Forwards Safety Insp Repts 50-277/87-30 & 50-278/87-30 on 871019-23 & Notice of Violation.Response Should Pay Particular Attention to Actions Taken or Planned to Ensure That Item of Noncompliance Corrected & Will Not Recur
ML20236X308
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 12/04/1987
From: Johnston W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Gallagher J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20236X311 List:
References
NUDOCS 8712090111
Download: ML20236X308 (2)


See also: IR 05000277/1987030

Text

_ _ _ _ _

_ - _ _ _ - - - _ _ _ _ _ - ___ - - _ _ _ - _ _ _ . _- - __- -_-_-

.

%,. '

N

t

4 '., i

'

.h c .

,

DEC 0 41987 '

l'

- Docket Nos.' 50-277. License'Nos. DPR-44

o'

50-278 DPR-56-

e

E Philadelphia Electric Company

L ATTN: Mr. J. W. Gallagher

? a Vice President

? Nuclear Operations-

2301' Market Street

Gentlemen:

Subject: Combination Inspection Report Nos. 50-277/87-30.and 50-278/87-30

This. refers to the : routine safety inspec ion conducted by fir. A. Krasopoulos-

of this office on October 19-23, 1987 at the Peach Bottom Power Station

Units 2.and 3, Delta, Pennsylvania of activities authorized by NRC' License No's.

OPR-44 anri DPR-56 and to the discussions o' our findings held by Mr. Krasopoulos

' with Mr. D. Smith of your staff at the conclusion of the inspection.

Areas = examined during this inspection are described in the NRC Region I

Inspection Report'which;is enclosed with this letter-. .W ithin these areas, the

. inspection consisted of selective examin(tions of procedures'and representative

,

records, interviews with' personnel, and observations by the inspector.

. Based on:tne results of this inspection,.it appears that one of your activities

was.not' conducted in: full compliance with'NRC. requirements,.as set forth in the

Notice of Violation, enclosed herewith as Appendix A. This violation has been

categorized by severity level in accordance with the " General Statement of.

-Policy.and Procedure for'NRC Enforcement Actions", 10 CFR Part 2,~ Appendix C

(Enforcement Policy).. .You are required to respond to this letter and in

preparing your response, you-should follow the instructions in Appendix A. j

! The deficiency identified in the Notice of Violation enclosed with this letter

was identified during a previous inspection of your licensed activities on

'

November- 15,1983,..and was documented in the enclosure to our letter dated

January 27, 1984. Your letter to this office dated February 23, 1984, stated

f that the noncompliance was caused by inadequate tracking systems. You stated

that.the Station Superintendent issued a directive emphasizing the importance

'of participating in the treining and made a commitment to maintai'n fire pro-

tection training as a high. priority item. You also stated that the Operation

Engineers staff will ensure that each member of the fire brigade has received

the-required training. From:our Octcber 20, 1987 inspection it appears that

the stated' corrective action were not effective since this item has recurred.

In your response to this letter, you s.hould give particular attention to those

actions taken or planned to ensure that the identified item of noncompliance

will be completely corrected and will not recur.

o .

""CIAL RECORD COPY CIR PB 87-30 - 0001.0.0

h h$$ 7l

IIl 0lOl

[ b.

,

E. $

!

,.  !

.' Philadelphia Electric Company 2

l

l

I

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget

as required by the Paperwork Reduction Act of 1980, PL 96-511.

Your cooperation with us in this matter is appreciated.

Sincerely,

Orid=1 M

William V. Johnston, Acting Director

Division of Reactor Safety

4

Enclosure:

1. Appendix A, Notice of Violation

2. NRC Region I Inspection Report Numbers 50-277/87-30 and 50-278/87-30

cc w/ encl:

Dickinson M. Smith, Manager, Peach Bottom Atomic Power Station

John S. Kemper, Senior Vice President, Engineering and Production

Thomas S. Shaw, Jr. , Vice President, Production

Troy B. Conner, Jr. , Esquire

W. H. Hirst,' Director, Joint Generation Projects Department,

Atlantic Electric

G.~ Leitch, Nuclear Generation Manager

Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire

Thomas Magette, Power Plant Siting, Nuclear Evaluations

W. M. Alden, Engineer in Charge,. Licensing Section

Doris Poulsen, Secretary of Harford County Council

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

HRC Resident Inspector

Commonwealth of Pennsylvania

bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

Section Chief, DRP

Robert J. Bores, DRSS

r

RI:DRS RI:DRS RI RS I

KRAS0POULOS ANDERSON EA / l

12/h 12/ 87 12/'A /87 g

0FFICIAL RECORD COPY CIR PB 87-30 0001.2.0

11/30/87 ;j

l

s

I

I

1

i

_ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ _ _ i