Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217G6971999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Calvert Cliffs Npp,Units 1 & 2.With ML20212A4441999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Ccnpp,Units 1 & 2. with ML20210S6091999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ccnpp,Units 1 & 2. with ML20209F1721999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Calvert Cliffs Npp.With ML20195K2811999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ccnpp,Units 1 & 2. with ML20206R5871999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ccnpp,Units 1 & 2. with ML20205P5441999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20207M8321999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Calvert Cliffs Nuclear Power Plant.With ML20199E2931998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Calvert Cliffs Npp. with ML20198B2631998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20195E5281998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Calvert Cliffs Nuclear Power Station,Units 1 & 2.With ML20154M5841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Calvert Cliffs Nuclear Plant,Units 1 & 2.With ML20151Y1191998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Calvert Cliffs Nuclear Power Plant Units 1 & 2.With ML20237B9371998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Calvert Cliffs Nuclear Power Plant ML20236R0881998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20249A7711998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ccnpp,Units 1 & 2 ML20247H5661998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Ccnpp ML20216G4601998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20248L3641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20202G6611998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20198N9441997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Calvert Cliffs Nuclear Power Plant,Units 2 & 3 ML20203H3081997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Calvert Cliffs Nuclear Power Plant ML20199D0801997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20198J6631997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Calvert Cliffs Nuclear Power Plant ML20210U7031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Ccnpp ML20210L0671997-07-31031 July 1997 Monthly Operating Repts for July 1997 for Ccnpp ML20149E2301997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Calvert Cliffs Nuclear Power Plant ML20148L1761997-05-31031 May 1997 Monthly Operating Repts for May 1997 for CCNP ML20141F1401997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20137W8781997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Calvert Cliffs Nuclear Power Plant ML20136J4941997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20134M2891997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20133N1031996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20132D1141996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Calvert Cliffs Nuclear Power Plant,Unit 1 & 2 ML20134L6621996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Calvert Cliffs Nuclear Power Plant Unit 1 & 2 ML20128Q8011996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Calvert Cliffs Npp,Units 1 & 2 ML20117N2171996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20116M6701996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20115F7281996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20112J1291996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20112A2421996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20107C1831996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20101D7831996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Ccnpp ML20149K8721996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Ccnpp ML20096D7031995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Ccnpp Units 1 & 2 ML20095H3741995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20096D7171995-11-30030 November 1995 Rev to Monthly Operating Rept for Nov 1995 for Ccnpp Unit 2 ML20094M0161995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Calvert Cliffs Nuclear Plant ML20093G5881995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Calvert Cliffs Nuclear Power Plants Units 1 & 2 ML20092G3521995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Calvert Cliffs Nuclear Power Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G6971999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Calvert Cliffs Npp,Units 1 & 2.With ML20216J8731999-09-10010 September 1999 Rev 52 to QA Policy for Calvert Cliffs Nuclear Power Plant ML20212A4441999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Ccnpp,Units 1 & 2. with ML17326A2011999-08-23023 August 1999 LER 99-004-00:on 990724,reactor Tripped Due to Main Transformer Bushing Flashover.Plant Was Brought to SS & Components Were Tested & Performed Satisfactorily.With 990823 Ltr ML20210S6091999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ccnpp,Units 1 & 2. with ML20210N6001999-07-27027 July 1999 ISI Summary Rept for Calvert Cliffs Unit 2. Page 2 of 3 in Encl 1 of Incoming Submittal Not Included ML20210B7941999-07-15015 July 1999 SER Denying Licensee Request for Changes to Current Ts,Re Deletion of Tendon Surveillance Requirements for Calvert Cliffs LD-99-039, Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified1999-06-30030 June 1999 Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified ML20209F1721999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Calvert Cliffs Npp.With LD-99-035, Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed1999-06-25025 June 1999 Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed ML20196C6981999-06-21021 June 1999 Safety Evaluation Concluding That Use of ASME Section XI Code Including Summer 1983 Addenda as Interim Code for Third 10-year Insp Interval at Calvert Cliffs Units 1 & 2 Until Review of 1998 Code Completed,Would Be Acceptable ML20195K2811999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ccnpp,Units 1 & 2. with ML20206R5871999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ccnpp,Units 1 & 2. with ML20195B3891999-04-30030 April 1999 0 to CENPD-279, Annual Rept on Abb CE ECCS Performance Evaluation Models ML20205N2951999-04-13013 April 1999 Special Rept:On 990314,fire Detection Sys Was Removed from Svc to Support Mod to Replace SRW Heat Exchangers in Unit 2 SRW Room During Unit 2 Refueling Outage.Contingency Measure 15.3.5.A.1 Will Continue Until Fire Detection Sys Restored ML20210T5211999-04-0101 April 1999 Rev 0 to Ccnpp COLR for Unit 2,Cycle 13 ML20205P5441999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20204H6471999-03-21021 March 1999 SER Re License Renewal of Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20207M8321999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Calvert Cliffs Nuclear Power Plant.With ML20203D4311999-02-0505 February 1999 Safety Evaluation Accepting Procedure Established for long-term Corrective Action Plan Related to Containment Vertical Tendons ML20199G4671999-01-20020 January 1999 SER Accepting USI A-46 Implementation for Plant ML20206Q3221999-01-11011 January 1999 Special Rept:On 981226,wide Range Noble Gas Effluent RM Was Removed from Operable Status.Caused by Failure of mid-range Checksource to Properly Reseat.Completed Maint & post-maint Testing & RM Was Returned to Operable Status on 990104 ML20207L0451999-01-0808 January 1999 Cost-Benefit Risk Analyses:Radwaste Sys for Light Water Reactors ML20199F4781999-01-0808 January 1999 Safety Evaluation Concluding That Bg&E Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves Susceptible to Pressure Locking.Concludes GL 95-07 Actions Were Addressed ML20198S7591999-01-0707 January 1999 SER Accepting Quality Assurance Program Description Change for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20207M2281998-12-31031 December 1998 1998 Annual Rept for Bg&E. with ML20199E2931998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Calvert Cliffs Npp. with ML20206R9911998-12-0808 December 1998 Rept of Changes,Tests & Experiments (10CFR50.59(b)(2)). with ML20198B2631998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20195H1001998-11-16016 November 1998 Safety Evaluation of First Containment Insp Interval Iwe/Iwl Program Alternative ML20196E2211998-10-31031 October 1998 Non-proprietary Rev 03-NP to CEN-633-NP, SG Tube Repair for Combustion Engineering Designed Plant with 3/4 - .048 Wall Inconel 600 Tubes Using Leak Limiting Alloy 800 Sleeves ML20195E5281998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Calvert Cliffs Nuclear Power Station,Units 1 & 2.With ML20154Q7191998-10-21021 October 1998 Special Rept:On 980923,unit 1 Wrngm Was Removed from Operable Status.Caused by Failure of Process Flow Transducer.Completed Maint to Remove Process Flow Transducer Input to Wrngm Microprocessor & Completed Formal Evaluation ML20154G3931998-10-0505 October 1998 Safety Evaluation Concluding That Flaw Tolerance Evaluation for Assumed Flaw in Inboard Instrument Weld of Pressurizer Meets Rules of ASME Code ML20154M5841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Calvert Cliffs Nuclear Plant,Units 1 & 2.With ML20153C2571998-09-18018 September 1998 Special Rept:On 980830,wide Range Noble Gas Monitor (Wrngm) Channel Was Removed from Operable Status.Caused by Need to Support Performance of Required 18-month Channel Calibr.Will Return Wrngm to Operable Status by 980925 ML20153C1091998-09-18018 September 1998 Part 21 Rept Re Defective Capacity Control Valves.Trentec Personnel Have Been in Contact with Bg&E Personnel Re Condition & Have Requested Potentially Defective Valves ML20151U5441998-09-0404 September 1998 Bg&E ISI Summary Rept for Calvert Cliffs ML20151T5281998-09-0101 September 1998 Special Rept:On 980819,declared Rv Water Level Monitor Channel a Inoperable.Caused by Failure of Three Heated Junction Thermocouples (Sensors) in Lower Five Sensors. Channel a & B Rv Water Level Probes Will Be Replaced ML20151Y1191998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Calvert Cliffs Nuclear Power Plant Units 1 & 2.With ML20237D4981998-08-19019 August 1998 Safety Evaluation Accepting Licensee Request for Extension of Second ten-year Inservice Insp Interval ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML20237B9371998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Calvert Cliffs Nuclear Power Plant ML20237D5941998-07-22022 July 1998 Rev 2 to Ccnpp COLR for Unit 2,Cycle 12 ML20236L7521998-07-0606 July 1998 Safety Evaluation Granting Bg&E 980527 Request for Relief from Requirement of Section IWA-5250 of ASME Code for Calvert Cliffs Unit 2.Alternatives Provide Reasonable Assurance of Operational Readiness ML20236F7791998-06-30030 June 1998 Safety Evaluation Authorizing Request for Temporary Relief from Requirement of Subsection IWA-5250 of ASME Code,Section XI for Plant,Unit 1 ML20236R0881998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20236X3101998-06-19019 June 1998 Rev 1 to Calvert Cliffs Nuclear Power Plant COLR for Unit 2,Cycle 12 ML20249A9571998-06-15015 June 1998 Special Rept:On 980430,fire Detection Sys Was Removed from Svc to Support Mod to Purge Air Sys 27-foot Elevation & 5-foot Elevation East Piping Penetration Rooms.Installed Temporary Alteration & Returned Fire Detection Sys to Svc ML20249A7711998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ccnpp,Units 1 & 2 1999-09-30
[Table view] |
Text
.
OPER ATING DAT A REPORT DSCKET NO. 50-318 DATE 10/15/82 COMPLETED BY Elaine latito TELEPHONE (301) 787e5363 OPERATING STAT US
- 1. Uni: Name: Calvert Cliffs No. 2 Notes
- 2. Reporting Period: Septater 1982 2,700
- 3. Licensed Thermal Pow er (MW ):
- 4. Nameplate Rating (Gross MWe); 911
- 5. Design Electries! ReimgiNet MWe): E
- 6. Maximum Dependab'e Capacity (Gross MWeJ: 860
- 7. Maximurn Dependable Capacity (Net MWe): 825
- 8. If Char ges Occur in Capseity Ratings (Items Nunter 3 Through 7) Since Last Report.Gise Reasons.
- 9. Power Leiello bhich Restricted.lf Any (Net 4 thel:
- 10. Reasor. For Restnerie:u lf Any:
This Month Yr..to Date Ct.mulative I1. Ilours in Reporting Period 720.0 6,551.0 _
48,215.0 '
0.0 u, w .1 m , m. i
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Resene Shutdown Hours 0.0 81.0 795.2
- 14. Hours Generator On Line 720.0 '6,136.7 41,181.1,
- 15. Unit Resene Shutdow.illours 0.0 O.0 0.0
- 16. Grors Thermal Energy Generated (MWHI 1.719.806 15,327,381 101,371,937 .
- 17. Cross Electrical Encray Genersted IMWill 542.205 4.971.190 33,386,593 __
- 18. Net Eleurical Energy Generated (MWH) 515.950 4.752.154 _ 31,837, % 5
- 19. Urut Senice Factor 100.0 93.7 85.4
- 20. Unit Annilshility Factor 100.0 93.7 63.4
- 21. Unit Capacity Factor iUsing MDC Ne I %.7 67.9 m.u
- 22. Unit Cepacity Factor tusing DER Net) 84.8 85.9 _
78.2
- 23. Unit f orced Outage Rate 0.0 6.0 4.s
- 4. Shutdowns Scheduled 0,cr Nest 6 Months 11)pe. Date.snd Duration of Each t:
No. 2 Scheduled for refueling, Unit General Inspection, Retubing of Condenser and to install the third
~
auxiliary feedwater train frcn 10/17/82 until 2/13/82.
- 25. If Shut Down At End Of Report Fenod. Estimated Date of Startup:
- 16. Units in Test Status (Prior to Commercial operationi. Forecast Achieved INITIA L CRITICALITY.
INITIAL ELECTRICITY COM%IERCI A L OPER ATION
~8210210457 821015
, PDR ADOCK 05000317 l (9/77)
R PDR
OPERATING DATA REPORT DOCKET NO. 317 DATE 10/15/82 COMPLETED BY Elaine lotito TELEPHONE (301) 787-5363 OPERATING STATUS Notes I. Urd: Name: Calvert Cliffs No. 1
- 2. Reporting Period. SePtenber 1982
- 3. Li:ensed Thermal Pow er (MWt p: 2700
- 4. Nameplate Rating (Gro>s MWe): 918 S. Design Electrical Rating (Net MWe): %5
- 6. Maximum Dependable Capacity (Gross MWe): 860
- 7. Masimum Dependable Capacity (Net MWe): 825
- 8. If Charges Oecur in Capacity Ratings litems Nur iter 3 Through 7) Since Last Report.Gi Reasons.
- 9. Power Lesel To hhiels Restricted. lf Any (Net MWe):
- 10. Reason For Restrictioits. lf Any:
Thia $onth Yr.. o.Date Cs.mulative 4
- 11. ilours In Reporting Period 720.0 6,551.0 _
64,860.0 *
- 12. Number Of flo irs Reactor Was Critical 511.6 4,310.3 50,910.0
- 13. Reactor Resene Shurdcwn Hours 0.0 3.1 l',795.5
- 14. Hours Generator On-Line 502.6 4,255.6 49,857.3; -
- 15. Unit Resene Shutdown IInurs 0.0 0'.0 0.0 -
- 16. Gross Thermal Energy Gererated (MWill 1,306,445 10,998,735 _
120,916,zu ,
- 17. Gross Electrical Energy Genersted IMWill 432,305 _
3,662,266 _ 39,636,zb3
- 18. Net Electrical Energy Generated (MWHI 411,446 3,495,433 J/,/v/, e
- 19. Unit Senice Factor 69.8 65.0 so.>
- 20. Unit Assilability Facto 69.8 65.0 76.9
- 21. Unit Capacity Factor (Using MDC Net, 69.3 64.7 70.6
- 22. Unit Capacity factor iUsing DER Net) 67.6 63.1 69.0
- 23. Unit Forced Outage Rate 30.2 6.8 8.7
- 24. Shutdowns Scheduled Oscr Nest 6 Months (Type. Date.and Duration of Eacht:
- 25. If St.ut Down At End Of Report Period. Estimated Date of Startup: 1
- 26. Unis:In Test Status (Prior to Commercial Operstion): Forecast Achieved INITIA L CRITICA LITY.
INITIA L ELECTRICITY COMMERCI A L OPER ATION (9/77)
50-318 DOCKET NO.
UNIT SHUTDOWNS AND POWER REDUCTIONS Calvert Cliffs No. 2 UNIT NAME DATE in/ts/s?
COMPLETED BY Elaine Intito REPORT MONT){ Septerrber 1982 TELEPHONE (301) 787-5363 e.
- E E
, .$E "h j $3 Liansee ,E-r, je. Cause & Corrective N. Date g 3g ( 2s5 Event 3g Action to
- $E 5 j ;p3 g Report a sn L g{ Prevent Recurrence 6
NO OlEACES PUIE: No. 2 Unit has been reduced to various load levels almost the entire month due to condenser tube Icaks.
I 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) I-Manual for Preparation of Data .
B. Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Event Report (LER) File (NUREG.
D-Regulatory Restriction 44 ontinuation 0161)
E-Operator Training & License Examination 5-Load Reduction F-Administrative 5 9-Other Exhibit 1 - Same Source G-Operational Erros (Explam)
. (9/77) llother (Explain)
DOCKET NO. 50-317 UNITSHUTDOWNS AND POWER REDUC 110NS UNIT NAME Calvert Clif fs Nn. 1
. DATE in/t s /w)
COMPLETED BY Elaine Intito REPORT MONTil Septmber 1982 11ELEPHONE 001) 787-5363 n.
- E E
' - ,$? 'h j E3 Licensee g e, gg Cause & Corrective
?k s. D. ate h 3g ( .5 g 5 Esen: ~g Action to H
$E $ e
~ ; =
f3 g
Report a mO u
{o Prevent Recurrence O
E 82-08 091882 S 217.4 A 1 E PitP E Replaced No. 12B Reactor Coolant Ptup Shaft Seal and other miscellaneous nnintenance.
I 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance ci Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Event Repor (LER) File (NUREG.
D-Regulatory Restriction 42 continuation 0161)
E-Operator Training & Ucense Eumination 5-Load Reduction F Administrative 5 9-Other Exhibit 1 Same Source G-Operational En ror ( E xplain)
, 19/77) llother (Explain) e
AVERAGE D AILY UNIT POWER LEVEL 5
DOCKET NO. 50.-317 UNIT Calvert Cliffs No. 1 DATE 10/15/82 COMPLETED BY Elaine Iotito
- (301) 787-5363 TELEPff0NE i
MONTil Septmber 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe Net) 1 849 826 17 2
852 -
18 852 -
3 19 4 850 -
20 810 -
5 21 t
6 850 -
22 ON -
7 23 851 8 24 849 -
9 25 10 -
26 II M9 27 288 l
! 12 849 28 856 849 859 13 29 I4 863 30 15 849 3I -
16 R49 i
INSTRUCTIONS On this format.hst the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
p,, ..
AVER AGE D AILY UNIT POWER LEVEL DOCKET NO. 50-318 UNIT Calvert Cliffs No. 2 DATE 10/15/82 COMPLETED BY Elaine lotito TELEPFIONE (301) 787-5363 MONTil Septmber 1982 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) (MWe-Net) 1 644 821 17 647 817 2 13 3 668 715 19 680 687 4 20 5
676 697 21 6 688 700 22 672 M 7 23 690 687 g
24 9 686 698
- 26 710 7 '+9 33 27 12 821 820 28 817 808 13 29 708 679 14 30 15 31 16 720 INSTRUCTIONS On this format. fist the nerage daily unit power level in MWe. Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77) 1
-Q
October 5,1982 REFUELING INFORMATION REQUEST
- 1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No. I
- 2. Scheduled date for next Refueling Shutdown: October 1,1983
- 3. Scheduled date for restart following refueling: December 11,1983
- 4. Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment?
Resumption of operation af ter refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
June 29,1983
- 6. Important licensing considerations associated with the refueling.
Reload fuel will be similar to that reload fuel inserted into the previous cycle.
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217 (b) 656 Spent Fuel Pools are common to Units 1 and 2
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
1830 Licensed 1358 Currently Installed
- 9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.
April,1991
i 4
+
l
) October 5,1982 4
REFUELING INFORMATION REQUEST
- 1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2.
- 2. Scheduled date for next refueling shutdown: October 15,1982.
! 3. Scheduled date for restart following refueling: January 12, 1982.*
1 j 4. Will refue ing or resumption of operation thereaf ter require a technical specification '
change or ather licensed amendment?
Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.
l i 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
October 11,1982*
- 6. Important licensing considerations associated with refueling, j Reload fuel will be similar to that reload fuel inserted in the previous cycle.
l 7. The number of fuel assemblies (a) in the core and (b) in the Spent Fuel Storage Pool. :
)
(a) 217 (b) 656 l
Spent Fuel Pool is common to Units 1 and 2.
! 8. The present licensed spent f_uel pool storage capacity and the size of any increase in
. licensed storage capacity that has been required or is planned, in number of fuel j assemblies.
i 1830 Licensed 1358 Currently Installed ,
- 9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core i of f load, r
- April,1991 3 *This information changed since last report.
l l
i l
_ - _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ - ._______.________.________________.____________._m_ _ _ _ _ _ _ _ _ _ _ . _ _ _ . _ _ _ . _ . _ _ _ _ _ . _ _ _ _ _
. . s.
i l
1
SUMMARY
OF UNIT 2 OPERATING EXPERIENCE -SEPTEMBER 1982 9/1 At the beginning of this reporting period Unit 2 was operating at 675 MWe with the reactor at 81% power while ins estigating saltwater leakage into the main condenser.
9/10 Resumed full load operation (860 MWe) at 0315. At 1330 load was reduced to 720 MWe to investigate saltwater leakage into the main condenser.
9/12 Increased load to 845 MWe at 0001.
9/13 Load was increased to capacity (860 MWe) at 0200. Decreased load to 755 MWe at 2330 for replacement of condensate demineralizer resin.
9/14 At 0110 load was reduced to 740 MWe to investigate saltwater leakage into the main condenser.
9/16 Resumed full load operation (865 MWe) at 1945.
9/19 At 0900 load was reduced to 655 MWe due to high circulating water A T and for investigation of saltwater leakage into the main condenser. Load was increased to 715 MWe at 1600.
9/25 Load was increased to 800 MWe at 0900 when indications of saltwater leakage
! returned. Decreased load to 710 MWe at 1300 to investigate.
- 9/28 Load was increased to capacity (860 MWe) at 0100, 9/30 At 0001 load was decreased to 720 MWe to clean main condenser water boxes and for investigation of saltwater leakage into the main condenser. Plugged 87 leaking condenser tubes this month. At the end of this reporting period Unit 2 was operating at 720 MWe with the reactor at 85% power while investigating saltwater leakage into the main condenser.
i
- s o.
SUMMARY
OF UNIT 1 OPERATING EXPERIENCE -SEPTEMBER 1982 9/1 At the beginning of this reporting period Unit I was operating at 875 MWe with the reactor at 100% power.
9/5 Decreased load to 755 MWe at 0305 for main turbine control valve testing.
Resumed full load operation (875 MWe) at 1100.
9/18 The unit was shutdown at 0124 to replace the shaft seal on 12B Reactor Coolant Pump and for other miscellaneous maintenance. The reactor was shutdown at 0225. The reactor was placed in cold shutdown at 1315.
9/19 Completed draining the Reactor Coolant System at 1315.
9/23 Completed filling the Reactor Coolant System at 0530.
9/25 Reactor Coolant System heatup was completed at 0850.
9/26 The reactor was brought critical at 1820.
9/27 The unit was paralleled at 0245.
9/28 Resumed full load operation (860 MWe) at 0100.
9/29 Load was increased to 890 MWe at 2100.
9/30 At the end of this reporting period Unit I was operating at 890 MWe with the reactor at 100% power.