Mgt Meeting Insp Repts 50-277/88-21 & 50-278/88-21 on 880609 Re Security Concerns at Plant Reported in Annual Security Audit & Findings of Util Investigation Into Allegations by Members of Plant Security Force
ML20151J138
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 07/21/1988
From: Keimig R, Lancaster W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20151J106 List:
References
50-277-88-21-MM, 50-278-88-21, NUDOCS 8808020190
Download: ML20151J138 (3)


Text

_ _ _ _ _ _ _ - - _ _

>

.

.

U.S. NUCLEAR REGULATORY COMMISSION

REGION I

Report No /88-21 50-278/88-21 Docket No License Nos. OPR-44 OPR-56 Licensee: Philadelphia Electric Company 2301 Market Street'

Philadelphia, Pennysivania 19101 Facility Name: Peach Bottom Atomic Power Station Units 2 and 3 Type of Meeting Management Meeting Meeting Date: June 9, 1988 '

Report Prepared by: ,

(1 Mc W. K. Lancaster, Physical Security

/

I datd k

Inspector Approved by: ,

[

~ N A 86

[' R.R.Keimig,ChiefSafeguardsSection date FRSSB, DRSS Meeting Summary: A management meeting was held at NRC P.egion I, King of Prussia, Pennsylvania, on June 9, 1988, to discuss security concerns at Peach Bottom Atomic Power Station Unit, 2 and 3. These security concerns were reported in the Philadelphia Ele.:tric Company's Annual Security Audit for the Peach Bottom Atomic Power Station Units 2 and 3 (dated May 25,1988) and the findings of Philadelphia Electric Company's investigation into allegations by members of the Peach Bottom Atomic Power Station's security force (report dated April 15, 1988).

The two reports identified several security concerns dealing with tha general performance objectives of 10 CFR 73.55(a). The meeting was attended by NRC and licensee managems.nt and lasted about 2h hours, during which the results of the two reports and the licensee's corrective actions were discussed.

l 8800020190 080721 PDR ADOCK 05000277 Q PNV

- _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _

e

.

Dg ails 1. Meeting Attendees Philadelphia Electric Company B. Birely, Senior Licensing Engineer D. Helwig, General Manager, Nuclear Quality Assurance D. Smith, Vice President, Peach Bottom Atomic Power Station (PBAPS)

D. Meyers, Support Manager, PBAPS G. Bird, Auditor, Nuclear Quality Assurance R. Weindorfer, Director, Nuclear Plant Security Nuclear Regulatory Commission J. Allan, Deputy Regional Administrator G. Sjoblem, Acting Director, Division of Radiation Safety and Safeguards W. Kane, Director, Divsion of Reactor Projects R. Bel'amy, Chief, Facilities Radiological Safety and 'afeguards Branch R. Keimig, Chief, Safeguards R. Capra, Acting Chief, Project Branch No. 2 J. Linville, Chief, Projects Section 2A J. Williams, Project Engineer T. Johnson, Senior Resident Inspector R. Bailey, Physical Security Inspector W. Lancaster, Physical Security Inspector W. Kushner, Safeguards Scientist J. Gutierrez, Regional Attorney W. Butler, Project Director, Office of Nuclear Reactor Regulation R. Skelton, Project Reviewer, Office of Nuclear Reactor Regulation 2. Summary of Discussion Mr. Allan opened the meeting and the attendees were introduced. Mr. Allan described the purpose of the Management Meeting and addressed the following issues: There appeared to be little evidence of prior security management planning and contractor oversight as indicated in both the 1988 Annual Audit Report and the April 15, 1988 investigation repor The security program is a significant issue for restart of the Peach Bottom Atomic Power Statio Allegations by Peach Bottom Atomic Power Station security force personnel are repetitive in natore and indicative of ineffectivo and/or insuf ficient security n:anagemens oversight, i

l J

e *

.

. The proprietary Security Shift Supervisors' training crogram does not appear to be effective as indicated by the continuing problems being experience There appears to be a general lack of basic supervisory and nuclear security skills within the contractor's security force supervisory staf Mr. Kane expressed Region I's concern relative to short-term corrective actions and asked Mr. Smith to discuss actions that the licensee proposed to take. Mr. Smith was not prepared to discuss short-term corrective actions and asked for a two week extension to prepare a presentation which would address that subject. Mr. Smith did discuss long-term corrective actions which included: 1) hiring a new proprietary security speciTlist to eventually being trained to Assume command of the PECO security organization; 2) reconsideration of the current security force contractor; 3) developing and implementing a new security force training program; and 4) providing more effective manage-ment oversight of the security force contracto Conclusion of Meeting Mr. Allan concluded the meeting by requesting the following: Assurance in writing from the licensee that the station is presently in compliance with the general performance objectives of 10 CFR 73.55(a) and, also in writing the licensee's short-term plans to address the issues dis-cussed at this meeting, Another Management Meeting, to be held in the near future, at which time the licensee will be expected to present its short term plans and their anticipated results, as well as to provide a status on implementation of long term plan Mr. Smith agreed to Mr. Allan's requests.