IR 05000382/1998010

From kanterella
Revision as of 05:45, 20 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Insp Rept 50-382/98-10 on 980622-26.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Access Authorization,Alarm Stations,Protected Area Access Control of Personnel & Packages & Vehicles
ML20236S400
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/20/1998
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML19044A082 List:
References
50-382-98-10, NUDOCS 9807240313
Download: ML20236S400 (12)


Text

_ _ _ _ - .____ _ - _ _ _

.

ENCLOSURE U.S. NUCLEAR REGULATORY COMMISSION

REGION IV

Docket No.: 50-382 License No.: NPF-38 ID Report No.: 50-382/98 #

Licensee: Entergy Operations, In Facility: Waterford Steam Electric Station, Unit 3 Location: Hwy.18 Killona, Louisiana Dates: June 22-26,1998 Inspector: Thomas W. Dexter, Senior Physical Security Specialist Plant Support Branch Approved By: Blaine Murray, Chief, Plant Support Branch Division Reactor Safety Attachment: Supplemental information

l 9907240313 990720 I PDR ADOCK 05000382 C G pm g

. _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _

.

.

-2-EXECUTIVE SUMMARY Waterford Steam Electric Station, Unit 3 NRC Inspection Report 50-382/98-10 This was an announced inspection of the licensee's physical security program. The areas inspected included access authorization, alarm stations, protected area access control of personnel, packages and vehicles, testing and maintenance, security program plans and procedures, security event logs, management support. management effectiveness, fitness-for-duty program, and followup of open items. Overall performance in the security area was effectiv Plant Succort j f

- Performance in the physical security area was good with improvements noted in several '

areas. Adequate compensatory measures were implemented to maintain the ,

redvadancy and protection of alarm stations during the installation of the new security j computer. Alarm station operators were alert and effectively trained. Security events  !

were correctly reported. The logs and supporting reports were neat and contained sufficient detail for the reviewer to determine root cause, deportability, and corrective j action taken. Senior management support for the security organization was good. New l X-ray machine video monitors were purchased, a new security computer was being I installed, the access authorization and fitness-for-duty physical facilities were being remodeled, and security staffing was maintained at a proper level. An effective program had been established for the timely deactivation of key cards following termination of an individual (Sections S1.1,1.2,1.3, and 6.1).

+ Concerns were identified in two recently revised procedures. Compensatory measures procedures for a degraded vehicle barrier did not specify the type of weapon a compensatory officer must have. The patrol tours procedure only defined a watch tour but discussed protected and vital area patrol tours (Sections 3.1 and 3.2).

- The security program was adequately managed. Due to a refueling outage and j'

equipment problems, overtime hours worked by security officers averaged over 14 percent a month for the past 6 months. The licensee's on-shift staffing was properly maintained (Section S6.2 and 6.3).

. Testing and maintenance of the security equipment were excellent. The individual conducting the tests was knowledgeable of the testing procedures and conducted performance-based tests (Section S2.1).

l l

- An effectively fitnew Sr-duty program was in place. The specimen collection facility was l well maintained and proper procedures were in place that prevented circumventing of

'

tests with false specimens. The licensee's fitness-for-duty procedures were comprehensive and thorough (Section S8.1).

I i

i

__ __ ____ _________ _ _________ _ _ _ __ __ _

.

l

.

-3-Report Details IV. Plant Support S1 Conduct of Security and Safeguards Activities S Access Authorization l insoection Scone (81700-02.01)

l-

The Access Authorization Program was inspected to determine compliance with the requirements of the security pla Observations and Findinos The inspector revieweci the records on 14 individuals who had recently terminated their employment with the licensee or contractors. The inspector also conducted interviews of the Access Authorization Program staff to determine the adequacy of the program. The 14 files reviewed were complete and thorough. The licensee's program for deactivating key cards following termination of an individual was effectively manage Conclusions

<

The Access Authorization Program was being effectively managed. An effective procedure had been established for the timely deactivation of key cards following termination of an individua S1.2 Alarm stations Insoection Scope (81700-02.01)

The alarm stations were inspected to determine compliance with the security plan. The areas inspected included capabilities of the alarm stations, redundancy and diversity of alarm stations, protection of alarm stations, and systems securit Observations and Findinos The licensee was in the process of installing a new security computer. This required the establishment of a temporary, secondary alarm station to maintain the redundancy and diversity of the alarm stations. Redundancy ensured that action by one alarm station operator could not reduce the effectiveness of the security' systems without the knowledge of the other alarm station operator. The inspector observed the temporary, I secondary alarm station, operation, equipment, and location within the plant and determined that the licensee was meeting the requirements of the physical security pla The inspector questioned station operators and determined that they were properly trained and knowledgeable of their duties.

l

- _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ . _ _ _ _ _ _ _ _ .

.

.

-4- Conclusions The licensee had implemented adequate compensatory measures to maintain the redundancy and protection of alarm stations during the installation of the new security computer. Alarm station operators were alert and effectively traine S Protected Area Access Control of Personnel. Packaaes. and Vehicles Insoection Scone (81700-02.01)

The access control program for personnel packages ano vehicles were inspected to determine compliance with the requirements of the security pla Observations and Findi_n_gs

- The inspector determined through observations at the primary access facility and at the vehicle sallyport that the licensee properly controlled personnel, package, and vehicle access to the protected area. Access control equipment used to search personnel was inspected and found to be functional and effectively maintained. The inspector also olaerved use of the X-ray machine used to search packages and material at the primary access facility. Security equipment operators demonstrated good knowledge of their dutie Conclusions Access control equipment used to search personnel was inspected and found to be functional and effectively maintained. Security equipment operators demonstrated good knowledge of their dutie S2 Status of Security 7acilities and Equipment S2,1 Testina and Maintenance (81700-02.07) Insoectica Scoce The inspector reviewed testing of access control equipment to determine compliance with the requirements of the security pla Observations and Findinas I

The inspector observed the licensee conducted testing of the explosive detectors, metal

, detectors, and the X-ray machine at the protected area primary access facility. The j

! individual conducting the tests was knowledgeable of the testing procedures and conducted performance-based tests. One metal detector, in stand-by status, did not detect the test device on the first pass through, but several other attempts to defeat the detector were unsuccessful. A repair request was written for the detector. The metal detector was not in use at the time of this inspection and had been successfully tested on u__ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - - - - - _ _ - - - -- - - - - - - - - - - - - -

_ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ - _ _

.

'.

-5-June 26,1998. Testing and maintenance of the access control equipment were a program strengt Conclusions Testing and maintenance of the security equipment were excellent. The individual conducting the tests was knowledgeable of the testing procedures and conducted performance-based test S3 Security and Safeguards Procedures and Documentation

'

S Security Proaram Plans and Procedures i a, insoection Scooe (81700-02.03)

' The physical security plan and the implementing procedures were inspected to determine compliance with the requirements of 10 CFR 50.54(p) and the physical security pla Observations and Findinas The inspector determined that previous plan changes were submitted within the required time frame submitted changes submitted did not reduce the effectiveness of the pla The inspector reviewed implementing procedures for adequacy, ensured that the

'

licensee maintained an effective management system for the development and of procedures, and that procedure changes did not reduce the effectiveness of the security progra Two minor concerns were identified regarding recently revised procedures. First, the procedure identifying compensatory measures for a degraded vehicle barrier did not i

specify the type of weapon a compensatory officer should carry. Second, the procedure that provided direction for conducting protected and vital area patrol tours was confusing because the procedure only defined a " watch tour," but the procedure discussed protected and vital area patrol tours. The licensee corrected both procedures prior to completion of the inspectio ' C&Drdulloff Changes to security programs and plans were reported within the required time fram Two minor concerns were identified in recently revised procedures. The procedure identifying compensatory measures for a degraded vehicle barrier did not specify the type of weapon a compensatory officer must have, and the procedure for conducting patrol tours only def.ned a watch tour, but discussed prviected and vital area patrol tours.

l

_ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ . _ _ . . _ . _ _ _ _ _ _

- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ ____

_

.

-6-S3.2 Security Event Logs Insoection Scoce (81700-02.03)

The inspector reviewed safeguards event logs and security incident reports to determine compliance with the requirements of 10 CFR 73.21(b) and (c),10 CFR 26.73, and the physical security pla Observations and Findings The inspector reviewed the security event logs entries for the period February 1 through June 15,1998. The records were available for review and maintained for the time required by regulations. The inspector determined that the licensee conformed to the regulatory requirements regarding the reporting of security events. The inspector also reviewed security incident reports and licensee security condition reports. The logs and supporting reports were neat and contained sufficient detail for the reviewer to determine root cause, deportability and corrective action take Conclusions A good security event reporting program was in place. The security staff was correctly reporting security events. The logs and supporting reports were neat and contained sufficient detail for the reviewer to determine root cause, deportability, and corrective action take S6 Security Organization and Administration S Management Sucoort Insoection Scooe (81700-02.06)

The effectiveness and adequacy of management support for the physical security program were inspecte Observations and Findinas The inspector determined by discussions with security force personnel that the security program received good support from senior management. New X-ray machine video monitors were purchased. A new security computer was being installed, the access authorization and fitness-for-duty facilities were being remodeled, and security staffing was maintained at a proper level. The inspector determined that the security program was implemented by a trained and qualified security staf Conclusions Senior management support for the security organization was good. New X-ray machine video monitors were purchased, a new secunty computer was being installed, the access

,

.

-7-authorization and fitness-for-duty facilities'were being remodeled, and security staffing l was maintained at a proper leve l S6.2 Manaaement Effectiveness Insoection Scooe (81700-02.06 The effectiveness and adequacy of the security managament staffs administration of the security program were evaluate Discussion

!

Management effectiveness of the security organization was adequate. The inspector !

determined that overtime hours worked by security officers had averaged over l 14 percent a month for the past 6 months. The overtime was caused by a refueling outage and compensatory posting for equipment repairs. Overtime may continue to be i over 14 percent pending completion of the new security computer installatio Conclusion The security program was adequately managed. Due to a refueling outage and equipment problems, overtime hours worked by security officers averaged over 14 percent a month for the past 6 month S Staffina Leysis I Insoection Scooe (81700-02.06)

The inspector reviewed the total number of trained security officers and armed personnel immediately available at the facility met response requirements in the physical security plan, Observations and Findinas The inspector determined from discussions with security supervisors and reviewing the security shift personnel rosters that there was an adequate number of security officers available to meet the number specified in the physical security pla Conclusion i i

The licensee's on-shift security staffing was properly maintaine l l

L__________________- _ __ _ _ . _ _ _ _ .

l

_ _ _ _ _ _ _ _ .

( .

.

l -8-S8 Miscellaneous Security and Safeguards issues (92904)

S Fitness-for-Duty (81502) Insoection Scoce A review of the licensee's implementation of their fitness-for-duty program was conducted to determine compliance with the 10 CFR Part 2 Observations and Findinas The inspector toured the fitness-for-duty testing facility, reviewed procedures, and interviewed the individual on duty at the facility. The licensee's fitness-for-duty facility was being renovated during the inspection. The inspector determined by observation that the licensee's collection facility was operated in accordance with 10 CFR Part 26. Precautions had been implemented that prevented circumventing the tests with false specimens. The licensee's fitness-for-duty procedures were comprehensive and thoroug Conclusions An effective fitness-for-duty program was in place. The specimen collection facility was well maintained, and proper procedures were in place that prevented circumventing of tests with false specimens. The fitness-for-duty procedures were comprehensive and thoroug S8.2 (Closed) Insoection Followuo item 382/9719-01: Blast analysis On fuel handling buildin During a previous security inspection, it was noted that the licensee did not include the fuel handling building in their bomb blast analysis for the plant. During this inspection, the inspector reviewed the revised bomb blast analysis for the fuel handling buildin The inspector also interviewed the engineer who conducted the engineering study to complete the revised analysis. The revised analysis was in accordance with regulatory requirement S8.3 (Closed) Violation 382/9805-03: Failure to have a derailer in plac During a pervious security inspection, the inspector discovered that on November 11, 1997, the hensee identified in a condition report that the derailer inside the service yard had become unattached from the track, and no compensatory measures were implemented. This degraded condition existed until February 11,1998. Security procedures did not provide adequate guidance for the security officers if they found the

, derailer degraded. During this inspection, the inspector verified that the licensee had I revised their procedure and that it now contained clear guidance on actions to take if the l derailer was found in a degraded condition. In addition, all security persnnnel received training on the revised procedure to ensure future compliance.

>

_______ _

, .-.

- - - - _ - - - ______________ _____ _ _ _ _ _ _ _ __ _ ___

..

.

. V. Manaaement Meetings XI Exit Meeting Summary The inspector presented the inspection results to members of licensee management at the

conclusion of the inspection on June 26,1998. The licensee acknowledged the findings l presented.

l l

L________2_----_________---_--.----.--__ - - _ - - - - - _ - - - . - - - - - _ - . - - - - - _ - - - - - - - - - - - - - - - - - - -----------------------------------------J

- - _________ _ _ ___ -__ _ - _ _ -

.

.

ATTACHMENT SUPPLEMENTAL INFORMATION PARTIAL LIST OF PERSONS CONTACTED Licensee E. Aviles, Coordinator, Nuclear Security E. Beckendorf, Superintendent, Plant Security M. Brandon, Licensing Supervisor S. Bruner, Manager, Planning and Scheduling D. Childress, Supervisor, Security Access Authorization and Fitness-for-Duty l H. Cooper, Manager, Corporate Security

. C. Dugger, Vice President, Operations l E. Ewing, Director, Nuclear Safety and Regulatory Affairs C. Hayes, Technical Coordinator, Nuclear Safety and Regulatory Affairs J. Kieff, Security Coordinator J. Lamb, Emergency Planning Manager  ;

T. Leonard, General Manager, Plant Operations G. Pierce, Director, Quality D. Pintado, Coordinator, Nuclear Security G. Scott, Licensing Engineer  ;

G. Zetsch, Supervisor, Security _ Operations 1 Contractor R. Amato, Specialist, The Wackenhut Corporation R. Bitner, Project Manager, The Wackenhut Corporation T. Duet, Security Training Coordinator, The Wackenhut Corporation J. Maikell, Staff Coordinator, The Wackenhut Corporation l J. Maher, Access Control Supervisor, The Wackenhut Corporation M. Power, Firewatch Coordinator, The Wackenhut Corporation A. Smith Project Supervisor, The Wackenhut Corporation NBC T. Farnholtz, Senior Resident inspector INSPECTION PROCEDURES USED IP 81700 Physical Security Program for Power Reactors IP 92700 Onsite Review of Licensee Event Reports IP 92904 Followup I

I

)

,

l-

_ _ _ _ _ _ - _ - _ _ _ - _ _ _ _

.

.

-2-ITEMS OPENED. CLOSED. AND DISCUSSED Closed 50-382/9719-01 IFl Fuel Handling Building Blast Analysis 50-382/9805-0 NOV Failure to have Derailer in Place PARTIAL LIST OF LICENSEE DOCUMENTS REVIEWED Waterford 3 Physical Security Plan, Revision 18, dated May 27,1998 Selected Condition Reports for 1998 Trending records on equipment problem Licensee Procedures Waterford 3 Procedure OM-110. " Continual Behavioral Observation Program," Revision 0, March 31,1995 Security Procedure PS-011-102, " Personnel Access Control," Revision 15, February 12,1998 Security Procedure PS-018-108, " Loss or Degradation of Security Equipment and Systems,"

Revision 3, May 18,1998 Security Procedure PS-011-103, " Vehicle Access Control," Revision 8, May 14,1998 Security Procedure PS-015-101, " Protected Area Patrol and Inspections," Revision 11, May 10, 1998 Fuel Handling Building Evaluation as part of Protection Against Malevolent Use of Vehicles, Document number EC-C94-020, Revision 1, March 30,1998

. Security Open Condition identifier List, June 16,1998

'

_ Security Guideline ADM-002, " Degrading Trend Program," Revision 0, January 20,1998 Waterford Degrading Trend Meeting Report, April 13,1998

. Corporate Security Procedure CS-WP-FFD-101, " Fitness for Duty Specimen Collection and Alcohol Testing," Revision 0, September 22,1997 Corporate Security Procedure CS-WP-FFD-102, * Blind Performance Testing," Revision 0, September 22,1997

)

{

- - _ - _ - - - - - __ --_- - - - - -- - - - - -

_ __ _ _ _ . _________ ____________ - _-_____ _______ _ _

l .

l'

I-3-Corporate Security Procedure CS-Wi-FFD-108, " Management and NRC Notifications,"

Revision 1, December 10,1997 l