Safety Insp Rept 50-461/87-22 on 870617-0903.No Violations Noted.Major Areas Inspected:Review Startup Test Results
ML20239A277
Person / Time
Site: Clinton Constellation icon.png
Issue date: 09/11/1987
From: Dunlop A, Dupont S, Landsbury R, Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20239A268 List:
References
50-461-87-22, NUDOCS 8709170239
Download: ML20239A277 (2)


Text

_ __

-

i

U.S. NUCLEAR REGULATORY COMMISSION

REGION III

Report No. 50-461/87022(DRS)

!

'

Docket No. r0-461 License No. NPF-55 Licensee: Illinois Power Company 500 South 27th Street l Decatur, IL 62525 Facility Name: Clinton Nuclear Power Station, Unit 1 Inspection At: Clinton Site, Clinton, Illinois Inspection Cenducted: June 17 through September 3, 1987 {

!

,

Inspectors: A. Dunlop, J % M ( [M 7- #/~ // ~/ 7 Date

.

$(UAf hv S. DuPont f ~// - b,7 Date l . n bur, 7- O Date Approved By: < . i t hief '7////P7 Test Programs Section Date Inspection Summary Inspection on June 17 through September 3, 1987 (Report No. 50-461/87022(DRS))

Areas Inspected: Routine, unannounced safety inspection to review startup test j r esu;ts (72532, 72301) l U els: Of the one arna inspected, no violations or deviations were identified.

i l

'

8709170239 870911 PDR G

ADOCK O 4ji L

____-_____ - -

.

"

DETAILS Persons Cont:cted Illinois Power Company

  • L. Holesinger, Assistant Manager, Startup
  • J. Rider, Joint Test Group Chairman
  • J. A. Brownell, Project Specialist, Licensing
  • C. Cherches, Licensing and Safety
  • 0. R. Vincent, Lead Commitment Control Engineer, Startup
  • Denotes those personnel listed above who attended the exit interview on September 3, 198 . Startup Test Results Evaluation The inspectors reviewed the results of the below listed startup test procedures to verify all test changes were identified and approved in accordance with administrative procedures; all test deficiencies were appropriately resolved, reviewed by management, and retested as required; test results were evaluated by appropriate engineering personnel and specifically compared with acceptance criteria; data was properly recorded, signed, dated, and documented as test deficiencies if out of tolerance, and test results were approved by appropriate personnel:

STP-14-1, "RCIC System" STP-71-H, " Residual Heat Removal" STP-77-H, " Main Steam Isolation Valve Leakage Control" STP-14-2, "RCIC System" STP-05-0, " Control Rod Drive System" STP-05-2, " Control Rod Drive System" STP-05-0 and STP-05-2 were not completed at the end of the inspection and will be documented in a subsequent inspection repor No violations or deviations were identifie . Exit Interview The inspector met with licensee and contractor representatives denoted in Paragraph I during and at the conclusion of the inspection on September 3, 1987. The inspector summarized the scope and results of the inspection and discussed the likely content of this inspection repor The licensee acknowledged the information and did not indicate that any of the information disclosed during the inspection could be corisidered proprietary in natur _ _ - _ _ _ _ _ _ _ _ _ - _ _ _ ___ _