Forwards Rev 9 to Inservice Insp Program,Consisting of Description,Program & Exam Schedule.Rept Submitted Due to Facility Mods & NRC Approval of Amend 99 to Facility Tech Specs.W/57 Oversize Drawings.Fee Paid
ML20235A243
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 07/01/1987
From: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20235A246 List: ... further results
References
FVY-87-72, NUDOCS 8707080370
Download: ML20235A243 (1)


Text

i VERMONT YANKEE NUCLEAR POWER CORPORATION RD 5, Box 169, Ferry Road, Brattleboro, VT 05301 ,g,,y 7, g ENGINEERING OFFICE 1671 WORCESTER ROAD -

  • FRAMINGHAM, MASSACHUSETTS 01701 July 1, 1987 TELEPHONE 617-872-6100 U.S. Nuclear Regulatory Commission FVY 87-72 Washington, D.C. 20555 Attn: Office of Nuclear Reactor Regulation Operating Branch #2 I Division of Licensing References a) License No. OPR-28 (Docket No. 50-271) .

l b) Code of Federal Regulations, Title 10 Chapter 1, Part 50, Section 50.55a c) ASME Section XI, 1980 Edition through the Winter 1980 Addenda d) ASME Section XI, 1974 Edition through the Summer 1975 Addenda e) Letter, VYNPC to USNRC, FVY.84-139, dated 11/27/84, Vermont Yankee Inservice Inspection Program Code Inspections

Dear Sir:

Subject:

Inservice Inspection Program, Revision 9 As required by 10CFR50.55a(g)(5)(i) and (iii), we are submitting herewith information supplementing Reference e). Revision of this second 120-month inspection interval program is necessary due to extensive facility modifi-cations and NRC approval of Amendment #99 to the Vermont Yankee Technical Specifications. Further identification and description of specific changes are provided in the preface to the subject document. This revised program has been developed in accordance with Reference b) to meet the requirements of Reference c) and, where appicable, Reference d). Changes to the program will be-submitted j for NRC approval prior to implementation only in the event that such changes constitute further exemptions under 10CFR50.55a(g)(5)(iii).

In accordance with the provisions of 10CFR170.12, an application fee of

$150 is enclosed.

We trust that the information contained in this submittal will be satisfac-tory; however, should you have any questions or require additional information, please contact us, h Very truly yours, L4> VERMONT YAN ENUCgEARPOWERCORPORATION 0 *[M O ' '

g f 5 Warren P. Murphy I

/dm h

\g

, Vice President and Manager of Operations

\ 8707080370 870701 PDR ADOCK 05000271 G PDR