ML20212H478

From kanterella
Revision as of 02:21, 21 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Perry Nuclear Power Plant Unit 1 Startup Rept, Covering Initial Startup from 860606-870301
ML20212H478
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/03/1987
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20212H480 List:
References
PY-CEI-NRR-0602, PY-CEI-NRR-602, NUDOCS 8703060120
Download: ML20212H478 (1)


Text

v f THE CLEVELAND ELECTR P.O. BOX $000 - CLEVELAND, OHIO 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLOG. - 55 PUBLICSoVARE Serving The Best Location in the Nation MURRAY R. EDELMAN SR VICE PRESIDENT NUCLEAR March 3, 1987 PY-CEI/NRR-0602 L Document Control Desk U.S. Nuclear Regulatory Commission Washington D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 Initial Startup Report

Dear Sir:

Attached is the initial Startup Report for Perry d Unit I covering the time period from June 6,1986 through March 1, 1987, inclusive. This report is submitted in accordance with Regulatory Guide 1.16 and Perry Technical Specifications, Section 6.9. j Please feel free to contact me if you have any questions.

Very truly yours, W h l Murray R. Edelman Senior Vice President Nuclear Group i

! Enclosure MRE:njc cc: Jay Silberg, Esq.

Paul Leech (2)

K. Connaughton

[hbg a L. Hiller (Office of Management & Program Analysis) g

(

j Regional Administrator, USNRC Region III 0703060120 W O303 0 PDR ADOCK 0500 P