Category:INSPECTION REPORT
MONTHYEARIR 05000277/19990071999-10-19019 October 1999 Insp Rept 50-277/99-07 & 50-278/99-07 on 990810-0922.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000277/19990051999-07-27027 July 1999 Insp Repts 50-277/99-05 & 50-278/99-05 on 990518-0628. Non-cited Violations Noted.Major Areas Inspected:Operations, Surveillances & Maintenance,Engineering & Technical Support & Plant Support Areas IR 05000277/19990041999-06-11011 June 1999 Insp Repts 50-277/99-04 & 50-278/99-04 on 990405-0517. Non-cited Violation Noted.Major Areas Inspected:Operations, Surveillances & Maintenance,Engineering & Technical Support & Plant Support Areas IR 05000277/19990011999-03-25025 March 1999 Insp Repts 50-277/99-01 & 50-278/99-01 on 990105-0215.No Violations Noted.Major Areas Inspected:Operations, Surveillances & Maint,Engineering & Technical Support & Plant Support Including Security & Safeguards Activities IR 05000277/19980111999-02-0101 February 1999 Insp Repts 50-277/98-11 & 50-278/98-11 on 981110-990104. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000277/19980091999-02-0101 February 1999 Insp Repts 50-277/98-09 & 50-278/98-09 on 981116-1204. Violations Noted.Major Areas Inspected:Reactor Core Isolation Cooling & 4kV Electrical Distribution Sys Operation Under Normal & Emergency Operating Conditions IR 05000277/19980121998-12-16016 December 1998 Insp Repts 50-277/98-12 & 50-278/98-12 on 981116-19.No Violations Noted.Major Areas Inspected:Emergency Preparedness full-participation Exercise Evaluation IR 05000277/19980101998-12-11011 December 1998 Insp Repts 50-277/98-10 & 50-278/98-10 on 980922-1109. Violations Noted.Major Areas Inspected:Licensee Operations, Surveillances & Maint,Engineering & Technical Support & Plant Support ML20155D4571998-10-28028 October 1998 Insp Repts 50-277/98-08 & 50-278/98-08 on 980811-0921. Violations Noted.Major Areas Inspected:Operations, Surveillances & Maintenance,Engineering & Technical Support & Plant Support Areas IR 05000277/19980071998-09-15015 September 1998 Insp Repts 50-277/98-07 & 50-278/98-07 on 980623-0810.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000171/19980011998-08-0707 August 1998 Insp Rept 50-171/98-01 on 980612.No Violations Noted. Major Areas Inspected:Review of Facility Mgt & Control, Decommissioning Support Activities,Radiological Safety & Independent Measurements by Inspector ML20236R7661998-07-16016 July 1998 Insp Repts 50-277/98-06 & 50-278/98-06 on 980505-0622. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000277/19980021998-06-0909 June 1998 Insp Repts 50-277/98-02 & 50-278/98-02 on 980315-0504. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000277/19970041998-05-14014 May 1998 Insp Repts 50-277/97-04 & 50-278/98-04 on 980309-13 & 0330-0403 (Onsite) & 980314-0429 (Inoffice).Violation Noted. Major Areas Inspected:Licensed Operator Requalification Training & Evaluation & Maint Rule Implementation Areas IR 05000278/19980051998-05-0707 May 1998 Insp Rept 50-278/98-05 on 980330-0424.Violations Noted. Major Areas Inspected:Events Re Discovery of Foreign Matl in 3A Core Spray Pump on 980324 IR 05000277/19980011998-05-0101 May 1998 Insp Repts 50-277/98-01 & 50-278/98-01 on 980118-0314. Violations Noted.Major Areas Inspected:Licensee Operations, Surveillance & Maint,Engineering & Technical Support & Plant Support Areas ML20217N3771998-03-30030 March 1998 Insp Rept 50-277/98-03 on 980212-0303.Violations Noted.Major Areas Inspected:Reviewed Events,Significance,Reportability & CAs for 2 'A' RFP Turbine High Level Trip Events Involving 3 1997 Failures & 1 Trip on 980206 ML20203E3701998-02-20020 February 1998 Insp Repts 50-277/97-08 & 50-278/97-08 on 971123-980117. Violations Noted.Major Areas Inspected:Plant Operations, Maint,Engineering & Plant Support IR 05000277/19970071997-12-16016 December 1997 Insp Repts 50-277/97-07 & 50-278/97-07 on 970921-1122. Violations Noted.Major Areas Inspected:Operations, Surveillance & Maintenance,Engineering & Technical Support & Plant Support Areas IR 05000277/19970061997-10-15015 October 1997 Insp Repts 50-277/97-06 & 50-278/97-06 on 970810-0920.No Violations Noted.Major Areas Inspected:Plant Operations, Maint,Engineering & Plant Support IR 05000277/19970051997-09-12012 September 1997 Insp Repts 50-277/97-05 & 50-278/97-05 on 970608-0809. Violations Noted.Major Areas Inspected:Operations, Surveillance & Maint,Engineering & Technical Support & Plant Support Areas ML20149L2951997-07-24024 July 1997 Insp Repts 50-277/97-04 & 50-278/97-04 on 970504-0607. Violations Noted.Major Areas Inspected:Operations, Surveillance & Maintenance,Engineering & Technical Support & Plant Support ML20140D2051997-06-0404 June 1997 Integrated Insp Repts 50-277/97-02 & 50-278/97-02 on 970308-0503.Violations Noted.Major Areas Inspected: Operations,Surveillance,Maint,Engineering,Technical Support & Plant Support IR 05000277/19970011997-04-14014 April 1997 Insp Repts 50-277/97-01 & 50-278/97-01 on 970112-0308.No Violations Noted.Major Areas Inspected:Operations, Surveillance & Maint,Engineering & Technical Support & Plant Support ML20138P2661997-02-10010 February 1997 Insp Repts 50-277/97-03 & 50-278/97-03 on 961209-970131. Violations Noted.Major Areas Inspected:Areas Involving Radiological Environ Monitoring Programs ML20134K2821997-02-0707 February 1997 Insp Repts 50-277/96-09 & 50-278/96-09 on 961110-970111.No Violations Noted.Major Areas Inspected:Operations, Surveillance & Maintenance,Engineering & Technical Support & Plant Support IR 05000277/19960121996-12-20020 December 1996 Insp Repts 50-277/96-12 & 50-278/96-12 on 961119-21.No Violations Noted.Major Areas Inspected:Erf Staffing, Procedure Implementation,Effectiveness of Mitigation Actions,Communications & Command & Control ML20132G4901996-12-20020 December 1996 Insp Repts 50-277/96-11,50-278/96-11,50-352/96-08 & 50-353/96-08 on 961003-1127.No Violations Noted.Major Areas Inspected:Documentations Containing Safeguards Info ML20132E9271996-12-18018 December 1996 Insp Repts 50-277/96-08 & 50-278/96-08 on 960908-1109. Violations Noted.Major Areas Inspected:Operations, Surveillance & Maintenance,Engineering & Technical Support & Plant Support ML20138G2791996-09-0707 September 1996 Insp Repts 50-277/96-06 & 50-278/96-06 on 960707-960907. Violations Noted.Major Areas Inspected:Operations, Surveillance & Maintenance,Engineering & Technical Support & Plant Support IR 05000277/19940101994-08-0404 August 1994 Insp Repts 50-277/94-10 & 50-278/94-10 on 940605-0716.No Violations Noted.Major Areas Inspected:Plant Operations, Maint,Surveillance,Engineering & Technical Support ML20059C7791993-12-20020 December 1993 Enforcement Conference Repts 50-277/93-27 & 50-278/93-27 on 931210.Areas Discussed:Safety Significance of Three Events Re Entry Into Controlled Areas W/O Satisfying Radiological Safety Requirements During Period of 931027-29 IR 05000277/19930281993-12-20020 December 1993 Insp Repts 50-277/93-28 & 50-278/93-28 on 931115-19.No Violations Noted.Major Areas Inspected:Licensee Main Steam Safety Valve & Safety/Relief Valve Related Activities ML20058D3431993-11-23023 November 1993 Insp Repts 50-277/93-27 & 50-278/93-27 on 931004-10.No Violations Noted.Major Areas Inspected:Alara,Planning for Radiological Work,Radiation Worker Practices,Training & Qualifications & Shipping of LLW for Disposal IR 05000277/19930241993-11-22022 November 1993 Insp Repts 50-277/93-24 & 50-278/93-24 on 930914-1030. Violation Noted.Major Areas Inspected:Operations,Refueling Maint,Surveillance,Engineering & Technical Support IR 05000277/19930261993-11-0808 November 1993 Insp Repts 50-277/93-26 & 50-278/93-26 on 930920-30.Major Areas Inspected:Isi Program & Related Activities IR 05000277/19930301993-11-0808 November 1993 Insp Repts 50-277/93-30 & 50-278/93-30 on 931018-22.No Violations Noted.Major Areas Inspected:Radioactive Liquid & Gaseous Effluent Control Programs IR 05000277/19930291993-11-0101 November 1993 Insp Repts 50-277/93-29 & 50-278/93-29 on 931012-15.No Violations Noted.Major Areas Inspected:Review of Pims Interface W/Maintenance Including Work Order Development & Maintenance trending,Unit-3 Arts/Mell Mod Training ML20058M2461993-10-19019 October 1993 Insp Repts 50-277/PA-93-02 & 50-278/PA-93-02 on 930913-14. No Violations Noted.Major Areas Inspected:Llrw Shipment to Burial Site Including,Shipping Documentation,Package Insp, Labeling,Marking,Placarding,Vehicle Insp IR 05000277/19930231993-10-13013 October 1993 Insp Repts 50-277/93-23 & 50-278/93-23 on 930913-17.No Violations Noted.Major Areas Inspected:Security Audits, Detection & Assessment Aids,Access Control of Personnel, Packages & Vehicles,Vital Key Area Control & Alarm Stations ML20057E7921993-10-0101 October 1993 Insp Repts 50-277/93-19 & 50-278/93-19 on 930802-06.No Violations Noted.Major Areas Inspected:Alara,External Dosimetry,Nuclear Quality Assurance Audits & Shipping of low-level Wastes for Disposal ML20057E2731993-09-27027 September 1993 Insp Repts 50-277/93-18 & 50-278/93-18 on 930802-06.No Violations Noted.Major Areas Inspected:Operational Objectives & Goals,Effectiveness of Performance & Self Assessment ML20057C2281993-09-22022 September 1993 Insp Repts 50-277/93-17 & 50-278/93-17 on 930803-0913.No Violations Noted.Major Areas Inspected:Util Staff & Mgt Response to Plant Events to Verify Proper Identification of Root Causes ML20057C1121993-09-16016 September 1993 Insp Repts 50-277/93-10 & 50-278/93-10 on 930628-30.Onsite Response to Exercise Scenario Very Good.Major Areas inspected:annual,partial-participation Emergency Preparedness Exercise IR 05000277/19930161993-08-0505 August 1993 Insp Repts 50-277/93-16 & 50-278/93-16 on 930712-15.Actions Taken to Strengthen Perceived Weaknesses Noted.Major Areas Inspected:Erosion/Corrosion Program,Per GL 89-08 ML20127N6521993-01-25025 January 1993 Insp Repts 50-277/92-32 & 50-278/92-32 on 921215-930118.No Violations Noted.Major Areas Inspected:Plant Operations, Maint & Surveillance,Engineering & Technical Support, Qa,Radiological Controls & Physical Security IR 05000277/19920321993-01-25025 January 1993 Insp Repts 50-277/92-32 & 50-278/92-32 on 921215-930118.No Violations Noted.Major Areas Inspected:Plant Operations, Maint & Surveillance,Engineering & Technical Support, Qa,Radiological Controls & Physical Security IR 05000277/19920821993-01-11011 January 1993 Insp Repts 50-277/92-82 & 50-278/92-82 on 921019-23 & 1130. Violations Noted.Major Areas Inspected:Licensee GL 89-10 Program & Walkdown IR 05000277/19920291992-12-24024 December 1992 Insp Repts 50-277/92-29 & 50-278/92-29 on 921101-1214.Minor Safety Significance Noted.Major Areas Inspected:Plant Operations,Maint & Surveillance,Engineering & Technical Support & Assurance of Quality IR 05000277/19920311992-12-15015 December 1992 Insp Repts 50-277/92-31 & 50-278/92-31 on 921116-20.No Violations Noted.Major Areas Inspected:Design & Procedures Used to Mitigate Consequences of Cable Spreading Room Fire 1999-07-27
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000277/19990071999-10-19019 October 1999 Insp Rept 50-277/99-07 & 50-278/99-07 on 990810-0922.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000277/19990051999-07-27027 July 1999 Insp Repts 50-277/99-05 & 50-278/99-05 on 990518-0628. Non-cited Violations Noted.Major Areas Inspected:Operations, Surveillances & Maintenance,Engineering & Technical Support & Plant Support Areas IR 05000277/19990041999-06-11011 June 1999 Insp Repts 50-277/99-04 & 50-278/99-04 on 990405-0517. Non-cited Violation Noted.Major Areas Inspected:Operations, Surveillances & Maintenance,Engineering & Technical Support & Plant Support Areas IR 05000277/19990011999-03-25025 March 1999 Insp Repts 50-277/99-01 & 50-278/99-01 on 990105-0215.No Violations Noted.Major Areas Inspected:Operations, Surveillances & Maint,Engineering & Technical Support & Plant Support Including Security & Safeguards Activities IR 05000277/19980111999-02-0101 February 1999 Insp Repts 50-277/98-11 & 50-278/98-11 on 981110-990104. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000277/19980091999-02-0101 February 1999 Insp Repts 50-277/98-09 & 50-278/98-09 on 981116-1204. Violations Noted.Major Areas Inspected:Reactor Core Isolation Cooling & 4kV Electrical Distribution Sys Operation Under Normal & Emergency Operating Conditions IR 05000277/19980121998-12-16016 December 1998 Insp Repts 50-277/98-12 & 50-278/98-12 on 981116-19.No Violations Noted.Major Areas Inspected:Emergency Preparedness full-participation Exercise Evaluation IR 05000277/19980101998-12-11011 December 1998 Insp Repts 50-277/98-10 & 50-278/98-10 on 980922-1109. Violations Noted.Major Areas Inspected:Licensee Operations, Surveillances & Maint,Engineering & Technical Support & Plant Support ML20155D4571998-10-28028 October 1998 Insp Repts 50-277/98-08 & 50-278/98-08 on 980811-0921. Violations Noted.Major Areas Inspected:Operations, Surveillances & Maintenance,Engineering & Technical Support & Plant Support Areas IR 05000277/19980071998-09-15015 September 1998 Insp Repts 50-277/98-07 & 50-278/98-07 on 980623-0810.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000171/19980011998-08-0707 August 1998 Insp Rept 50-171/98-01 on 980612.No Violations Noted. Major Areas Inspected:Review of Facility Mgt & Control, Decommissioning Support Activities,Radiological Safety & Independent Measurements by Inspector ML20236R7661998-07-16016 July 1998 Insp Repts 50-277/98-06 & 50-278/98-06 on 980505-0622. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000277/19980021998-06-0909 June 1998 Insp Repts 50-277/98-02 & 50-278/98-02 on 980315-0504. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000277/19970041998-05-14014 May 1998 Insp Repts 50-277/97-04 & 50-278/98-04 on 980309-13 & 0330-0403 (Onsite) & 980314-0429 (Inoffice).Violation Noted. Major Areas Inspected:Licensed Operator Requalification Training & Evaluation & Maint Rule Implementation Areas IR 05000278/19980051998-05-0707 May 1998 Insp Rept 50-278/98-05 on 980330-0424.Violations Noted. Major Areas Inspected:Events Re Discovery of Foreign Matl in 3A Core Spray Pump on 980324 IR 05000277/19980011998-05-0101 May 1998 Insp Repts 50-277/98-01 & 50-278/98-01 on 980118-0314. Violations Noted.Major Areas Inspected:Licensee Operations, Surveillance & Maint,Engineering & Technical Support & Plant Support Areas ML20217N3771998-03-30030 March 1998 Insp Rept 50-277/98-03 on 980212-0303.Violations Noted.Major Areas Inspected:Reviewed Events,Significance,Reportability & CAs for 2 'A' RFP Turbine High Level Trip Events Involving 3 1997 Failures & 1 Trip on 980206 ML20203E3701998-02-20020 February 1998 Insp Repts 50-277/97-08 & 50-278/97-08 on 971123-980117. Violations Noted.Major Areas Inspected:Plant Operations, Maint,Engineering & Plant Support IR 05000277/19970071997-12-16016 December 1997 Insp Repts 50-277/97-07 & 50-278/97-07 on 970921-1122. Violations Noted.Major Areas Inspected:Operations, Surveillance & Maintenance,Engineering & Technical Support & Plant Support Areas IR 05000277/19970061997-10-15015 October 1997 Insp Repts 50-277/97-06 & 50-278/97-06 on 970810-0920.No Violations Noted.Major Areas Inspected:Plant Operations, Maint,Engineering & Plant Support IR 05000277/19970051997-09-12012 September 1997 Insp Repts 50-277/97-05 & 50-278/97-05 on 970608-0809. Violations Noted.Major Areas Inspected:Operations, Surveillance & Maint,Engineering & Technical Support & Plant Support Areas ML20149L2951997-07-24024 July 1997 Insp Repts 50-277/97-04 & 50-278/97-04 on 970504-0607. Violations Noted.Major Areas Inspected:Operations, Surveillance & Maintenance,Engineering & Technical Support & Plant Support ML20140D2051997-06-0404 June 1997 Integrated Insp Repts 50-277/97-02 & 50-278/97-02 on 970308-0503.Violations Noted.Major Areas Inspected: Operations,Surveillance,Maint,Engineering,Technical Support & Plant Support IR 05000277/19970011997-04-14014 April 1997 Insp Repts 50-277/97-01 & 50-278/97-01 on 970112-0308.No Violations Noted.Major Areas Inspected:Operations, Surveillance & Maint,Engineering & Technical Support & Plant Support ML20138P2661997-02-10010 February 1997 Insp Repts 50-277/97-03 & 50-278/97-03 on 961209-970131. Violations Noted.Major Areas Inspected:Areas Involving Radiological Environ Monitoring Programs ML20134K2821997-02-0707 February 1997 Insp Repts 50-277/96-09 & 50-278/96-09 on 961110-970111.No Violations Noted.Major Areas Inspected:Operations, Surveillance & Maintenance,Engineering & Technical Support & Plant Support IR 05000277/19960121996-12-20020 December 1996 Insp Repts 50-277/96-12 & 50-278/96-12 on 961119-21.No Violations Noted.Major Areas Inspected:Erf Staffing, Procedure Implementation,Effectiveness of Mitigation Actions,Communications & Command & Control ML20132G4901996-12-20020 December 1996 Insp Repts 50-277/96-11,50-278/96-11,50-352/96-08 & 50-353/96-08 on 961003-1127.No Violations Noted.Major Areas Inspected:Documentations Containing Safeguards Info ML20132E9271996-12-18018 December 1996 Insp Repts 50-277/96-08 & 50-278/96-08 on 960908-1109. Violations Noted.Major Areas Inspected:Operations, Surveillance & Maintenance,Engineering & Technical Support & Plant Support ML20138G2791996-09-0707 September 1996 Insp Repts 50-277/96-06 & 50-278/96-06 on 960707-960907. Violations Noted.Major Areas Inspected:Operations, Surveillance & Maintenance,Engineering & Technical Support & Plant Support IR 05000277/19940101994-08-0404 August 1994 Insp Repts 50-277/94-10 & 50-278/94-10 on 940605-0716.No Violations Noted.Major Areas Inspected:Plant Operations, Maint,Surveillance,Engineering & Technical Support ML20059C7791993-12-20020 December 1993 Enforcement Conference Repts 50-277/93-27 & 50-278/93-27 on 931210.Areas Discussed:Safety Significance of Three Events Re Entry Into Controlled Areas W/O Satisfying Radiological Safety Requirements During Period of 931027-29 IR 05000277/19930281993-12-20020 December 1993 Insp Repts 50-277/93-28 & 50-278/93-28 on 931115-19.No Violations Noted.Major Areas Inspected:Licensee Main Steam Safety Valve & Safety/Relief Valve Related Activities ML20058D3431993-11-23023 November 1993 Insp Repts 50-277/93-27 & 50-278/93-27 on 931004-10.No Violations Noted.Major Areas Inspected:Alara,Planning for Radiological Work,Radiation Worker Practices,Training & Qualifications & Shipping of LLW for Disposal IR 05000277/19930241993-11-22022 November 1993 Insp Repts 50-277/93-24 & 50-278/93-24 on 930914-1030. Violation Noted.Major Areas Inspected:Operations,Refueling Maint,Surveillance,Engineering & Technical Support IR 05000277/19930261993-11-0808 November 1993 Insp Repts 50-277/93-26 & 50-278/93-26 on 930920-30.Major Areas Inspected:Isi Program & Related Activities IR 05000277/19930301993-11-0808 November 1993 Insp Repts 50-277/93-30 & 50-278/93-30 on 931018-22.No Violations Noted.Major Areas Inspected:Radioactive Liquid & Gaseous Effluent Control Programs IR 05000277/19930291993-11-0101 November 1993 Insp Repts 50-277/93-29 & 50-278/93-29 on 931012-15.No Violations Noted.Major Areas Inspected:Review of Pims Interface W/Maintenance Including Work Order Development & Maintenance trending,Unit-3 Arts/Mell Mod Training ML20058M2461993-10-19019 October 1993 Insp Repts 50-277/PA-93-02 & 50-278/PA-93-02 on 930913-14. No Violations Noted.Major Areas Inspected:Llrw Shipment to Burial Site Including,Shipping Documentation,Package Insp, Labeling,Marking,Placarding,Vehicle Insp IR 05000277/19930231993-10-13013 October 1993 Insp Repts 50-277/93-23 & 50-278/93-23 on 930913-17.No Violations Noted.Major Areas Inspected:Security Audits, Detection & Assessment Aids,Access Control of Personnel, Packages & Vehicles,Vital Key Area Control & Alarm Stations ML20057E7921993-10-0101 October 1993 Insp Repts 50-277/93-19 & 50-278/93-19 on 930802-06.No Violations Noted.Major Areas Inspected:Alara,External Dosimetry,Nuclear Quality Assurance Audits & Shipping of low-level Wastes for Disposal ML20057E2731993-09-27027 September 1993 Insp Repts 50-277/93-18 & 50-278/93-18 on 930802-06.No Violations Noted.Major Areas Inspected:Operational Objectives & Goals,Effectiveness of Performance & Self Assessment ML20057C2281993-09-22022 September 1993 Insp Repts 50-277/93-17 & 50-278/93-17 on 930803-0913.No Violations Noted.Major Areas Inspected:Util Staff & Mgt Response to Plant Events to Verify Proper Identification of Root Causes ML20057C1121993-09-16016 September 1993 Insp Repts 50-277/93-10 & 50-278/93-10 on 930628-30.Onsite Response to Exercise Scenario Very Good.Major Areas inspected:annual,partial-participation Emergency Preparedness Exercise IR 05000277/19930161993-08-0505 August 1993 Insp Repts 50-277/93-16 & 50-278/93-16 on 930712-15.Actions Taken to Strengthen Perceived Weaknesses Noted.Major Areas Inspected:Erosion/Corrosion Program,Per GL 89-08 ML20127N6521993-01-25025 January 1993 Insp Repts 50-277/92-32 & 50-278/92-32 on 921215-930118.No Violations Noted.Major Areas Inspected:Plant Operations, Maint & Surveillance,Engineering & Technical Support, Qa,Radiological Controls & Physical Security IR 05000277/19920321993-01-25025 January 1993 Insp Repts 50-277/92-32 & 50-278/92-32 on 921215-930118.No Violations Noted.Major Areas Inspected:Plant Operations, Maint & Surveillance,Engineering & Technical Support, Qa,Radiological Controls & Physical Security IR 05000277/19920821993-01-11011 January 1993 Insp Repts 50-277/92-82 & 50-278/92-82 on 921019-23 & 1130. Violations Noted.Major Areas Inspected:Licensee GL 89-10 Program & Walkdown IR 05000277/19920291992-12-24024 December 1992 Insp Repts 50-277/92-29 & 50-278/92-29 on 921101-1214.Minor Safety Significance Noted.Major Areas Inspected:Plant Operations,Maint & Surveillance,Engineering & Technical Support & Assurance of Quality IR 05000277/19920311992-12-15015 December 1992 Insp Repts 50-277/92-31 & 50-278/92-31 on 921116-20.No Violations Noted.Major Areas Inspected:Design & Procedures Used to Mitigate Consequences of Cable Spreading Room Fire 1999-07-27
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000277/19990071999-10-19019 October 1999 Insp Rept 50-277/99-07 & 50-278/99-07 on 990810-0922.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000277/19990051999-07-27027 July 1999 Insp Repts 50-277/99-05 & 50-278/99-05 on 990518-0628. Non-cited Violations Noted.Major Areas Inspected:Operations, Surveillances & Maintenance,Engineering & Technical Support & Plant Support Areas IR 05000277/19990041999-06-11011 June 1999 Insp Repts 50-277/99-04 & 50-278/99-04 on 990405-0517. Non-cited Violation Noted.Major Areas Inspected:Operations, Surveillances & Maintenance,Engineering & Technical Support & Plant Support Areas IR 05000277/19990011999-03-25025 March 1999 Insp Repts 50-277/99-01 & 50-278/99-01 on 990105-0215.No Violations Noted.Major Areas Inspected:Operations, Surveillances & Maint,Engineering & Technical Support & Plant Support Including Security & Safeguards Activities IR 05000277/19980111999-02-0101 February 1999 Insp Repts 50-277/98-11 & 50-278/98-11 on 981110-990104. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000277/19980091999-02-0101 February 1999 Insp Repts 50-277/98-09 & 50-278/98-09 on 981116-1204. Violations Noted.Major Areas Inspected:Reactor Core Isolation Cooling & 4kV Electrical Distribution Sys Operation Under Normal & Emergency Operating Conditions IR 05000277/19980121998-12-16016 December 1998 Insp Repts 50-277/98-12 & 50-278/98-12 on 981116-19.No Violations Noted.Major Areas Inspected:Emergency Preparedness full-participation Exercise Evaluation IR 05000277/19980101998-12-11011 December 1998 Insp Repts 50-277/98-10 & 50-278/98-10 on 980922-1109. Violations Noted.Major Areas Inspected:Licensee Operations, Surveillances & Maint,Engineering & Technical Support & Plant Support ML20155D4571998-10-28028 October 1998 Insp Repts 50-277/98-08 & 50-278/98-08 on 980811-0921. Violations Noted.Major Areas Inspected:Operations, Surveillances & Maintenance,Engineering & Technical Support & Plant Support Areas IR 05000277/19980071998-09-15015 September 1998 Insp Repts 50-277/98-07 & 50-278/98-07 on 980623-0810.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000171/19980011998-08-0707 August 1998 Insp Rept 50-171/98-01 on 980612.No Violations Noted. Major Areas Inspected:Review of Facility Mgt & Control, Decommissioning Support Activities,Radiological Safety & Independent Measurements by Inspector ML20236R7661998-07-16016 July 1998 Insp Repts 50-277/98-06 & 50-278/98-06 on 980505-0622. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000277/19980021998-06-0909 June 1998 Insp Repts 50-277/98-02 & 50-278/98-02 on 980315-0504. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000277/19970041998-05-14014 May 1998 Insp Repts 50-277/97-04 & 50-278/98-04 on 980309-13 & 0330-0403 (Onsite) & 980314-0429 (Inoffice).Violation Noted. Major Areas Inspected:Licensed Operator Requalification Training & Evaluation & Maint Rule Implementation Areas IR 05000278/19980051998-05-0707 May 1998 Insp Rept 50-278/98-05 on 980330-0424.Violations Noted. Major Areas Inspected:Events Re Discovery of Foreign Matl in 3A Core Spray Pump on 980324 IR 05000277/19980011998-05-0101 May 1998 Insp Repts 50-277/98-01 & 50-278/98-01 on 980118-0314. Violations Noted.Major Areas Inspected:Licensee Operations, Surveillance & Maint,Engineering & Technical Support & Plant Support Areas ML20217N3771998-03-30030 March 1998 Insp Rept 50-277/98-03 on 980212-0303.Violations Noted.Major Areas Inspected:Reviewed Events,Significance,Reportability & CAs for 2 'A' RFP Turbine High Level Trip Events Involving 3 1997 Failures & 1 Trip on 980206 ML20203E3701998-02-20020 February 1998 Insp Repts 50-277/97-08 & 50-278/97-08 on 971123-980117. Violations Noted.Major Areas Inspected:Plant Operations, Maint,Engineering & Plant Support IR 05000277/19970071997-12-16016 December 1997 Insp Repts 50-277/97-07 & 50-278/97-07 on 970921-1122. Violations Noted.Major Areas Inspected:Operations, Surveillance & Maintenance,Engineering & Technical Support & Plant Support Areas IR 05000277/19970061997-10-15015 October 1997 Insp Repts 50-277/97-06 & 50-278/97-06 on 970810-0920.No Violations Noted.Major Areas Inspected:Plant Operations, Maint,Engineering & Plant Support IR 05000277/19970051997-09-12012 September 1997 Insp Repts 50-277/97-05 & 50-278/97-05 on 970608-0809. Violations Noted.Major Areas Inspected:Operations, Surveillance & Maint,Engineering & Technical Support & Plant Support Areas ML20149L2951997-07-24024 July 1997 Insp Repts 50-277/97-04 & 50-278/97-04 on 970504-0607. Violations Noted.Major Areas Inspected:Operations, Surveillance & Maintenance,Engineering & Technical Support & Plant Support ML20140D2051997-06-0404 June 1997 Integrated Insp Repts 50-277/97-02 & 50-278/97-02 on 970308-0503.Violations Noted.Major Areas Inspected: Operations,Surveillance,Maint,Engineering,Technical Support & Plant Support IR 05000277/19970011997-04-14014 April 1997 Insp Repts 50-277/97-01 & 50-278/97-01 on 970112-0308.No Violations Noted.Major Areas Inspected:Operations, Surveillance & Maint,Engineering & Technical Support & Plant Support ML20138P2661997-02-10010 February 1997 Insp Repts 50-277/97-03 & 50-278/97-03 on 961209-970131. Violations Noted.Major Areas Inspected:Areas Involving Radiological Environ Monitoring Programs ML20134K2821997-02-0707 February 1997 Insp Repts 50-277/96-09 & 50-278/96-09 on 961110-970111.No Violations Noted.Major Areas Inspected:Operations, Surveillance & Maintenance,Engineering & Technical Support & Plant Support IR 05000277/19960121996-12-20020 December 1996 Insp Repts 50-277/96-12 & 50-278/96-12 on 961119-21.No Violations Noted.Major Areas Inspected:Erf Staffing, Procedure Implementation,Effectiveness of Mitigation Actions,Communications & Command & Control ML20132G4901996-12-20020 December 1996 Insp Repts 50-277/96-11,50-278/96-11,50-352/96-08 & 50-353/96-08 on 961003-1127.No Violations Noted.Major Areas Inspected:Documentations Containing Safeguards Info ML20132E9271996-12-18018 December 1996 Insp Repts 50-277/96-08 & 50-278/96-08 on 960908-1109. Violations Noted.Major Areas Inspected:Operations, Surveillance & Maintenance,Engineering & Technical Support & Plant Support ML20138G2791996-09-0707 September 1996 Insp Repts 50-277/96-06 & 50-278/96-06 on 960707-960907. Violations Noted.Major Areas Inspected:Operations, Surveillance & Maintenance,Engineering & Technical Support & Plant Support IR 05000277/19940101994-08-0404 August 1994 Insp Repts 50-277/94-10 & 50-278/94-10 on 940605-0716.No Violations Noted.Major Areas Inspected:Plant Operations, Maint,Surveillance,Engineering & Technical Support ML20059C7791993-12-20020 December 1993 Enforcement Conference Repts 50-277/93-27 & 50-278/93-27 on 931210.Areas Discussed:Safety Significance of Three Events Re Entry Into Controlled Areas W/O Satisfying Radiological Safety Requirements During Period of 931027-29 IR 05000277/19930281993-12-20020 December 1993 Insp Repts 50-277/93-28 & 50-278/93-28 on 931115-19.No Violations Noted.Major Areas Inspected:Licensee Main Steam Safety Valve & Safety/Relief Valve Related Activities ML20058D3431993-11-23023 November 1993 Insp Repts 50-277/93-27 & 50-278/93-27 on 931004-10.No Violations Noted.Major Areas Inspected:Alara,Planning for Radiological Work,Radiation Worker Practices,Training & Qualifications & Shipping of LLW for Disposal IR 05000277/19930241993-11-22022 November 1993 Insp Repts 50-277/93-24 & 50-278/93-24 on 930914-1030. Violation Noted.Major Areas Inspected:Operations,Refueling Maint,Surveillance,Engineering & Technical Support IR 05000277/19930261993-11-0808 November 1993 Insp Repts 50-277/93-26 & 50-278/93-26 on 930920-30.Major Areas Inspected:Isi Program & Related Activities IR 05000277/19930301993-11-0808 November 1993 Insp Repts 50-277/93-30 & 50-278/93-30 on 931018-22.No Violations Noted.Major Areas Inspected:Radioactive Liquid & Gaseous Effluent Control Programs IR 05000277/19930291993-11-0101 November 1993 Insp Repts 50-277/93-29 & 50-278/93-29 on 931012-15.No Violations Noted.Major Areas Inspected:Review of Pims Interface W/Maintenance Including Work Order Development & Maintenance trending,Unit-3 Arts/Mell Mod Training ML20058M2461993-10-19019 October 1993 Insp Repts 50-277/PA-93-02 & 50-278/PA-93-02 on 930913-14. No Violations Noted.Major Areas Inspected:Llrw Shipment to Burial Site Including,Shipping Documentation,Package Insp, Labeling,Marking,Placarding,Vehicle Insp IR 05000277/19930231993-10-13013 October 1993 Insp Repts 50-277/93-23 & 50-278/93-23 on 930913-17.No Violations Noted.Major Areas Inspected:Security Audits, Detection & Assessment Aids,Access Control of Personnel, Packages & Vehicles,Vital Key Area Control & Alarm Stations ML20057E7921993-10-0101 October 1993 Insp Repts 50-277/93-19 & 50-278/93-19 on 930802-06.No Violations Noted.Major Areas Inspected:Alara,External Dosimetry,Nuclear Quality Assurance Audits & Shipping of low-level Wastes for Disposal ML20057E2731993-09-27027 September 1993 Insp Repts 50-277/93-18 & 50-278/93-18 on 930802-06.No Violations Noted.Major Areas Inspected:Operational Objectives & Goals,Effectiveness of Performance & Self Assessment ML20057C2281993-09-22022 September 1993 Insp Repts 50-277/93-17 & 50-278/93-17 on 930803-0913.No Violations Noted.Major Areas Inspected:Util Staff & Mgt Response to Plant Events to Verify Proper Identification of Root Causes ML20057C1121993-09-16016 September 1993 Insp Repts 50-277/93-10 & 50-278/93-10 on 930628-30.Onsite Response to Exercise Scenario Very Good.Major Areas inspected:annual,partial-participation Emergency Preparedness Exercise IR 05000277/19930161993-08-0505 August 1993 Insp Repts 50-277/93-16 & 50-278/93-16 on 930712-15.Actions Taken to Strengthen Perceived Weaknesses Noted.Major Areas Inspected:Erosion/Corrosion Program,Per GL 89-08 ML20127N6521993-01-25025 January 1993 Insp Repts 50-277/92-32 & 50-278/92-32 on 921215-930118.No Violations Noted.Major Areas Inspected:Plant Operations, Maint & Surveillance,Engineering & Technical Support, Qa,Radiological Controls & Physical Security IR 05000277/19920321993-01-25025 January 1993 Insp Repts 50-277/92-32 & 50-278/92-32 on 921215-930118.No Violations Noted.Major Areas Inspected:Plant Operations, Maint & Surveillance,Engineering & Technical Support, Qa,Radiological Controls & Physical Security IR 05000277/19920821993-01-11011 January 1993 Insp Repts 50-277/92-82 & 50-278/92-82 on 921019-23 & 1130. Violations Noted.Major Areas Inspected:Licensee GL 89-10 Program & Walkdown IR 05000277/19920291992-12-24024 December 1992 Insp Repts 50-277/92-29 & 50-278/92-29 on 921101-1214.Minor Safety Significance Noted.Major Areas Inspected:Plant Operations,Maint & Surveillance,Engineering & Technical Support & Assurance of Quality IR 05000277/19920311992-12-15015 December 1992 Insp Repts 50-277/92-31 & 50-278/92-31 on 921116-20.No Violations Noted.Major Areas Inspected:Design & Procedures Used to Mitigate Consequences of Cable Spreading Room Fire 1999-07-27
[Table view] Category:UTILITY
MONTHYEARIR 05000277/19900801990-11-0909 November 1990 SSFI Rept 50-277/90-80 & 50-278/90-80 on 900917-1003. Significant Weaknesses Identified.Major Areas Inspected: Adequacy of Licensee Corrective Actions Implemented IR 05000277/19900171990-10-0505 October 1990 Insp Repts 50-277/90-17 & 50-278/90-17 on 900814-0924.No Violations Noted.Major Areas Inspected:Operational Safety, Radiation Protection,Physical Security,Control Room Activities & Surveillance Testing IR 05000277/19900151990-09-0606 September 1990 Insp Repts 50-277/90-15 & 50-278/90-15 on 900723-27. Violations Noted.Major Areas Inspected:Cleaning & Testing of Both Diesel Engine & Generator ML20056A5061990-07-30030 July 1990 Insp Repts 50-277/90-13 & 50-278/90-13 on 900516-0702. Violations Noted.Major Areas Inspected:Operational Safety, Radiation Protection,Physical Security,Control Room Activities,Licensee Events & Maint IR 05000277/19900101990-06-15015 June 1990 Insp Repts 50-277/90-10 & 50-278/90-10 on 900403-0515.No Violations Noted.Major Areas Inspected:Operational Safety, Radiation Protection,Physical Security,Licensee Events, Control Room Activities,Surveillance Testing & Maint IR 05000277/19890211989-09-27027 September 1989 Insp Repts 50-277/89-21 & 50-278/89-21 on 890828-0901.No Violations Noted.Major Areas Inspected:Posting & Labeling, Organization & Staffing,Radiation Work Permits,Abandoned Radwaste Sys & Auditing IR 05000277/19890201989-09-21021 September 1989 Insp Repts 50-277/89-20 & 50-278/89-20 on 890730-0902.No Violations Noted.Major Areas Inspected:Onsite Regular, Backshift Insp (236 H Unit 2,135 H Unit 3) of Accessible Portions of Unit 2 & 3,operational Safety & Security IR 05000277/19890191989-08-22022 August 1989 Onsite Regular,Backshift & Deep Backshift Special Power Ascension & Restart Insps 50-277/89-19 & 50-278/89-19 on 890618-0729.No Violations Noted.Major Areas Inspected: Accessible Portions of Units 2 & 3 & Physical Security IR 05000277/19890171989-06-27027 June 1989 Insp Repts 50-277/89-17 & 50-278/89-17 on 890613-15.No Violations Noted.Major Areas Inspected:Licensee Partial Participation in Annual Emergency Preparedness Exercise on 890614 IR 05000277/19890161989-06-22022 June 1989 Restart Safety Insp Repts 50-277/89-16 & 50-278/89-16 on 890507-0617.Major Areas Inspected:Unit 2 Power Ascension Transient Testing & steady-state Operation at 35% Power Plateau,Radiation Protection & Physical Security IR 05000277/19890121989-05-25025 May 1989 Insp Repts 50-277/89-12 & 50-278/89-12 on 890410-13.No Violations Noted.Major Areas Inspected:Changes to Emergency Preparedness Program,Emergency Facilities,Independent/ Reviews/Audits & Notifications & Communications IR 05000277/19890151989-05-18018 May 1989 Insp Repts 50-277/89-15 & 50-278/89-15 on 890402-0506.No Violations Noted.Major Areas Inspected:Operational Safety, Unit 2 Prestartup Activities & Power Ascension & Testing, Radiation Protection & Physical Security IR 05000277/19890131989-05-10010 May 1989 Insp Repts 50-277/89-13 & 50-278/89-13 on 890405-07.No Violations or Deviations Noted.Major Areas Inspected: Licensee Action on Previously Noted Insp Findings in Electrical Area IR 05000277/19890111989-04-20020 April 1989 Insp Repts 50-277/89-11 & 50-278/89-11 on 890405-11.No Violations Noted.Major Areas Inspected:Implementation of Unit 2 Restart Power Testing Program,Including Review of Program & Verification Re in-plant Program IR 05000277/19890061989-04-12012 April 1989 Safety Insp Repts 50-277/89-06 & 50-278/89-06 on 890227-0307.No Violations or Deviations Noted.Major Areas Inspected:Previously Identified Open Items in Inservice Testing & Local Leak Rate Testing Areas IR 05000277/19890141989-04-11011 April 1989 Physical Security Insp Repts 50-277/89-14 & 278/89-14 on 890405.All Commitments Made to Resolve Open Items Met.Major Areas Inspected:Progress to Date on Open Items in Insp Repts 50-277/89-80 & 50-278/89-80 ML20248D6151989-03-28028 March 1989 Insp Repts 50-277/89-04 & 50-278/89-04 on 890109-14.No Violations Noted.Major Areas Inspected:Licensee Actions in Response to NRC Ltr to Pepco Re Allegations on motor- Operated Valve Refurbishment IR 05000277/19890071989-03-21021 March 1989 Insp Repts 50-277/89-07 & 50-278/89-07 on 890130-0210. Violations Noted.Major Areas Inspected:Electrical Power Sys Including Verification of as-built Drawings,Adequacy of Breaker & Fuse Coordination & Plant Mods IR 05000277/19890801989-03-16016 March 1989 Physical Security Insp Repts 50-277/89-80 & 50-278/89-80 on 890105-27.Major Areas Inspected:Security Program Mgt & Effectiveness,Personnel Experience & Qualifications,Testing & Maint & Licensee self-assessments & Audits IR 05000277/19890811989-03-0606 March 1989 Integrated Assessment Team Insp Repts 50-277/89-81 & 50-278/89-81 on 890203-17.Major Areas Inspected: Effectiveness of Restart Plan Corrective Actions & Degree of Readiness of Licensee Mgt Controls IR 05000277/19880411988-11-0808 November 1988 Insp Repts 50-277/88-41 & 50-278/88-41 on 881003-07.No Violations Noted.Major Areas Inspected:Fire Protection/ Prevention Program IR 05000277/19880351988-11-0303 November 1988 Insp Repts 50-277/88-35 & 50-278/88-35 on 880926-30.No Violations Noted.Major Areas Inspected:Licensee Performance in Areas of Maint Surveillance Procedures & Records That Verify Component Availability,Per Tech Spec Requirements IR 05000277/19880371988-11-0303 November 1988 Insp Repts 50-277/88-37 & 50-278/88-37 on 880926-30.No Violations Noted.Major Areas Inspected:Radiation Safety Program,Including Status of Previously Identified Items & post-project Reviews of Unit 3 Pipe Replacement ML20206L4251988-11-0101 November 1988 Insp Repts 50-277/88-38 & 50-278/88-38 on 880926-30. Violations Noted.Major Areas Inspected:Licensee Corrective Actions for Previous Environ Qualification (EQ) Findings & Licensee EQ Documentation Re Cable Splices Qualificability ML20206D3121988-10-27027 October 1988 Insp Repts 50-277/88-32 & 50-278/88-32 on 880831-0929.No Violations or Deviations Noted.Major Areas Inspected: Licensed Operator Requalification Training Program. Weaknesses in Requalification Program Identified IR 05000277/19880341988-10-25025 October 1988 Insp Repts 50-277/88-34 & 50-278/88-34 on 880903-1014.No Violations Noted.Major Areas Inspected:Accessible Portions of Units 2 & 3 Operational Safety,Radiation Protection, Physical Security,Control Room Activities & Licensee Events IR 05000277/19880281988-10-18018 October 1988 Insp Repts 50-277/88-28 & 50-278/88-28 on 880829-0902.No Violations Noted.Major Areas Inspected:Review of Licensee Operating procedures,non-licensed Operators Training & on Site & Offsite Review Committees IR 05000277/19880361988-10-12012 October 1988 Insp Repts 50-277/88-36 & 50-278/88-36 on 880926-28.No Violations Noted.Major Areas Inspected:Annual full-participation Emergency Exercise Performed on 880927 IR 05000277/19880171988-10-0606 October 1988 In-Depth Team Insp Repts 50-277/88-17 & 50-278/88-17 on 880711-22.Violations Noted.Major Areas Inspected:Facility Maint Program & Program Implementation IR 05000277/19880331988-10-0404 October 1988 Insp Repts 50-277/88-33 & 50-278/88-33 on 880906-09.No Violations Noted.Unresolved Item Noted.Major Areas Inspected:Radioactive Effluent Controls Program,Including Releases,Radiation Monitoring Sys Calibr & Surveillances IR 05000277/19880291988-09-19019 September 1988 Insp Repts 50-277/88-29 & 50-278/88-29 on 880805 & 08-12.No Violations Noted.Major Areas Inspected:Replacement of Unit 2 & 3 Emergency Water sys,errosion-corrosion Program in Unit 2 & 3 & Radiographic Condition of Unit 3 Recirculation Pump IR 05000277/19880241988-09-16016 September 1988 Insp Repts 50-277/88-24 & 50-278/88-24 on 880716-0902.No Violations Noted.Major Areas Inspected:Operational Safety, Radiation Protection,Physical Security,Control Room Activities & Surveillance Testing IR 05000277/19880311988-09-0808 September 1988 Partially Deleted Insp Repts 50-277/88-31 & 50-278/88-31 on 880827-29 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected:Mgt Effectiveness,Assessment Aids - Protected Area & Access Control - Personnel ML20154L1751988-09-0808 September 1988 Partially Deleted Insp Repts 50-277/88-26 & 50-278/88-26 on 880725-29 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Assessment Aids - Protected Area & Access Control - Personnel & Mgt Effectiveness ML20153D0741988-08-25025 August 1988 Insp Repts 50-277/88-30 & 50-278/88-30 on 880815-19. Violations Noted.Major Areas Inspected:Adequacy of Licensee Actions in Response to IE Bulletin 80-11 & Adequacy of Corrective Actions in Response to Violation 87-16-01 IR 05000277/19880231988-08-23023 August 1988 Physical Security Insp Repts 50-277/88-23 & 50-278/88-23 on 880627-30.No Violations Observed.Major Areas Inspected: Followup on Licensee Implementation of Commitments Identified in Util 880603,13,17 & 24 Ltrs IR 05000277/19880271988-08-15015 August 1988 Insp Repts 50-277/88-27 & 50-278/88-27 on 880802-04.No Violations Noted.Major Areas Inspected:Emergency Response Facilities,Public Info Program,Changes to Emergency Prearedness Program & Followup of Previously Noted Issues IR 05000277/19880251988-08-11011 August 1988 Insp Repts 50-277/88-25 & 50-278/88-25 on 880718-22.No Violations or Deviations Noted.Major Areas Inspected:Util Licensed Operator Requalification Program W/Respect to Program Effectiveness IR 05000277/19880181988-07-26026 July 1988 Insp Repts 50-277/88-18 & 50-278/88-18 on 880604-0715.No Violations Noted.Major Areas Inspected:Accessible Portions of Unit 2 & 3,operational Safety,Radiation Protection, Physical Security,Control Room Activities & Maint IR 05000277/19880211988-07-21021 July 1988 Mgt Meeting Insp Repts 50-277/88-21 & 50-278/88-21 on 880609 Re Security Concerns at Plant Reported in Annual Security Audit & Findings of Util Investigation Into Allegations by Members of Plant Security Force IR 05000278/19880141988-07-20020 July 1988 Insp Rept 50-278/88-14 on 880509-20.Unresolved Items & Concerns Noted.Major Areas inspected:safety-related Piping Weldments Selected from Plant Replacement Piping Program Insp Plan,Including Welding & Preservice Insp IR 05000277/19880191988-07-18018 July 1988 Insp Repts 50-277/88-19 & 50-278/88-19 on 880606-10.No Violations Noted.Major Areas Inspected:Implementation & Effectiveness of Corrective Actions in QA Program for Procurement of Commercial Grade Items IR 05000277/19880201988-07-12012 July 1988 Insp Repts 50-277/88-20 & 50-278/88-20 on 880613-17.No Violations Noted.Major Areas Inspected:Nonradiological Chemistry Program in Measurement Control & Analytical Procedure Evaluations IR 05000277/19880221988-07-0707 July 1988 Insp Repts 50-277/88-22 & 50-278/88-22 on 880623.No Violations Noted.Major Areas Inspected:Emergency Preparedness Annual Emergency Drill & Followup of Corrective Actions on Previously Identified Issues IR 05000277/19880131988-06-0808 June 1988 Insp Repts 50-277/88-13 & 50-278/88-13 on 880423-0603.Four Violations Noted by Licensee.Major Areas Inspected: Operational Safety,Radiation Protection,Physical Security, Refueling Activities,Maint,Outstanding Items & Events IR 05000277/19870351988-06-0101 June 1988 Insp Repts 50-277/87-35 & 50-277/87-35 on 871113-880114.No Violations Noted.Major Areas Inspected:Overall Crew Interaction,Knowledge & Use of Plant Procedures,Knowledge & Use of Tech Specs & Crew Communication IR 05000277/19880111988-05-18018 May 1988 Insp Repts 50-277/88-11 & 50-278/88-11 on 880411-15.No Violations Noted.Major Areas Inspected:Status of Previously Identified Items,Air Sampling Program,Alara,Worker Allegation & Pipe Replacement Project Changes IR 05000277/19880121988-05-11011 May 1988 Safety Insp Repts 50-277/88-12 & 50-278/88-12 on 880419-20. No Violations Noted.Deficiencies Found in Emergency Action Level Scheme & Personnel Response.Major Areas Inspected: Emergency Preparedness Training Program ML20153B8831988-04-28028 April 1988 Insp Repts 50-277/88-04 & 50-278/88-04 on 880201-11.No Violations Noted.Major Areas Inspected:Review of Licensee Action in Response to USI A-7, Mark I Containment Program IR 05000277/19880081988-04-21021 April 1988 Insp Repts 50-277/88-08 & 50-278/88-08 on 880314-18. Violations Noted.Major Areas Inspected:Replacement of Recirculation Sys Piping on Unit 3 & Detection of IGSCC in Shroud Support Access Cover Plates of Unit 3 1990-09-06
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000277/19990071999-10-19019 October 1999 Insp Rept 50-277/99-07 & 50-278/99-07 on 990810-0922.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000277/19993021999-10-13013 October 1999 NRC Operator Licensing Exam Repts 50-277/99-302OL & 50-278/99-302OL (Including Completed & Graded Tests) for Tests Administered on 990913-16.All Applicants Passed All Portions of Exams IR 05000277/19993011999-08-0404 August 1999 NRC Operator Licensing Exam Repts 50-277/99-301 & 50-278/99-301 Administered on 990702-14 (Administration) & 990715-22 (Grading).Six of Six Limited SROs Passed All Portions of Exams IR 05000277/19990051999-07-27027 July 1999 Insp Repts 50-277/99-05 & 50-278/99-05 on 990518-0628. Non-cited Violations Noted.Major Areas Inspected:Operations, Surveillances & Maintenance,Engineering & Technical Support & Plant Support Areas IR 05000277/19990041999-06-11011 June 1999 Insp Repts 50-277/99-04 & 50-278/99-04 on 990405-0517. Non-cited Violation Noted.Major Areas Inspected:Operations, Surveillances & Maintenance,Engineering & Technical Support & Plant Support Areas IR 05000277/19990011999-03-25025 March 1999 Insp Repts 50-277/99-01 & 50-278/99-01 on 990105-0215.No Violations Noted.Major Areas Inspected:Operations, Surveillances & Maint,Engineering & Technical Support & Plant Support Including Security & Safeguards Activities PNO-I-99-011, on 990208,operators Experienced lock-up of Unit 2 Plant Monitoring Sys Computers While Performing Testing for Y2K Mod of Rod Worth Minimizer Sys.Region I Public Affairs Prepared to Respond to Media Inquiries1999-03-0303 March 1999 PNO-I-99-011:on 990208,operators Experienced lock-up of Unit 2 Plant Monitoring Sys Computers While Performing Testing for Y2K Mod of Rod Worth Minimizer Sys.Region I Public Affairs Prepared to Respond to Media Inquiries ML20202J8241999-02-0101 February 1999 Notice of Violation from Insp on 981116-1204.Violation Noted:On 981204 There Were Two Instances Where PECO Had Failed to Properly Translate Design Info Into Procedures Used for safety-related Activities IR 05000277/19980091999-02-0101 February 1999 Insp Repts 50-277/98-09 & 50-278/98-09 on 981116-1204. Violations Noted.Major Areas Inspected:Reactor Core Isolation Cooling & 4kV Electrical Distribution Sys Operation Under Normal & Emergency Operating Conditions IR 05000277/19980111999-02-0101 February 1999 Insp Repts 50-277/98-11 & 50-278/98-11 on 981110-990104. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20202J5361999-01-29029 January 1999 Notice of Violation from Insp on 980309-1222.Violation Noted:Three Licensee Operators Failed to Successfully Complete Requalification Program for Facility for Which License Being Sought IR 05000277/19980121998-12-16016 December 1998 Insp Repts 50-277/98-12 & 50-278/98-12 on 981116-19.No Violations Noted.Major Areas Inspected:Emergency Preparedness full-participation Exercise Evaluation IR 05000277/19980101998-12-11011 December 1998 Insp Repts 50-277/98-10 & 50-278/98-10 on 980922-1109. Violations Noted.Major Areas Inspected:Licensee Operations, Surveillances & Maint,Engineering & Technical Support & Plant Support ML20206N6821998-12-11011 December 1998 Notice of Violation from Insp on 980922-1109.Violation Noted:On 980810,chemistry Technicians Failed to Properly Perform Required Actions of Step 4.4.3 When D Detector, RIS-2-17-458D Went Downscale During Test ML20155F7571998-10-30030 October 1998 NRC Operator Licensing Exam Repts 50-277/98-301OL & 50-278/98-301(OL) (Including Completed & Graded Tests) for Exams Administered on 980914-22.All Applicants Passed Exam ML20155D4141998-10-28028 October 1998 Notice of Violation from Insp on 980811-0921.Violation Noted:Prior to 980912,PECO Failed to Properly Maintain Sys Operation Procedure 12.1.A-3,rev 19,resulting in Two RWCU Sys Events in August 1998 ML20155D4571998-10-28028 October 1998 Insp Repts 50-277/98-08 & 50-278/98-08 on 980811-0921. Violations Noted.Major Areas Inspected:Operations, Surveillances & Maintenance,Engineering & Technical Support & Plant Support Areas IR 05000277/19980071998-09-15015 September 1998 Insp Repts 50-277/98-07 & 50-278/98-07 on 980623-0810.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000171/19980011998-08-0707 August 1998 Insp Rept 50-171/98-01 on 980612.No Violations Noted. Major Areas Inspected:Review of Facility Mgt & Control, Decommissioning Support Activities,Radiological Safety & Independent Measurements by Inspector ML20236R7661998-07-16016 July 1998 Insp Repts 50-277/98-06 & 50-278/98-06 on 980505-0622. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236R7511998-07-16016 July 1998 Notice of Violations from Insp on 980505-0622.Violations Noted:On 980515,inoperable B Channel Had Not Been Placed in Tripped Condition for Approx 28 H ML20249A4841998-06-11011 June 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:During Eecs Suction Strainer Replacement Mod in Oct 1997,licensee Did Not Establish Instructions & Procedures to Prevent Foreign Matl IR 05000277/19980021998-06-0909 June 1998 Insp Repts 50-277/98-02 & 50-278/98-02 on 980315-0504. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20249A0781998-06-0909 June 1998 Notice of Violation from Insp on 980315-0504.Violation Noted:Radiation Area Signs Were Not Visible Nor Conspicuous ML20237E6931998-06-0808 June 1998 EN-98-045:on 980611,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Two Violations Re Failure to Implement Adequate Foreign Matls Exclusion Program at Facility,Which Led to Debris ML20247L2791998-05-14014 May 1998 Notice of Violation from Insp on 980309-13 & 0330-0403. Violation Noted:From January 1998 to 980313,facility Licensee Administered Annual Operating Test to Operators in Manner That Sample Not Sufficiently Comprehensive IR 05000277/19970041998-05-14014 May 1998 Insp Repts 50-277/97-04 & 50-278/98-04 on 980309-13 & 0330-0403 (Onsite) & 980314-0429 (Inoffice).Violation Noted. Major Areas Inspected:Licensed Operator Requalification Training & Evaluation & Maint Rule Implementation Areas IR 05000278/19980051998-05-0707 May 1998 Insp Rept 50-278/98-05 on 980330-0424.Violations Noted. Major Areas Inspected:Events Re Discovery of Foreign Matl in 3A Core Spray Pump on 980324 IR 05000277/19980011998-05-0101 May 1998 Insp Repts 50-277/98-01 & 50-278/98-01 on 980118-0314. Violations Noted.Major Areas Inspected:Licensee Operations, Surveillance & Maint,Engineering & Technical Support & Plant Support Areas ML20217P7281998-05-0101 May 1998 Notice of Violation from Insp on 980118-0314.Violation Noted:Nrc Identified That Control Room Supervisor Did Not Visually or Verbally Communicate Alarm Ack of an Expected Alarm That Come in on Unit 3 ML20217N3771998-03-30030 March 1998 Insp Rept 50-277/98-03 on 980212-0303.Violations Noted.Major Areas Inspected:Reviewed Events,Significance,Reportability & CAs for 2 'A' RFP Turbine High Level Trip Events Involving 3 1997 Failures & 1 Trip on 980206 ML20217N3651998-03-30030 March 1998 Notice of Violation from Insp on 980212-0303.Violation Noted:Nrc Identified That as of 980303,LER Had Not Been Submitted for Event of 970401,involving Condition Prohibited by TS Section 3.3.2.2 IR 05000277/19970091998-02-26026 February 1998 NRC Operator Licensing Exam Repts 50-277/97-09OL & 50-278/97-09OL Conducted on 970922-26.Exam Results:Two RO & Seven SRO Applicants Passed Exam.One SRO Applicant Failed Operating Portion of Exam ML20203E3701998-02-20020 February 1998 Insp Repts 50-277/97-08 & 50-278/97-08 on 971123-980117. Violations Noted.Major Areas Inspected:Plant Operations, Maint,Engineering & Plant Support ML20203E3601998-02-20020 February 1998 Notice of Violation from Insp on 971123-980117.Violation Noted:In Nov 1997,operations Personnel Did Not Fully Adhere to Routine Test Procedure RT-O-040-620-2,Rev 4, Outstanding HVAC & Outer Screen Insp for Winter Operation ML20197H0431997-12-16016 December 1997 Notice of Violation from Insp on 970921-1122.Violation Noted:Peco Did Not Properly Implement Written Procedures on Three Separate Occasions.Specifically,Between July 1997 & 0922,personnel Did Not Follow Instructions for Work Order IR 05000277/19970071997-12-16016 December 1997 Insp Repts 50-277/97-07 & 50-278/97-07 on 970921-1122. Violations Noted.Major Areas Inspected:Operations, Surveillance & Maintenance,Engineering & Technical Support & Plant Support Areas IR 05000277/19970061997-10-15015 October 1997 Insp Repts 50-277/97-06 & 50-278/97-06 on 970810-0920.No Violations Noted.Major Areas Inspected:Plant Operations, Maint,Engineering & Plant Support ML20217A6461997-09-12012 September 1997 Notice of Violation from Insp on 970608-0809.Violation Noted:Licensee Did Not Properly Maintain Written Procedures for Bypass of MCR Ventilation Sys When Div 1 MCR Radiation Monitor Was Inoperable IR 05000277/19970051997-09-12012 September 1997 Insp Repts 50-277/97-05 & 50-278/97-05 on 970608-0809. Violations Noted.Major Areas Inspected:Operations, Surveillance & Maint,Engineering & Technical Support & Plant Support Areas ML20149L2951997-07-24024 July 1997 Insp Repts 50-277/97-04 & 50-278/97-04 on 970504-0607. Violations Noted.Major Areas Inspected:Operations, Surveillance & Maintenance,Engineering & Technical Support & Plant Support ML20149L2911997-07-24024 July 1997 Notice of Violation from Insp on 970504-0607.Violation Noted:Between mid-1993 & Nov 1996,grand Master Keys That Could Be Used to Open Locked High Radiation Areas Not Maintained Under Administrative Control ML20149H1931997-07-17017 July 1997 SALP Repts 50-277/97-99 & 50-278/97-99 for 951015-970607 ML20140D2051997-06-0404 June 1997 Integrated Insp Repts 50-277/97-02 & 50-278/97-02 on 970308-0503.Violations Noted.Major Areas Inspected: Operations,Surveillance,Maint,Engineering,Technical Support & Plant Support ML20140D1841997-06-0404 June 1997 Notice of Violation from Insp on 970308-0503.Violation Noted:Between 970321-26,PECO Failed to Maintain Measures to Assure That Design Quality Std Deviations for safety-related Rhr,Hpci & HPSW Were Controlled IR 05000277/19970011997-04-14014 April 1997 Insp Repts 50-277/97-01 & 50-278/97-01 on 970112-0308.No Violations Noted.Major Areas Inspected:Operations, Surveillance & Maint,Engineering & Technical Support & Plant Support ML20138P2571997-02-10010 February 1997 Notice of Violation from Insp on 961208-970131.Violation Noted:From 960718-29,during Mod to Turbine Bldg,Licensee Did Not Assure That Turbine Bldg Atmosphere Exhausted Through Penetrations in Bldg Wall ML20138P2661997-02-10010 February 1997 Insp Repts 50-277/97-03 & 50-278/97-03 on 961209-970131. Violations Noted.Major Areas Inspected:Areas Involving Radiological Environ Monitoring Programs ML20134K2821997-02-0707 February 1997 Insp Repts 50-277/96-09 & 50-278/96-09 on 961110-970111.No Violations Noted.Major Areas Inspected:Operations, Surveillance & Maintenance,Engineering & Technical Support & Plant Support ML20134F9051997-02-0303 February 1997 Notice of Violation from Insp on 960305 & 0506 & Between 1003 & 1127.Violation Noted:Electronic Copy of Limerick Physical Security Plan,Located on PECO Nuclear Local Area Network & Document Not Under Control 1999-08-04
[Table view] |
See also: IR 05000277/1987030
Text
_ _
.
.
U.S. NUCLEAR REGULATORY COMMISSION
REGION I
Report No. 50-277/_87-30 and 50-278/87-30
Docket No. 50-277/50-278
License No. DPR-44 and DPR-56 Priority -
Category C
Licensee: Philadelphia Electric Company
2301 Market Street
Philadelphia, Pennsylvania 19101
Facility Name: Peach Bottom Atomic Power Station Units 2 and 3
Inspection At: Delta, Pennsylvania
Inspection Conducted: October 19-23, 1987
Inspector: f 9
Kras poUlos, keactof Engineer, DRS
//[Ju!87
_A. / dafe
Also participating in the inspection and contributing to the
report were:
K. Sullivan, Electrical System Specialist, BNL
R. Hodor, Mechanical Systems Specialist, BNL
Approved by: . /k 7
C, # Anderson, Chief, Plant System 'date ;
Section, DRS
Inspection Summary: Inspection on October 19-23, 1987, (Combined Report Nos.
50-277/87-30 and 50-278/87-30).
Areas Inspected: Special, announced team reinspection of the licensee's efforts
to comply with the requirements of 10 CFR 50, Appendix R, Sections III. G, J, ,
I and L, concerning fire protection features to ensure the ability to achieve .I
and maintain safe shutdown in the event of a fire.
l
l Results: One violation was identified. Three items remained unresolved at the
! end of the inspection.
l
h
G
. _ _ _ _ _ _ _ _ _ - _ _ _ _ _
_ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . . _ _ _ _ _ - _ _ _ _ _ . _ . _ _ _ - _ _ _ _ _ - _ _ - - - _ _ _ _ _ _ _ _ . _ _ - _ _ _
f
.
.
Details
1.0 ' Persons Contacted
-1.1 Philadelphia Electric Company (PECo)
- R. Lees, Chief Electrical Engineer
- B. Clark, Site Administrative Engineer
- A. Donell', QA Site Supervisor
- C. Swenson, Nuclear Operations
- W. Boyer, Electrical Supervising Engineer
- D. Spamer, Electrical Engineer
- W. Birely, Licensing Engineer
- S. Yuill, Fire Protection Coordinator
- G. Termine,- Electrical Engineer
- W. Brady, Mechanical Engineer
- C. Gerdes, Mechanical Engineer
- F. Adams, Engineering Designer
- G. Cambell, Engineering Designer
'*R.' Rock, Electrical Engineer
- D. Thompson, Electrical Engineer
- D.- Brecker,. Consultant (EPM)
- J.-McCawley, Electrical Engineer
- M. Phillips, Public Service Electric and Gas
- R. Dell Angelo, Engineering Designer
G. Morley, Supervising Mechanical- Engineer
A. Melikian, Consultant (EPM)
R. Ploff, Consultant (EPM)
0. Brecken, -Consultant (EPM)
M. Lohr; Electrical Engineer
J. Pizzola, QA Engineer
J. Marinucci, Consultant (GE)
M. Hammond, Construction Engineer
J. Cleary, Mechanical Engineer
1.2 Nuclear Regulatory Commission (NRC)
Denotes those present at the exit interview.
,
_ _ . _ _ __ . _ . _ _ _ - -
F .a
.
. 3
3
2.0 Review of Previous Inspection Findings
Open (violation) 50-277/83-31-02 and 50-278/83-29-02: Failure to meet the
Appendix R Fire Brigade training requirements.
During the above referenced inspection performed in 1983 the NRC
determined that the licensee's Fire Brigade training was deficient
because training requirements were not implemented. The deficiencies
identified were the failure of brigade members to attend training meetings
and failure to participate in the hands-on fire fighting practice.
The licensee in their annual and triannual fire protection program audits
identified similar def'.ciencies during 1984, 1985 and 1986, calendar
3
years. During 1986, in audit No. AP86-121PL the licensee's audit
team issued a Significant Nonconformance Report (SNCR) to the Superinten-
dent - Operations because actions taken in the past failed to prevent
recurrence.
The:NRC in inspection 277/278/85-44 reviewed the licensee's corrective
actions in~this area but was unable to resolve the issue because the
licensee's corrective actions were inadequate. To assure the adequacy of
the licensee's corrective actions, the inspector reviewed the following:
-
Attendance records for quarterly training
-
Attendance records for drill participation
-
Attendance records for hands-on practice initial training and
refresher instruction.
The inspector also observed a fire drill for training effectiveness,
and reviewed the drill procedure. From the review of the relevant fire
brigade training documents and correspondence, the inspector determined
the following:
-
The records review determined that at least 20 fire fighters did not
participate in the required two' drills per year and at least five did
not attend the initial classroom and refresher instruction required
by 10 CFR 50 Appendix R Section III.I.
-
The inspector ascertained in discussions with licensee personnel that
fire fighters responding to drills do not usually wear protective
clothing or respiratory gear. Only in less than 20% of the drills do
the fire fighters use protective clothing and respiratory apparatus.
-
During the drill observed by the inspector, the brigade members were
coached by the drill coordinator and told what to do. Drills
performed thus lack realism and the team practice concept is lost.
-
These training concerns were previously identified by the NRC and
the licensee's own QA activities, however, they were allowed to
recur.
i
, , 1
1
__ _._ _
.
- .
.
'
-a
.
10 CFR 50 Appendix R Section III.I. requires that the Fire Brigade train-
ing program consists of initial classroom instruction followed by periodic
instructions.
' Fire brigade drills are required per 10 CFR 50 Appendix R 3ection III.I.3.
so that the fire brigade can practice as a team. These drills shall be
performed at regular intervals not to exceed 3 months with each member
participating in at least two drills per year. Each drill shall include
an assessment of each Brigade member's conformance with the fire fighting
procedures and use of fire fighting equipment including self contained
breathing apparatus.
~
This is a violation of the above referenced Appendix R requirements ~
- (50-277/278-87-30-01).
Open (Unresolved Item) 50-277/84-40-01 and 50-278/84-19-01: Visual check of
Fire Dampers does not provide assurance that Dampers will perform as
required.
The licensee's T.S. require that fire dampers are inspected visually. The
NRC raised the concern that a visual damper inspection does not provide
assurance that the fire dampers will be able to function properly during.
a fire. This concern was raised because: A) The licensee could not pro-
vide Q.C. records indicating that the fire dampers were drop tested after
installation, as called for in the engineering packages; and, 8) a recently
issued 10 CFR 21 letter highlighted the concern that the type of fire
dampers used by the licensee may not close under air flow conditions.
The licensee addressed this concern by revising the fire fighting
strategy procedures giving the fire brigade the option to de-energize the
- ventilation systems involved. With no air flow presumably the fire
dampers will close. The licensee's actions did not satisfy the original
NRC concern for the following reasons:
1) The inspector observed a fire brigade drill. Although an attempt was
made to verify whether the fire jumped to areas above the hypo-
thetical fire scene, no attempt was made to find and isolate the
ventilation equipment.
2) . Assuming that the brigade does turn off the air handling units there
is no assurance that the dampers will fully close after the air
i handling units are turned off. This is because the dampers may drop
L and bind in a partially open position before the air flow is cut-off.
To assure that the dampers close, the licensee must provide assurance
- . that the dampers will close under air flow or that the air handling
L units are de-energized prior to dropping of the dampers.
l
l
i__
. . - _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ - - _ _ _ _ _ - _ - _ _ _ - _ _ _ _
y
2
,
.
.
5
This' item continues to be. unresolved. Considering the above concerns the
inspector questioned the' operability of the dampers.
Closed (Unresolved Item) 50-277/84-40-02 and 50-277/84-19-02: Triannual.
audit findings.not-formally resolved.
The NRC raised the concern that the American Nuclear Insurers (ANI)
audits used by the licensee to satisfy the T.S. audit requirements may-
not satisfy the guidance issued by the NRC in Generic Letter-(GL) 82-21.
This is because these audits are performed to satisfy insurance
requirements.
The G.L. sets forth the scope of the triannual audits which must be
'
performed by an "outside" consultant.
The licensee committed to use an outside consultant henceforth to perform
these audits. The inspector reviewed audit report AP 86-121PL which was
performed by a qualified fire protection consultant. This audit was the
-first performed to satisfy the commitment. The review of this audit
did not identify any-unacceptable conditions.
This item is resolved.
~
Closed (Violation) . 50-277/84-40-03 and 50-278/84-19-03: Degraded fire
doors constitute a violation of Appendix R separation criteria.
The NRC identified several fire doors that were degraded. These fire
doors were installed in walls separating redundant safe shutdown.compo-
nents. The deficiencies were: an inability to close because of an
atmospheric pressure ~ differentials, Missing U.L. labels without, other
documentation to assure the fire. rating of the door and delaminated' doors.
'The licensee's corrective actions included balancing of the ventilation
systems so as not to affect door closure, replacing damaged or unlabeled
doors and revising acceptance criteria of the door surveillance procedure.
'The inspector surveyed the doors identified in the violation and several
other fire doors and did not identify any unacceptable conditions. This
item'is resolved.
Closed (Unresolved Items) 50-277/278/86-08-01, 86-08-02, 86-08-03
86-08-04, and 86-08-05: Because of incomplete analysis compliance with
Appendix R requirements could not be verified.
J
The unresolved items listed above were identified during the inspection
validating the licensee's compliance with the 10 CFR 50 Appendix R ;
Sections III.G, III J, and III L. requirements. These items were all
administratively closed in consideration of the NRC reinspection of these
issues discussed in Sections 4 through 6 of this inspection report. {
l
L l
__.. .
J
_ - _ _ _ _ _ - - _ __ __ ___ __ __ __
-__ _ __ _ __ _ _ _ _ - _ - _ - - _ - _ - __ -
7. .
i
i-
. 6
Closed'(Violation) 50-277/86-26-02: Fire watch inconsistent with T.S.
requirements
The NRC determined that T.S. 3.14.B.4 was violated when the fire watch,
posted as a compensatory measure for the inoperable Diesel Generator Room
Cardox' system, left the area under his wa*.ch. The Cardox system was-
inoperable because-the Diesel Generator Full Load Test Procedure ST.8.1
requires that.the Cardox system be by passed during the test of the
diesels.
The NRC reviewed the licensee's corrective actions in this area which are
as follows: The licensee counseled the individual responsible for the
event and also revised procedure ST 8.1 to. include a statement regarding
the fire watch requirements when the cardox system is defeated. Insofar
as this is an isolated incident, the preventive measures taken by the
licensee are adequate. This. item is resolved.
, 3.0 Background
10 CFR 50.48 and 10 CFR 50, Appendix R, became effective on
February 17, 1981. For Peach Bottom Units 2'and 3, the applicable
portions of this regulation are the Appendix R Sections III.G, " Fire
Protection of Safe Shutdown Capability," III.J, " Emergency Lighting "
III.L " Alternative and Dedicated Shutdown Capebility," and III.I Fire
Brigade Training.
Section III.G of Appendix R requires that fire protection be provided to
ensure'that one safe shutdown train remains available in the event of a
fire. Section III.J requires that emergency lights are installed in all
areas' required for safe shutdown purposes and Section III.L specifies-
requirements for alternate shutdown capability.Section III.I specifies
the required training ' for the Fire Brigade.
The NRC during March 17-21, 1986 performed an inspection to verify the
licensee's compliance with the above requirements, During that j
inspection the determination was made that the licensee's facilities j
could not be adequately inspected because the supporting analyses,
evaluations and procedures were found to be incomplete. i
l
The licensee subsequently was requested to provide the NRC with a
justification for continuing operations (JCO)' after the licensee informed
the NRC that about 50 instance; of Appendix R violations were identified.
This JC0 also committed that Unit 2 would be in compliance at the end of j
the current refueling outage and Unit 3 at the end at their next refueling j
outage. l
1
l
l
!
.
_ _ _ _ _ _ - _ _ _ _ _ _ . _ _ _ . - _ - - - - _ - - _ - - _ - . - -
-_-____ - ____ ___ -
[
.. .
. .. 7
4.0 . Post-Fire Safe Shutdown Capability 1
4.1 Systems Required for' Safe Shutdown
In the event of a fire concurrent with the loss of offsite power,
the following systems are used to provide the safe shutdown
capability of the plant:
-
High Pressure Coolant Injection (HPCI) System
-
Reactor Core Isolation (RCIC) System 1
-
Automatic Depressurization (ADS) and non-ADS Safety Relief
Valves (SRVs)
-
Residual Heat Removal (RHR) System-shutdown cooling mode,
suppression pool cooling mode, and low pressure coolant
injection (LPCI) mode
-
Core Spray (CS) System
-
High Pressure Service . Water (HPSW) System
-
Emergency Service Water (ESW) System
-
.Onsite AC Power Generation and Distribution System
-
Onsite DC Power Generation and Distribution System
-
Essential Ventilation Systems (for Emergency Diesel Rooms)
Safe shutdown is initiated from the control room by a manual. scram
of the control rods or automatically by the reactor protection
system.
The support systems required for safe shutdown include the emergency
'
service water system (ESW) for diesel generator cooling, high
pressure service water system (HPSW) for RHR heat exchanger cooling,
onsite AC emergency power system, onsite DC Emergency power system
and essential ventilation systems.
The licensee uses four methods, A, B, C and D to achieve safe shut-
,
down in the event of a fire. The method used depends on the location
of the fire. The fire hazard analysis identifies the safe shutdown
method for each fire area. These methods are described in the
following paragrapis.
Method A
For Method A, RCIC is used to maintain reactor vessel coolant inven-
tory. RHR and HPSW are used for suppression pool cooling which is
required for decay heat removal. Heat is transferred from the
vessel to the suppression pool via the ADS system and/or the RCIC
steam turbine discharge.
Method B
For Method B, HPCI is used to maintain reactor vessel coolant inven-
tory, RHR and HPSW are required as in method A for suppression pool
L
l
_____1____________im --._m - -
_ - - - - - ._ -
.,
.
. 8
.
'
cooling. - Heat is transferred from the vessel to the suppression pool
via the ADS system and/or the HPCI steam turbine discharge.
Method C
'
4
For Method C,-the reactor is depressurized using the ADS system to.a
.pcint where either the Core Spray or the'LPCI mode of th'e RHR-
syster.s can be used to maintain core invantory.
-Method D
Method D, is the alternative shutdown method for a catastrophic fire
.
'in either the Control Room, Cable' Spreading Room or the Emergency
Shutdown Panel Area. This. method is described in the following
section.
4.2 Alternate Safe Shutdown Areas
The licensee provided alternate safe shutdown capability independent
of the rain control-room, cable spreading room and the emergency
shutdown panel area. The alternative shutdown stations are provided
with circuit isolation capability using manual control switches,
relays, breakers er fuse-disconnect switches, to ensure that no
electrical connection exists between the alternative shutdown
circuits and those affected by a fire in any one of the
above-mentioned areas.
In the event of an unmitigated fire in these areas, the operators
will proceed to alternative shutdown stations to indtiate shutdown
operations. Communications will be established between the
operators who are at the alternative shutdown stations and the
coordinating operator. The alternative control stations for Peach
Bottom are in the following locations:
HPCI Alternativ6 Control Station - This panel is located in each unit
in the MG set room at elevation 135' e 0". The HPCI alternative
control station is equipped with pumo diagnostic instrumentation and
transfer switches and alternative power supplies for the HPCI
turbine. This panel is also equipped with the alternative process
monitoring instrumentation which indicates raattur vessel pressure
and level, suppression peol temperature, and c9ndensate s'.orage tank
level.
Diesel Generators; Alternative Control Station - These panels are
located in Unit 2 4KV emergency switchgear rooms B/D and are common
to both Units 2 and 3. Tho panels are equipped with transfer
switches to isolate all main control room control circuits, and also
diesel generator diagnostic instrumentation.
l
l
_ - _ _ - - _ _ _ _ _ _ _ _ l
- - - _ - _ _ - _ _ - _
.
. 9
4kV Emergency Switchgear Alternative Controls - These
controls are located in the 4KV emergency switchgear rooms in each
unit. Transfer switches provide alternative. local control and
status indication for the motor control centers and for the ESW,
RHR and HPSW pumps.
ADS Transfer / Isolation Station - Alternative control capabilities
for 3 ADS valves and the associated nitrogen supply isolation valves
are located on the HPCI Alternative Control Stations in the M-G
Set-Rooms. The transfer / isolation switches for these controls are
located in the 4KV switchgear rooms. The remote locations for the
"~
transfer / isolation switches are necessary to preserve safe shutdown
capability for the M-G Set Rooms.
RHR/HPSW Suppression pool Alternative Control Stations -
Alternative control capabilities and transfer / isolation switches
for one loop c) RHR/HPLW Motor Operated Valves (MOV's), needed to
support Suppression Pool Cooling, are located at the HPCI
Alternative Control Stations in the M-G Set Rooms.
4.3 Remaining Plant Areas
The licensee indicated that all other areas of the plant not required
ta have an alternate safe shutdown system, comply with the require-
ments of Section III.G.2 of Appendix R, unless an exemption request
has been approved by-the staff.
5.0 Inspection Methodology
The inspection teain examined the licensee's provisions for separating and
protecting equipment, cabling and associated circuits necessary to
achieve .ind maintain hot and cold shutdown conditions. This inspection
sampled selected fire areas which the licensee had identified as being in
ccmpliance with Section III.G.
The following functional requirements were reviewed for achieving and
maintaining hot ard rald shutdewn:
Pressure control
Process monitoring
The inspection team examir,ed the licensee's capability to achieve and
maintain hot shutdown and the capability to bring the plant to cold shut-
down conditions in the event of a fire in various areas of the plant.
The examination included a review of drawings, safe shutdown procedures
and othar documents. Drawings were reviewed to verify electrical
l
l
i
I
L _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ __- _____-_-_ _
Q.
l
!; .- 10-
!
L' ' independence from the fire areas of concern. Procedures were reviewed
for general content and feasibility.
Also inspected were fire detection-and suppression systems and the degree
of physical separation between redundant traint of Safe Shutdown Systems
(SSSs). The team review included an evaluation of'the susceptibility of
.the SSSs to damage from fire suppression activities or from the rupture
or inadvertent operation of fire suppression systems.
The inspection team examined the licensee's fire protection features
provided to maintain one train of equipment needed for safe shutdown free
_
of. fire damage. Included in the scope of this effort were fire area
boundaries, including walls, floors and ceilings, and fire protection of
operings such as fire doors, fire dampers, and penetration seals.
The_ inspection team also examined the licensee's compliance with'Section
III.J, Emergency Lighting.
6.0. Inspection of Protection Provided for Safe Shutdown Systems
6.1 Protection in Various Fire Areas
The team reviewed the protection provided to SSSs in selected fire
areas for compliance with Appendix R, Sections III.G.1, 2 and 3.
During the previous Appendix R inspection, compliance in this area
could not ba verified because the licensee's analysis was incomplete.
Therefore', the team could not ascertain whether redundant safe
shutdown components were within the same fire area. The licensee's
current analysis identified the method to be used in each area. The
licensee also verified that components relied upon for shutdown are
either outside the area of concern or are protected. The system
review and plant walkdown did not identify any unacceptable condi-
-tions. This' review resolves the previously identified unresolved
item 50-277/278/86-08-01.
6.2 Safe shutdown Procedure Review and Walk-down
The team revlewed the procedures used by the licensee in the event
of a fire. Following a report of a fire the operators initial
guidance is from procedure ON-114 " Actual Fire Reported in the Power
Block, or, Diesel Generator Building, Emergency Pump, Inner Screen,
or Emergency Cooling Tower Structures - Procedure." The operators
are guided by this procedure to Procedure T-300 when symptom; indi-
cate that fire damage threatens safe shutdown systems. The T-300
procedure is a symptomatic procedure which contains an index direct-
ing the operators to the proper T-300 series fire guide for the
affected fire area.
For a fire in Fire Area 25 which includes the Main Control Room,
Computer Room, the Cable Spreading Room and the Emergency Shutdown
_ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ -
__ _
.
. 11
Panel. Area, Fire Guide T-325 directs.the use of Procedure SE-10
" Plant Shutdown from the Alternate Shutdown Panel" if the Control
Room shutdown systems are threatened by fire damage.
If the fire requires Control Room evacuation, the operators manually
scram both Reactors and take control of the plant from the alternative
shutdown panels. Shutdown Method D described in section 4.1 is used.
Procedure SE-10 as reviewed by the team was found to'be adequate.
The team commented.that some steps in the procedure may need signa-
ture checks to assure control. For instance the steps monitoring the
reactors' cooldown rate and other steps that operators perform in.the
attachments to the procedure do not have sign-off blocks that the
operation was performed. The licensee in subsequent discussions
committed to review the procedure and add sign-off spaces where
needed.
The procedure walkdown was . performed using three operators because
the operations at only the Unit 2 Alternate Shutdown panel were
observed. For an actual fire four operators would be used.
The walkdown identified that some operations performed during the
hot shutdown phase are repairs. Since repairs are not allowed by
the NRC guidance.the licensee committed to seek an exemption from
NRR. This is an unresolved item (87-30-02). Other observations
during the walkdown of the procedure were that the breaker panel for
the inboard steam isolation valve of the HPCI system has a cover
fastened on with wing nuts. The team observed that if the wing nuts
are too tight the operators may not be able to open the panel. The
licensee stated that either bigger wing nuts or a tool will be pro-
vided to assure panel access.
Since the shutdown procedure was adequate, this resolves the pre-
viously identified unresolved item 50-277/278/86-08-02 regarding the
lack of shutdown procedures during that inspection. During the
walkdown of the procedure, the team also made observations on the
adequacy of the emergency lights. The team did not identify any
unacceptable conditions. This resolves item 86-08-05 concerning the
adequacy of the emergency lights.
6.3 Protection for Associated Circuits
l Appendix R. Sections III.G and III.L require that protection be
i
provided for associated circuits that'could prevent operation or
cause maloperation of redundant trains of systems necessary for safe
shutdown. The circuits of concern are generally associated with
safe shutdown circuits in one of three ways:
l
l
' S _ . _ _ _ _ _ _ _ _ _
- __ --
b
'
. 12
.. Common bus concerns
Commen enclosure concern
The associated circuits were evaluated by the team for common bus,
spurious signal, and common enclosure concerns. Power, control, and
instrumentation circuits were examined on a sampling basis for
potential problems.
6.3.1 Common Bus Concern
The common bus concern may be found in circuits, either safety
related or non-safety related, where there is a common power
source with shutdown equipment and the power source is not
electrically protected from the circuit of concern.
The team examined, on a sampling basis, protective relay coordi-
nation for 4160V and 480V buses and protection for. specific
instrumentation, control and power circuits. The coordination
of fuses and circuit breakers was checked by examination of the
licensee's fuse and breaker coordination curves. The licensee
performs relay calibration during refueling outages on approxi-
mately 18 month intervals.
A deficiency was identified as follows:
- High Impedance Fault Protection
In lieu of performing a complete plant specific analysis of
this concern, the licensee submitted for review test data j
which was obtained from a cable fault test. The objective j
of the test was to support the licensee's position that the ;
occurretice of multiple high impedance faults due to fire
will not have an adverse effect on the circuit l
coordination.
The test was perforr.ied by the licensee's staff during the ,
month of October 1987. The test consisted of a Cable Tray
which was filled to approximately 23*' capacity with Nuclear
Grade, IEEE 383 cables. The cabling was then exposed to a
" Simulated Appendix R Fire Source." The flame source was
ribbon in shape and located approximately 3" from the
underside of the Cable Tray. The flame had a thermal
output of 70,000 btu.
Based on the results of this test the licensee concluded
that the occurrence of multiple high impedance faults will 1
not affect the safe shutdown capability of the plant.
~
I
1
1
- _ _ _ _ _ _ - _ . __ _ _
_. __
d .
l
l- , 13
Thc licensee committed to submit the test procedure and
results to the NRC for review. Pending review of the test
data by NRC this item will remain unresolved. (87-30-03)
6.3.2 Spurious Signals Concern
The spurious signal concern is made up of 2 ittmu
False motor control and instrament indications can
. occur such as those encountered during'the 1975 Browns
Ferry fire. These could be caused by fire initiated
grounds, short or open circuits.
Spurious operation of safety related or non-safety
related components can occur that would adversely
affect. shutdown capability (e.g., RHR/RCS isolation
valves).
The team reviewed documents, on a sampling basis, in the
following areas to ascertain that no spurious sigaal concern
exists:
Current transformer secondaries
High/ low pressure interfaces
a
General fire instigated spurious signals
A deficiency was identified as follows:
High/ Low Pressuie Interface Concerns
The high/ low pressure interface analysis performed by the
licensee has determined that spurious opening of the RHR Shut-
down Cooling Suction Line Isolation Valves (MO-10-17 & 18) will
not result.in failure of the RHR Low Pressure Shutdown Cooling
Piping. This determination is based on information contained in
General Electric Co. Report NEDC-31339 "BWR Owners Group Assess-
ment of Emergency Core Cooling System Pressurization In Boiling
Water Reactors." By letter dated December 10, 1986, the
licensee has submitted this report to the NRC for review.
Pending final NRC review of the BWR Owners Group Report, this
item will remain unresolved (87-30-04).
Fuse Replacement Controls
During the review of the licensees circuit coordination study it
was identified that the licensee does not have administrative
control procedures in place to control future fuse replacement
activities. The licensee stated that a procedure to control
_ - _ _ _ _ _. .-. _ - -
_ _. _ . _ . __. _ _ _ _ - .
l :*
..
..: 14
fuse replacement is currently in the process of being written
- . and implemented. The licensee further explained that fuse re-
placement is currently performed by either " replace in kind" or
,
using the Control Room mark up drawings which call for. the type.
of fuses to be.used.
6.3.3 Common Enclosure Concern
'The common enclosure concern may be found when redundant
circuits are routed together in a raceway or enclosure and they
are not electrically protected or when a fire can destroy both
circuits'due to inadequate fire barriers. The team reviewed a.
randum sample of associated circuits routed together and found
these circuits to be protected by coordinated electrical protec-
tion devices. The review of the common enclosure concern did
not identify any unacceptable conditions.
7.0 Unresolved ~ Items
Unresolv~ed items are matters for which more information is required in .
order to ascertain whether they are acceptable, violations, or I
deviations. Unresolved items are discussed in Sections 6.2 and 6.3.
8.0 Exit Interview
The inspection team met with the licensee representatives, denoted in
Section 1.0, at the conclusion of the inspection on October 23, 1987, and
the team leader summarized the scope and findings of the inspection at
-that time.
The team leader also confirmed with the licensee that the report will not
contain any proprietary information. The licensee agreed that the inspec-
tion report may be placed in the Public Document Room without prior
licensee review for proprietary information (10 CFR 2.790).
At no time during this inspection was written material provided to the
licensee by the team.
_ - - - _ -