice Welds 1/28/88 TXX-88188 CP-84 08 Corrective Action CP-85 34 Status for Reportable CP 85 42 Items CP-86 82 2/4/88 TXX 88190 CP 87-04 Plug Welding on Embedded Channels 2/4/88 TXX-88196 CP 87-23 Conduit Unions

4 l

Q11.g Letter No.

SDAR No.

Subiect 2/12/88 TXX-88211 CP-83-ll Cooling Water Piping 2/16/88 TXX-88212 CP-82-15 Piston Skirt Castings 2/19/88 TXX-88242 CP-86-40 Application of Non-Qualified Agastat Relays 2/29/88 TXX-88275 CP-87-79 Cable and Raceway Data Systems Calculations 3/1/88 TXX-88280 CP-87-03 6.9 kV Switchgear 3/1/88 TXX-88283 CP-85-36 Train C Conduit Supports 3/14/88 TXX-88317 CP-86-07 Service Water System Leakage 3/21/88 TXX-88331 CP-87-131 Deficiencies in Steam Generator Cubicle Steel Platform Framing and Pressurizer Support Slab 3/28/88 TXX 88356 CP-87-122 Nozzle load Interfaces 3/29/88 TXX 88337 CP 87-132 Unqualified Limitorque Actuators 3/29/88 TXX-88354 CP-87-03 6.9 kV Switchgear Installation 3/30/88 TXX-88364 CP-82-07 Defective Governor Drive Couplings 4/4/88 TXX-88344 CP-86-10 Electrical Penetration Assemblies 4/13/88 TXX-88393 CP-88-28 Tube Steel Manufacturing Defects j

4/15/88 TXX 88358 CP-86-53 Seismic Design of Conduit 4/15/88 TXX-88403 CP-86 52 Field Drilled CP-87-76 Cable Tray Holes 3-

2.

Interim Reports transmitting information concerning a deficiency and providing the required information as to description of the deficiency, safety implications and corrective action:

Q11g Letter No.

SDAR No.

Subiect 11/20/87 TXX-6957 CP 83 90 RHR Relief Valve Piping 1/5/88 TXX-88-15 CP-87 61 Snug Tight Torquing of r

Structural Bolts 1/6/88 TXX-88033 CP 87-71 Missing Welds and Undersized Members 3.

Interim Reports submitted to provide followup information related to specific deficiencies:

i Qalg letter No.

SDAR No.

Subiect 11/20/87 TXX 6977 CP 86-72 Small Bore Piping and Supports 3/17/88 TXX-88304 CP 88 21 Torque Valves for J. C. White Tubing Restraints t

l l

l I

[

I 4

I

O I

C.

6 Letters - Final Reoort - Final Reports of deficiencies determined not to be reportable under the provisions of 10 CFR50.55(e):

Q11g letter No.

SDAR No.

Subiect 11/2/87 TXX-6919 CP 87 34 Equipment Norzle Load Interfaces 11/9/87 TXX-6916 CP 87-111 Motor Control Center Loose Terminal 2/3/88 TXX-88197 CP 87-39 NSSS Control Cabinets Optical Isolation Chips CP-88 02 HVAC Gravity Dampers 2/5/88 TXX-88204 CP-86 08 Installation of Super Hilti Kwik Bolts CP 86 12 Commodity Installations at Secondary Wall i

Design Gaps CP 87-83 Seismic Analysis of Service Water Discharge Structure CP 87-125 Service Water Piping Supports 2/12/88 TXX 88208 CP-86 71 Cable Pulling Tension CP-87-05 Post-LOCA High Range Radiation Monitor CP 87-08 Calibration Accuracy of Pressure Standard CP-87 41 Pressure Transmitters CP-87-69 Design Basis Tornado Analysis for HVAC Ductwork and Components 2/26/88 TXX 88265 CP 87-78 Cable Tray Welding Procedures Deficiency

.~ -- -.- ---

l D.

72 letters Final Reoort - Deficiency is reportable and corrective action taken.

1.

Final Reports of deficiencies which have been determined to be reportable under the provisions of 10 CFR 50.55(e).

Each listed report contains the required information as to description of the deficiency, safety implications and corrective action / preventative action:

Djtig letter No.

SDAR No.

Subiect 1/29/88 TXX-88013 CP 87-135 Control Room AC and Primary Plant Ventilation Systems 2/4/88 TXX 88173 CP-87-66 Structural Bolting in Tension 2/4/88 TXX 88179 CP-84-14 Load Verification of Seismic I Structures 2/4/88 TXX-88194 CP 88 26 Turbine Building Design Requirements 2/5/88 TXX 88174 CP 87 68 Hilti Bolt Inadequacies 2/5/88 TXX-88172 CP 87-56 Pipe Whip Restraints 2/5/88 TXX 88177 CP 87-131 Deficiency in Cubicle Steel Platform and Support Slab 2/5/88 TXX 88185 CP 86 04 Proximity Placement of Richmond Inserts 2/5/88 TXX 88186 CP-88 22 Service Water Discharge Pipe Missile Protection 2/9/88 TXX-88215 CP-87-47 Consumable Materials Replacement Program 2/26/88 TXX 88240 CP-83 09 Reactor Trip Switchgear 4/4/88 TXX 88195 CP 86 51 Hilti Anchor Bolts 4/8/88 TXX-88305 CP 85 36 Train C Conduit Supports 4/13/88 TXX 88389 CP 88-27 7300 System PC Cards 1

6-

2.

Final Reports of deficiencies which have been determined to be reportable under the provisions of 10 CFR 50.55(e) and other Supplemental Reports related thereto which status corrective action and provide information:

D.Lt.g Letter No.

SDAR No.

Subiect 11/7/87 TXX 6960 CP 86-11 Component Cooling Water Pump Impeller Linear Indications 2/4/88 TXX-88171 CP 85 29 Design of Architectural Features 2/4/88 TXX 88182 CP 88 06 Containment Spray EQ 2/4/88 TXX-88184 CP 87-13 Class IE Separation Violations 2/4/88 TXX-88191 CP 87 61 Torquing of Structural Bolts 2/5/88 TXX-88175 CP-87 71 Missing Welds and Undersized Members 2/5/88 TXX-88176 CP 87-127 Platform and Support Structure Design j/8/88 TXX 88207 CP 86 54 Design of Control Room Ceiling 2/12/88 TXX-88202 CP 87 21 Effect of Thermolag on o

Derating Factors 2/16/88 TXX 88235 CP 87 50 Turbine Driven Auxiliary Feedwater Pump 2/17/88 TXX-88236 CP 87-85 Degradation of Class IE Circuits 2/18/88 TXX-88231 CP 86-62 Polar Crane Support Structure 2/22/88 TXX 88226 CP 86 38 Traceability of IE Pigtail Extensions 2/22/88 TXX 88243 CP 84 31 Control Room Separation Wall 7

QLt.t Letter No.

SDAR No.

Subiect 2/24/88 TXX 88239 CP 86 22 Safeguards Area Fan Coolers j

2/25/88 TXX 88260 CP 87 45 Reactor Coolant Pump Motor Backup Circuitry 2/26/88 TXX 88267 CP 86 18 Safety Chilled Water I

Chiller Units 2/26/88 TXX 88261 CP-86 48 Cable Tray Transverse i

Clamps 3/1/88 TXX-88270 CP 85 39 Equipment Conduit Interface 3/1/88 TXX 88271 CP 85 50 Cable Tray Tee Fittings 3/1/88 TXX 88250 CP 86 67 Pre-Operational Vibrational Test Criteria 3/1/88 TXX 88266 CP 87 59 Improper Application of Construction Aids l

3/3/88 TXX 88257 CP 87 124 Xomox Valves 3/4/88 TXX 88272 CP 87 28 Condensate Storage Tank Overpressurization i

3/4/88 TXX 88279 CP 87 22 Liner Attachment Material Requirements:

Impact Testing

(

3/4/88 TXX 88289 CP 88 10 15 kV Cus Ampacity h

t Rtting j

3/7/88 TXX 88234 CP 86 82 Cable Tray Hanger j

Splice Welds i

3/7/88 TXX-88237 CP-85 34 Conduit Support Design 3/7/88 TXX-88287 CP-87-40 Electrical Isolation Between Class IE and Non Class IE Equipment 3/8/88 TXJ 48273

(/ 88-7C Gould Battery Packs CP 86-4f i

8-

,._,...,_,y.

, ~...... _, _ _. _ _

Q11.t letter No.

SDAR No.

Subiect 3/10/88 TXX 88277 CP 87 91 Startup Transformer 0 nrload r

3/10/88 TXX 88278 CP 87-51 480 V Containment Electrical Penetration Backup Protection 3/10/88 TXX-88301 CP 8518 Embedded Angles 3/11/88 TXX-88252 CP 86 40 Application of Non-Qualified Agastat Relays 3/11/88 TXX-88286 CP 87-139 Unqualified Terminal Blocks 3/11/88 TXX 88296 CP 87-49 Solid State Safeguards Systems Internal Wiring Terminations 3/11/88 TXX 88312 CP 86-19 Instrument Installations - Steam i

Service Pressure Transmitters 3/15/88 TXX 88314 CP 86-31 Diesel Generator Lube Oil Sump Tank Foot Valves 3/15/88 TXX 88323 CP-86-73 ASME Snubber Attachment Brackets 3/22/88 TXX 88335 CP 86-72 Small Bore Piping and Supports 3/22/88 TXX 88336 CP 86-36 Large Bore Piping and Supports 3/25/88 TXX 88276 CP-88 07 Reactor Coolant Pump Wiring 3/29/88 TXX-88311 CP-79 08 Installation of Drilled in Expansion Anchors 3/30/88 TXX 88244 CP 83 15 Cable Tray Clamps 3/30/88 TXX-88329 CP-85 54 Seismic Qualification of HVAC Supports i

9 i

l

9 4

D.Ltt Letter No.

SDAR No.

Subiect 3/30/88 TXX 88343 CP-87 Il6 Purge Gas Overpressurization of the Condensate Storage Tank and Reactor Makeup Water 3/30/88 TXX-88352 CP 84-08 Curtain Fire Dampers 3/30/88 TXX 88371 CP 86 54 Original Design of Control Room Ceiling 3/31/88 TXX 88295 CP-86-45 Seismic Category II Systems and Components 3/31/88 TXX-88350 CP 87-23 Conduit Unions 3/31/88 TXX-88357 CP 87-121 6.9 Kv/480 Y Transformer Bus Bar Clearance 3/31/88 TXX-88374 CP 87 132 Unqualified Limitorque Actuators 4/8/88 TXX 88368 CP 88-12 Class IE and Non-Class IE Cable Separation 4/14/88 TXX-88370 CP-87-122 Nozzle Load Interfaces 4/15/88 TXX-88351 CP 86 49 Adaptor Modules and Electrical Penetrations 4/15/88 TXX 88383 CP-86-51 Anchor Bolts Supplied by Hilti l

4/15/88 TXX 88390 CP-86-35 Motor Operators for Manual Valves 4/15/88 TXX-88392 CP 87 50 Turbine Driven Auxiliary Feedwater Pump Bearing Temperature

' )

RESPONSES TO NRC INSPECTION REPORT /

NOTICE OF VIOLATION / NOTICE OF DEVIATION The following correspondence was issued by Applicants to the NRC concerning inspection reports, during the period of February 26, 1988 to April 25, 1988:

RiLLt Letter No.

Sub.iect 9/9/87 TXX-6729 Revised Date of Full Compliance This letter transmitted a revised date of full compliance for NOV, Item E relating to Inspection Report Nos. 50-445/86-07 and 50-446/86-06.

Q1Le Letter No.

Subiect 2/1/88 TXX-88192 Response to Notice of Violation This letter transmitted a response to NOV. Items 1, 2 and 3 relating to Inspection Report Nos. 50 445/87-27 and 50 446/87-20.

Qalt letter No.

Subiect 2/4/88 TXX-88205 Response to Open Items This letter transmitted a response to open items associated with Inspection Report Nos. 50-445/87-19 and 50 446/87 15.

Ritt.g Letter No.

Sub.iect 2/4/88 TXX-88199 Revised Date of Full Compliance This letter transmitted a revised date of full compliance for NOD, Item B relating to Inspection Report Nos. 50 445/86 03 and 50-446/86-02.

Eitle letter No.

Sub.iect 2/12/88 TXX 88222 Supplemental Information This letter transmitted supplemental information relating to Inspection Report Nos. 50 445/86 03 and 50-446/86 02.

l l i l

l

m l

Q11, Letter No.

Subiect 2/15/88 TXX-88219 Revised Date of Full Compliance This letter transmitted a revised date of full compliance for NOV, Item A relating to Inspection Report Nos. 50 445/86-22 and 50 446/86 20.

Q11g Letter No.

Subiect 2/16/88 TXX-88220 Response to Notice of Violation This letter transmitted a response to the NOV relating to Inspection Report Nos. 50 445/87 30 and 50 446/87-22.

QAlg Letter No.

Subiect 2/19/88 TXX 88246 Revised Date of Full Compliance This letter transmitted a revised date of full compliance for NOV, Items B and C relating to Inspection Report Nos. 50 445/87-18 and 50-446/87-14.

Q111 Letter No.

Subject 2/24/88 TXX-88218 Response to Notice of Violation and Notice of Deviation i

This letter transmitted a response to the NOV and NOD relating to Inspection Report Nos. 50-445/87-32 and 50 446/87-24.

Q111 Letter No.

Subject 2/24/88 TXX-88253 Revised Date of Full Compliance This letter transmitted a revised date of full compliance for NOV, Item E relating to Inspection Report Nos. 50 445/85 07 and 50 446/86 05, i

i Q11g Litter No.

Subject 2/26/88 TXX 88264 Response Date of Full Compliance This letter transmitted a revised date to full compliance for NOV Item A relating to Inspection Report No 50 445/87-16.

i i

l 12-1 i

Q111 Lttter No.

lyk,itqt 3/1/88 TXX 88263 Revised Date of Full Compliance This letter transmitted a revised date of full compliance for NOV. Items B, C and D relating to Inspection Report Nos. 50 445/85 13, 50 445/85-18 and 50 446/86-12.

Ella Letter No.

Sub.iect 3/11/88 TXX-88309 Response to Open Items and Unresolved Issues This letter transmitted a response to open items and unresolved issues relating to Inspection Report No. 50 445/87-22.

Q1tg Letter No.

Sub.iect 3/14/88 TXX-88298 Response to Notice of Violation and Notice of Deviation This letter transmitted a response to the NOV and N00 relating relating to Inspection Report Nos. 50 445/87 35 and 50-446/87 26.

QLtg Letter No.

Subiect 3/15/88 TXX-88310 Revised Date of Full Compliance This letter transmitted a revised date of full compliance for NOV's relating to Inspection Report Nos. 50 445/87-11, 50-446/87-09, 50 445/S7-30 and

(

50 446/87-22.

QLtg Letter No.

Sub.iect 3/15/88 TXX-88221 Revised Response to Notice of Violation 4

This letter transmitted a revised response to NOV Item C relating to Inspection Report Nos. 50 445/87-161 and 50-446/87-13.

Qttg Letter No.

Subiect 3/15/88 TXX-88308 Revised Date of Full Compliance This letter transmitted a revised date of full compliance for the NOV relating to Inspection Report Nos. 50-445/86-31 and 50 446/86-25.

Q111 Letter No.

Subiect 3/18/88 TXX 88325 Revised Response to Notice of Violation This letter transmitted a revised response for NOV Item B relating to Inspection Report Nos. 50 445/87-30 and 50 446/87-22.

Ella Letter No.

Subiect 3/18/88 TXX 88324 Revised Date of Full Compliance This letter transmitted a revised date of full compliance for NOV, Item B relating to inspection Report Nos. 50 445/87-31 and 50 446/87-23.

Q111 Letter No.

Sub.iect 3/21/88 TXX 88303 Response to Inspection Report -

Design Validation Program This letter transmitted a response to open items relating to Inspection Report Nos. 50 445/87-19 and 50 446/87-15.

Egli Letter No.

Subiect 3/24/88 TXX 88334 Response to Notice of Violation This letter transmitted a response to the NOV relating to Inspection Report Nos. 50-445/88 01 and 50 446/88 01.

Q111 Letter No.

Subiect 3/30/88 TXX-88352 Revised Date of Full Compliance This letter transmitted a revised date of full compliance for NOV, Item 1 relating to Inspection Report Nos. 50 445/87 27 and 50 446/87-20.

Q111 Letter No.

Subiect 3/30/88 TXX 88339 Revised Response to Notice of Violation This letter transmitted an updated response to NOV relating to Inspection Report Nos. 50 445/85-13 and 50 446/85 09. _

i QLtg Letter No.

Subiect 3/30/88 TXX 88366 Revised Date of Full Compliance This letter transmitted a revisad date of full compliance for NOV, Item A t

relating to Inspection Report Nos. 50 445/87-11 and 50 446/87 09.

Q11g Letter No.

Subiect 3/30/88 TXX 88316 Revised Date of Full Compliance This letter transmitted a revised date of full compliance for NOV, Item E (446/8602 V017) and Item C (446/8620-V 02) relating to Inspection Report Nos.

50 445/87 03, 50 446/86 02, 50 445/86 22 and 50 446/86 20.

Q31g letter No.

Sub.iect 3/31/88 TXX 88300 Response to Notice of Violation and Notice of Deviation This letter transmitted a response to the NOV and NOD relating to Inspection Report Nos. 50 445/88 05 and 50 446/88 04.

Ditt letter No.

Subiect 3/31/88 TXX 88367 Revised Response to Notice of Violation This letter transmitted a revised response to NOV, Item A (445/8731 V 01) relating to Inspection Report Nos. 50 445/87-31, and 50-446/87-23 and NOV (445/8735 V 02) relating to Inspection Report Nos. 50 445/87 35 and 50 446/87-26.

Q1tg Letter No.

Sub.iett 4/11/88 TXX 88332 Response to Open Items This letter transmitted a response to the Inspection Reports (50-445/87 37 and 50 446/87-28) issued for the CPSES Design Validation Program.

Responses were provided for open items in the area of Mechanical / Fluid Systems, Electrical, Systems Interaction Program, Civil / Structural and Instrumentation / Controls.

i 1

- 15.-

i i

l QAls Letter No.

Subject l

4/15/88 TXX 88394 Revised Date of Full Compliance j

This letter transmitted a revised date of full Compliance for NOV, Item A L

relating to Inspection Report Nos. 50 445/86 22 and 50 446/86 20.

QAli Letter No.

Subiect l

4/15/88 TXX 88395 Revised Date of Full Compliance

(

This letter transmitted a revised date of full compliance for NOV. Item B relating to Inspection Report Nos. 50 445/87 30 and 50 446/87 22.

P QLtg letter No.

Subject 4/15/88 TXX-88396 Response to Notice of Violation This letter transmitted a response to the NOV relating to Inspection Report Nos. 50 445/88 12 and 50 446/88 10.

i r

t I

i t

l l

i 16-l

CPRT/ CORRECTIVE ACTION PROGRAM The following correspondence was issued by Applicants to the NRC concerning CPRT and/or the Corrective Action Program during the time period of February 26, 1988 thru April 25, 1988:

DAlg letter No.

Sub.iect 7/8/87 TXX-6559 CPRT Results Report This letter transmitted an SRT approved CPRT Results Report for ISAP III.a.1 Hot Functional Testing, Rev. 1.

Rat.g letter No.

Sub.iect 10/5/87 TXX-6838 CPRT Results Report This letter transmitted an SRT approved CPRT Results Report for ISAP VI.b, Polar Crane Shimming.

Qalg Letter No.

Sub.iect 11/9/87 TXX-6943 CPRT Results Reports This letter transmitted SRT approved CPRT Results Reports for ISAP I.c, Train C Conduit and Supports, II.a, Reinforcing Steel in the Reactor Cavity and II.d. Seismic Design of Control Room Ceiling Elements.

DAlg letter No.

Sub.iect 1/18/88 TXX-88101 CPRT Results Report This letter transmitted SRT approved CPRT Results Reports for ISAP I.d.1, QC Inspector Qualifications and VII.b.3, Pipe Support Inspections.

l Ea_t.g letter No.

S,biect 2/8/88 TXX-88209 Project Status Report 1

j This letter transmitted copies of the Project Status Report for l

"Civil / Structural," Revision 0.

l l !

t

E!Lt1 Letter No.

Sub.iect 2/18/88 TXX-88247 Project Status Report This letter transmitted copies of the Project Status Report for "Heating, Ventilation and Air Conditioning (HVAC)", Rev. O.

Qitta Letter No.

Sub.iect 2/29/88 TXX-88269 CPRT Results Report and Collective Significance Report This letter transmitted copies of an SRT approved CPRT Results Report for ISAP VII.a.9, Adequacy of Purchased and Safety-Related Material and Equipment and the Collective Significance Report.

Qitta letter No.

Sub.iect 3/1/88 TXX-88284 Corrective Action Implementation This letter was submitted to status the implementation of certain corrective actions scheduled to be completed pursuant to the Post Construction Hardware Validation Program.

Qalt Letter No.

Subiect 3/14/88 TXX-88318 CPRT Results Reports Thisiettertransmittedinformationconcerningtheavailabilityofsupporting documentation for Results Report VII.a.9 and the Collective Significance Report.

Qitta letter No.

Sub.iect 1/16/88 TXX-88254 Corrective Action Program This letter transmitted information concerning design deficiencies identified in the Corrective Action Program.

Qitta Letter No.

Sub.iect 3/24/88 TXX-88340 Project Status Report This letter transmitted copies of the errata prepared for the Project Status Reports concerned with I.arga Bore Piping and Pipe Supports and Small Bore Piping and Pipe Supports. __

Q11g Letter No.

Subject 4/6/88 TXX-88379 Project Status Report This letter transmitted errata prepared for the Project Status Reports relating to Equipment Qualification and Electrical.

Q11g letter No.

Subject 4/8/88 TXX-88380 Project Status Report This letter transmitted copies of certain Project Status Reports to the Texas Department of Labor and Standards.

Q111 Letter No.

Subject 4/14/88 TXX-88373 Response to NRC Staff Requests This letter transmitted TV Electric's response to the NRC Stoff's request for an explanation of the applicability of the Corrective Action Program to CPSES Unit 2.

e l

l 19

INTERNAL AND TECHNICAL AUDITS The following internal and technical audit reports of CPSES Engineering and Construction activities were issued in the period from February 26, 1988 -

April 25, 1988:

Number:

ATP-88 77 Date:

1/6/88-2/4/88 Report Date:

2/25/88 Location:

SWEC - Boston /New York, IMPELL - Ft. Worth /CPSES Scope:

Verification and technical evaluation of design validation activity, including the resolution of generic issues, as related to feedwater and component cooling water systems.

Number:

ATP-88 82 Date:

2/9/88-2/15/88 Report Date:

3/1/88 Location:

IMPELL - CPSES Scope:

Verification and technical evaluation of the IMPELL design validation activities in the area of Fire Protection - Fire Seai Program.

Number:

ATP-88-83 Date:

2/8/88-2/12/88 Report Date:

2/26/88 Scope:

Verification and Technical evaluation of design validat'e <

activities, including the resolution of generic issues, in the area of Conduit Supports, Trains A, B, and C > 2".

Number:

ATP-88-84 Date:

2/22/88-3/14/88 Report Date:

3/17/88 Location:

SWEC Boston Scope:

Verification and technical evaluation of design validation activities, including the resolution of generic issues, in the area of Mechancial/ Nuclear..

Number:

ATP-88-85 Date:

2/22/88-2/26/88 Report Date:

3/11/88 Location:

EBASCO - New York Scope:

Verification and technical evaluation of design validation activities, including the resolution of generic issues, in the area of Cable Tray Supports.

Number:

ATP-88-86 Date:

2/17/88-2/25/88 Report Date:

3/11/88 Location:

SWEC-Boston Scope:

Verification and technical evaluation of design validation activities, including the resolution of generic issues, in the area of Instrumentation and Controls.

Number:

ATP-88-90 Date:

3/16/88-3/22/88 Report Date:

4/8/88 Location:

SWEC - Boston Scope:

Verification and technical evaluation of design validation activities, includir.g the resolution of generic issues, being performed by SWEC on-site ht CPSES in the area of Instrumentation and Controls.

Number:

ATP-88-91 Date:

3/17/88-3/25/88 Report Date:

4/8/88 Location:

EBASCO - CPSES l

Scope:

Verification and technical evaluation of design validation activities, including the resolution of generic issues, in the area of Fire Protection - Fire Damper System.

Number:

ATP-88-93

(

Date:

3/28/88-4/1/88 Report Date:

4/19/88 Location:

SWEC - Cherry Hill, N. J.

l Scope:

Verification and technical evaluation of design validation l

activities, including the resolution of generic issues, in the area of Moment Restraints and Integral Welded Attachments (PSAS).

l l l l

~.

Number:

ATP-88-94 Date:

3/23/88-3/31/88 Report Date:

4/19/88 Location:

IMPELL - Ft. Worth, Tx Scope:

Verification and technical evaluation of design validation activities, including the resolution of generic issues, in the area of Environmental Equipment Qualification.

Number:

TCP-87-44 Name:

Measuring and Test Equipment Date:

11/23-30/87 Report Date:

12/13/87 Scope:

TV Electric QA audit TCP-87-44 was performed on November 23-30, 1987, at Comanche Peak Steam Electric Station, to verify the implementation of the Construction Measuring and Test Equipment (M&TE) Program.

This review included verification of both supervisory and technical personnel's education and training, calibration records, equipment storage, calibration methods / procedures, and the control process for nonconforming M&TE.

Number:

TCP-87-46 Name:

Preservice Inspection Unit 2 Date:

12/7-9/87 Report Date:

12/16/87 Scope:

TV Electric QA Audit TCP-87-46, was performed on December 7-9, 1987, at CPSES, to verify the implementation of the Section XI Preservice Inspection (PSI) Program.

This review included Westinghouse NDE personnel qualification, Westinghouse NDE procedure qualification, PSI Plan review and approval, document control, QC surveillance, records control, organization, Plan compliances to ASME Section XI, and relief requests.

Number:

TCP-87-47 Name:

Interim Records Vault / Permanent Plant Records Vault Date:

11/9-12/87 Report Date:

12/10/97 Scope:

Audit TCP-87-47 was conducted to assure program compliance to applicable codes and standards and to verify procedural implementation for QA Record retention and storage. The audit was conducted in the Interim Record Vault and Permanent Plant Record Vault facilities starting November 9 and continuing through November 12, 1987. The audited organization was Management Systems in the areas of record control, storage and training. Also included, was the follow up of Records Surveillance as a condition of closure of Deficiency No. 2 of audit TCP-86-42, the previous audit of the Permanent Plant Records Vault. _

Number:

TCP-88-02 Name:

CTH Post Construction Hardware Validation Program Unit 1 Cable Tray Hanger (CTH) As-Building Program Date:

2/1-19/88 Report Date:

3/8/88 Scope:

TV Electric QA Audit, TCP-88-02, was preformed February 1-19, 1988 at Comanche Peak Steam Electric Station, to assess the adequacy and implementation of the Post Construction Hardware Validation Program (PCHVP) and related Unit 1 Cable Tray Hanger (CTH) As-Building Program. The audit scope consisted of the following aspects:

program, organizational interfaces, engineering walkdowns, Preliminary As-Built Drawings (PAB), Final As-Built Drawings, QC As-Built / Modification Inspections, training and certification of QC personnel, CTH Traveler Packages and field observations of the final As-Built Installations.

Number:

TCP-88-03 Name:

ASME Pipe / Supports Installation / Inspection Date:

2/1-5/88 Report Date:

2/23/88 Scope:

TV Electric QA Audit, TCP-88-03 was performed February 1-5, 1988 at CPSES, to verify the implementation of Brown & Root ASME Pipe / Supports Installation / Inspection Program.

This audit included the review of Service Water System ASME Piping and Supports Packages for proper control of material identification / traceability, Multiple / Weld Data Cards, Repair Process Sheets, Welder Qualification, Weld Technique Sheets, Liquid Penetrant Examination Reports, Magnetic Particle Examination Reports, and Training Records for NDE/QC personnel.

In addition, Weld Filler Material Issue Stations, Field Configuration / dimensions and Record Storage were also checked for adequate control.

Number:

TCP-88-04 Name:

SPADU Program (Procedures) l Date:

1/15-24/88 Report Date:

4/4/88 Scope:

TV Electric QA Audit, TCP-88-04 was performed on February 15-24, 1988 at CPSES, to assure that procedure revisions reflect revised specification commitments resulting from the Specification, Procedure and Drawing Update (SPADU) Program.

The defined scope of l

Audit TCP-88-04 addresses only the activities directed at procedural technical reviews and procedure updating when impacted by relative specification changes or revision.

l.

Number:

TCP-88-05 Name:

TV Electric and Site Subcontractors (Engineering &

Construction) Design Control Criteria III (10CFR50 Appendix B)

Program Date:

2/22-3/1/88 Report Date:

3/8/88 Scope:

TV Electric QA Audit, TCP-88-05, was preformed February 22-March 1, 1988 to verify the adequacy of TV Electric and Site Subcontractors (Engineering and Construction) documented programs concerning Design Control (Criterion III) of 10CFR50 Appendix B.

Included in the audit scope was the review of QA Manuals / Plans and Design Interfaces.

Number:

TCP-88-06 Name:

Instrumentation and Controls Program Date:

2/22-29/88 Report Date:

3/22/88 Scope:

TV Electric QA Audit, TCP-88-06 was performed February 22-29, 1988 at Comanche Peak Steam Electric Station, to verify implementation of the Instrumentation and Controls (I&C) Program. The scope included organization, training, records, M&TE, material control, NCR/DR Reporting, and procedure compliance to design specifications.

Number:

TCP-88-08 Name:

Comanche Peak Engineering Design Control Date:

2/29-3/22/88 Report Date:

4/23/88 Scope':

The purpose of this audit was to verify adequacy of the TV Electric Comanche Peak Engineering (CPE) Design Control Program and Procedures for assumption of design and design control activities.

Adequacy was assessed for compliance with requirements of ANSI N45.2.ll, Draft 2, Rev. 2-1973 and ANSI N45.2.ll-1974 as applicable for Comanche Peak Steam Electric Station (CPSES) Construction and Operational Phase. Additionally, a sample of current CPE design / design control activities was audited to verify adequacy and compliance with applicable procedures.

Number:

TCP-88-10 l

Name:

Commitment Tracking System Program Review and Evaluation Date:

3/7-10/88 Report Date:

3/31/88 Scope:

TV Electric QA Audit, TCP-88-10, was preformed March 7-10, 1988 at Comanche Peak Steam Electric Station, to review and evaluate the Commitment Tracking Program as it relates to the identification, i

assignment, tracking and dispositioning of commitments.

l l '

l l

l l

(

- - =

Number:

TIN-87-02 Name:

Vendor Compliance Date:

12/2-3/87 Report Date:

12/13/87 Scope:

TU Electric QA Audit, TIN-87-02, was performed December 2-3, 1987, at CPSES, to verify the adequacy and implementation of the Vendor Compliance Program. This review consisted of verification of organization, training, audit reporting and formatting, Vendor QA Manual reviews, Vendor Evaluations, Pre-Award Surveys, Vendor Inspection Checklists, Vendor Information Notices (VIN's), and Vendor Branch Reports (VPB's).

Number:

TSU-87-02 Name:

Startup Testing Date:

11/30-12/7/87 Report Date:

12/18/87 Scope:

TV Electric QA Audit, TSU-87-02 was performed November 30 thru December 4, 1987 at Comanche Peak Steam Electric Station to verify the implementation and compliance of the Startup Test Program to site requirements.

Included in this audit were instructions, procedures, document control, records, system status, control of M&TE and personnel training. The audit team reviewed two (2)

Special Performance Tests of Unit 1 Diesel Generators, one (1) Flush Plan for Component Cooling Water Unit 2 and Lube Oil System, Unit 2 Diesel Generator.

Number:

TUG-87-26 Name:~

Corrective Action Date:

10/26-11/13/87 Report Date:

12/12/87 Scope:

TV Electric QA Audit, TUG-87-26, was performed on October 26 thru November 13, 1987, at CPSES to evaluate the program for Currective Action and verify the implementation of this program.,

Number:

TUG-87 27 Name:

Emergency Plan Date:

10/30-11/18/87 Report Date:

12/17/87 Scope:

TV Electric QA audit TUG-87-27 was performed on October 30-November 18, 1987 at CPSES to verify implementation and readiness of the Stations Emergency Plan and Emergency Plan Procedures. The audit was conducted in accordance with the requirements of Emergency Planning as set forth in 10CFR50 Appendix E titled "Emergency Planning and Preparedness for Production and Utilization Facilities" and NUREG 0654 titled, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants".

Number:

TUG-88-01 Name:

Procurement Date:

01/11-2/10/88 Report Date:

3/1/88 Scope:

TV Electric QA Audit, TUG-88-01, was performed January 11 -

February 10, 1988, at Comanche Peak Steam Electric Station, to verify the implementation and adequacy of the CPSES Procurement Program. The Scope of this audit included the following program aspects:

Procurement document review / approval, records control, i

organization, receiving inspection, personnel training and qualification, item substation, vendor document sut,mittal requirements, and procurement specifications.

This audit also included verification of corrective action implementation for audit TIN-86-03, Deficiency No. PR-2, and implementation of the commitments made by CPSES as a result of NRC Generic Letter 83-28 "Vendor Interface".

O Number:

TUG-88-05 Name:

Fire Protection Date:

2/15-26/88 Report Date:

3/17/88 Scope:

TV Electric QA Audit, TUG 88-05, was performed on February 15-26, 1988 to verify programmatic controls and implementation of the Fire Protection Program.

The audit was conducted in accordance with the requirements of the Branch Technical Position, APCSB 9.5-1 with the exceptions as set forth in the CPSES FSAR (Final Safety Analysis Report, through amendment 66 dated January 15,1988) and NRC Generic Letter 82-21 titled "Technical Specification for Fire Protection Audits". The CPSES Technical Specification requirement 6.5.2.8(F), to utilize the services of a i

certified Fire Protection Engineer or consultant every third year, i

were met by adding an independent consultant, R. E. Berry, FPE, to the audit team.

l {

MISCELLANEOUS The following additional correspondence was issued by Applicants to the NRC during the time period of February 26, 1988 - April 25, 1988:

Djtte Letter No.

Sub.iect 10/30/87 TXX-6905 Proposed Changes to Technical Specifications This letter transmitted plant specific proposed changes to the Standard Technical Specifications.

Djtt.g Letter No.

Sub.iect 11/20/87 TXX-6912 FSAR Amendment 65 This letter transmitted a description of FSAR Amendment 65.

Djti.g Letter No.

Sub.iect 1/7/88 TXX-88045 F0!A-87-231 This letter transmitted the TV Electric response to F01A-87-231.

D.iljt Letter No.

Sub.iect 1/12/88 TXX 88085 Fire Fighting Training This letter transmitted the quarterly summary of fire fighting training activities.

DjLtft letter No.

Sub.iect 1/19/88 TXX-88087 FSAR Amendment 67 This letter transmitted advance draft copies of FSAR Amendment 67 changes' Djlte Letter No.

Sub.iec t 2/5/88 TXX-88193 NRC Compliance Bulletin 87-02 This letter transmitted responses requested by NRC Compliance Bulletin 87-02.._.

Qalg Letter No.

Subiect 2/5/88 TXX-88200 FSAR Amendment 68 This letter transmitted advanced copies of FSAR Amendment 68 changes.

Qalg letter No.

Subiect 2/11/88 TXX-88223 NRC Bulletin 87-02 This letter transmitted a response to NRC Compliance Bulletin 87-02.

Q11g Letter No.

Sub.iect 2/12/88 TXX-88210 DOE Form EIA-254 This letter transmitted a completed DOE Form EIA-254, "Semiannual Report on Status of Reactor Construction".

Q11g letter No.

Subiect 2/12/88 TXX-88216 6M6 Pressurizer Safety Valve Internals This letter transmitted a TV Electric commitment to perform certain inspections of the Crosby 6M6 pressurizer safety valve internals.

Q11g Letter No.

Sub.iect 2/15/88 TXX-88229 FSAR Amendment 68 This letter transmitted a description of FSAR Amendment 68.

Q11g Letter No.

Sub.iect 2/16/88 TXX-88232 Emergency Plan Procedures This letter transmitted revised Emergency Plan Procedures for CPSES.

Q;is Letter No.

Subiect 2/18/88 TXX-88227 Jet Impingement Analyses This letter transmitted a Jet Impingement Analyses performed by TV Electric..

QAlg Letter No.

Sub.iect 2/26/88 TXX-88245 Nuclear Material License This letter transmitted information regarding fuel shipment pursuant to Special Nuclear Material License No. SNM-1912.

Dalt Letter No.

Sub.iect 3/1/88 TXX-88262 Enforcement Action (EA) 86-09 This letter transmitted a revised response to EA 86-09.

Dal; Letter No.

Sub.iect 3/4/88 TXX-88285 Construction Permit Amendment Operating License Amendment This letter transmitted a request to amend construction permit Nos. CPPR-126 and CPPR-122 and the Application for an Operating License to reflect a reallocation of ownership interests in CPSES.

Qalq Letter No.

Sub.iect 3/11/88 TXX-88282 Jet Impingement Analyses This letter transmitted information regarding a Jet Impingement Analysis prepared by TV Electric.

QLtg Letter No.

Sub.iect 3/15/88 TXX-88306 Steam Generator Tube Rupture Analysis This letter transmitted a study entitled "Design Basis Analysis of a Postulated Steam Generator Tube Rupture Event for Comanche Peak Steam Electric Station, Unit 1."

Data letter Not Subiect 3/18/88 TXX-88327 1988 Emergency Field Exercise This letter transmitted scheduling information regarding the 1988 Emergency Field Exercise..

QLta Letter No.

Sub.iect 3/18/88 TXX-88326 1988 Emergency Field Exercise This letter transmitted scheduling information regarding the 1988 Emergency Field Exercise.

Q11g Letter No.

Sub.iect 3/18/88 TXX-88248 FSAR Amendment 69 This letter transmitted a description of FSAR Amendment 69.

Q111 Letter No.

Sub.iect 3/18/88 TXX-88281 AMSAC Report Response This letter transmitted a clarification to a previous AMSAC SER Evaluation Report response.

Data letter No.

Subiect 3/23/88 TXX-88330 NRC Bulletin 88-02 This letter transmitted the TV Electric response to NRC Bulletin 88-02 "Rapidly Propagating Fatigue Cracks in Steam Generator Tubes".

Ditg Letter No.

Sub.iect 3/25/88 TXX-88338 Safety Issues Management System This letter transmitted information relative to the NRC's Safety Issues Management System.

Data letter No.

Sub.iect 3/25/88 TXX-88294 Response to NRC Technical Concerns This letter transmitted a TV Electric response to NRC Staff technical concerns and allegations in the area of electrical / instrumentation and civil / structural.

Ritta letter No.

Subiect 3/25/88 TXX-88302 Special Nuclear Material License This letter transmitted a request for amendment to Special Nuclear Material License No. SNM-1912 and the application for Special Nuclear Material License for Unit 2.

Eitta Letter No.

Sub.iect 3/25/88 TXX-88345 Technical Specifications This letter transmitted a schedule for the review of draft technical specifications for CPSES.

E!Lta letter h Sub.iect 3/28/88 TXX-88342 Jet Impingement Analyses This letter transmitted information regarding the performance of the CPSES jet impingement analyses.

Ritt_q Letter No.

Sub.iect 3/28/88 TXX-88341 Generator Tube Vibration Instrumentation This letter transmitted information providing the justification for the removal of the tube vibration instrumentation installed in the CPSES Unit 1 Steam Generators as part of the vibration test program.

Qit.tg Letter No.

Sub.iect 3/31/88 TXX-88365 Amendment of Construction Permit This letter transmitted information relating to TV Electric's request to amend the CPSES Construction Permits and the Application for an Operating License.

Qit.a letter No.

Sub.iect t

4/4/88 TXX-88315 Pipe Support Allegations This letter transmitted the results of an investigation into anonymous pipe support allegations.

l

l

Qala Letter No.

Subiect 4/8/88 TXX-88377 Westinghouse Circuit Breakers This letter transmitted the TV Electric response to NRC Bulletin 88-01 concerning defects in Westinghouse Circuit Breakers.

Qalg Letter No.

Sub.iect 4/8/88 TXX-88381 IE Bulletin 85-03 This letter transmitted the TV Electric response to NRC's request for additional information relating to IE Bulletin 85-03.

Hala Letter No.

Sub.iect 4/11/88 TXX-88372 Generic letter 83-28 This letter transmitted additional information concerning the CPSES Vendor Interface Program and responding, in part, to Generic Letter 83-28.

Qalg Letter No.

Sub.iect 4/15/88 TXX-88382 Whipjet' Program Report This letter transmitted the "CPSES-1 Whipjet Program Report" to the NRC.

O OTHER On behalf of TV Electric, R. A. Wooldridge has submitted various documents to the ASLB for their information.

These documents include the following for the time period of February 26, 1988 - April 25, 1988:

2/29/88 Notification of transmittal of approved Results Report for ISAP VII.a.9, Adequacy of Purchased and Safety-Related Material and Equipment and the Collective Significance Report.

3/14/88 Transmittal of information updating the letter originally submitting Results Report VII.a.9 and the Collective Significance Report.

3/17/88 Notification of the transmittal of errata prepared for Project Status Reports relating to "Cable Tray and Cable Tray Hangers," "Conduit Supports Train C 2 Inch Diameter and Less", and "Conduit Supports Trains A and B, and Train C Larger Than 2 Inch Diameter".

3/18/88 Notification of the transmittal of errata prepared in connection with Project Status Reports relating to "Large Bore Piping and Pipe Supports" and "Small Bore Piping and Pipe Supports."

3/24/88 Transmittal of excerpts from the Form 10-K filed with the Securities and Exchange Commission.

4/6/88 Notification of the transmittal of errata prepared for the Project Status Reports relating to "Equipment Qualification" and "Electrical". )

The following reports were issued by the CPRT Overview Quality Team (0QT) during the time period of February 26, 1988 - April 25, 1988.

3/22/88 Internal Memo from J. V. Neely to J. W. Beck transmitting a report entitled "Follow Up on 0QT Final Report Recommendations.

The following listing represents the consultants' reports received by CPSES Engineering during the time period of February 26, 1988 - April 25, 1988:

Investigation of Weld Quality for Safety Related Pipe Supports.

Project Status Report for Civil / Structural CPSES - Unit 1.

Project Status Report for HVAC.

Backup meteorological Tower Representatives analysis.

Final Report.

Project Status Report Errata Sheets for equipment qualification, conduit supports for Train C 2" diameter and less, conduit and cable tray hangers.

Specific Technical Issue Report for Cable Tension Evaluation -

CPSES - Unit I and 2 Corrosion Evaluation - Station Service Water System - CPSES -

Unit 1.._

UNITED STATES OF AMERICA NUCLEARREGULATORYCOMM before the

$$ -8 N (4

tch ATOMIC SAFETY AND LICENSING BO D

g N

)

In the Matter of

)

Docket Nos. 50-445-OL

)

50-446-OL TEXAS UTILITIES ELECTRIC

)

COMPANY et al.

)

)

(Application for an (Comanche Peak Steam Electric

)

Operating License)

Station, Units 1 and 2)

)

)

CERTIFICATE OF SERVICE I, Thomas A.

Schmutz, hereby cortify that the fore-going Applicants' Eleventh Progress Report was served this 3rd day of May 1988, by mailing copies thereof (unless otherwise inditated), first class mail, postage prepaid to:

  • Peter B.

Bloch, Esquire

  • Adjudicatory File Chairman Atomic Safety and Licensing Atomic Safety and Licensing Board Panel Docket Board U.S. Nuclear Regulatory U.S. Nuclear Regulatory Commission Commission Washington, D.C.

20555 Washington, D.C.

20555 Assistant Director for

  • Alan S.

Rosenthal, Esq.

Inspection Programs Chairman Comanche Peak Project Division Atomic Safety and Licensing U.S.

Nuclear Regulatory Appeal Panel Commission U.S. Nuclear Regulatory P.O. Box 1029 Commission Granbury, TX 76048 Washington, D.C.

20555

  • /

Asterisk indicates service by hand or overnight courier.

9.

  • Juanita Ellis Robert D.

Martin President, CASE Regional Administrator, 1426 South Polk Street Region IV Dallas, TX 75224 U.S.

Nuclear Regulatory Commission William R.

Burchette, Esquire 611 Ryan Plaza Drive Heron, Burchette, Ruckert, Suite 1000

& Rothwell Arlington, Texas 76011 Suite 700 1025 Thomas Jefferson St.,

Washington, D.C.

20007 N.W.

Dr. Kenneth A. McCollom Administrative Judge 1107 West Knapp

  • William L.

Clements Stillwater, Oklahoma 74075 Docketing & Service Branch U.S.

Nuclear Regulatory Joseph Gallo, Esquire Commission Hopkins & Sutter Washington, D.C.

20555 Suite 1250 1050 Connecticut Avenue, N.W.

20036 Government Accountability Project

  • Janice E. Moore, Esquire Midwest Office Office of the General Counsel 104 E. Wisconsin Avenue - B U.S. Nuclear Regulatory Appleton, WI 54911-4897 Commission Washington, D.C.

20555 Susan M. Theisen, Esquire Assistant Attorney General

  • Anthony Roisman, Esquire Attorney General of Texas 1401 New York Avenue, N.W.

Environmental Protection Division Suite 600 P.O.* Box 12 54 8 Washington, D.C.

20005 Austin, Texas 78711-1548 Lanny A.

Sinkin Robert A.

Jablon, Esquire Christic Institute Spiegel & McDiarmid 1324 North Capitol Street 1350 New York Avenue, N.W.

Washington, D.C.

20002 Washington, D.C.

20005-4798 Nancy Williams

  • Elizabeth B. Johnson CYGNA Energy Services, Inc.

Oak Ridge National Laboratory 2121 N. California Blvd.

P.O.

Box X Building 3500 Suite 390 Oak Ridge, Tennessea 37830 Walnut Creek, CA 94596

~

  • Dr. Walter H. Jordan David R.

Pigott 881 West Outer Drive Orrick, Herrington & Sutcliffe Oak Ridge, Tennessee 37830 600 Montgomery Street San Francisco, CA 94111

y..-
  • Robert-A. Wooldridge, Esquire Worsham, Forsythe, Sampels

& Wooldridge 2001 Bryan' Tower, Suite 3200 Dallas, Texas 75201

  • W.

G.

Counsil Executive Vice President Texas Utilities Electric -

i Generating Division 400 N. Olive, L.B.

81 Dallas, Texas 75201 Thomas A. Schmutz

(/

Dated:

May 3, 1988 t