Rev 8 to Operations QA Plan
ML20066H216
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 12/19/1990
From: Hall D, Jordan T
HOUSTON LIGHTING & POWER CO.
To:
Shared Package
ML20066H213 List:
References
NUDOCS 9102200223
Download: ML20066H216 (115)


Text

..- - - . . . . . . . . . , . . - .

. . . , , . , . . . ~ . ~ , - . . _-,...-,....~-~...-.......-..-..--.m..

K,

' n E

. e,

\ ControllediManual No. i t

! Manual _'Holde r ? j

g. m

~. a n) g ,

'f ,

?

iCONTR0tif.Di -

?

e-.

o--. ..

-t' MEBf:()B 1991)

+

N jyg J " a /

A a

jg- k em

- -7 ..

)

't I

.i

?

\ >

.t OPERATIONS.'QUALITi> ASSURANCE ~ PLAN. '

,  ?!

a

. -- g

?

1 e ..

h l .i.

I: <.

L-l' .

.)

L-.

g

?: .

a i

1, .

a..

g- ,

.- - t~ . ..<i..

'i p- m.

i t :,

,l , ' - < ,

.t 7- >

r . South; Texas Project Electric Generating <Stationt <

d hd.

t

$~

'

  • i

~~9102200223'910208 i

-fDR ADOCK 0500049s

]? .PDR , q e 2: , ,

.~  !.J ' ._ q

,g

- --- .-. . .. . . ........x_,_.;_,,_,..... . ,, .,,,,,g....g,,.,. , , , , , _ . . . , _ , ., ; _,,

STP 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION E8  ;

OPERATIONS QUALITY ASSURANCE' PLAN i PAGE . 1 OF : 1 EFFECTIVE DATE 12/21/90 Approved by*

Date: M- ,

D. P. ~ tGT1 .!

Group Vice President, Nuclear i Approved by: Date: /2/8 O'  :

T. Jordhn / /

G ne al. Manager, Nuclear Assurance-

.i l

1 i

PORC Meeting No.: 90-048 , Date: 8-21-90 a

(

,I

STP 724 (02/90)

WW85 8OUTH TEXAS PROJECT ELECTRIC GENERATING STATION Table of Contents 7'O OPERATIONS QUALITY ASSURANCE. PLAN proc 1y 2-TABLE OF^ CONTENTS ((denW 12-21-90 t

chapters Requiring NRC Approval Chapter Title of Effective Effective Humber Chaoter Revision No. Date Definitions 5 12-21-90 1.0 Organization 5 12-21-90 2.0 Program Descript3cn -6 12-21-90 3.0 Conduct of Plant Operations 5 12-21 4.0 Qualification, Training, and 4 12-21-90

-Certification of Personne1' 5.0 Maintenance,-Installation.of 4 12-21-90 r-)j (s

Modifications, and Related Activities 6.0 Design and Modification Control -5 12-21-90 7.0 Procurement 5 12-21-90 l

8.0 Control and Issuance of' 4 12-21 !

Locuments 9.0 Control of Material 4 12-21-90 10.0 Incpection 6- 21-90 l 11.0 Test Control 5 12-21-90

! - 12.0 Instrument and Calibration 5 12-21-90 l' Control 13.0- Deficiency' Control 4 12-21-90 14.0 Records Control. 4 12-21-90 15.0 Quality Assurance Audit ~4 : 12-21-90 and Surveillance Ov

STP 724 (02/90) .,

SOUTH TEXAS _ PROJECT ELECTRIC GENLRATING_.8TATION """'" Tabu E 8 of Contents T' , _ ~ .

OPERATIONS QUALITY ASSURANCE PIAN t SC 2 OF 2 EFFECTIVE TABLE OF CONTENTS DATc 12-21-90 Chapters Not Requiring'NRC-Approval Chapter Title of Effective Effectivo Number Chanter Revision No.- Date 16.0 Nuclear Fuel Management- 4 12-21 -ASME Code Section XI - Repairs 12-21-90 17.0 4 and Replacements ,

18 . 0 ~ ASME Code Section-XI - Inservice 4 12-21-90. >

Inspection and Testing.,

O V

C) v 4

f v vv +*e

STP 724 (02/90)

" "8E" SOUTH TEXAS PROJECT ELECTRIC- GENERATING STATION 37 tafinitions 5 hj V

OPERATIONS QUALITY ASSURANCE PLAN PAGE 1 or 9 DEFINITIONS trrtcTivt DAR 12-21-90 This chapter is provided to define terminology used in chapters of the OQAP. They-are derived from standard definitions where possible. Program procedures and document a which implement the' OQAP may provide variations of these definitions providing the intent of the OQAp definition and requirements are satisfied.

DEFINITIONS Abnormal condition - Any of the-followings

a. Exceeding a limiting condition for a power plant operation-established in the applicable technical specifications.
b. observed inadequacies in the implementation of administrative or procedural controls such that the adequacy causes or threatens to cause the existence or development-of an unsafe condition in connection with toe operation of.a nuclear power plant.

O)

( c. Conditions arising from natural or off-site man-made events that affect or threaten to affect the safe operation of a power plant.

Administrative _ controls - Rules, orders, instructions, procedures, policies, and designations of authority and responsibility written by management to obtain assurance of safety and high-quality operation. >

Annroval - An act of endorsing or~ adding positive authorization or both.

Anoroved Vendors List - A listing of vendors who have been evaluated to specific criteria and have been found to be qualified to provide specific items and/or services' .

As-Built Data - Documented data that describe the condition actually achieved in a product.

Audit - A documented activity performed in accordance with written procedures or checklists to verify, by examination and l evaluation of~ objective. evidence, that applicable. elements of the l quality assurance program have been developed,rdocumented,=and i

effectively implementedLin accordance-with'specified-s requirements. An audit does not-include surveillance or-(-s) inspection for the purpose of process control or product

\~/ acceptance. (ANSI N45.2.12) -.,

-- - .~ . -. - . . . ..

1 SF 724 (02/90) I E5

[ SOUTH TEXAS PROJEdT ELECTRIC GENERATING Definitions STATION

(

OPERATIONS QUALITY-ASSURANCE PLAN PAGE 2 OF 9 DEFINITIONS - Eracnw oAn 12-21-90 Authorized Nuclear Inspector (ANIl - Inspectors performing inspections required by Section III of the ASME Code who have=

been quelified by written examination under_the rules of any state of the United States or province of Canada which has adopted the code. The inspector shall'be an employee of an authorized inspection agency and shall not be an employee of-the certificate of Authorization holder. The ANI shall meet the requirements of ANSI N626.

Authorized Nuclear Inservice Insoector (ANII) - Inspectors performing inspections required by Section XI of the:ASME code.

The ANII is a representative of an authorized inspection agency or a state or-municipality of the United States, Canadian Province, or other enforcement authority having-jurisdiction over the Nuclear Power components at the plant site.-

Calibration - The process by which standards or working equipment ,

are checked against standards-of known-higher. accuracy and-adjusted as necessary to ensure their compliance with designated O specifications.

Certification - The action of determining, verifying, and attesting in writing to the qualifications of personnel or material.

Cleanness - A state of being clean in accordance with predetermined standards, and usually implies-freedom from dirt, scale, heavy rust, oil, or'other contaminating. impurities.-

Commercial Grade Item - A commercial grade item (as defined in l 10CFR21) is one which:

a. Is notisubject to-design or specification requirements that' are unique to the nuclear _ power industry; and l b. Is used in applications other thanJin the nuclear power.

industry; and-

c. Is to be procuredLfrom a manufacturer _or supplier on-the basis of specifications set forth in the manufacturer's-published product description (i.e., catalog)..

L l

e

'I SF 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION .

E5 gg Definitions (bj OPERATIONS QUALITY ASSURANCE PLAN PAGE 3 OF- 9 DEFINITIONS. ErFECDVE DAK - 12-21-90 component - A piece of equipment such as a vessel, piping, pump, valve, or core support structure, which-will be combined with other components to form an assembly.

Contaminants - Foreign materials such as mill scale, dirt, oil, 1 chemicals, and any matter that renders a-fluid, solid, or surCace-impure and unclean according to present standards of acceptable cleanness.

Contractor - Any organization under contract for furnishing equipment, material, or services. It includes the terms vendor, supplier, subcontractor,, fabricator, and subtier levels of these,-

where appropriate. Prime-contractor is used to indicate either the architect engineer, NSSS supplier, constructor, or nuclear fuel supplier.

Corrective Action - Any appropriate measure applied-for the purpose of making less likely the recurrence of the initial yg deficiency. Examples are:

~

a. Revision of procedures, practices, and/or design documents,
b. Increased surveillance of procedures and practices.
c. Work stoppage until problem situation-is alleviated,
d. Special training of-porsonnel,
e. Reassignment of personnel.

Corrective Maintenance - Repair and restoration.of equipment or components that have failed or are malfunctioning and are'not performing their intended function.

Critical Characteristics -' Identifiable and measurable-attributes / variables of a commercial grade item, which once selected to be verified, provide reasonable assurance that~the '

item received is the item specified.

Dedication - The point in time after which a commercial grade item is accepted for a safety-related application and deficiency reporting becomes the responsibility of the party performing the acceptance.

. STP 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING-8TATION Definitions ff 5

j O

OPERATIONS QUALITY ASSURANCE PIAN.

Pact 4 or - '9 1 DEFINITIONS trrECTM oxg 21-90 i

Deficiency - The characteristic of an item or document that makes: )

it nonconforming with the original criteria and is reported as.

audit findings, supplier deficiencies, event reports,: significant defectsc nonconformance reports, corrective:actionLreports, or. ,

other procedurally contro11ed'mechanismo.:

Realgn

. Technical and management-proces!sesiwhich. commence with.

identification of design input and whichl lead to and include-the issuance of design output documents.

i Desian control - Design control is-the pro'cassiused to verify:

that the design drawings,. design' calculations and specifications,'

including fabrication'and inspection 1 procedures for both shop and field, meet the project requirements.~

Desian Input - Those criteria, parameters,Lbases,1or other design requirements upon which a-detailed;finalldesignLie based, y Desian Outant - Documents such as drawings,' specifications, Land a 1

-other documents defining-technica11 requirements of' structures,

. systems, and components..

i Document-Review - The process of appraisal of documentation..:to-determine the adequacy of the document withErespect to. J quality / technical requirements.

L t

Drawina - A document which depicts:the geometric configuration 1of "

-an item,_ or the function of an. item.

Eaulvalency Evaluation A technical = evaluation' performed tCr confirm- that an- alternative ' item, not t identicalitolthenoriginal1 item, will satisfactorily perform its" intended' function onceLin service.- This term is synonymous with " Equal-to-or-Better-Than Evaluation".

Examination - An element of inspection: consisting of investigation of materials, components, supplies, or: services,Eto-determine conformance to thoselspecified requirements whichucant be determined .by' such investigation. : Examination is.usuallyq.

-nondestructive and includes simple physica1Lmanipulation,Jgaging,

.and measurement. -

' ~

Handlina - An act of physically moving. items by handLor.

mechanical means,;but-not including-transport' modes.u l

r

S1P 724 (02/00)

SOUTH TEXAS PROJECT ELECTNd GENERATING STATION "8'"

Definitions P0 OPERATIONS QUALITY ASSURANCE PLAN 5 or 9

" " PAGE cTM 12-21-90 Hold Point - A preselected step in any procedure or work process that identifies a portion or portions of,the procedure or work process which requires QA/Qc inspection due to the complexity, safety considerations, and/or inaccessibility of the activity and beyond which work may not progress until the required inspection is performed.

In-Service Insoection - The inspection performed generally during a reactor refueling outage or plant shutdown which assures that the nuclear equipment, vessels, and materials are of sufficient integrity to provide protection of public health and safety.

Inspection - A phase of quality control by which means of examination, observation, or measurement determines the conformance of materials, supplies, components, parts, appurtenances, systems, processes, or structures to predetermined quality requirements.

Item - Any level of unit assembly, including structures, system, O subsystem, subassembly, component, part, or material.

Material - A substance or combination of substances forming components, parts, pieces, and equipment items. (Intended to include such as machinery, castings, liquids, formed steel shapes, aggregates, and cement.)

Nonconformance - A deficiency in characteristic, documentation, or procedure which renders the quality of an item unacceptable or indeterminate. Examples of nonconformance include: physical defects, test failures, incorrect or inadequate documentation, or deviation from prescribed processing, inspection, or test procedures.

Notification Point - A preselected step established by Quality

,- Control in any procedure or work process which identifies a discretionary inspection point which may be waived based on the availability of Quality control personnel and other activities of a more critical nature.

Nuclear Fuel - Uranium ore, converted uranium, enriched uranium, fabricated fuel, pins and assemblies.

Packace - A wrapping or container including its contents of material or equipment.

i STP 724 (02/90)

SOUTH TEXAS-PROJECT ELECTRIC GENERATING STATION Definitions PI g OPERATIONS QUALITY ASSURANCE PLAN PMg 6 or 9 DEFINITIONS fy[**12-21-90 Part - An item which has work performed on it and which is- i attached to and becomes part of=a component before completion of '

the component.

Plant Modification - A planned physical change to a plant .

structure, system or component as described in design. documents.-  ;

Preventive Maintenance - Preventive,-periodic and planned <

maintenance actions taken to-maintain a piece of equipment within design operating conditions and extend its life and is performed prior to equipment failure. This includes-technical specification surveillances, inservice. inspections and other- '

regulatory forus of-preventive maintenance.

?

Procedure - A document that specifies or describes'how-an  ;

activity is to be performed. It may include methods to be ,

employed, equipment, or materials to be used and sequence of operations. ,

O

( ,/ Procurement - Interdisciplinary function'by whichLequipment',-

  • materials, or services-are acquired.:

Procurement Documents - PurchaseLrequisitions, purchase orders,  :

drawings, contracts, specifications or. instructions used to define requirements for purchase.-

f" (ANSI N45~.2.13)

Proposal - A document which describes-.the equipment,. material, or '

services which the vendor proposes to. furnish. 'The proposal-should include commercial information.and'a' statement of any exceptions to-the provisions of the inquiry.-

Purchase Order for Contract) - A document authorizing-a vendor to .

I provide-equipment, material:or services in accordance with the- '

l 1

terms and conditions-established in the-purchase order;or contract.

Qualification (Personnel) - The characteristics or abilities -

gained through training.or experience or both that enable an  ;

individual to perform a required function. 3 Oualified Procedure - A= procedure which= incorporates all applicable codes-and standards, manufacturer's parameters, and 1 engineering specifications'and has been proven adequate for its intended purpose.

,f sv)

\

l 1

STP 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION mem p r-xs Definitions 5

( ) OPERATIONS QUALITY ASSURANCE PLAN PAGE 7 or 9 DEFINITIONS trrtenw pag 12-21-90 Quality Assurance - All those planned or systematic actions necessary to provide adequate confidence that an item or facility will perform satisfactorily in service.

i Quality control - Those quality assurance actions which provide a means to control and measure the characteristics of an item, process, or facility to established requirements.

Quality-Related - Those activities or items required to be included in the Operations QA program by the UFSAR, Federal Codes, other regulatory licensing requirements or management directive. The term quality-related encompasses safety related activities or items.

Qualltv-Related Item - A structure, system, or component identified in UFSAR Section 3.2 as requiring quality assurance during the operations phase of STPEGS.

(~')/

t Receiving - Taking delivery of an item at a designated location.

'~'

Records - Those records, physical or electronic media, which furnish documentary evidence of the quality of items and of activities affecting quality. A document is considered a quality assurance record when the document has been completed.

Reference Standard - Standards (that is, primary, secondary and working rtandards, where appropriate) used in a calibration program. These standards establish the basic accuracy limits for that program.

Repair - The process of restoring a nonconforming characteristic to a condition such that the capability of an item to function reliably and safety is unimpaired even though the item still may not conform to the original statement.

1 Replacements - Spare and renewal components, appurtenances and subassemblies or parts of a component or system. Replacements also include the addition of components but do not include the i addition of complete systems.

l l Rework - The process by which a nonconforming item is made to conform to a prior specified requirement by completion, remachining, reassembling, or other corrective means.

73

./

STP 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION $?

(~% Definitions 5-() OPERATIONS QUALITY ASSURANCE PIAN PMX S OF 9 DEFINITIONS g Drg 12-21 Safetv-Related - Those plant' features necessary_to< assure the integrity of the reactor coolant pressure-boundary, the

' capability to shut down the reactor and maintain it in a safely shutdown condition, or the capability to prevent-or-mitigate the consequences of accidents which could result in~off-site exposures comparable to the guideline exposure of NRC Regulations 10CFR100.

Soecial Process - A process, the results of which are highly i dependent on the control:of the process cr the skill of the 1 operators, or both, and in which the specified quality cannot bei 1 readily determined by inspection or' test of the product.

Soecification - A concise statement of a set of requirements to be satisfied by a product, material, or process indicating, whenever appropriate, the procedure by means;of which:it may be determined whether the requirements given:are-satisfied..

~

(Specifications may also be used to describe'tocbnical services

(~') to be provided.)

U Stendard - The result of a particular standardization effort approved by a recognized authority.

Ston Work - The suspension of an activity.

Storace - The act of holding items at the construction site or in an area other than its permanent location inLthe plant =.-

2urveillance --The act of observing.real time activities and/or reviewing documentation to verify conformance with specified-requirements and industry gvud practices,-and-toLevaluate-their adequacy and effectiveness.

i Surveillance Testing - Periodic testing ta) verify that safety ;

related structures,. systems,.and components continue to function or are in a-_ state of readiness to perform theirffunction.'

Survey - An activity performed in a vendor's facility tx) determine the adequacy and implementation'of a vendor's quality .

assurance program. 'This1 activity is normally done-prior tonaward of a purchase order..

System - A group of subsystems united.by come interaction or-  !

,-) interdependence, performing duties but_ functioning as a single (j unit.

STP 724 (02/90) '

SOUTH TEXAS' PROJECT ELECTRIC GENERATING STATION $$ 1 l

! Definitions 5-OPERATIONS QUALITY ASSURANCE PLAN-( PACE 9 or 9

-l I

DEFINITIONS EFFECTIVE o ATE - 12-21-90 Testina - The determination or verification of the ccpability of  !

an item to meet specified reqitirements by subjecting the item to a set of physical, chemical, environmental, or operating-conditions.

pjite-as-is - A disposition which may be-imposed for a nonconformance when it can be established that the discrepancy will result in no adverse-conditions and that.the item under consideration will continue to= meet all engineering functional-requirements including performance, maintainability,: fit, and safety.

Verification - An act of confirming, substantiating, and assuring

-that an activity or condition-has been implemented in conformance with the specified requirements.

I CL HL&P 8480(1946J NU.BER R EV.

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION

.INDEX- 3I

( QUALITY ASSURANCE PROCEDURES- pang 1 op 5 INDEX ff'ecme 07-17-89 i

Procedure Title of Revision EffectiEe Outstanding U Number Procedure Number- Date ICNs-

~

VOLUME-1 "-- Q T--I v#-f SECTION 1.0 GENERAL

.c QAP-1.1 Organization and l' 05-25 --------

1' Responsibilities (G)

QAP-1.2 Procedure = Development (G) 2 '04-12 89 -------- i l'

QAP-1,3 Records Control (G) 1 05-25-86 ------ -

QAP-1.4 Indoctrination and .1 05-25-88 --------

Training of Personnel (G)

-QAP-1.5 Deficiency Reporting (G) 3- 04-12-89 ------- .

q QAP-1.6 Procurement of Items 1 05-25 88- --------

.and Services (G)

SECTION 2.0 QA ACTIVITIES i

QAP-2,1 Training, Qualification 1 09-28-88 ----- - -

and Certification of Audit Personnel (A/A) e QAP-2.2 Training, Qualification 1 05-25_-88 ----- ---

and Certification of d Surveillance Personnel (I/S)

,-- QAP-2.3 Operational QA Trend 3 06-30-89 --------

Analysis (QL) d QAP-2.4. QA Evaluation of Vendors 2 04-12-89 ---------

(QE) q QAP-2.5 Document Review (QE) 1 05-25-88 -------~ 'i QAP-2.6 Procurement Document- 1 05-25-88 --------

Review (QE)

]

V QAP-2.7 Vendor Audits (A/A) DELETED j

,. u

.i

I STP 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GF.NERATING STATION ! **" 7V-Chapter 1.0 h

((' ' OPERATIONS QUALITY ASSURANCE PLAN -

PAZ l or 8 ORGANIZATION Shf

  • 12-21-90 1.0 PURPOSE 1.1 The purpose of this chapter is to' describe the organizational structure as related-to quality assurance and toLestabilsh the responsibilities of organizations _for the South Texas-Project Electric Generating Station (STPEGS).

i .

j 2.0 SCOPE i 2.1 Houston Lighting - & , Power Company (HL&P) , as licensee and Project Manager for itself and the othor owners, has the Quality Assurance (QA) responsibility:'for design, engineering,' procurement,-fabrication,

. modification, maintenance,- repair, inservice inspection, refueling, testing, and operation of_the i South Texas Project Electric Gener6 ting Station ,

(STPEGS).

[~]

v 3.0 DEFINITIONS 3 .1- None ,

I:

4.0 REFERENCES

, 4.1 None

5.0 RESPONSIBILITIES 4

The Nuclear Group in comprised of Nuclear Generation, 4

5.1 Nuclear Engineering, Nuclear Support - ,

Planning / Assessment,_ Human:Rescurces-Nuclear' Nuclear Licensing, and Nuclear Assurance.' 'The' heads of.these groups report to the Group Vice: President, Nuclear.. '

t 5.1.1 The Group Vice President, Hudlear,-has everall' responsibility for :the implementation of the operations. Quality Assurance Program and approvAng.the10perations' Quality Assurance Plan-

' (OQAP) and revisions thereto. He is.also-responsible-for engineering,= modification, and? i operations activities of STPEGS.

t

.5.1.2 The Vice: President, Nuclear Generation, is responsible for' staffing STPEGS with qualified..

~

f-'

( personnelfand acquiring and coordinating the assistance of internal and external 1

'Y ) .

i I ,

e  ;

SF 724 (02/90) . -

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION rs .

Chapter 1.0' "h OPERATIONS QCALITY A3SURANCE PLAN 6 ---

('")  ; Fact 2 or B

ORGANIZATION -

$ygenn 12-21-90 ,

organizations for the testing, startu),x operation, modification, maintenanen, and security-of STPEGS.

[ 5.1.2.1 The= Plant Manager,:STPEGS, has prime responsibility for the safo opetTtion

, of the STPEGS. The plan-; staff, under-the direction of the Plant Managar,;

STPEGS, develo, psi tetailed procedures and instructions for testing,,

operation, modification, maintenance,-- '

and radio;ogical monitoring.of the.

STPEGS. Li i

'The Plant Manager,ISTPEGS,- reports to the Vite President, Nuclear Generation.

i 5.1. 2. 2 - The Danager,-NucleariSecurity, is responsible f or the development -and

^ (~N coordination of the security program, s including. practices and procedures; .

4

_providing security services;

-establishment and. maintenance of physical security _i_and for administration of the Site Access

'Authorication Program.

4 The Manager,jNuclear Security, neports

'to the-Vice President, Hunlear, i

Generation.

S.1.2.3 The Manager, Nuclear Training, 13- /

responsible for' developing-and-implementing formal trainirg' programa i c and curricp.la to support _tne training and certification of--STPEGS"personnei.-

_The Manager, Nuclear. Training, repos".s, to'the Vice Preuident, Nuclear-Generation.

5.1.3- Thn'Vice= President, Nuclear Engineering, IA q responsible'for der,ign engineering, planti i engineering,. purchasing,-material control,,and

, fs design reviews for.STPEGS. In addition,'the H

' (N/ l Vice President, Muclear Engineering, is 4 responsible for nuclear fuel: design,-fuel  ;

& 2.

~ -- ___. --t - ,

STP 4' 1 R/9C)

~ ~

W MBER T IS0iiTbEXAS PROJECT ELECTRIC GENERATING STATION RE?

Chapter 1.0 "O i

fh OP2 RATIONS QUALITY ASSURANCE PLAN PACE 3 OF ORGAN 1'JATION

- E "^

((7E *2-21-90 s

acquisition, fuel management- and proviC~n Ce s procurement and storage of equipment, Aacerf. ), 1 and services for STPEGS.  !

4 5.1.3.1 The Mana ger, Nuclear Purcharinj aind Materials Managenent is ree;ansib'e

.for the procuremeat of eouipment, .

mate rial, and cervicA% including the }

} cet 61 nation of procuraaa.7t \'ocument review; receipt, handli7.g, storage of equipraent and materLals; ana _,

_ . maintain 4cq' ti a Ap;l,cVed Vendors List t (AVL).

_1 The Manager, Nuclear Purchasing and Materigls Management, reports to the Vice President, Nuclear Engineering, for project direction and is matrixed to the HL&P Corporate Organization for administrative direction.

f-(

5.1.3.2 The Manager, Plant Enginacring, is responsible for providing technical support for day to day activities of plant operations and for the development, implementation, and administration of the plant testing program.

The Manager, Plant Engineering, reports to the Vice President, Nuclear g Engineering.

I , 5.1.3.3 The Manager, Design Engineering is

(, responsible for establishment and p p- , maintenance of the plant design bases and plant configuration. Design /

Engine.oring issues plant modifications, resolves plant nonconformances, approves special process procedures and suppotits the ASME XI Inservice Inspection Program.

Tha Manager, Design Engineering, reports to the Vice President, Nuclear Engineering, ,

$9 724 (02/90)

  • "D'" "'"'

SOUTH TEXAS PROJECT ELECTRIC GENEP.ATING STATION p Chapter 1.0 T'

, OPERATIONS QUALITY ASSURANCE PIM ORGANIZATION

$77[IM 12-21-90 5.1.4 The Vice President, Nuclear Support, is responsible for assuring that activities associated with the distribution of documents, the records management system, plant communications, and the administrative computer systems are in compliance with the 00AP.

5.1.4.1 The General Manager, Information Resources, is responsible for providing a records management system including processing, storage, preservation, and retriavability.

The General Manager, Information Resources, reports to the Vice President, Nuclear Support.

5.1.5 The General Manager, Nuclear Assurance, is responsible for the development, implementation,

('T and maintenance of the STPEGS QA Program, making

(_,) periodic reports on its effectiveness, review of selected documents which control activities within its scope, and preparation, control, and approval of tr.e 00AP and revisions thereto. The General Manager, Nuclear Assurance, has the authority to identify, initiate, recommend, or provide solutions to quality-related problems and verify the implementation and effectiveness of the solutions. This position has the

, independence to conduct QA/ Quality control (QC)

! activities without undue pressure of cost or schedule. The General Hanager, Nuclear Assurance, has the authority to stop work for 1 cause in engineering, design, procurement, fabrication, modification, testing, and operations phases of the nuclear plant. This authority in QA matters has been granted by the Group Vice President, Nuclear. The-QA organization's responsibilities during operation

're shown in Attachment.II. The QA organization, including the inspection staff, is baced upon the anticipated QA/QC involvement in operation, modification, and maintenance activities and by a survey of site QA staffs of 7- other-utilities with nuclear-power plants in 4

operat:on.

(J

1

$TP 724 (02/90)

SOUTP, TEXAS PROJECT ELECTRIC GENERATWG STATION Chapter 1.0 E5 l O OPERATIONS QUALITY ASSURANCE PLAN ORGANIZATION PAot 5 or- 8 4

trrccTwt DAtt 12-21-90 The position of General Manager, Nuclear Aesurance, is on the same or higher organ l ational level as the highest line manager responsible-for performing activities affecting quality as shown in Attachment I.

5.1.6 The Manager, Nuclear Licensing, is responsible for development.of planc.and procedures which implement the Emergency Plan, the conduct of drills and exercises which test the effectiveness of the Emergency Plan,.and for providing technical direction to ensure that STP Licensing activities are consistent with HL&P, Licensing policy. i i

5.1.6.1 The Executive Director NSRB is- i responsible-for the management of the l Nuclear Safety- Review Joard which- 4 conducts independent reviews and audits of significant activities-as delineated I

( by technical specifications.- j The Executive Director NSRB reports to  ;

the Manager, Licensing.

5.1.7 The Manager, Human Resources-Nuc' lear, is responsible for supporting thw Site' Access Authorization Program in:the screening of HL&P employtos.

The Manager, Human. Resources-Nuclear, reports to the Group Vice President, Nuclear, for project-direction End is-matrixed to:the HL&P Corporate

  • Organizatson for technical' direction.

6.0 REOUIREMEHIS  :

6.1 South Texas. Project Electric' Generating Station Organization 6.1.1 Attachment-I depicts the-organizational' s':ructure of the STPEGS as it relates to'the.

implemunt ation of the. operations- Quality Assurance Plan.. The structureLreflects the-g- reporting. alignment for key' positions.

b -

.__..-...__..~..._. _ _ . _ . _ ._.._._ .._ .___-_.__... _ _._._.__..._- ._

1 STP 724 (02/90) _

SOUTH TEXAS PROJECT ELECTRIC GENERATING 8TATION Chapter 1.0 E'

5 O. - OPERATIONS QUALITY ASSURANCE PLAN PAOC 6 or 8  ;

ORGANIZATION f[d*12-21-90  ;

7.0 DOCUMENTATION r 7.1 None

! 8.0 ATTACHMENTS

), 8.1 Attachment I ~ Nuclear Group -QA Functions j 8.2 Attachment II - Nuclear Assurance Responsibilities >

j j

4 4

I

-(  ;

I -i k

F i

r i-i n

3 4

i-4 - . . . . . . . , . . . . - - , , - - - . . . . , , , . . - - _ _ ,

. , _ _ - . . _ , , . _ _ ~ , - - , _ , , . - . - _ , - - - . . . _ - . _ - . . . . , . . _ . _ . - . _ . _ . , , - , . .

.! ! l' I ;li il  ; 1! :l  !  !:

  • 1 .!  !  ! l i d6R8 g f

gc2 wmN# &2mo* m moa5 agm5 z$a mM>2oz

~ g'

@ %4 yo c .

oNCeHOm o@Ead g8{O 5Ex l

=

mN " 9

  • E@5 e>eg~ ,

rhes o$ b&o .

It

>eUagn4 _

MS I E T T E MR A R I

RDS l

E I P

RP MS U RE N R I

i i G

Y G N

E I

N I

TEN IIE T

N eI N

G R E

I R ME SRM A S F E R I E AE AEE I

TG P

M N

O F N NE E

I S

E N D G I

N E

L N P I G

N E

~

WMRMN DAA l

PtM A

~-

O I E C T C

l-R N '

E U G Y W F N

C T E R N I ET I O EIT N A

G A N F R

P A D T E A LR KE RNE L

P N

A M 6I A R

T MES U

& N G '

1 E

_ - ~

G I

S G .

, ii E

N P '

S I

T U

O NRE M P

RE T

E E E NM S '

B I A I R H R V E S N

G R R A S N .

G I

G RE MI C

E P ME E R P

L L R A ~ t N E L D

O L S T C E I

P H

S U RC A N 5

M U N E A L R I

T O C U A ES SA I

H E u

I r

a P

E-s i .

S t N E I L P A R I

M D050 I

r e ._

E n i

R 1

a-- 9 .

7 .

p m

1l llI1l 5 5 s53

=O 5z gx>* =ao 4 E59 y

- m mSa5 oE@$$ m4>$* -

du 9a3@ "

O o 5 9 smo " g >C 4 E E b EM y {

2R *a

  • o g >5 ye o*
5sM

?M " 04

>U55EH s" S S S S E E E C C E R E N N R O NC A

L L

T N U. O D I E T C

A A

L I

A L N LI R LI LI E T E E V

P E Y V V N O VE R

I R

I R

U C Ri S

S S S S E

I T

I L .

I B S S S S I

E N N R O N S O O D O

I I I R I T I T E 0 C N C E

T I

T C 3 N E T

C R

A T C

O P S EP E T E S S Y PS N P N I

N N D C W' S I I I E

R E

C N S M S A At M A

R G N

l i R G T U UI D N S S Ui m R O PR E T S I E R MN N G

R S MS L E D /

N SE E E EM I O N SDC A EEN I G P R n

E Y Ru I I C C O G R D E

D 00 -

E w P R m n

i.

u A F x F

P E

L -

C U

N S T ST S ,

T N I I g

I A D D O

J A

L P AU NT U A

O 2 A

7 -

lli! if 'm

SW 724 (02/90) __

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATioh """ l Chapter 2.0 76 O- OPERATIONS QUALITY ASSURANCE PLAN' Pari 1 Or 14 PROGRAM DESCRIPTION trrte m oAn 12-21-90 1.0 PURPOSE 1.1 The purpose of this chapter is to define criteria and establish administrative controls for implementation of the Operations Quality Assurance Program for the South Texas Project Electric Generating Station (STPEGS).

2.0 EgQEE l

, 2.1 The Operations Quality Assurance program is applicable  ;

to safety-related material, equipment, services and activities described in 10CFR50, Appendix B; 10CFR71,  ;

Subpart Hi ASME Boiler and Pressure Vessel Codo, Sections III and XI;'and quality related areas as. j defined by STPEGS management in this Operations Quality '

Asa.rance Plan (0QAP) or other program documents or procedures. Quality-related areas include the Fire Protection Program, Emergency Plan, Radiological Environmental Monitoring Program, Radwaste Management

s Program, Computer Program Verification and Control,

(\_) Physical Security Program, Seismic and Environmental Equipment Qualification Programs, and Radiation Protection Program.

3.0 DEFINITIONS 3.1 None

4.0 REFERENCES

4.1 10CFR50, Appendix B

[ 4.2 10CFR71, Subpart H ,

4.3 ASME B&PV Code 4.4 OQAP Chapter 14.0,-Records Control 5.0 REQUIREMENTS 5.1 The Operations Quality Assurance Program consists-of various documents which identify and. provide the mechanism for-verifying implementation of commitments,

' requirements, and actions necessary.to attain quality; assurance objectives.

F-STP 724 (02/90)

  • "8'"

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION ffo?

Chapter 2.0 O OPERATIONS QUALITY ASSURANCE PLAN PACE 2 or 14 6

PROGRAM DESCRIPTION. trrtcwt oAn 12-21-90 5.2 The OQAP is prepared to implement the STPEGS Operations Quality Assurance Program.

5.2.1 The OQAP provides policies to be implemented for the STPEGS. The OQAP also assigns responsibilities necessary for the. attainment of p ality assurance objectives and the verification of conformance to established requirements.

5.2.2 Attachment I provides a matrix cf 10CFR50, Appendix B criteria to the OQAP chapters.  ;

i 5.3 Establishing Policies and Goals 5.3.1 QA policies and goals for STPEGS are defined in the OQAP. The Group Vice President, Nuclear has overall responsibility for quality assurance.  ;

5.3.2 The General Manager,-Nuclear Assurance, is responsible for the development of the Quality Assurance (QA) Program. The minimum requirements established for this position are 5.3.2.1 A bachelors degree in science or engineering, or an equivalent combination of. education and experience.

5.3.2.2 Five years experience in the management of quality-assurance.

Fifteen years experience.in-industry quality assurance standards, and federal and state regulatory requirements.

5.3.2.3 Familiarity with nuclear power generation facilities and.the related .

operations.-

l 5.3.2.4 Knowledge of the industry'sEquality )

assurance standards and regulatory' requirements.

() 5.3.2.5 Management. experience and familiarity with FL&P corporate organizations.

,_.,_____am_-m. _ . _ - _ -_-_.-- - --

LTP 724 (02/90) ._

SOUTH TEXAS PROJECT. ELECTRIC GENERATING 8 TAT 10N I/[ j 6

s Chapter 2.0 OPERATIONS QUALITY ASSURANCE PLAN --

Pact 3 or 14 PROGRAM DESCRIPTION YAYt 12-21-90 i 5.3.3 Procedures and revisions which control quality-related work programs and activitias, performed by STPEGS organizations described in Chapter 1.0'are reviewed by QA as defined in this chapter.

5.4 organizational Independence 5.4.1 The reporting arrangement utilized by.the NA Department ensures that those personnel charged with responsibility for verifying compliance-with QA Program requirements have the organizational freedom tot 5.4.1.1 Identify quality problems.

5.4.1.2 Initiate, recommend, or provide 1 solutions.  !

5.4.1.3 Verify implementation of. solutions.

5.4.2 The reporting arrangement, as illustrated on Attachment I, of Chapter-1.0, is such that personnel responsible for verifying compliance with quality requirements do not have' direct responsibility for the performance of that work.

The General Manager, NA, provides technica1'and 5.4.3 administrative direction to the QA Managers in -

the areas of-audits, surveillances,: quality engineering, inspection,.and material testing.

3 '

5.5 QA Program l 5.5.1 HL&P has established the Operations-QA Program for the operations phase of the STPEGS, which

)

includes testing, operation, maintenance, retueling, inservice inspection,.and-modification.' The HL&P. Nuclear-QA Program.for a '

the operations phase. requires that.HL&P, its contractors, subcontractors, and vendors comply )

I with the criteria established:by 10CFR Part 50,  !

Section'50.55at 10CFR Part 50, Appendix A,-

.m General' Design-Criterion (GDC):1; 10CFR.Part-50, Appendix B, and 10CFR Part'71=Sub-Part-H.

It is the; intent of HL&P-to. comply, as defined

STP 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION Chapter 2.0 76 O OPERATIONS QUALITY ASSURANCE PIAN PACE 4 0F 14 PROGRAM DESCRIPTION -

g ,12-21-90 out herein, with the applicable American National Standgrds lastitute (ANSI) N45.; daughter standards, ANSI N18.7, and implementing Regulatory Guides (RGs) as defined herein and in Updated Final Safety Analysis Report (UFSAR)

Table 3.12-1.

5.6 Delegation of QA Functions 5.6.1 During normal operations the QA Program will be executed by STPEGS personnel, who may be assisted by subcontract personnel. During refueling, maintenance, and inservice inspection, first-level quality control inspection and nondestructive examination (NDE) activities may be subcontracted. However, STPEGS will retain responsibility for the total QA Program, and STPEGS NA personnel will perform audits and surveillance (s) of subcontracted QA activities.

5.6.2 When first-level quality control inspection and NDE are performed by STPEGS personnel, they are qualified and certified in accordance with applicable codes, standards, procedures, and other regulations. Monitoring and surveillance of the quality control and NDE activities shall be performed by operations OA personnel.

5.7 Identification of Safety-Relat.ed Items and Services 5.7.1 The STPEGS QA Program described herein is applied to all activities affecting the safety-related functions of those structures, systems, and components which prevent, or mitigate the consequences of postulated accidents that could cause undue risk to the health and safety of the public. The safety-related structures, systems, and components controlled by the-QA Program are listed in UFSAR Section 3.2, along with their associated fire protection systems.

UFSAR Section 3.2 also identifies those quality-related structures, systems, and components (in addition to fire protection systems) which are not safety-related but to O which the STPEGS Operations QA program is applied.

STP 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION Chapter 2.0 E6 O OPERATIONS QUALITY ASSURANCE PLAN PACE 5 or 14 PROGRAM DESCRIPTION trrtcTivt dan 12-21-90 5.7.2 The fire protection QA Program is part of the overall STPEGS Operations QA Program and is therefore under the management control of QA.

Fire protection QA Program criteria are being implemented as part of the HL&P Operations QA-Program, as defined in this OQAP.

5.7.3 Expendable or-consumable items necessary for the functional performance of safety-related structures, systems, and components are subjected to quality assurance requirements as specified in written procedures.- These procedures include provisions for review and control in accordance with industry standards and specifications and the safety-related function of the expendable or consumable item.

5.8 Development of the QA Program

(^T 5.8.1 The Operations QA Program was fully implemented

(_), 90 days prior to initial. fuel loading. The QA Program shall be in~effect throughout the operating life of the STPEGS.

S.9 QA Program Documents 5.9.1 The QA Program shall be implemented with-documented instructions, procedures, and drawings which include appropriate quantitative and qualitative acceptance criteria for determining that prescribed activities have been satisfactorily accomplished. Precedures shall include the control of the sequence of required inspections,-tests, and other operations when important to quality. To change these controls, the individual procedure must-be changed-and shall require the same-review and approval given to the original.

procedure. Such instructions, procedures, and drawings are reviewed and approved for compliance with requirements appropriate.to their safety classification by individuals qualified'to'do so.

l

(~

(_/ i 1

r. ' .. i . . . . . , , . * . . .

m.. _ ,

.____m2_ _ _ _ . _ _ _ _ - - - -

STP 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION gg Chapter 2.0 I

,y OPERATIONS QUALITY AS5URANCE PIAN 14 Pact 6 or PROGRAM DESCRIPTION y 04g 12-21-90 5.9.2 Attachment II lists typical procedures developed to implement the QA Program.

Provisions for deletions, additions and minor program changes do not permit including a complete listing of procedures.

5.9.3 Interdepartmental Procedures 5.9.3.1 Interdepartmental-procedures shall be established to implement and control activities covered by the 00AP.When more than one department or organization is involved. These procedures provide for integration of 1 responsibilities and activities, and help to ensure continuity of activity between departments / organizations.

l 5.9.3.2 Specific departments / organizations shall be designated for the

(_, preparation and approval of each' procedure. Since these procedures contain .* uirements for-more than

one depa,taent/ organization, a
designated procedure coordinator is -

! responsible for' initiating review with affected departments /organi-zations and resolution of comments.

5.9.3.3 Selected interdepartmental procedures and revisions are reviewed by-Nuclear Assurance before their-. issuance. The-review attests that these= procedures have been reviewed;for compliance with the Operations Quality Assurance Program. The review is documented-and the comments on the current procedure revision will be maintained for verification.

l 5.9.4 Departmental Procedures 1

5.9.4.1 Departmental procedures shall be established to implement the OQAP, interdepartmental procedures, and

(],

other operating, licensing and code requirements.- These departmental-i

1 l

l STP 724 (02/90) wuusta atv. 1 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION

(~x Chapter 2.0 T' OPERATIONS QUALITY ASSURANCE PLAN

'Q _

PACT 7 Or 14 PROGRAM DESCRIPTION

[$ctw12-21-90 procedures detail specific methods for implementation.

5.9.4.2 D6partmental procedures shall be approved by the management of the issuing department. The approval assures awareness of content and concurrence with the identified responsibilities.

5.9.4.3 Selected departmental procedures and revisions are reviewed by Nuclear Assurance before their issuance. The review attests that these procedures have beer reviewed for compliance with the Operations Quality Assurance Program. The review is documented and the comments on the current procedure revision will be maintained

/~'N for verification.

V 5.10 Personnel Indoctrination and Training 5.10.1 General indoctrination and training programs shall be providea for site personnel to assure that they are knowledgeable regarding quality programs and requirements. The training requirements for STPEGS personnel are described in UFSAR Section 13.2. Records shall l demonstrate compliance with applicable

! requi ements. Personnel performing complex, unusual, or potentially hazardous work shall be instructed in special indoctrination or briefing sessions. Emphasis shall be on special requirements for safety of personnel, radiation control and protection, unique features of equipment and systems, operating constraints, and control requirements in effect during performance of work. Where required by codes and standards, personnel are trained, qualified, and certified according to written procedures in the principles and techniques of performing specific activities.

5.10.2 Personnel performing surveillance testing t (y) activities shall be similarly trained in accordance with written procedures.

l l

STP 724 (02/90)

SOUTH TEXAS PC0 JECT ELECTRIC GENERATING STATION Chapter 2.0 E

O OPERATIONS QUALITY ASSURANCE PIAN PAtX S OF 14 6

PROGRAM DESCRIPTION EFFECDW oAn 12-21-90 5.10.3 Training will be conducted in a time frame adequate'to allow personnel to prepare for their job responsibilities and before-commencing quality-related work. Proficiency of personnel chall be maintained-by retraining, reexamining, and/or recertifyiry in accordance with initial requirehants and procedures.

5.10.4 In addition to general employee training and indoctrination described above, departmental and interdepartmental procedures provide for training of personnel who perform quality-related work. - These procedures provide for training in the principles and-techniques of the activity involved and for maintenance of .1 '

proficiency of personnti by retraining, re~

examining, and/or racertifying-to an extent commensurate with the safety significance of I the activity. The procedures address

() documentationLof:

5.10.4.1 Scope, objective,-and-method of  ;

implementing the training program.

5.10.4.2 Documentation of the training sessions including attendees, dates, and results, where appropriate.

5.11 Policies and Goals 5.11.1 It is the policy of HL&P, acting as licensee and Project Manager for itsel'f.and the other owners of the STPEGS, to assure.that the design, procurement, construction,-testing, and operation of-the STPEGS are in conformance-with +

specifications, procedures, codes, and Nuclear Regulatory Commission- (NRC) regulations. The-responsibility.of each organization supporting the STPEGS.is to ensure that the requirements- i stated in this QA Program are incorporated into '

procedures. Adherence to those procedures is mandatory for all STPEGS' organizations and contractors or_ vendors-providing items or services covered by.the QA Program.

STP 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING 8TATION Chapter 2.0 P0 O. OPERATIONS QUALITY ASSURANCE PLAN Pact 9 Or 14 PROGRAM DESCRIPTION

[gy[I"12-21-90 5.11.2 The OQAP identifies activities and establishes requirements for procedures which identify, report, and verify the resolution of safety-related quality problems. The implementing procedures call for the resolution of quality problems at the lowest.possible authorleed level. However, if a dispute-is encountered in the resolution of a quality problem which cannot be resolved at lower levels, Nuclear Assurance presents the problem to the Group Vice Pretadent, Nuclear, for resolution.

5.12 Control of Activities 5.12.1 The OQAP requires HA revisw and/or approval of. ,

procedures which control selected-activities. '

These procedures shall require the use of the proper equipment, completion of prerequisites for starting an. activity, and suitable-O environment for performing the activity.

Procedures will comply with the appropriate standards.

5.12.2 STPEGS personnel attend planningi schedaling, and status meetings affecting quality-related activit- a necessary to assure adequate QA coveraq a program application exists.

5.13 Management Reviet i

5.13.1- The implementation of the-QA. Program requirements shall be verified through i independent and integral control activities.

The QA organization, under the General Manager, NA, shall conduct audits, surveillances, and inspections of the operating! plant and of-the i interfacing organizations' quality-related j activities.

5.13.2 The results of the audits,-surveillances, and_ l inspection activities are presented in-a-periodic? report to the Group Vice President,.

Nuclear.

i f

$TP 724 (02/90)

SOUTH TEXA8 PROJECT ELECTRIC GENERATING STATION Chapter 2.0 P

0 O OPERATIONS QUALITY ASSURANCE PLAN Pact 10y 14 PROGRAM DESCRIPTION

$$t "* 12-21-90 5.13.3 Assessments of HL&P's implementation of the Operations QA Program are conducted under the cognizance of the Nuclear safety Review Board-and results are transmitted to the Group Vice President, Nuclear for his review and/or action.

5.13.4 STPEGS may use the services of architect-engineer firms, Nuclear-Steam Supply System (NSSS) suppliers, fuel-fabricators, constructors, and others which-provide or augment STPEGS efforts during operations._

These organizations are required to work under a QA program to provide control of quality activities consistent with the scope of their assigned work. The QA programs of such contractors or consultants shall be' subject to >

review, evaluation, and acceptance by QA before initiation of activities affected by the program. ,

5.14 operations Quality Assurance. Plan. Changes 5.14.1 HL&P is committed'to maintaining the OQAP as an effective and meaningful document to provide programmatic direction on STPEGS. Changes-to the QA Program, as described in the OQAP, Will be processed under 10CFR50.54(a).- When changes are made in the-OQAP to the organizational elements only, appropriate notification will be 1 made to the NRC within 30 days of implementation.

5.15 Computer Code Programs 5.15.1 The development, control, and use of computer code programs which affect quality-related items will be controlled by OQAP. Prior _to use of a computer code. program in a quality-related. '

activity, the appropriateness of the program shall be verified. In addition,--all such programs shall be appropriately certified for use.- .

V

k 9

STP 724 (02/90)

"**'" "IV- '

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION Chapter 2.0 i

( OPERATIONS QUALITY ASSURANCE PIAN PACE 1 100 14 i PROGRAM DESCRIPTION DATE 12-21-90 6.0 DOCUMENTATION 6.1 Procedures which are generated as required by thit chapter shall identify the records which are required to implement and document those activities. The records shall be controlled in accordance with Reference 4.4.

6.2 Operations Quality Assurance Plan (00AP) 7.0 ATTACHMENTS 7.1 Attachment I oQAP - 10CFR50, App. B Matrix 7.2 Attachment II OQAP - QA Program Documents O

O

STP 724 (02/90)

SOUTH TEXA8 PROJECT ELECTRIC GENERATING STATION Chapter 2.0 E'

6 C4 OPERATIONS QUALITY ASSURANCE PLAN

'. PAGE ID 14 PROGRAM DESCRIPTION g DATE 12-21-90 ATTACHMENT I OPERATIONS OUALITY ASSURANCE PLAN CEAETEBS 10 CFR 50 APPENDIX B_ CRITERIA 1.0 Organization I 2.0 Program Description II 3.0 Conduct of Plant Operations V, XIV 4.0 Qualification, Training and II, IX Certification of Personnel ,

5.0 Maintenance, Installation of- III, V, VIII, IX Modifications, and Related Activities 6.0 Cesign and Modification Control III (V

\

7.0 Procurement IV, VIII, X,;.XIII, XIV, VII P

8.0 Control and Issuance of. Documents V,~VI 9.0 Control of Material VIII, XIII,.XIV, VII_

10.0 Inspection X 11.0 Test Control XI 12.0 Instrument and Calibration XII Co1 trol.

13.0 Deficiency Control XV, >DNC 14.0 Records Control XVII.

15.0 QA Audit and Surveillance XVIII-16.0 Nuclear Fuel Management III,;IV, VII, VIII, X, XIII, XIV

(

STP 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION Chapter 2.0 Y O OPERATIONS QUALITY ASSURANCE PLAN PROGRAM DESCRIPTION

$$N 12-21-90 17.0 ASME Section XI Repairs and-

  • and. Testing

2 O

O

.a I sis imd' .wa

i STP 724 (02/90)

SOUTH TEXA8 PROJECT ELECTRIC GENERATING STATION "E?

Chapter 2.0 8 O -

OPERATIONS QUALITY ASSURANCE PIAN PROGRAM DESCRIPTION PAOC 140r 14 i trrn w DATE 12-21-90 l 2

ATTACHMENT II _,

^

3Il $g88iI

!!lIsiF1Ii iIs lh i w  :

Z l I

0 -

U k -

8 2 \

s 5 gh50 t

eJ 3*l g as -l C3- ,

i

-]

$! j o  : isll!

t

STP 724 (02/90)

NWBER REV.

SOUTH TEXAS PROJECT ELECTRIC GkNERATING STATION Chapter 3.0 T' O OPERATIONS-QUALITY ASSURANCE PLAN

^

CONDUCT OF PLANT OPERATIONS

((7gEenn 12-21-90 1.0 PURPOSE 1.1 The purpose of thin chapter is to prescribe the requirements and responsibilities for the conduct of plant operations at the South Texas Project Electric Generating station (STPEGS).

2.0 ESQEE 2.1 This chapter applies to all personnel engaged in quality-related activities associated with the operation of the STPEGS.

3.0 DEFINITIONS 3.1 None

4.0 REFERENCES

4.1 STPEGS Technical Specifications 4.2 Regulatory Guide 1.33, Quality Assurance Program Requirements (Operations) 4.3 NUREG 0737, Requirements for Emergency Response 4.4 OQAP Chapter 14.0, Records Control 4.5 10CFR100, Reactor Site Criteria 5.0 REOUIREMENTS 5.1 Activities affecting quality-related structures, systems, and components shall be conducted in accordance with written, approved procedures, as delineated in Reference 4.2. i 5.1.1 Procedural compliance-and requirements for procedure use shall be prescribed in writing.

Measures shall~be established by which temporary changes to approved procedures can be made, including the designation of a person (s)-

authorized to approve such_ changes.- Temporary changes which clearly do-not change the intent; of the approved procedure shall be made in

_(

=-

accordance with Reference 4.1.

STP 724 (02/90) south TEXA8 PROJECT ELECTRIC GENERATING STATION " * *'" "E V-Chapter 3.0 Y '

O OPERATIONS QUALITY ASSURANCE PLAN CONDUCT OF PLANT OPERATIONS QC" 12-21-90 5.1.2 Guidance shall be provided to identify the 3 manner in which procedures:are to be j implemented. Examples of-such guidance include j identification of thows tasks that requires:  !

5.1.2.1 _The written procedure to be present and '

followed step by,_ step while the task is being performed.

5.1. 2. 2, The operator to have committed the procedural steps to memory.

5.1.2.3 Verification of completion of significant steps by initial or signatures on checkoff lists.-

5.1.3 The types of procedures that shall be present and referred to directly are those developed for extensive or complex tasks where reliance _on ___ 1 memory cannot be trusted, e.g., reactor startup, O tasks which are infrequently performed, and!

tasks in which operations must'ba performed in a i

specified sequence. Necessary data shall'be recorded as the task is performed.

5.1.4 Temporary procedures may.be issued to direct: -j operations during testing,s refueling,- '

maintenance, and modificational to provide d guidance in unusual situations not within the -l scope of_the norma 1' procedures; and to ensure  !

orderly and uniform operations-for short periods when the plant, a system, or a component is.

performing in a manner not covered by existing detailed procedures or has been modified or extended.in such a manner that-portions'of existing procedures do-not apply. Temporary' procedures shall include designation of the period of time during which the procedures are to be:used and'shall be subject-to the same review'and approval process as permanent-procedures.

-5.1.5 Emergency Operating Procedures shall be prepared  ;

in accordance with-Reference 4.3.

-i O

'f s

f .1 M

sTP 724 (07/90) gx SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION Chapter ?0 75

( OPERATIONS QUALITY ASSURANCE PLAN Pact 3 or 5 CONDUCT OF PLANT OPERATIONS

$getu 12-21-90 5.2 Operating Orders '

5.2.1 A mechanism shall be provided for issuing management instructio.as which have short-term applicability and whAch require dissemination.

Such instructions, sometimes referred to as special orders, operating orders, or standing orders should encompass special operations, job-turnover and relief, data taking, publications and their distribution, plotting process parameters, personnel actions, or other similar matters.

5.2.2 A mechanism shall be provided for management to issue information and direction to the oncoming evening and night shifts. These night orders shall be signed and dated by a responsible supervisor.

5.3 Shift Operations (v~') 5.3.1 The responsibilities and authorities of Licensed Operations Personnel shall be specified in plant procedures. These procedures shall include responsibilities and authorities for startup, shutdown, and operation of the reactor and associated equipment, for observance of instrumentation and for implementation of the Emergency Plan (Refer to Reference 4.1). The cognizant Shift Supervisor shall be responsible for maintaining sufficient knowledge of system or equipment tests or inspections in progress to (

control the overall plant operation. Personnel performing tests or inspections shall keep the Shift Supervisor or Control Room Operator advised of the current status of tests or inspections in progress which may affect plant operations.

5.3.2 When operating during normal, abnormal or emergency conditions, the operator shall rely on plant instrumentation, unless proven to be incorrect. When operating parameters are not as .

expected, the unit shall be placed in a known i 7s safe condition. A manual reactor' trip or safety

()

system actuation shall be initiated if system parameters for reactor trip or safety systems- >

l l,

$TP 724 (02/90) ~

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION Chapter 3.0 E5

(,' -) OPERATIONS QUALITY ASSURANCE PIAN PAGE 4 OF 5 CONDUCT OF PLANT OPERATIONS trrtcTwt 12-21-90 ogg exceed their actuation setpoint and automatic actuation does not occur.

5.3.3 In the event of an emergency not covered by an

4pproved procedure, operations personnel shall t<&e action to minimize personr.el injury, damage to the facility, and maintain offsite exposures within the requirements of 10CFR100.

5.4 Equipment Control 5.4.1 Procedures shall provide for control of equipment as necessary to maintain personnel.and reactor safety and to avoid unauthorized operation of equipment. These procedures shall require control measures such as locking or tagging to secure and identify the control status of equipment, and iesponsibility and action necessary for isolating the equipment.

r^g These procedures phall require independent I (_,/ verifications where appropriate'to ensure these

! measures have been correctly implemented.

5.4.2 Procedures shall provide for the-identification or required tests and inspections and provide de:umentary evidence-that the tests and faspections have been performed prior to t

considering the affected system operable.

l 5.4.3 Permission to release equipment _or systems for maintenance shall be granted by designated operations personnel. These operations personnel shall verify before release that, based on a review of the plant technical specifications, the system or component can be released for the time period that-it may be out of service. The requirements for equipment j operability stated in Reference 4.1 shall be j met.

6.0 DOCUMENTATION l 6.1 Procedures which are generated as required by this chapter shall identify the records which are required 7~si to implement and dccument those activities. The-

records shall be controlled in accordance with

's I Reference 4.4._

r t

1 sTP 724 (e.>/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STAT 10N E' l Chapter 3.0 5 OPERATIONS QUALITY ASSURANCE PLAN

1. PACE 5 or 5 CONDUCT OF PLANT OPERATIONS- --

trrtcTivt 12-21 .

DATE  ;

7.0 ATTACHMENTS t

7.1 None i

9 d

S 1

5 V

t i.

k

+

L

~k

, -_- , - , - , , . , . . . .  ;,.~,--.,,,,....,,.2..-

_ . _ . _ _ _ . . _ . . . . , , _ . . ..;_._,-._;...a...._...e._,_...

i 1

j. STP 724 (02/90) _ l SOUTH TEXA8 PROJECT ELECTRIC. GENERATING STAT 10N
    • l f/of Chapter 4.0 4 '

4 O OPERATIONS. QUALITY ASSURANCE PIAN -

1 V QUALIFICATION, TRAINING AND-CERTIFICATION OF PERSONNEL Pact .1 or 4 1

fa$C" 12-21-90  ;

f 1.0 PURPOSE  ;

1.1 Thepurpose'ofthischa$teristoestablish-requirements for qualif cation, training, and-  !

certification of personnel whose activities,mayaaffact t quality-related structures, systems, components and activities at the South Texas Project Electric Generating Station (STPEGS).

2.0 SCOPE 2.1 This chapter provides for the qualification,. training  ;

-and certification-of personnel performing activities .  !

related to the structures, systems and components under -

i the jurisdiction of the Operations Quality _ Assurance- l Plan (00AP) . t 3.O DEFINITIONS ~

3.1 None 4.0 REFEBIlLQXS 4.1- - Regulatory Guide 1.8,' Personnel Selection: and Training 4.2 Regulatory Guide 1.58, Qualification'of Nuclear. Power

-Plant Inspection, ExaminationLand Testin2 Personnel-4.3 Regulatory Guide-1.146,LQualification of-Quality-Assurance Program Audit' Personnel ^ for: Nuclear: Power Plants 3

-['

4.4 SNT-TC-1A, Recommended-Practice for-Nondestructive Personnel Qualification'andLCertification -!

4 . 5' 10CFR55 Operator's Licenses-4.6! ASME Section XI,. Rules forLInservice' Inspection of' l Nuclear Power Plant Components ,

4. 7- OQAP~ Chapter-1~4.0, Records Control- -l 5.0 REOUIREMENTS q 5.1 General

. ---t ,,.s,. . - . . , , - . , . _ . .m v4 r--i-,= - , - , 4, , , ,, . - -,#

}

l $TP 724 (02/90) ___

l SOUTH TEXA8 PROJECT ELECTRIO GENERATING STATION "'?

Chapter 4.0 I

  • OPERATIONS' QUALITY ASSURANCE PLAN --

N- QUALIFICATION, TRAINING AND Pact 2 or 4 i j CERTIFICATION OF PERSONNEL g DATE 12-21-90 ,

7 l

5.1.1 Position qualificat. ion requirements shall be established for personnel performing activities

within the scope of this document in accordance I with Reference-4.1, 4.~2, 4.3, 4.4~, 4.5~and 4.6. '

5.1.2 Programs shall be developed for1 training and certification of personnel. The-programs shall .

provide fort T

5.1.2.1 Establishing individtlal training files.

5.1.2.2 Documented certification,-when '

required (i.e., NRC licensed il personnel, NDE personnel). L 5.1.2.3 Continuing training-and retraining. .

5.2 General Employee Training 5.2.1 A general employee-training program shall be

-developed and administered to all personnel requiring unescorted access within-the

- protected and/or vital areas.1 This. program  ;

shall address but not be limited to the followings i 5 2.1.1 Job rniated procedures andl instructions ,

5.2.1.2 QA: program indoctrination- .

5.2.1.3 Radi'ological health and safety 5.2.1.4 Industrial safety _and1firei protection y

5.2.1.0 Emergency Plan [_

5.2.1.6' Security-program 5.2.1 Temporary personnel employed-at:the STPEGS shall be trained in the above areas-.to the -

extent necessary tolansure: satisfactory ,

lh. performance of their duties.

V 4

I

, , , - - , ,  :,,. ,- .L., , ,-- # 4-_.o , . i , ;, .. Eb<

I I

sty n4 (o2/90) _ _

SOUTH TEXA8 PMJECT ELECTRV, GENERATING STATION "'"

Chapter 4.0 E!

4 '

OPERATIONS QUOLITY 79SURAPOE PLAN -

QUALIFICATIC!), Th INING AND- FME 3& 4-CERTIFICATI0t T J',ERSONNEL tr/Ecnyt can 12-21-90 ,

=. -.-

k 5.2.2 Temporary personnel employa'd.at the.STPEGS shall be trained in the above areas to the -j extent necessary to: assure satisf actory-performance of their duties.

5.3 specialized Training Programs 5.3.1 NRC licensed operators shall be qualified, trained and certified in accordance with '

Reference 4.1 and-4.5.

5.3.2 Inspection, testing and examination personnel

.shall be qualified, trained and certified:in-accordance with Reference 4.2. ,

5.3.3 tiondestructive examination personnel shall j receive training which asetsythstrequirements of Reference 4.4-and 4.6. l O' 5.3.4 Audit personnel shall be qualified,-trained and certified to the requirements ofcReference 4.3. 4 5.3.5 other personnel shall be qualified and trained commensurate with the1 functions they perform (e.g., welding, coating, chemical' cleaning, '

maintenance, etc.).

5.4 Training Haivers'and Exemptions!

5. 4 .1- Training Waivers

~

A training waiver may be used to substitute existing-training, requirements with-documentation of experience, alternate"or

, equivalent training,;or demonstrated' competency.

in the area (s) to be waived. Training-waivers-

-shall be controlled in accordance with approved procedures.

5.4.2.. Exemptions.

'An exemption authorizes ansindividual whose

- . experience, training,-or. certification does not' satisfy or match minimum requirements to-

- C -- -

perform unsunervised duties--in-the exempted-i w

__ - - L A-~.-.____--- --

l

- $TP 724 (02/90)

SOUTH TEXA8 PROJECT ELECg2J GENERATIMG STAT)0W N" E Chapter 4.0 4 OPERATIONS QUA1.ITY ASSURANCE PLAN- - t C

QUALIFICATION, TRAINING AND Pact 4 or 4 CERTIFICATION OF PERSONNEL ~ ~ " ~ "

t

,limcwt pATE 12-21-90 4 i

area. An exemption may also be utad to authorize an= individual to perform the duties-of the exempted area without meeting the minimum documentation requirements o1 a1 training waiver. Exemptions shall bu controlled in accordance with approved procedures.

5.5 Procedures shall provide for the evaluation of job 2

performance of employees to determine-the capabilities of the individual to ment established qualification-requirements. '

5.6 procedures shall provide for the recertifhation of appropriate personnel in accordance with applicable standards.

5.7 Training and: certification of personnel, to the. degree O -

necess ary -for the activity, shall be completed prior to assignment of work on quality-related items or activities.

6.O DOCUMENTETH1{'

6.1 Procedures which are generated .as required' by this, chapter shall identify the rect.rds which are required to implement and document those. activities. The records shall be controlled in accordance with Reference 4.7.

7.0 AIDCHMENTS 7.1 None O l l

-+ -- , - - - : .- . . ,

STP 724 (02/90) _ _ _

" 85 SOUTH TEXAS- PROJECT ELECTRIC GENERATING STATION lEV.

Chapter 3.0 h I' OPERATIONS QUALITY-ASSURANCE PLAN k MAINTENANCE, INSTALLATION OF Pact 1 or 7 ,

MODIFICATIONS, AND RELATED ACTIVITIES  !

UrnmW put 12-21-90

!S 1.0. PURPOSE  !

i 1.1 The purpose of this chapter is to establish requirements for the conduct of maintenance and. - -

installation-controls for modifications _on quality-related structures,_ systems, and components at the South Texas Project Electric Generating Station j (STPEGS).

2.0 SCOPE > I 2.1 This chapter is applicable to-maintenance and the installation of modifications including related activities such as special processes (e.g., welding, '

i cleaning, and housekeeping). '

~

3.0 Dyl,T)CT191lp, g- 3.1 None 4.O BEFEREi{gfa '

4.1 ReguAatory Guide 1.33, Quality _ Assurance Program Requirements (Operations) 4.2 OQAP Chapter 3.0, Conduct of Plant Operations y 4.3 OQAP Chapter 4.0, Qualification,J Training-and- 1 Certification of Personnel. 1

' ~

4.4 OQAP Chapter 8.0, Control-andLIssuance of Documents 4.5 OQAP Chapter 12.0, Instrem.ht and Calibration Control' 4.6 OQAP Chapter 14.0, Records' Control 5.0 REOUIREMENTS 5.1 -Maintenance, the installation of modificatior.A, and'  ;

related. activities which may affect the functioning of '

structures,' systems, or components shall:

5.1.1 Be. performed:in a manner.to ensure quality-equivalent 'to: that specified:in original design bases 1and requirements, vmaterials

()T

(_ specifications,_and_ inspection requirements, or -

a documented engineering approved alternative.

STP 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION Chapter 5.0 lk .'$

OPERATIONS QUALITY ASSURANCE PLAN N- MAINTENANCE, INSTALLATION OF . PAGE 2 or 7-MODIFICATIONS, AND RELATED ACTIVITIES

[x$cnw 21-90 1

5.1.2 Be preplanned-and performed in accordance Oith written procedures, documented instructions, or drawings appropriate to the circumstances-which conform to applicable codes, standards, specifications, and criteria,.and:

5.1.2.1 Address controls which' assure-quality-of maintenance'and modification installation activitier. (for example:,

inspections,_measuremer.cs, tects, welding, heat treatment, cleaning,;

nondestructive examination, and personnel qualifications) and contain provisions-to document the performance thereof.

5.1.2.2 Contain measures which identify the inspection and test status of-material, equipment, and components used in Os maintenance-and modification installation activities.-

5.1.2.3 Assure-that the equipment has been-returned to normal operating status at the completion of the work which-includes-verification of funntional acceptability.

5.1.2.4 Be. performed.bysor'under the-supervision'of qualified personnel and

.in such a manner that the-activity can be safely performed under the? existing ,

plant operating conditions.

5.1. 2 . 5 ' Be performed only after authorized relehse of equipment in accordance with procedures?that meet the requirements of Reference 4.2.

5.1.2.6 Provide measures for the protection-of-workers and equipment, including personnel entry into enclosed. spaces such as tanks and voids.

y

SF 724 (02/90) ,

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION Chapter _5.0' E 4

/^g OPERATIONS QUALITY ASSURANCE PLAN-V MAINTENANCE, INSTALLATION OF MODIFICATIONS, AND RELATED ACTIVITIES PAGE 3 or 7 EFFECTIVE DAK 12-21-90 s

5.1.2.7 Provide neans of preventing. e unauthorized operation of equipment (e.g., locking or tagging).

5.1.2.8 Assure control of temporary-modifications (e.g., blank flanges or }

temporary electrical jumpers).

5.1. 2 . 9 ' Provide'a method of ensuring that all required tasts and inspections 1are complete prior.to return-to service of the item on which the work was performed.

5.1.3 Assure procedures,'and changes thereto, are reviewed and approved in accordance_with Reference 4.4.

5.2 Preventive Maintenance 5.2.l' A preventive maintenance. prog"am shall be maintained'which prescribes the: frequency and type of maintenance to be performed. This

-program is. based on service conditions, manufacturer's recommendations, and experience-with. comparable equipment. It.will be revised and updated as operating experience'is gained.

5.3 Corrective Maintenance.

5.3.1 The causelof malfunctions shall be promptly determined, evaluated, and: recorded.

5.3.2 Replacement components 1of a new-type shall receive adequateEtesting or be-of a design for-which experiencebindicates a high probability of_ ,

satisfactory _ performance.

5.3.3 Where unproventraliabil'ity of a(new or repaired component which;could affect nuclear safety exists, consideration should:be given_to an augmented testing <and inspection program until a suitable level.of performance has been demonstrated.-

L 4

STP 724 (02/90)

SOUTH- TEXAS PROJE0T ELECTRIC GENERATING STATION Chapter 5.0  %=

rw i

OPERATIONS QUALITY ASSURANCE PLAN MAINTENANCE, INSTALLATION OF 7 p Acc -- 4 or MODIFICATIONS, AND RELATED ACTIVITIES fygenW 12-21-90 5.4 Emergency Maintenance should operating conditions occur which warrant. .

immediate corrective maintenance in order to prevent ~or mitigate the release of radioactive material, hazards-to personnel,-or extensive equipment-damage, then the following shall apply Direct corrective actionishall be taken to

~

5.4.1 stabilize the condition. Procedures shall-designate those, operating individuals responsible for authorizing this initial corrective action for various> structures, systems, or components.

5.4.2 Once the condition has stabilized, the initial corrective action taken shall beidocumented'and reviewed:in accordance with approved procedures._

If the initial action taken is judged'to be incorrect cnf inadequate, alternative corrective _

\ action shall be taken.

5.5 Control of Special Process

'5.5.1 Special processes include manufacturing _

processes, inspections, tests, and others which.

require qualification.of the procedures, technique or personnel to controll the quality of ,

the process ~. Special processes:(e.g.,; welding, heat treating, chemical cleaning, protective-coating, and nondestructive examination)j shall be performed J.n accordance with applicable i codes, standards, specifications,; criteria and other special requirements-as qualifiedtby Nuclear Generationi-Nuclear Engineering, or ,

Nuclear Assurance,-as' applicable.,

5.5.1.1 Written procedures-shallEbefestablished-and utilized to assure these' activities are accomplished.in.a' controlled manner.

5.E 1.2 Special processes shall be' performed by qualified personnel usingiqualified; J procedures. Personnel shall be' qualified under Reference 4.3.

(

- , Y

-i STP 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION **8" _._ Ei Chapter 5.0- 4 C' OPERATIONS QUALITY ASSURANCE PLAN

(~ MAINTENANCE, INSTALLATION OF- Pact 5 or 7 MODIFICATIONS, AND RELATED ACTIVITIES' ErrtcTNE oAn 12-21-90 Procedures and equipment shall be -

qualified under applicable codes and.

standards.

5.5.1.3 The necessary qualification of personnel, procedures or' equipment shall be uniquely defined o For special processes not covered j by existing codes or standards, or '

o- Where an item's quality.

requirements exceed the requirements of established-codes and standards. ,

5.5.1.4 Records shall be maintained and kept-- c current for the qualification of procedures,nequipment,.and personnel associated with special-processes.

Records are in sufficient detail to clearly define the-procedures,-

equipment, or personnel being .

qualified, criteria or requirements used for qualification, and-the individual approving the qualification.

5.5.1.5 Procedures shall. provide for the control of special process identification indicators, such as welders stamps, as appropriate.

5.5.2 Control of Outside Contractors J 5.5.2.1 Qualified outside organizations may be.

employed to perform special processes ,

and chall be required to conform to the requirements described in this chapter.

Special process procedures submitted-by an outside organization in accordance ,

with procurement document requirements -  !

shall receive a technical review by the responsible engineering organization.

a  :

_ _---_=--.a _ - - - --

l sw 724 (o2/so)

SOUTH TEXA8 PR03ECT ELECTRIC GENERATING STATION Chapter 5.0 E 4 O OPERATIONS QUALITY ASSURANCE PLAN U MAINTENANCE, INSTALLATION-OF Pact 6 or 7 MODIFICATIONS, AND RELATED ACTIVITIES y

gig 12-21-90 5.6 Housekeeping and cleanness Control 5.6.1 Housekeeping and cleanness-control practices

-shall be established which assure-that:

5.6.1.1 The nature of work activities, .

conditions, and environments that can' affect.the quality of structures, systems, and comporients is- controlled.

Control measures shall be established -

to prevent the entry of.extrancour Laaterial into a closed syste7.and:to-ensure that foreign materiai !.s removed before the area is closed.

5.6.1.2- Appropriate cleaning materials, equipment processes, and-procedures are.

used to assure that the quality of an-f- item is not degraded.as a result-of (j

housekeeping or cleaning practices or techniques and provide for the disposal of combustible-material and debris to-support fire protection.

5.6.1.3 Access is controlled to prevent foreign material introduction during the maintenance or modification of systems.

o Cleaning following maintenance or-modification of' radioactively-contaminated systems or equipment in radiation fields shall1 require special consideration ~for-

' -radioactive contamination control and storage of: radioactive waste.

o Prior to-closuretof designated systems or components, an-inspection =

shall be conducted'to assure-cleanness. The results of the >

-inspection shall be' documented.

5.6.1.4 -Where necessary, special cleaning.

requirements-associated =with certain; equipment'shall be' addressed in kT/

m appropriate-procedures.

1

sw 724 (o2/so) i SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION Chapter 5.0 E4 OPERATIONS QUALITY ASSURANCE PLAN -

\ MAINTENANCE, INSTALLATION-OFL . pax - 7 or 7  ;

MODIFICATIONS, AND RELATED ACTIVITIES g A oAn 12-21-90 j

5.7 Documents Associated with Maintenance / Modifications-5.7.1 Documents, such as maintenance, modifications, '

-and installation procedures, maintenance requests, drawings, specifications and others ,

shall be issued, reviewed and controlled in  !

-accordance with Reference 4.4.

5.7.2 Maintenance, modification, and installation documents shall be traceable to the structure, system or component repaired, replaced, or maintained and shall as a minimum contain the following:

5.7.2.1 Description of components.

5.7.2,2 Description of work done including.

parts used.-

() 5.7.2.3 Names--of responsible persons doing work.

5.7.2.4 Traceability of parts used. , ,

5.7.2.5 Reference to measuring and test equipment used.

5.7.2.6 Inspection and test status.

6.0 DOCUMENTATION 6.1 Procedurea which are generated as-required by this 4 chapter shall identify the records which are required to implement and document'those activities.- The records shall be controlled in'accordance with- -

Reference 4.6.

7.0 ATTACHMENTS 7.1 None 4-6

. _m_- - _ _ .-_ . - - - _ . -

STP 724 (02/90)-

wuusta nov.

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION Chapter 6.0 lh  ;

OPERATIONS QUALITY ASSURANCE PLAN O DESIGN AND MODIFICATION CONTROL

^

y$tCVW g 12-21  ;

1.0 PURPOSE 1.1 The purpose of this chapter is to establish the requirements and responsibilities for design control of new structures, systems or components,-and modification control-ef existing structures, systems, or components ut the South Texas Project Electric-Generating Station (STPEGS).

2.0 SCOPE 2.1 This chapter applies:to the-design and modification ,

activities associated with the preparation and review  !

of design documents including the translation of applicable code of Federal Regulation requirements and ,

- design bases into design documents.

3.0 DEFINITIONS 3.1 None

%_/

4.0 REFERENCES

4.1 STPEGS Technical Specifications 4.2 OQAP Chapter 5.0, Maintenance, Installation of Modifications, and Related Activities 4.3 OQAP Chapter 14.0, Records Control' 4.4 10CFR50.59, Changes, Tests and Experiments 5.0 REOUIREMENTS 5.1 Measures shall be established to< document selection of design inputs. Changes to:specified design inputs, including identification of theirLaource, shall be ,

identified and documented. JAs'the design evolves, any_

unreviewed safety question evaluations-shall be performed as required by 10CFR50.59.

5.2 Measures shall be established to control design activities to assure design inputs are translated into design documents such as_ specifications,. drawings, procedures, or instructions.

O V

l r's l

STP 724 (02/90)

REV.

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION ".BER Chapter 6.0 T' OPERATIONS QUA1.ITY ASSURANCE PLAN PAGE 2 or 6 DESIGN AND MODIFICATION CONTROL

[77gEctw 12-21-90 5.2.1 Design activities involving reactor physics; stress, thermal, hydraulic,'and accident analysis; materials compatibility; and accessibility for maintenance,. inservice inspection, and repair will be performed according to approved procedures by appropriately qualified individuals. Results of analyses will be appropriately verified and documented.

5.2.2 Design documents shall include appropriate quality standards. If-an alternate quality requirement is used (e.g.,-other.than the originally specified quality standard) the change shall be documented and approved.

5.2.3 ' Design analyses shall be sufficiently-detailed as to purpose, method, assumptions, design input, references, units,-and status (preliminary or final) such that a technically

(

~

qualified person can-review'and-understand the analyses and verify-the adequacy of the results without recourse to the-originator.

5.2.4 A review for application suitability of materials, parts, Jequipment, and processes essential to the functions of quality-related structures, systems, and components is done as part of the design document preparation and review process. The procedures which-govern the preparation and review,of design documents require that valid. industry standards and specifications be used for1this. review.

Review of standard off-the-shelf = commercial materials, parts, and-equipment for-suitability of--application with quality-related structures, systems,-and components will be conducted before selection'.

Procedures shall identify design documents-which require an inline QA review. This review is for seismic'and quality group classification,; selection of quality standards, and any deviation from quality-standards..

G.

O

. ____mm _ _ _ _ _ _ _.

m

-1 STP 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERAflNG STATION ._

Chapter 6.0 E5 g OPERATIONS QUALITY ASSURANCE PLAN PAGE 3 of 6 DESIGN AND MODIFICATION CONTROL EFFECTIVE l 12-21-90 lDATE 5.3 Measures shall be established to identify and control design interface among participating organizations (internal and external).

5.4 Measures shall be established to verify adequacy of:

design and design changes.

5.4.1 The design-process shall include design verification by qualified persons to assure that the design is adequate and meets specified design input. Design control' procedures shall specify-requirements for the selection and verification. performance

- Design verification of design shall be either by design review, alternate calculation, qualification. testing, or by a combination of these.- The depth of design verification shall be commensurate with the importance of the system or component to plant

(~N safety,-complexity of the' design, and

\ similarity of design to previous designs'.

5.4.1.1 If the verification method performed is only through qualification-testing, the following are required.

o Procedures _shall provide criteria that specify when_ verification should_be by test.

o- Prototype,-component, or: feature testing shall be performed as early as possible before installation of plant equipment, or before the point when the installation would~become irreversible.

o Verification'by test'shall'be performed under conditions that simulate the most adverse design-conditions.ns determined by analysis.

5.4.2 Design verification shall be pefformed by

,hh)

~'

competent individuals or groups other than-those who performed the original design.

I STP 724 (02/90)

SOUTH TEXAS PI,0 JECT ELECTRIC GENERATING STATION *** To? ,

Chapter 6.0 5 i

[. OPERATIONS QUALITY ASSURANCE PLAN PAGE 4 Or 6 DESIGN AND MODIFICATION CONTROL trFTen w DAR' 12-21-90 5.4.3 Design verification should not be performed'by individuals that have immediate-supervisory responsibility for the individual 1 performing the design; have specified a singular design approach; have ruled out certain design considerations; or have established.the-design inputs for that particular design aspect.

However, the. supervisor may perform the verification if the supervisor is-the only technically qualified individual and the need for the supervisor to perform the review is approved and documented in advance by,the supervisor's management.

5.4.4 Design verification will normally be performed'

. prior to' release for procurement,-manufacture, installation, or.use by another organization in other design activities. . Exceptions shall be justified and documented. . Procedures shall.

g-sg control the justification of; exceptions and g ) the completion of'the verification of all affected design-output documents prior to relying on the component,Esystem, or structure to perform its function.

5.5 Measures shall be. established to control the approval, issuance, and-changes of designLdocuments-to prevent the inadvertent use of - superseded design ~ information.

Design documents include-design drawings and specifications, vendor documentr, setpoints with tolerances and design' limits..

5.6 Changes made to design documents are reviewed and approved by the same groups or organization which reviewed and approved original design documents. If

.' the organization which originally approved.a particular design document is no longer responsible, another organization may be designated if competent in the specific design area, has access to-pertinent background information and has an-adequate understanding of the requirements-and-intent of the original design.

5.7 Errors and deficiencies found in approved design documents, including design methods, that:could-l's adversely affect quality-related structures, systems,

\_J l or components shall be documented and action taken to l

(

1

STP 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION

"" 8" -

Chaptor 6.0 E5 G/ OPERATIONS QUALITY ASSURANCE PLAN -

Pact 5 of 6 DESIGN AND MODIFICATION-CONTROL EFFECTIVE org 12-21-90 correct and prevent the recurrence of deficiencies..

5.8 Measures shall be established for the identification and control of deviations from specified quality.

standards.-

5.9 Measures shall be~ established which-assure that maintenance and modifications associated with design changes which may affect the functioning of quality-related structures 1 systems, or components are performed in a manner to ensure quality at least equivalent to that specified in the UFSAR or other original design bases and requirements.'

5.10 Measures shall be established to maintain the list of quality-related structures, systems, and. components current after modifications'are made.

-5.11 Measures shall be established to assure that only.

verified, qualified,and controlled computer codes are

() 5.12 authorized for use.

Modifications ~

5.12.1 Modifications to quality-related. structures, systems, and components shall~be controlled, reviewed, and approved.

5.l?.2 Installation and testing of: modifications

shall be performed in accordance withu l Reference 4.2 and approved procedures. These procedures shall contain provisions as appropriate to ensure quality of installation and appropriate post modification testing..

5.12.3 Quality-related structures, systems, and components shall not be declared operable after a modification until.-the following provisions are satisfied:

5.12.3.1 Affected-procedures are' revised and distributed to appropriate users, 5.12.3.2 Appropriate personnel are trained.

o V 1 l a 1

l STP 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING-STATION

""" E Chapter 6.0 lh

/'N OPERATIONS-QUALITY ASSURANCE PLAN -

PAGE 6 0F 6 DESIGN AND MODIFICATION CONTROL rrE m DAR 12-21-90 5.13 Plant Modifications will be checked against the design changa documentation for proper implementation prior to closing out the design change process. ,

60 DOCUMENTATION 6.1 Procedures which are generated as required by this-  ;

chapter shall, identify,the records which are required to implement and document those activities.- The records shall be controlled in accordance with Reference 4.3.

7.0 ATTACHMENTS 7.1 None O

STP 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION

"" EV-Chapter 7.0 lh i

"] OPERATIONS QUALITY ASSURANCE PLAN i

{d PROCUREMENT PAGE' 1 or 14 (7gEm 12-21-90 1.0 EURPOSE l 1.1 The purpose of this chapter is to establish the requirements for procurement of items and services for i the South Texas Project Electric Generating Station (STPEGS). i 2.0 SCOPE 2.1 This chapter applies to-the procurement of quality-related items and services, and commercial grade items procured for dedication and use in'a nuclear safety-related application. These activities includs procurement document control, bid evaluatiot., vendor-evaluation, verification of vendor activities and receiving inspection.

3.0 DEFINITIONS 3.1 None

()

4.0 REFERENCES

4.1 10CFR50, Appendix B-4.2 10CFR21, Reporting of' Defects and. Noncompliance 4.3 ANSI N45.2.12/ Reg. Guide 1.144, Auditing of Quality; Assurance Programs-for Nuclear Power Plants 4.4 ANSI N45.2.13/ Reg. Guide l.123, Quality Assurance Requirements for Control of Procurement of Items and 1 Services for Nuclear Power-Plants. '

4.5 . ANSI N45.2.2/ Reg.-Guide l.38, Packaging, Shipping, ,

Receiving, Storage and Handling of Items for Water-

  • Cooled Nuclear Power Plants ,

4.6 ANSI N18.7/ Reg. Guide 1.33, Administrative Controls and Quality Assurance for the Operational Phaselof Nuclear Power Plants.

4.7 EPRI NP-5652 (NCIG-07), Guideline for the Utilization-of Commercial Grade Items in Nuclear Safety Related Application -

t'h ~

rx 1 I

sTP 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION

$7

(~% OPERATIONS QUALITY ASSURANCE PLAN

\ PAGE. 2 0F 14 PROCUREMENT' rFECTIVE ogg - 12-21-90 4.8 OQAP Chapter 4.0, Qualification, Training'and Certification'of Personnel 4.9 OQAP Chapter 13.0, Deficiency Control 4.10 OQAP Chapter 14.0,-Records Control 5.0 REQUIREMENTS 5.1 Procurement Document Preparation, Review and Control 5.1.1 Responsibility for procurement is a joint effort of all the departments within the Nuclear Group. 1 The department requesting the, quality-related-material-or: service provides' technical content.

NA reviews the request for. quality requirements and the Nuclear Purchasing and Materials Management' Department (NPMM) is responsible for-commercial provisions.

. 5.1.2 The sequence of preparation, review, approval, and issuance of procurement _ documents is generally as follows:

5.1.2.1 Purchase Requ3.sitions o Purchase requisition forms shall be:

used to initiate the_ procurement of.

quality-related materials, parts, components,-services, and Commercial Grade Items-(CGI). Procurement may be initiated by.any Nuclear. Group personnel.

o Purchase requisitions shall include-material'and component ~

identification' requirements, drawings, specifications,= standards, inspection and test requirements,-

and special, process instructions as appropriate.

o Purchase requisitions for quality--

related materials, parts, components, services,-or CGIs shall r'g be reviewed-by the cognizant

(_) technical organization and NA

STP 724 (02/90)

SOUTH-TEXAS PROJECT ELECTRIC GENERATING STATION

"*8'"

Chapter 7.0-E 5;

( OPERATIONS QUALITY ASSURANCE PLAN --

3 or

( PROCUREMENT PACE ~14 trrtcw DAR - 12-21-90 personnel to-verify that adequate technical and quality requirements, respectively, have been specified.

The reviews-for' technical and-quality requirements shall be performed by someone'other than'the originator of-the requisition.

5.1.2.2 Purchase Orders and Contracts o Purchase orders and contracts are prepared:and issued by.NPMM and establish _for-the suppliers the technical and quality requirements which must be met. These documents also establish the-commercial-conditions for~the procurement action.  ;

o Purchase orders:and contracts shall

(~h accurately reflect the technical and i

\ssl quality requirements established by I the Purchase Requisition. If,-

during the bid negotiations with the supplier, it becomes'necessary;or-commercially desirable'to change the technical or quality requirements, such changes shall be presented for approval to the cognizant technical 4

organization which approved the

original requirements and to Nuclear Assurance.

5.1. 2. 3 ' Change. Controls' I 1

o. Additions, modifications,- _

H I

exceptions, and otherfchanges to procurement document quality /and .

-technical. requirements:shall~ require a review and approval equivalent to

that of-the: original document.

! Commercial consideration changes-not-affecting the technical or-quality requirements may not require review and concurrence by the originator.

() 5.1.3 For the procurement of sparelor replacement t

4 4

1

STP 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION Chapter 7.0 E5 OPERATIONS: QUALITY ASSURANCE PLAN ~

[U). PAGE - 4 0F 14=

PROCUREMENT cre i.

oAn 12-21-90 j parts, equipment, materials, and services,.. the  :

quality and technical requirements shall be equal to or greater than the design basis L requirements for.the original part, equipment, materials or services; except where.less stringent quality or technical requirements.may be established' based on1 specific evaluations and.

justification.. The cognizant. technical organization shall document-such justi3 .;ation..

r 5.1.3.1 Safety related items may be procured asl CGIs ifia documented engineering evaluation indicates the CGI will provide equivalent performance.

5.1.3.2 Review ~of purchasing documents by NA personnel shall verify that quality ,

requirements:are_ correctly stated, 1 verifiable, and controllable; that acceptance / rejection criteria.are

(-)s

( included; and that~the documents have been prepared, reviewed, and-approved in accordance with STPEGS.QA Program ',

requirements. -

5.2 Procurement Document Content 5.2.1 . Procurement document control measures shall assure that appropriate regulatory requirements, design bases,_and'other requirements are included in the procurement process. Originating and reviewing organization procedures shall

. require that the following be included or invoked by. reference in: procurement documents as appropriate:

5.2.1.1~ Applicable regulatory, code, and design requirements,- including 1 applicable material and component identification requirements,_

drawings, specifications, standards, inspection and_ test-requirements, special. process' instructions _and-handling,

( preservation, cleaning, storage,

, N packaging and shipping J

STP 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STAYl0N T-l

  • OPERATIONS QUALITY ASSURANCE PLAN PAGE 5 0F 14  !

PROCUREHENT UncDW oAn 12-21 requirements.- These requirements shall equal or exceed the criginal requirements and be aufficient to preclude repetition.

of defects.

5.2.1.2 Extent that supplier QA program shall comply.with 10CFR50,.

' Appendix B or.the QA program requirements of other nationally recognized codes and standards, as applicable;-or for CGIs to be dedicated for safety related-use by HL&P based on the results of a survey of the vendor's controls,.

the vendor's HL&P approved and/or i surveyed-program.-

5.2.1.3 Requirements for supplier.

fs documents, such as instructions,

( procedures, drawings,

-specifications, inspection and test records, and suppliers' QA records to be prepared, submitted,-or be made evailable for review and/or approval by 4 STPEGS personnel'.

5.2.1.4 Requirements for suppliers of quality-related items-to-maintain the status of required inspections or. tests throughout the manufacturing process to preclude inadvertent bypassing of such inspections and-tests.

5.2.1.5 Requirements for HL&P's right of; access to suppliers' facilities and work documents for inspection and audit.

5.2.1.6 Requirements forcextending applicable STPEGS; procurement requirements to~. lower-tier suppliers and' subcontractors,

including HL&P's access to

\_ facilities and records.

i

l-SF 724 (02/00) __

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION *"8" Chapter 7.0 E5 -

I O OPERATICl?D OUALITY A9puRANCE 'eIAN ty esi 6 or 14~

PROCUREMENT trrann

~

)

ogg 21-90 g !

5.2.1.7 Requirements for supplier  !

. reporting to STPEGS '

nonconformances to procurement document requirements-and conditions for their disposition.  !

5.2.1.8 Requirements for-the retention,-

. control, and maintenance of supplier QA records that are not maintained by.HL&P. . Supplier-furnished records'shall include -

1 o Documentation that-identifies i the purchased' item-and the specific procurement-requirements (e.g., codes, standards, and specifications) met by-the item.

[ o Documentation identifying any

\-

procurement requirements that-have not-been met..

o A description of those nonconformances: fromL procurement requirements dispositioned " accept-as-is" i

or " repair".

5.2.1.9 Requirement for the. supplier to  !

submit a copy of-its QA program

~

. description (does not apply for CGIs).-

  • 5.2.1.10 Requirements for.the performance of maintenance and receipt-

-inspection checks where t applicable.

5.2.1.11 -Applicability ofe10CFR21 reporting requirenents..

o The reporting requirementsooft 10CFR21'do not apply to

[~T vendors of CGIs to be a

\,) dedicated for use by.HL&P.

.u . . . . . . . _ _ - - -

l 1

STP 724 -(02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION

" 85 Chapter 7. 0 E5- ,

-['N OPERATIONS QUALITY ASSURANCE PLAN j

PACE 7 0F 14 l PROCUREMENT EnIcVW DAT: 12-21 -)

5.3 Bid' Evaluation 5.3.1 Bid Evaluations shall be performed to evaluate- '

adherence to technical and quality assurance requirements. '

5.4 Supplier Selection

5. 4 .1- Suppliers of quality-related items or services shall be required to submit copies of their QA program description for evaluation 1 prior to the-issuance of a purchase order or execution of a contract, and acceptability shall be documented.

The process by which suppliers are judged as being a capable procurement source is described as follows:

5.4.1.1 Procurement source evaluation and selection involves QA, Engineering, NPMM, and STPEGS plant personnel, as _

appropriate.- These organizations-participate in the-qualification evaluation of suppliers in accordance e' with written procedures.

5.4.1.2 Measures for the evaluation and selection-of procurement sources shall be specified in procedures and may vary-depending upon the complexity and safety classification'of the item or service. 'When_ procurement source evaluations,are performed, the

-information1to be-considered shall include oneior more of the following:

o Experience of. users of_ identical or i similar products of-the prospective supplier,.other utility or approved contractor audits / evaluations, audits / evaluations by cooperative utility groups, American Society of Mechanical-Engineers-(ASME)

Certificates of Authorization, j STPEGS-records'accumuitced in

()

\s /

previous procurement actions, and STPEGS product operating experience l

o 1 l H i

SF 724 (0,2/90)

SOU1H TEXAS PROJECT ELECTRIC-GENERATING 'TATION

. Chapter 7.0 E5 D N OPERATIONS QUALITY ASSURANCE PLAN b PROCUREMENT PAGE -

B OF 14 l trrtcTivt Oxyt 12-21-90 i

may be used-in this evsluation.

When other utility, contractor or-cooperative utility audits /evalu-ations are used, the documentation-will-be obtained and reviewed.

Supplier history shall reflect recent capability.- Previous-favorable experience with suppliers.  ;

may-be an adequate basis for i judgments: attesting to suppliers' -

capability. 4 o An evaluation of the supplier's current quality records supported by-documented qualitative and quantitative information which can ,

be objectively evaluated. This may include review and evaluation of'the supplier's QA Program Manual,

,.- g procedures, and responses to-(y .questionaires,-as appropriate.-

o A source evaluation of'the:

supplier's technical and quality.

capability as determined by a direct evaluation of facilities and u personnel 1(audit, survey, or a surveillance) Land quality program l implementation. Resolution or a?

Leommitment to resolve unacceptable

-technical or quality requirements identified by the bid 1 evaluation or vendor evaluation shall be obtained

-prior to:the awardfof:a purchase

, order or contracta-5.4.1.3 Procurement source-evaluations involve a review of technical and1 quality considerations to an extent' considered appropriate by each participant.. .

Technical considerations include the design.or manufacturing capability and-technical ability of suppliers to producelor provide the design, service, item orl component. Quality considerations > include one of the

()s

(_ previously stated methods of supplie. j t

-J

sw 724 (o2/eo) __

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION Chapter 7.0-75 i

()

C OPERATIONS QUALITY ASSURANCE PLAN PAGE 9 0F 14 PROCUREMENT trrECTIVE ogg 12-21 evaluation and a-consideration of a supplier's-current quality program or capabilities.

5.4.1.4 A documented quality assurance evaluation of a' quality-related vendor's quality program.shall be performed to assure it meets.the appropriate requirements of 10CFR50 Appendix B, or where applicable,Lother=

nationally recognized codes and standards. <

5.4.1.5 Vendors may be placed on the Approved Vendors List-after passing this evaluation.

5.4.1.6 A vendor shall not.be issued a purchase order-or contract unless they have been-accepted for placement on the' Approved

(~j Vendors List or an exception has.been -

approved by the General Manager, Nuclear Assurance. ,

5.4.1.7 Service' organizations which will supply only manpower and no other service are not required to be on the Approved  ;

Vendors List or have an STPEGS approved quality.aasurance program as long as t 4

the supplied personnel are' trained and work under the auspices of the1STPEGS Operations Quality.AssuranceLPlan._

5.4.2 'Each vendor on the Approved Vendors List shall be evaluated by Nuclear' Assurance at le'ast once-each, twelve months as provided by Reference 4.4.

5.4.2.1 A vendor may be removed from the Approved-Vendors-List if evaluation determines theLvendor is: unacceptable,-

the vendor requests removal or by direction of the; General Manager, Nuclear Assurance.

5.4.3 Planning of: verification activities to be

/~T employed.for item or service acceptance shall 1s_/ . begin,during the purchase requisition or l

1

. _ . . -__=__:---

]

SF 724 (02/90) I SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION Chapter 7.0 E5 l ^

[ OPERATIONS QUALITY ASSURANCE PLAN-t PAci 10y 14 PROCUREMENT.

Entcmm l

DAR 12-21-90 i

ontract preparation and review stage. i.,un extent of the verification activities will vary and be a function of the relative safety significanco, complexity of-the purchased-item or service, and the supplier's past-performance.

The verification activities may include vendor surveillance, receipt inspection, or post-installation testing.

-Verification activities are planned to assure- .

conformance to procurement document; requirements. Procedures'shall establish the-organizational responsibilities for identifying required verifications and methods, performing-and documenting the verification activities.

5.4.3.1 Vendor surveillance shall be performed using surveillance plans developed in accordance with QA-' procedures with appropriate input from the-cognizant

technical organization. The surveillance plan shall specify the characeristics or processes tx> be witnessed, inspected or verified, and accepted; the' method of surveillance; and the documentation required.-

5.4.3.2 Vendor surveillance inspections may;be

-waived by the General Manager, Nuclear Assurance =or designee.

5.4.3.3 Vendor related reports-shallL-be-evaluated to determine the-effectiveness of the vendor's quality assurance program.-

5.5 Receiving Inspection-

~

5.5.1 Received purchased items shall be inspected-for shipping damage.and the requirements cf ANSI-N45.2.2 Section 5.2.1 and the applicable attributes of Section 5.2.2.

5.5.2 Receiving inspection shall be coordinated with vendor surveillance inspection. If vendor

/j surveillance inspection is not performe4 or did

\_/ not address'all' applicable attributes, rs aipt L

SF 724 (02/90) l SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION "'f Chapter 7.0 ,5 7 l

.O OPERATIONS QUALITY ASSURANCE PLAN i PAGE 110F - 14 l PROCUREMENT ErrEcw I oAn 12-21-901 l ..

inspection shall be performed and shall include the applicable additional attributes listed in ANSI N45.2.2 Section 5.2.2,.except for <

commercial grade _ items dedicated by survey which

shall be-receipt _ inspected as required by the procurement document.

5.5.3 Receiving inspection checklists shall'be developed using the requirements'specified in, the procurement-documents and applicable attributes of ANSI.N45.2.2.

5.5.4 Statistical sampling methods:may be used.for groups-of'similar items._ Sampling shall. comply with nationally recognized methods or approved engineering .aternates.

5.5.5 Receiving inspections chall be performed by personnel trained and qualified in accordance gs with Reference 4.8.- Technical assistance'shall- 1

(,,) ~ provided by Nuclear Generation or Nuclear Engineering as applicable.

5.5.6 Receiving inspection activities shall include:

5.5.6.1 Identifying materials, parts, and components and their status upon-receipt by tagging or other acceptable-means of identification,'or segregating and controlling items in receiving hold areas' separate from the storage facilities-for acceptat u items.

Identification of-items shall i correspond to the identification '

required by procurement documents and be noted on receiving documentation.

5.5.6.2 Verification of items for this acceptance, including examination for shipping damage, correctness.of identi'ication, and specified quality. 4

- doc: _entation. 1 5.5.6.3 Inspecting or. testing,_where i appropriate, using approved procedures-and calibrated tools, gauges, and

\ measuring equipment for. verification l

I L

u '

STP 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION _

E' Chapter 17.0- 5

,C;'

O OPERATIONS QUALITY ASSURANCE PLAN-PAGE 12or - 14 PROCUREMENT EFFECTIVE oATg 12-21-90 3 i

acceptance of items,-including off-the-shelf items.

5.S.6.4 Items determined to be acceptable _for -

use shall be identified with an

" accept" tag or other acceptable _means i of identification; prior to-_ release for storage or use., ,

5.5'.6.5 Received items which do not conform to procurement documents are controlled-and segregated (if' practical) and. ,

processed in accordance-with Reference-4.9.. q 5.5.7 Acceptance by-post-installation test may be utilized , following ~one of the ' preceding:

verification methods. fPost-installation testing' may be used for acceptance verification when it-L is difficult to' verify item quality- <

7-s -

l characteristics, the item requires an integrated-system checkout:or test, or the. item cannoti demonstrate its1 ability to perform whenLnot in-use. Engineering 9pecifications;shall-betused l' for developing' post-installation test

' instruction requirements and acceptance documentation.. Post-inctallation testing issthe-responsibility'of the~PlantLManager, STPEGS, and is witnessed by NA' personnel 1at_specified hold .

points.

5.5.B' Acceptance;of Procur'ed Items and Services 5.5.8.i-Acceptance' of' items and services =shall be based:on one or more of the following:

o Written certifications o Supplier audit' o_-Source inspection l o Receiving inspection! I o Vendor Surveillance-o' Post-installation test-1 i

w s v x - <>

I STP'724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION wwam p Chapter-7.0- '51 Q

OPERATIONS QUALITY ASSURANCE ~ PLAN-Q PACE 130F 14- ,

PROCUREMENT-gp An,12-21-90

_ n -.

5.5.9 -Documented evidsnce.from the napplisr'that-procured items meet procurement quality-requirements such as co6es, standsrds,7or specifications willibe Maintained at1the. plant' site. Such evidence.shall:be provided-byethe supplier, at-the stine of-source or recnipt inspection,L for reviewLandiva*ritication before acceptance. The; documented'avidenceLwillEbe retrievable 1and available_tt. the plant site prior to installation or use of the' procured item, unless othe 'tiseEcontrolled in;accordance, with OQAP: Chapter .3.0,'Fara. 5.1.9.=

5.6 Vendor Surveillance and Audit -

~

5.6.1 Suppliers Certificates,of Conformance are periodically evaluated by. audits, independent inspections, Tor tests:to ascure'that they are valid and.results are documentea. ~ When-I~'i

\/

-acceptance istbased upon supplier audit or: ~

vendor.-surveillance,-documented evidence shall be-furnished to the plant 1 receiving.

organization.

5.6.1.1 Acceptance. by vendor surveillance may:

-be considered-when.the' item or' service

~

-is vital-.to' plant safety; or:the . .

quality characteristics are difficult _ ,

to verify after receipt; or theLitem or service is: complex in' design, manufacture,-inspection, or test.; -

Vendor survail' lance involves;a< physical.

presence to-monitor,1by-observation, .

designated activitiesLforithe purpose of evaluating supplier performance and product acceptance.

-5.6.2 ~The STPEGS~NA: audit program providet for periodic scheduled'audita of suppliern,.

contractors,; subcontractors, and others' performing safety-related" work.' The audit-schedule 11s prepared and' updated by'HA.

Frequency of.these audits-isJbased upon the safety,1 complexity',-and quality r6quirements, '

/i and'as a minimum shall.be in\ compliance-with

(,)/ Reference 4.3.

~ - - p , -

, - , , .I

STP 724 (02/00)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION 05?'

OPERATIONS QUALITY ASSURANCE PLAN PAGE 140F 14 PROCUREMENT trrte n DATt . 12-21-90 6.0 DOCUMENTATIt4 ,

5.1 Procedures which a'.e generated as required by this chapter shall'ide'.tify the records which are required to implement and document those activities. The records shall be controlled in accordance with Reference 4.10.

7.0 ATTACMMENTS 7.1 None ,

O O

- . . .. . . =-. .--

SW 724 (07/90) .

"8" SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION Chapter 8.0

. @ 4

. /G OPERATIONS QUALITY ASSURANCE PLAN

~V PAGE. 1 OF 3 CONTROL AND ISSUANCE OF DOCUMENTS EFFECTIVE DAE 12"21~90 1.0 PURPOSE 1.1 .The purpose of.this. chapter-is to establish the.

requirements for review, approval,-distribution'and use of quality-related documents such as instructions, procedures and drawings, including ~ changes thereto for the South Texas Project Electric Generating: Station (STPEGS). 1 2.0 SCOPE 2.1 This chapter is appl-1 cable to documents which control quality activities for the licensing, operation,.

testing, maintenance, and plant modification cf the STPEGS. These documents include, but:are not limited to, instructions; procedures; specifications;' drawings; vendor. manuals; status registers-(such as.-drawing lists, equipment lint); procurement documents; design-documents;-design change requests; as-built-documents; non-conformance and deficiency _ reports; Updated Final:

\~

Safety Analysis Report and program manuals-(such:as

, OQAP, Emergency Plan,. Inservice Inspection Plan, etc.).

3.0 QEFINITIONS 3.1 None

4.0 REFERENCES

4.1 OQAp-Chapter 6.0,-Design and Modification Control 4.2 OQAP Chapter 14.0, Records Control

. 5.0 BEOUIREMENTS 5.1 Procedures shall be established which identify.the organizations or individuals responsible for;the preparation, review, approval, and issuance'of quality related documents and changes thereto.

5.2 Departments responsible for program-implementing documents shall be required to' provide and assure;the.

necessary review and approval, prior toruse, for instructions, procedures, and drawings. Review and approval. assures that" issued documents include proper

(~ quality and technical requirements, and are correct for V their intended use. Additionally, individual e v - * 'w-s

t SF

~

724 (02/90) [

80UTH TEXA8 PROJECT ELECTRIC GENERATING 8TATiON Chapter 8.0 24 i

, l' 1

OPERATIONS QUALITY ASSURANCE PLAN

.,,/ PAOC 2 or 3 -

CONTROL AND ISSUANCE OF DOCUMENTS trrtenn i pan 12-21-90 dept.rtments are rerponsible for. controlling documents-generated or reviewed-in the department.for which the department has preparation and final approval or  :

external interface responsibility. .

s 5.3 Document reviews shall be performed by appropriately _ ,

qualified personnel with access to pertinent background '

information to establish a basis for an adequate-review. Nuclear AsoJrance'shall review selected documents for. quality requirements.

5.4 Proceduren'shall establish controlled-distribution of-documents and changes thereto includingt -:

5.4.1 Es*Tblishing current-and updated distribution i 345 ,.-

S.4.2 P csonnel or organizations acknowledging receipt l and insertion of controlled documents and changes therato.:

O- 5.4.3 Controlling documents to avoid the.use of outdated'or inappropriate documents. -

5.4.4 Establishing and maintaining master document lists identifying the current. revision of -!

documents.

5.4.5 Temporary changes to procedures.

5.5 Documents shall be available:and'used at1 work locations by~ individuals or organizations' performing-qrality-related activities when required based uponette nature of the. work. Clearly identified controlled copies of documentc shall be.available_at the point of use' prior i to commencing activities. .

5.9 Revisions.or changes to' documents shall be reviewed and i

approved by the same. organizations.thatiperformed the '

original review and. approval =unless other organizations are designated and have. knowledge of the' requirements and intent of the original document. Personnel:using a . ,

document to perform _ quality lrelatedl activities are -i responsible for assuring the documents being-used=are

.the correct invision prior tofsuch use.

)

.- 4,- # e- rv -w m--e--- ., ,w-r.+ cege -

yW- -*y y--*M-yv =--y * $F' .$ h- m 8-F

t

$fP 724 (02/90)

SOUTH TEXA,9 PROJECT ELECTRIC GENERATING STATION """

EP OPERATIONS QUALITY ASSURANCE PLAN O

PAGE 3 Of 3 CONTROL AND ISSUANCE OF DOCUMENTS trricw

, pan 12-21-90 5.7 Procedure reviews shall be performed 5.7.1 Following an unusual incident such as an accident, unexpected transient, significant operator error, or unusual equipment malfunction.-

5.7.2 Following a plant modification to a system to .

which a specific procedure is applicable.

5.7.3 No less frequently than every two years by an individual knowledgeable in-the area affected by the procedure to determine if chang 6s are necessary or desirable. This review shall be-performed by a nember'of a designated review group as an independent activity that is at' least as rigorous as the initial procedure review. A general revision to-a procedure constitutes a review.-

('

s-5.8 Procedures shall be developed for the control and distribution of vendor / contractor documents such as approved drawings, specifications, technical manuals and instructions.

5.9 Control of design documents is addressed in Reference 4.1.

6.0 DOCUMENTATION 6.1 Procedures which are generated as required.by'this chapter shall identify the records which are required to implement and' document those activities. The records shall be; controlled in accordance with Reference 4.2.

7.0 ATTACHMENTS 7.1 None

-h O

$TP 724 (02/90)

SOUTH TEXA8 PROJECT ELECTRIC GENERATING STATION Chapter 9.0 i OPERATIONS QUALITY ASSURANCE PLAN CONTROL OF MATERIAL

((dN 12-21-90 i 1.0 PURPOSE 1.1 The purpose of this. chapter in to describe requirements and assign responsibility for control of material at the South Texas Project Electric Generating Station (STPEGS).

2.0 SCOPE 2.1 This chapter applies to identification, control and traceability of material, parts and components during receipt, storage, handling, issuance,' installation and shipping activities.

3.0 DEFINITIONS j 3.1 None

4.0 REFERENCES

O 4.1 ANSI N45.2.2/ Reg. Guide 1.38, Packaging, Shipping, b Receiving, Storage and Handling of Items.ft:r_ Nuclear Power Plants '

4.2 ANSI N45.2.3/ Reg. Guide'l.39, Housekeeping During the '

Construction Phase of Nuclear Power Plants 4.3 00AP Chapter 4.0, Qualification, Training and f i Certification of Personnel-  !

4.4 OQAP Chapter.7.0, Procurement 4.5 OQAP Chapter 14.0, Records Control 5.0 REQUIREMENTA

/- _

e 5.1 Quality-related material, equipment, and components s shall be handled,. stored,_ shipped,-cleaned, and- ,

preserved to assure that the quality of items is~

maintained.from-fabrication =through installation.  ;

~

5.2 Identification and Traceability l Requirements ~

5.2.1 Physical identification of_ material (including-3 '

consumables), parts and. components shall be used

~

_w henever possible or. practical and- i

[ (Gf. identification shall be trueable to the l

STP 724 (02/90) _,

"WBER REV.

SOUTH TEXA8 PROJECT ELECTRIC GENERATING 8 TAT 10N Chapter 9.0 T' r OPERATIONS QUALITY ASSURANCE PLAN PACE 2 0F 4 CONTROL OF MATERIAL E VW

$[7 12-21-90 appropriate documentation such as drawings, specifications, purchase orders, manufacturing

-and inspection documents, deviation reports, and physical and chemical test reports.

5.2.2 Identification marking requirements include 5.2.2.1 Where physical identification marking t is used, the marking shall be clear, unambiguous and indelible and shall be applied in such a manner as not to-affect the function of the item.

^

5.2.2.2 Markings shall be transferred to each part of an item.whenever possible or practical when subdivided and shall not-be hidden or ob? iterated by surface treatment or coatings'unless other means of identification are substituted (e.g. , color coding) .: -

O 5.2.2.3 Procedures shall specify that identification be maintained,- either on-the item or on records traceable to the -

item, and verified as required. ,

throughout fabrication, erection, installation, and use:of_the. item. The.

identification must be verified 1and:

documented prior to'releaseafor fabrication, erection, installation r and/or usenof the= item.

5.3 Material Storage-5.3.1 Measures'shall be established for the control of- >

items in storage which includes- . storage location, storage levels, procedures which require periodic surveillance of stored items to verify specific' protective environmental =

requirements, inspection results, item careLand protective measures, personne1Laccess to storage

-areas,-and material issues. LControl of items in-storage shall comply with the requirements of Reference 4.1.- Storage conditions commensurate with the safety classification of-the materials.

/~N will be maintained.

D i

4

, , , . -~-- , - e aer-

STP 724 (02/90)

SOUTH TEXA8 PROJECT ELECTRIC GENERATING STATION chapter 9.0 l[?

O OPERATIONS QUALITY ASSURANCE PLAN CONTROL OF MATERIAL pax 3 or 4 mm 12-21-90 DAR 5.3.2 Procedures shall'be developed for storage of chemicals, reagents,-lubricants, and other consumable: materials which will-be used in 3

conjunction with quality-related systems. Items ~

having limited = shelf or operating life shall be-identified and controlled to preclude the use of- -

t expired items.

5.4 Material Handling 5.4.1 Procedures shall be developed for handling of items which, because of weight, size, susceptibility-to. shock damage or other conditions, require special handling.

5.4.2 Measures shall be established to rate and-inspect hoisting and handling equipment in accordance with Reference 4.1.

5.5 Shipping 5.5.1 Measures shall be established for the packaging, loading and transportation of items off-site in accordance with Reference 4.1.

5.6 Housekeeping 5.6.1 Measures shall be; established for. housekeeping activities in the warehouse areas"which include:

zone designation, environment control, work area cleanliness, fire protection, inspection, and. l surveillance. These measures shall1 meet the  ;

requirements-of Reference 4.2. '

5.7 Personnel performing = handling, preservation, storage, cleaning, packaging,. shipping, and inspection to the requirements of -tdiis chapter shall be trained and qualified per Referenceu4.3. ,

6.0 DOCUMENTATIOH 6.1 Procedures which are-generated as. required by this chapter shall : identify the records- which are required .

to. implement and document those activities. The records'shall be controlled in,accordance with  !

Reference-4.5. I

sre n4 (or/so) suusta nov.

SOUTH TEXA8 PROJECT ELECTRIC GENERATING 8TATl0N Chapter 9.0 Y OPERATIONS QUALITY ASSURANCE PIAN CONTROL OF MATERIAL

$$N 12-21-90 7.0 ATTACHMENTS 7.1 Hone O

___6---.-_m-- ..-

STP 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION 0'?

Chapter 10.0 0 3 OPERATIONS QUALITY ASSURANCE PLAN (U INSPECTION PACC 1 0F 5 EcmW

((7t 12-21-90 1.0 PURPOSE 1.1 The purpose of this chapter is to prescribe the requirements and the responsibilities for incpection.

2.0 SCOPE 2.1 This chapter is applicable to inspection activities assoc iated with quality-related systems, structures and components at the South Texas Project Electric  ;

Generating Station (STPEGS).

3.0 DEFINITIONS 3.1 None 4.0 REEERENCES 4.1 OQAP Chapter 4.0, Qualification, Treining and N' _J) Certification of Personnel 4.2 OQAP Chapter 12.0, Instrument and Calibration Control '

4.3 OQAP Chapter 14.0, Records Control 5.0 REOUIREMENTS 5.1 Inspection 5.1.1 Inspections shall be performed by written and approved procedures. The inspection criteria established for performing inspections and the detail of the inspection. process shall be determined based on the complexity of the activity and possible safety impact to the plant. Qualification of individuals performing inspections shall be in accordance with Reference 4.1. These individuals shall be other than those who performed or directly supervised the activity being inspected and do not report to the same immediate supervisor.

Inspection-requirements may be included as a part of the document controlling the activity, or a separate inspection procedure prepared to

,e N specify, as appropriate, the inspection

_ (,) _ performance requirements as noted below.

I

SW 724 (02/90) ,

SOUTH TEXA8 PROJECT ELECTRIC GENERATING STATION E-Chapter 10.0 6;

] OPERATIONS QUALITY ASSURANCE PIAN PAGE 2 Or 5 INSPECTION gggy oAn 12-21-90 5.1.1.1 Identification of characteristics and activities to be inspected 5.1.1.2 Acceptance and rejection criteria 5.1.1.3 Inspection process utilized 5.1.1.4 Identification of procedures, drawings, specifications, and ,

revisions utilised ,

5.1.1.5 Specification of the necessary measuring and test equipment including accuracy and calibration due dates as applicable 5.1.2 Examples of tho' activities subject to inspection include:

() 5.1.2.1- Special processes 5.1.2.2 Modifications 1 5.1.2.3 Receipt of materials, parts and components 5.1.2.4 Maintenance 5.1.2.5 Packaging, shipping and handling of radioactive waste material 5.1.3 When inspections associated.with-normal operations of:the plant'are performed by individuals-other^than those who performed or

.' directly supervised the work,_but are within j the same group, the following controls' apply:

5.1.3.1 The quality'o'f the work can be demonstrated-through a functional test when the activit breaching a pressure y involves-retaining. item.-

l

~/ -

l 1

j r, ,-n . - ~ , , 4 ,, w e n,-x n. . - - - . -

- m- r

$TP 724 (02/90)

SOUTH 1EXA8 PROJECT ELECTRIC GENERATING STATION EP Chapter 10.0 6

, OPERATIONS QUALITY ASSURANCE PLAN

\ . Pact 3 or 5 INSPECTION mem dan 12-21-90 5.1.3.2 The qualification criteria t'or inspection personnel.are reviewed and ,

found acceptable by the QA organization prior to initiating the-inspection.

5.1.4 Process Monitoring 5.1.4.1 Process monitoring of work epipment, .and personnel activities,ilized shall be ut as a control method  ;

when direct inspection of processed items is impossible or irpracticable.

Monitoring shall be performed to~

verify that quality-related-activities are performed in accordance with documented instructions, procedures, drawingo,

~g and specifications.

\~ 5.1.5 Supporting Inspections 5.1.5.1 Both-inspections and process monitoring shall be used when control of the activity is inadequate without both. The need for such monitoring shall be determined prior to initiation of the activity, if possible, or may be stipulated later if circumstances warrant.

5.1.6 Mandatory Inspections 5.1.6.1 Mandatory inspection holdpoints are established by the organization performing the work, Engineering,.or by QA/QC personnel. . Witnessing or inspection of hold points by-QC shall be-accomplished before_ work can' v proceed. 1 Plant procedures and work instructions.shall be' reviewed by QA/QC. personnel'for concurrence with- >

the, established mandatory hold i points.

1 4

$F 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION wuust,i g.

OPERATIONS QUALITY ASSURANCE PLAN Pact 4 or 5 INSPECTION trrtcm oAn 12-21-90 5.1.6.2 QC also establishes notification points for the purpose of being informed of upcoming activities (e.g., prior to the start of a test)-

where a mandatory holdpoint may not be appropriate, but QC involvement.

may be desired.

5.1.7 Inspection results are reviewed and approved by-qualified personnel to verify =that the inspection requirements were satisfied..

5.1.8 Inspection activities shall be documented and as a minimum, shall-identify the following:-

5.1.8.1 Item inspected 5.1.8.2 Date of-inspect 10n

() 5.1.8.3 5.1.8.4

. Inspector Type of observation / inspection 5.1.8.5 Results and acceptability 5.1.8.6 Reference-to information on action taken in connection.with-nonconformances 5.1.8.7 Test equipment used 5.1.9 Inspection requirements for modifications, repairs, and replacements shall-be equivalent to the inspection requirements of the original design or approved alternatives.

5.1.10 Procedures.shall be reviewed'by personnel sufficiently knowledgeable in the requirements-of the activity to ensure that the<necessary hold points.are designated.

5.1.11- Measuring and test equipment: utilized-as part; of the-inspection process shall be. controlled by.the requirements of Reference 4.2.

-- j u

a

SW 724 (02/90) y SOUTH TEXA8 PROJECT ELECTRIC GENERATING STATION Chapter 10.0 E6

()

t OPERATIONS QUALITT ASSURANCE PLAN --

PAGE 5 or 5

  • INSPECTION trrten w oAn 12-21-90 i

5.1.12 Acceptance

' 12.1

. Procedures shall-be established for '

processing, evaluation, and' final e acceptance of inspection data ~ . The  ;

qualified inspector performing the r t

, inspection is responsible for the immediate evaluatic7 and

  • acceptability of inspection resulta..

Designated individuals or groups are responsible for reviewing.and  ;

evaluating inspection results j including recording of data,  !

computations, drawings, or  !

specification interpretations.

5.2 Nondestructive Examination (NDE)

NDE shall ce performed in accordance with:

~

5.2.1

(-%

procedures which address the applicable requirements of ASME, ASTM, or other appropriate codes and standards.

5.2.2 .The applicable requirements of Section 5.1, Inspection,.shall apply to the performance, evaluation, and documentation of NDE results.

5.3 Inspection Status 5.3.1 The status'of individual item-inspections shall be identifiable through the use of stamps,-

tags,. labels, routing cards'or documentation traceable to the item.

6.0 DOCUMENTATION 6.1 Procedures which are generated'as required lby thisc chapter shall; identify the' records which are required to implement and document those activities. .The records shall be controlled-in accordance with Reference 4.3.

7.0 ATTACHMENTS 7.1 None

$TP 724 (02/90) ,

SOUTH TEXA8 PROJECT ELECTRIC GENERATING STATION E '

C OPERATIONS QUALITY ASSURANCE P1AN PAGE 1 OF 4 TEST CONTROL tmcw DAlt 12-21-90

, 1.0 PURPOSE 1.1 The purpose of this chapter is to establish requirements for testing of quality-related structures, systems, and components.

s.O E.qp2E 2.1 This chapter is applicable to the testing of quality-related structures, systems, and components during the operational-phases to demonstrate compliance with design and operational requirements.

3.0 DIJINITIONS 3.1 None

4.0 REFERENCES

O 4.1 South Texas Project Electric Generating Station V (STPEGS) Technical Specifications 4.2 OQAP Chapter 4.0, Qualification, Training and j Certification of Personnel '

4.3 OQAP Chapter 12.0, Instrument and Calibration Control 4.4 OQAP Chapter 14.0, Records Control 5.0 REOUIREMENTS 5.1 The test programs-shall be developed to demonstrate that plant structures',_ systems, and components will perform in accordance with-design requirements.

5.1.1 Tests performed following-maintenance or modification shall satisfy the original design or test requirements or.an engineering approved alternative.

5.1.2 Test programs include operability tests, surveillance tests, and equipment tests, including those associated _with plant maintenance, modification, proceddre changes,-

O and the acceptance of purchased material.~

V 1

l l

STP 724 (02/90)

SOUTH TEXA8 PROJECT ELECTlHC GENERATING STATION Chapter 11.0 E5 O

v OPERATIONS QUALITY ASSURANCE PLAN PAGE 2 or 4 TEST CONTROL trrtcTivt oAn 12-21-90 5.2 Procedures shall be developed to control tests of quality-related structures, systems, and components to assure satisfactory service upon completion of I

maintenance or modifications. ,

5.3 Procedures shall be developed to schedule and control surveillance testing of those items and systems required by Reference 4.1.

5.4 Test procedu shall providt, as necessary,_for the followingt 5.4.1 The requirements and acceptance' limits contained in applicable licensing, design and~ procurement documents.

5.4.2 Instructions for performing the. test,. including prerequisites, test sequence, and caution or safety notes, and shall be in sufficient. detail O' so that the. test operator's interpretation.is not required.

5.4.3 Calibrated test equipment with the accuracy required for performing the actreity. t 5.4.4 Provisions for documenting or recording test data and results

5.4.5 Acceptance

criteria.;

5.4.6 Inspection holdfand/or.cnotification points for inspection / witness by-Nuclear = Assurance.

5.4.7 Provisions for assuring the test prerequisites

.' have been met.

5.4.8 Provisions for control of jumpers,; lif ted leads, blank flanges, strainers or safety. tags, etc.

5.4.9 Provisions for returning a system to normal' configuration upon completion of the test. .

l 5.4.10 Environmental conditions'shall'be noted in test procedures,-as appropriate.

l

, ,- , ._y, 2.,,., . . - - e

STP 724 (02/90)

" " E" SOUTH TEXA8 PROJECT ELECTRIC GENERATING 8TATION ff Chapter 11.0 5 O OPERATIONS QUALITY ASSURANCE PLAN TEST CONTROL PAOC 3 Or 4 EntcTivt DATE 12-21-90 5.5 Measuring and Test equipment (M&TE) used during test activities shall be. controlled in accordance with Reference 4.3.

5.6 Procedures shall be developed to ensure that test data and results are reviewed by a qualified individual (s) and are evaluated for compliance with applicable test l acceptance criteria.

5.7 Personnel performing test activities, including developing and implement 1:ig test procedures and evaluating and reporting test results, shall be qualified in accordance with Reference 4.2.

5.8 Administrative procedures shall provide for  !

identification of structure,_ system, and component test '

status through the use of status indicators (i.e.,

clearance tags, markings, records) to assure only items that have passed required tests are used or operated.  !

\- 5.9 Test records, where applicable, shall includet  !

5.9.1 Identification of items or systems tested.

5.9.2 Date of test.

5.9.3 Tester and data recorder identification.

5.9.4 Type of observation / test.

5.9.5 Test results and acceptability, s

5.9.6 References to nonconformances and action taken. '

5.9.7 Person reviewing and evaluating test results. ,

5.9.8 Test equipment used.

6.0 DOCUMENTATIOE  !

6.1 Procedures which are' generated as required by this  !

chapter shall identify.the records'which are required' to implement.and document those activities. 1The records shall be controlled in accordance with Referenc* 1.4. ll u

1 i

sTP n4 (02/90)

SOUTH TEXA8 PROJECT ELECTRIC GENERATING STATION $$

chapter 11.0 5 i

OPERATIONS QUALITY ASSURANCE PLAN

) TEST CONTROL

[AYE 12-21-90 l

7.0 ATTACHMENTS 7.1 None i

4 O

1

'I k

.Mdmm-g- =e =

-w --wgey- >-=c w- 'm9 r--

STP 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION

" 8" Chapter 12.0 E5 O OPERATIONS QUALITY ASSURANCE PLAN -

PAGE 1 Or 3 INSTRUMENT AND CALIBRATION CONTROL g DAR 12-21-90 1.0 PURPOSE 1.1 The purpose ef this chapter is to establish requirements to ensure measuring and test equipment (M&TE), and installed instrument and control devices used in quality-related activities or structures, systems and components are properly controlled, maintained, and calibrated at the South Texas Project Electric Generating Station (STPEGS).

2.0 SCOPE 2.1 This chapter is applicable to equipment used to measure, test, evaluate, and inspect quality-related items and systems during operational phases and to installed instrument and control devices used to measure, record, and control quality-related plant operations.

/^x 3.0 DEFINITIONS t]

3.1 None

4.0 REFERENCES

4.1 OQAP Chapter 4.0, Qualification, Training and  :

(

Certification of Personnel 4.2 OQAP Chapter 14.0, Records Control 5.0 REQUIREMENTS i 5.1 Procedures shall be developed to establish the method and interval of calibration for installed instrument and control devices. The calibration method and interval shall be based on the type of equipment, stability, and reliability characteristics, required accuracies and other conditions affecting calibration.

5.2 Procedures shall be developed for the control and calibration of measuring and test equipment at prescribed intervals or prior to use. Reference standar6s having known valid relationships to national standarda shall be used. Each organization shall be

(~N responsib'o for assuring that the measuring and test

(_-) equipment (MIE) it uses has been calibrated.to the I ni

$TF 724 (02/90) _

SOUTH TEXA8 PROJECT ELECTRIC GENERATING STATION Chapter 12.0 E5 '

O OPERATIONS QUALITY ASSURANCE PLAN INSTRUMENT AND CALIBRATION CONTROL PACE 2 0F 3 trnnw DAR 12-21-90 ,

f 4

accuracy required for.its intended use.

5.3 Reference standards shall have an uncertainty (error) requirement of no more than 1/4 of the tolerance of the equipment or device being calibrated. When .

commercial standards with the required uncertainty error are not available, a' reference standard may be used if the standard error tolerance is equal to or ,

less than the error tolerance of the equipment being '

calibrated. The basis of this acceptance shall be documented and authorized by responsible management.

In those cases where a reference standard is not traceable to a national standard because a national standard does not exist, the basis for calibration shall-be documented.

t Measuring and test-equipment shall be uniquely 5.4 identified. The records directly traceable to the equipment shall: indicate the date of calibration, the identity of the person who calibrated the equipment, i the results of the calibration and the next

(%- calibration due date.

5.4.1 A calibration label will be attached to measuring and test equipment to indicate the calibration due date. If this label interferes with-the equipment function or is impractical, the calibration label will be attached to the equipment case.

5.5 Measures shall be established'to trace the use of each

  • item of measuring and test-equipment. When measuring and test equipment-is found out of calibration, an  ;

evaluation shall be made and documented for the validity of previous inspection and test results and for the acceptability'of items previously inspected or  ;

tested.

5.6 Measuring and test equipment, installed instruments-and control devices suspected or known to be.in error or defective shall be immediately removed from service or properly tagged-to indicate the error or defect.

5.7 Heasuring-.and test equipment, installed instruments and control-devices consistently found to-be out of .

l calibration shall be repaired or replaced.

f^}/

N-l

.-,,-a.; , ,.: . , , . . . , , - , , , .

= _ _. . .--. . . _ - _ _ - -. . ._

STP 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION Chapter 12.0 7 5 OPERATIONS QUALITY ASSURANCE PIAN O- Pact 3 or 3 ,

INSTRUMENT AND CALIBRATION CONTROL ggcu cAn 12-21-90 5.8 Measuring and test equipment shall be handled and stored commensurate with their environmental and sensitivity requirements.

5.9 Measuring and test equipment which becomes lost shall be considered out of tolerance and upon its recovery, it shall be recalibrated.

5.10 Personnel calibrating measuring and test equipment and installed instrument and control devices shall be qualified per Reference 4.1.

5.11 Contractors and vendors, who provide their own measuring and test equipment, shall have a program that meets the requirements of this chapter.

5.12 This chapter does not require the calibration and control of rulers, tape measures, levels and other fs such devices if normal commercial practices provide

t, ) adequate accuracy.  ;

5.13 Inspection, test, maintenance, repair, and other procedures shall include provisions to assure that M&TE used in activities affecting quality are the proper range, type and accuracy.

5.14 Measuring and test equipment, utilized for chemical 1 and radiological control purposes are not required to >

meet the requirements of this chapter, provided ,

laboratory control practices are implemented to ensure '

accuracy of analyses.

6.0 DOCUMENTATION i

.' 6.1 Procedures which,are generated as required by this  :

chapter shall identify the records which are required 1 to implement and document-those activities. The 1 records shall be' controlled in accordance with l Reference 4.2. t 7.0 ATTACHMENTS 7.1 None

  • rs

%.a 'l r -

, - , , ,,,. .- .. , . , - + , ,w

y l

1

$TP 724 (02/90)

" " I SOUTH TEXA8 PROJECT ELECTRIC GENERATING STATl0N f/of Chapter 13.0 4

\ OPERATIONS QUALITY ASSURANCE PLAN <

PAot 1 or 4 i DEFICIENCY CONTROL trri m 12-21-90 )

oAn  ;

1 1.0 PURPOS.E 1.1 The purpose of this chapter is to establish requirements and responsibilities for the identification, documentation, evaluation, resolution, i control and reporting of deficiencies. l 2.0 SCOPE l 2.1 This chapter applies to deficienciec discovered in i 1 items, services and activities under the scope of-the ,

operations Quality Assurance Plan-and the reporting of

items to the Nuclear Regulatory Commission-(NRC) in f accordance with Title 10 Code of Federal Regulations. 1 3.0 DEFINITIONS 3.1 None

4.0 REFERENCES

4.1 10CFR50, Appendix B 4.2 10CFR21, Reporting-of Defects and Noncompliance

, 4.3 10CFR50.72, Immediate Notification Requirements for Operating Nuclear Power Reactors

?

4.4 10CFR50.73, Licensee Event Report System.

4 4.5 South Texas Project Electric Generating Station (STPEGS) Technical Specifications 4.6 OQAP Chapter 14.0,-Records Control a

5. 0 - PEOUIREMENTS
5.1 All personnel working
under the jurisdiction of the' Operations-Quality Assurance Plan are responsible for reporting identified deficiencies to appropriate:

management-foriresolutionLin accordance with appro"ed-

, procedures.

5.2 - Procedures shall be developed for the control of:

- (" items, services or activities.which do not' conform to s

. N ,.

I J

l STP 724 (02/90) ,

"'" E-8OUTH TEXA8 PROJECT ELECTRIC GENERATING STATION Chapter 13.0 4 I~ OPERATIONS QUALITY .SSURANCE PLAN D) DEFICIENCY CONTROL PACE 2 or 4 Entenn DAtt 12-21-90

?

established requirements. These procedures shall provide for the following:

5.2.1 Identification and documentation of the deficient condition.- (

5.2.2 Identification of the requirements, source, or ,

reference information being violated. ,

5.2.3 Notification of responsible management.. >

5.2.4 . Control of the' deficient item or activity by tagging, segregation, administrative controls, or other appropriate means to prevent ,

inadvertent installation, use, or continuation  :

of the deficient activity and removal of.such.

controls when the item is returned to service or availability.

() 5.2.5 Resolution and/or disposition approved by.

authorized personnel prior to. closing out-the <

nonconformance documentation and restoring the item to normal service.

5.2.5.1 Material nonconformance disposition categories are o "Use-as-is" o " Reject" o " Rework" in accordance with documented procedures o " Repair" in accordance with-documented procedures 5.2.5.2 "Use-as-is" and " repair"-disposition  ;

of nonconforming-items shall be approved:and justified in writing by ,

Engineering.

5.2.5.3 Evaluations shall be performed to. ,

ascertain recurrence control measures.

}

t

_g , _, _..m'.. 7 ,. _ , w ._ 3 . y., _ , . , ,

STP 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION If Chapter 13.0 4 OPERATIONS QUALITY ASSURANCE PI.AN

/]

V PAOC 3 Or 4 DEFICIENCY CONTROL trn cTivt DATE 12-21-90 5.2.6 Documentation of the corrective action taken.

5.2.7 Review and/or verification of the corrective action by Nuclear Assurance, as appropriate.

5.2.8 Reinspection of repaired and reworked items shall be to criteria as stringent as those applied to the original work. Reinspection results are documented on inspection reports or other work process control documents.

5.2.9 Installation of nonconforming material, parts, and components may be performed after the effect of their installation has been evaluated and the installation approved by Plant Management and Engineering. Nonconforming items which may not be installed are those which, because of their makeup and intended g3 use, cannot be repaired or reworked after being

( ) installed and those which, if installed and later removed, would degrade that system, structure, or component. Installed nonconforming items are not energized, used, or placed in servico until the action required by the disposition, including reinspection, has been completed or an engineering evaluation has been prepared to justify the intended use of the nonconforming item.

5.2.10 Disputes ove.r corrective action are normally resolved by Plant Management. Should this resolution not be satisfactory, the parties may elevate the matter to higher management for resolution.

5.3 Procedures shall provide the following administrative controls of deficiencies:

5.3.1 Unique identification and numbering of deficiencies.

5.3.2 Preparing and maintaining status reporting of deficiencies.

(~N 5.3.3 Actions to be taken-to assure timely corrective

(_) action on deficiencies.

l sw n4 (or/so)  ;

SOUTH TEXA8 PROJECT ELECTRIC GENERATING STATION Chapter 13.0 74 I

l OPERATIONS QUALITY ASSURANCE PLAN  ;

Os DEFICIENCY CONTROL PACC 4 0F 4 I trncm i ont 12-21-90 J 5.4 Procedures which identify and track deficiencies shall' l require management review of each report _to determine  !

j if the condition is significant. For significant l l conditions adverse to quality, the cause of the l condition and the corrective action taken to preclude repetition shall be documented and reported to appropriate levels of management. I 5.5 Measures shall be-established for review and evaluation of deficiencies for reportability to the ,

NRC ah required by Reference 4.1, 4.2, 4.3, and 4.4, as appropriate.

5.6 The authority-to stop' work has been assigned to the General Manager, Nuclear Assurance for any activity i being performed by company personnel or contractors '

i which do not conform to established requirements.

, 5.7 Measures shall be established for-the evaluation-and-trending of plant deficiencies, The results of these reviews and analyses. are report 4J to the affected organization and executive management, and are audited by the QA organization on a biannual basis.

Significant adverse trends shall be handled-l'n J

accordance with.this chapter.

6.0 DOCUMENTATION i

1, 6.1 Procedures which are generated as required by this-chapter:shall-identify the records which are required to implement and document those activities.- The records shall be. controlled in accordar.ca with Reference 4.6.

i 7.0 ATTACHMENTS 7.1 None i

f y

N_) '

l

4 stP 724 (02/90)

L i

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION Chapter 14.0 E4 OPERATIONS QUALITY ASSURANCE PLAN

' RECORDS CONTROL mm oAn 12-21-90 1.0 PURPOSE 1.1 The purpose of this chapter is to describe tha requirements and the responsibilities for the i collection, storage, retrieval, and maintenance of ,

quality-related records.-

2.0 ECQEE 2.1 This chapter is applicable to those quality-related ]

records acquired and developed as a result of, or in  !

support of, the South _ Texas Project Electric Generating- 1 Station (STPEGS).

3.0 DEFINITIONS 3.1 None

4.0 REFERENCES

4.1 ANSI N45.2.9/ Reg. Guide 1.88, Requirements for the Collection, Storage, and Maintenance of Nuclear Power plant Quality Assurance Records.

5.0 REQUIREMENTS 5.1 Records shall be collected,- filed, . stored, : maintained, and dispositioned in accordance with Reference 4.1. '

5.1.1 Records include, but are not limited tot plant history; operating logs; records of principal maintenance and modification activities;-

~

. reportable occurrences-and other records required by the Technical Specifications; .

results of reviews, inspections,. tests, audits, i and material analyses;. monitoring of work performance; qualificationtof personnel, l procedures, and-equipment; drawings,.

specifications, procurement documents, warehousing documents,-calibration procedures <

and. calibration-reports;.and nonconformance and  !*

corrective action reports.

4

STP 724 (02/90)

AOUTH TEXAS PROJECT ELECTRIC GENERATING STATION Chapter 14.0 E 4 OPERATIONS QUALITY ASSURANCE PLAN O\ RECORDS CONTROL PACC 2 Or 3 trrt s DAg 12-21-90 5-1.1.1 The records control program provides evidence that activities affecting quality are defined and implemented, and that inspection and test documents contain a description of the type of observation; the identification of inspector or data recorder; the date and inspection-or test results; -

l acceptability of the results; and reference any action taken in documenting or resolving any l nonconformances.

5.2 Record storage facilities shall-meet the requirements of Reference 4.1.

5.3 A list of record types and the classification of.these record types as to retention period shall be:

() maintained.

5.4 An index of stored records shall be maintained. The index shall include retention period and location of l the records within the' storage area. -The STPEGS DTL (an electronic data base) is used as a record I index/ checklist. If-a conflict of retention times i exists between regulatory, standard, or technical i specification requirements, the. longer retention period shall be specified.

5.5 Records indexing systems shall providc sufficient cross-reference between the-record and items or activities to which the record applies.

5.6 The receipt, processing,,and handling of records shall be controlled by procedures, i 5.7 To ensure that QA records are identifiable and retrievable, a computerized records management system-has been developed. This system provides for-a method '

to identify the-document (s)/ record (s) or 1 document / record-package (s) for retrieval purposes. 'The system also provides the ability to cross-reference-the identification with other possible identifiers of the (s = document (i.e., specification number, purchase order

) number, equipment number). QA records may be stored on- i a

sm 724 (or/so) ,

SOUTH TEXA8 PROJECT ELECTRIC GENERATING STATION "'T Chapter 14.0 k OPERATIONS QUALITY ASSURANCE PLAN O RECORDS CONTROL PA00 tm 3 or 3 ogg . 12-21 l 1

.1 photographic, optical, or electronic media; the file i locations of documents are available from the computer. j 1

5.8 Controlled access to the record storage facility shall l be established.

5.9 Records may be corrected / supplemented in accordance with procedures which provide for appropriate review or ',

approval by.the originating or other authorized organization. Corrections / supplements-shall include the date and identification of-the person making the correction / supplement,-shall be in ink and be entered in a manner such that the-original-information-is not  :

obliterated.

5.10 Organizations generating records are responsible for ensuring activities are, documented accurately, legibly, ,

and with' sufficient traceability; and submitting

/,_. designated documents for. independent review prior to entering into the records system in accordance with '

appropriate procedures.

6.0 DOCUMENTATION 6.1 Procedures which are generated as. required by this

' chapter shall identify the records which are required to implement and document those activities. The records =shall be controlled in accordance with-this chapter.

7.0 ATTACHHINIS- .

f 7.1 None y ( g T 9' -"

j q I

$TP 724 (02/90) _

8OUTH TEXA8 PROJECT ELECTRIC GENERATING STATION "'?

Chapter 15.0 "k

['si OPERATIONS QUALITY ASSURANCE PIAN QUALITY ASSURANCE AUDIT pAcc 1 or 7 l AND SURVEILIANCE

$N 12-21-90 il 1.0 PURPOSE i

1.1 The purpose of this chapter is to establish requirements for a system of. audits and surveillances of quality assurance programs for the South Texas j Project Electric Generating Station (STPEGS).

i 2.0 SCOPE 2.1 This chapter provides for implementing a program of internal audits and site surveillances which include preparation, performance, reporting, and fellow-up to ensure the reqairements of the operations Quality Assurance Program are being properly implemented.

3.0 DEFINITIONS 3.1 None

4.0 REFERENCES

4.1 ' ANSI N45.2.12/ Reg. Guide 1.144, Auditing of Quality ,

Assurance Programs for Nuclear power Plants l 4.2 OQAP Chapter 4.0, Qualification, Training and Certification of-Personnel 4.3 OQAP Chapter 7.0, Procurement 4.4 OQAP Chapter 13.0, Deficiency Control 4.5 OQAP Chapter 14.0,' Records Cor. trol p 5.0 BE.QUJREMENTS 5.1 'A comprehensive audit-program in compliance with  ;

Reference 4.1 shall-'be established and implemented-by '

HL&P to-verify internal and-external quality-activity compliance with the Operatior.s QA Program.; The audit program shall assure that applicablo elements of the program have been~ developed, documented, and are effectively implemented and shall--provide-for-.-

reporting-and reviewing audit results by: appropriate levels-of management. The following areas,are i

included in the audit-program q

i

-)Q 4

STP 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING 8 TAT 10N Chapter.15.0 E 4 O OPERATIONS QUALITY ASSURANCE PLAN QUALITY ASSURANCE AUDIT

'AND SURVEILLANCE PMx 2 or 7 (nTenn org 12-21-90 5.1.1 Operation, maintenance,_ and modifications 5.1.2 -Preparation, review app designs,specificatkons,roval,-and'controlof

-procurement documents, instructions, procedures, and drawings 5.1.3- Material and special process control 5.1.4 Indoctrination and training' programs 5.1. 5 ' -Implementation of operatinggand test procedures 5.1.6 Calibration of naasuring and test' equipment' f 5.1.7 corrective action and nonconformance control 5.1.9 Performance of:theLplant staff,' including training records- ,

() 5.1.9 Plant inspection activities 1 5.2 Qualified personnel assigned ~ auditing responsibilities shall be independent of any direct. responsibility.for

=the performance of the activities'which they. audits shall be experienced or trained commensurateLwith the scope and complexity _of the-activities to be audited; and shall be qualified in accordance withithe.

requirements of Reference 4.2.

5.2.11LAn audit team consists of:one.(orLaore)- '

qualified person (s).: A qualified;1ead auditor shall be appointed,as the audit: team leader.

The audit team: leader shall.be responsible for

  • the written p'insi checklists,_ team c' orientation "it notification, preaudit-confetence, m M14: performance,-post-audit-conference, reporting,-and: follow-up activity to assure corrective' action. The audit team-

. leader shall promptly= report conditions requiring-immediate. corrective. action to the appropriate management;of_the audited organization.- Other audit findings willLbei identified-texthe! audited organization.at the post-audit:conferenceJForma1> audit reports; I- shal14be-prepared:end> submitted =to the; audited g ].

N ' organization within-30tdaysiafter;the-post-C' .

-- - + -

SW 724 (02/90) l 80t[TH TEXAS PROJECT ELECTRIC GENERATWG STATION Chapter 15,0 E4 g ,l OPERATIONS QUALITY ASSURANCE PLAN V QUALITY ASSURANCE AUDIT PAOC 3 CF 7 AND SURVEILLANCE gnem pan 12-21-90 audit conference.

5.2.2 Other personnel may assist in the conduct of audits, sv3h as technical specialisto, management representatives, or auditurs in training.- such personnel selected for auditing assignments shall have training or experience commensurate with the scope,-complexity,.or special nature of the activities to be audited.

Personnel parforming. audits shall have no direct responsibility for the area audited.-  :

5.3 An audit plan, approved inr Nuclear Assurance Management, shall be issued annually.to include  !

5.3.1 Activition/ organizations to be audited.

, 5.3.2 Time-frame in which the audit will be l

conducted.

5.3.3 Required frequency for auditing the' activity-(annual, biannual, etc.).

5.4 Internal Audits 5.4.1 Internal audits.shall be conducted by QA and shall be performed with a frequency commensurate with their safety significance.

An audit of all safety-related activities shall-be completed in accordance with formal audit-schedules within a period of two years.

Supplementary to1the biennial requirement to audit all safety-related. activities, the .

following program elements'shall'be audited at '

the indicated frequencies:-

~

5.4.1.1 The'results of actions taken to correct deficienciesithat affect

  • I ' nuclear safety and occur in facility equipment, structures, systems,;or method of operation - at least once every six months.

, 5.4.1.2 The conformance of'facil'ity operation

/T1 to provisions contained within the-N_/' t Technical Specifications.and  ;

, . .. .a., -

. . . , , . .. .. ,i.-- n ' . . - ..

STP 724 (02/90) _

"8" SCUTH TEXAS PROJECT ELECTRIC GENERATING STATION @

G OPERATIONS QUALITY ASSURANCE PLAN QUALITY ASSURANCE AUDIT AND SURVEILLANCE pax 4 or 7 gggg dan 12-21-90 applicable license conditions - at least once every twelve months.

5.4.1.3 The performance, training, at.d qualifications of the facility rtaff including training records and supervisory evaluations - at least ore" every twelve months.

Review of the audit program shall be performed 5.4.2 at least semiannually by the independent' review body or by a management representative to verify that audits are being accomplished in y accordance with the requirements of the QA Program.

5.4.3 Audit results shall be reviewed periodically by 2

the QA Organization for quality trends and overall audit program effectiveness. The results of these reviews shall bed reporte( co 2

appropriate management in perir ic summary j reports.

a 5.4.4 Auditud organizations;are responsible for mi

" providing timely corrective action including

=

action to prevent recurrence for programmatic problems identified by an audit or 5 surveillance.

5 g 5.5 Supplemental audits shall be conducted when: ,

(7 5.5.1 Significant changes are made to the quality assurance program.

y 5.5.2 It is necessary to determine the root cause of

problem areas which may impact the g effectiveness of the quality aasurance program.

=

5.b.3 A systematic, independent asscosment of program h effectiveness is necessary.

B 5.5.4 Requested by appropriate management.

YO a

a a

!L__ ________________ _ .

.. . 3- . . .

, i --

i t STPJ24 (02/90)

SOUTH TEXA8- PRO M,T ELECTRICTGENERATING -STATION  ??

Chapter 15.0-E4 OPERATIONS' QUALITY ASSURANCE:: PLAN .,

PAot 5 ' or - 7- f QUALITY ASSURANCE AUDIT."

AND SURVEILLANCE? gggy j  ;

oAn 12-21-90 5

't 5.6 Audit implementation shal'llinclude-the following: 3

'5.6 . 1 . Written notification'to the auditedi . '

organir.ation: of athec scheduled audit,7 if.an: ,

announced audit.

5.6.2 Developmentfofsan.-individual audit plan / scope.

5.6.2.1 The audit /planLand any;necessary reference-documentstshall be-available- '

to theraudit team' members.:

' 5. 6. 3 - ,A preaudit andtpostaudit' conference with' responsible 3 organizational management.-

5. 6. 4 ' Use of a-checklistLor. procedure as a' guide- .

duringithe performance _of the.Laudit.- ..

5.6.'5 Identifying andidocument'inglauditLdefici'encies.

5.6.6 Providing-a.writtes report'of the' audit-within thirty 1daystafter, completion ofitheLaudit to responsible-management.1 Thefaudit report!shall' address thoselitems1 required by' Reference 4.1.

5.6.7 -AuditedJorganizations provide timely;and!

3 thorough corrective' action and recurrenceJ control;to discrepanciesFidentifiedtduring the:

audit.' In!theLevent that.correctiveiaction-cannot beLeompleted;within-thirty daysi:the; auditedlotganization's< response shallDinclude a scheduledi date fore theCcorrective actior;.

Earlier. dates for correctiveTaction-may!be;-

j established.-if-l circumstances dictate. '

i

%x ,

5.G.8 Evaluation of correctivs-action ~-for, 1

-deficienciesiandifollow-uptverificationias-appropriate 7 5.7- . Assessments are conducted > annua'lly'to assess HL&p's

' implementation;of the'OperationsLQuality' Assurance Program. These-assessments willibe conductediby?

organizations independentcoffthe.Lactivitiesl. performed:

to assure the HL&P OQAP is!beingrproperly? implemented. 3 M The Nuclear-Safety-ReviewfBoard shall define the1 scope =

- of the: assessment'and determine the schedule. The!-

4) , .!

y' '!

si- .

  • (

1-T 49'

l l

STP 724 (02/90) l "*""

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION Chapter 15.0 74 i I)

OPERATIONS QUALITY ASSURANCE PIAN V . QUALITY ASSURANCE AUDIT Pact 6 or 7 AND SURVEILLANCE '

ErrEcTivE -

i oAg 12-21-90 results of these assessments will be transmitted to the Group Vice President, Nuclear.

5.8 Procedures shall be developed to control. Nuclear Assurance site surveillance activities.- Site g surveillances shall be used to observe and verify that quality-related activities are accomplished in i accordance with prescribed procedures.

5.9 A surveillance schedule shall be developed to ensure adequate coverage of quality-related activities.

5.9.1 The frequency of site surveillances is-based upon the complexity of the activity, icportance of the activity, and magnitude of discrepancies noted during previous audits or-surveillances.

5.9.2 Uns3heduled site surveillances may be performed fT to accommodate changes in plant conditions or

( ,) systems.

5.10 Scheduled site surveillances.are performed using a surveillance checklist. The. surveillance checklist shall be prepared using applicable procedures, specifications, codes, and regulatory requirements for source requirements.

5.11 Site surveillance results are documented, and a summary of surveillancen and-evaluation of surveillance findings shall be prepared and transmitted to responsible manugement.

5.12 Nonconforming equipment, components, parts, materials,-

activities or documentation identified during an audit or site surveillance shall be documented in accordance with Reference 4.5.

5.13 Personnel performing surveillances shall be trained and qualified in accordance with Reference 4.3.

O< s-

=

_, .' .m .'. ' '

. _ . _ _ . _ . ___-__---.m. _m____

STP 724 (02/90)

+

""85 SOUTH TEXAS UOJECT ELECTRIC GENERATING STATION .

$7' Chapter 15.0 4 OPERATIONS QUALITY-ASSURANCE PLAN

\ QUALITY-ASSURANCE AUDIT-- Pact 7 or 7:

AND SURVEILLANCE ErrECTIVE ox7t 12-21-90 ,

6.0 DOCUMENTATION 6.1 Procedures which are generated as required by this

- chapter shall identify the records which are required i to implement and document those activities.- The  !

records shall be controlled in accordance with  !

t Reference 4.7.

7.O ATTACIRigETH ,

I 7.1 .None:

.i 1

4 lo l

1 4

p i

4 I

s i

l i

4 i~

STP 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION MER .

ChapterLl6.0- 4-

OPERATIONS QUALITY ASSURANCE PLAN

N PAGE 1 OF . 4 NUCLEAR FUEL MANAGEMENT EtrECTWE dan 12-21-90 1.0 PURPOSE l l

1.1 The purpose of this chapter is to-describe the requirements and responsibilities for the-design, procurement, control and physical accounting _of nuclear fuel for the South. Texas Project Electric-Generating Station (STPIGS). i 2.0 Eg! ?

~

2 .1. ...is chapter describes the fabricated nuclear fuel activities within the scope of the Operations Quality Assurance Plan (OQAP)..

3.0 DEFINITIONS ,

31 None:

4.0 BEFERENCES 4.1 OQAP Chapter 6.0, Design.and Modification Control 4.2 OQAP Chapter 7.0, Procurement s

4.3 OQAP Chapter 9.0, Control of Material-4.4 OQAP Chapter 13.0, Deficiency' Control 4.5 -OQAP Chapter 14.0,: Records Control-4.6 OQAP Chapter 15.0,-Quality-Assurance Audit and:

Surveillance 5.0 RESPONSIBILITIES 5.1 The Vice President,7 Nuclear Generationiis' responsible for the receipt, onsite storage, handling, and physical accountability of nuclear-fuel assemblies, monitoring,-

.ard=use of nuclear' fuel within. core performance guidelines and cafety analyses,.providing for the receipt inspection ~of nuclear fuel assemblies, and preparation of spent fuel for shipment. j 5.2 The Vice President, Nuclear Engineering is' responsible

(~')\

(_ for assuringLthat nuclear-fuel management activities,

STP 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION wuusta g.

Chapter 16.0 4 9 OPERATIONS QUALITY ASSURANCE PLAN NUCLEAR FUEL MANAGEMENT PAM trrECTIVE 2 OF 4 DAR 12-21-90 which include procurement, fuel design and analyses, reactor core performance guidelines and safety analy es in support of core operations, special nuclear materials status report preparation, and licensing new and reload fuel with the Nuclear Regulatory Commission, are conducted in accordance with this chapter.

~

5.3 The General Manager, Nuclear Assurance is responsible for providing quality assurance support for fuel procurement, receipt and installation of fuel assemblies and verification that requirements are being-implemented thorough quality assurance surveillance and audits.

6.0 REOUIREMENTS 6.1 Application of quality assurance requirements to nuclear fuel management activities shall be e accomplished in accordance with approved procedures that implement the following elements of the Operations Quality Assurance Plan.

6.1.1 Deficiency Control 6.1.1.1 Nonconforming items related to the receipt of nuclear fuel assemblies shall be documented and controlled in

.accordance with Reference 4.4.

6.1.2 Auditing and Surveillance Activities 6.1.2.1 The activities identified in this chapter shall be audited in accordance with the-Reference 4.6.

6.1.3 Collection, Storage, and Maintenance of Quality Assurance Records 6.1.3.1 The appropriate quality assurance records applicable to nuclear fuel shall-be identified, administered, and stored in accordance with the applicable requirements of Reference 4.5.

i 21P 724 (02/90) ,

SOUTH TEXAS PROJECT ELECTRIC: GENERATING STATION chapter 16.0 E4

) OPERATIONS QUALITY ASSURANCE PLAN l V PAGE 3 OF- _4' NUCLEAR FUEL MANAGEMENT EFTECTIVE prig 12-21-90  !

6.1.4 Control of Modification and Design Activities 6.1.4.1 , Fuel'and core design and design j verification activities shall be i accomplished in accordance with the? l applicable requirements described in Reference 4.1.'

6.1.5 Procurement Control 6.1.5.1 Procurement activities related to-fabricated nuclear-fuel assemblies shall<be-accomplished in accordance with:the requirements of-Reference 4.2.

6.1.6 Material-Control-6.1.6.1 The handling and storage of nuclear:

fuel assemblies and associated.

equipment received at-the STPEGS,shall-be performed.in accordance with the applicable
requirements _of Reference 4.3. Technical assistance,: including ,

necessary instructions for handling, l preservation,-storage andfother special controls, shal1~be provided by the-supplier: of nuclear- fuel, assemblies in-accordance with~the--fuel: contract.

6.2 Engineering Support Activities 6.2.1 .The following fuel management activities shall be accomplished-in accordance with' approved procedures which provide the.necessary interface;

. controls :' '

6.2.1.1 -Fuel Design and Analysis:

6.2.1.2 Core-related Safety and Transient Analysis 6.2.1.3 Fuel Performance Analysis r

y 1

STP 724 '(02/90)

" ""E" SOUTH TEXAS < PROJECT ELECTRIC G5dERATING STATlON Ef ,

Chapter 16.0.' 4  !'

O OPERATIONS QUALITY A'sSURANCE PLAN, PAGE 4 OF 4  !

NUCLEAR TUEL MANAGEMENT ErrECM c ATt - 12-21-90 ,

a i

7.0- DOCUMENTATION "!

7.1 Procedures which are. generated as. required-by this i 4 chapter.shall identifyithe records which are required- -!

to implement and document those-activities. The i records shall be controlled in accordance with-Reference-4.5. .j 8.0 ATTACHMENTS

~

8.1 None 1 I

4 i

kl -

i V i 5

1

]

l s

0 V ' :i l

]

k i

1 STP 724 (02/90)

NUWBER REV, SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION Chapter 17.0- "h

'O OPERATIONS QUALITY ASSURANCE PLTdi PAGE 1 OF 3 ASME CODE SECTION XI - REPAIRS-AND-REPLACEMENTS'

[ygenn 12-21-90 1

1.0 PURPOSE ,

1.1 The purpose of this chapter is-to prescribe requirements and--responsibilities-for repair and replacement activitics governed by ASME Boiler and-Pressure Vessel Code,Section XI, Rules.forLInservice-Inspection of Nuclear Power Plant Components.

2.0 SCOPE 2.1 .This chapter isLapplicable to examination, repair and

-replacement activities performed on ASME Class 1, 2 ,-

and 3 components.

3.0 DEFINITIONS 3.1 None 4.0 AEFERENCES

[)

4.1 ASME Code Section XI, Rules for Inservice Inspection-of Nuclear Power Plant Components

, 4.2 OQAP Chapter 14.0, Records Control 5.0 RESPONSIBILITIES 5.1 The Vice President,, Nuclear Generation is responsible for the planning, management,c and. control of.the performance of repairs, replacementsLand tests.

5.2 The Vice President, Nuclear Engineering'isfresponsible for developing the repair and replacement program

including specifications for design, fabrication, testing, and examination.

!' 5.3 The General Kanager, Nuclear Assurance-is responsible for providing; qualified personnel to perform examinations of component repairs 7and-replacements and verifying the requirements of this-chapter are

implemented. i 6.0 BEOUIREMENTS

! 6.1 Repair and replacement activities 1 required by .

, /' Reference 4.1 shall=be-conducted in accordance'with- l

( written _and approved procedures or instructions. I l

1

SF 724 (02/90) - _ _ , ,

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION Chapter 17,0 E4 A. OPERATIONS QUALITY ASSURANCE PLAN bl ASME CODE SECTION XI - REPAIRS AND REPLACEMENTS PAGE . 2 0F 3 EUanW DATE 12-21-90 Areas to be addressed include:

6.1.1 Accessibility for component examination, repair or replacement.  ;

6.1.2 Identificatori of system boundaries: and code class-for each component.

6.1.3 The method for' interfacing with the= authorized nuclear incpection agency.

6.1.4 Qualification of nondestructive examination methods.

6.1.5 Qualification requirements for nondestructive examination personnel.

6.1.6 Qualification requirements for welders and welding = operators.

( ) 6.1.7 Qualification of welding procedures.

6.1.8 Conduct of examinations and-inspections.

6.1.9 A component repair or repl& cement package including installation and test procedures and quality assurance' requirements.

6.1.10 Conduct of system pressure and functional tests.

6 .1.11 ~ A component replacement package including-specifications for design, fabrication and examination-as applicable-for the-replacements.

6.1.12 Preparation, submittal and retention of required records and reports.

l 7.0 DOCUMENTATION 7.1 Procedures which are generated as required"by this-chapter shall identify'the records which are required to implement and document those activities. The records shall be controlled in accordance with' Reference 4.2.

b("'T

. _ _.._.~ _ _ - . _ . _ _ . . , _ _ _ _ _ _ _ _ _ _ _ _

STP 724 (02/90)

SOUTH-TEXAS PROJECT ELECTRIC' GENERATING STATION "*""._ .. $f  !

Chapter:17.0 4 OPERATIONS: QUALITY ASSURANCE' PLAN _

Pact. 3 - or . 3 i ASME CODE'SECTION XI . REPAIRS AND, REPLACEMENTS.

EFFECTIVE DATE 21-90 8.0 ATTACHMENTS 8.1 None  ;

i O

k.J 1

O ,

t !

.s

-~~,.i ..4.,-.

1 I

I

l. STP 724 (02/90) - i

" " 8'"

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION _ Ef Chapter 18.0- 4 OPERATIONS QUALITY ASSURANCE PIAN

.O PAGE 1 OF 3 ASME CODE SECTION XI - INSERVICE INSPECTION' trFEcuvt AND TESTING- oAn 12-21-90 1.0 PURPOSE 1.1 The' purpose of this chapter _is to prescribe .

requirements _and responsibilities for the inservice examination and testing programs at the South Texas Project Electric Generating = Station (STPEGS).

2.0 SCOPE i 2.1 This chapter applies to.the inservice oxamination and testing of class 1, 2 and 3 pressure retaining.

components.and component supports as specified in .

Section XI of the-ASME Boiler and Pressure Vessel Code i and additional ISI commitments as-specified in the 1 UFSAR.

3.0 DEFINITIONS 3.1 None s

4.0 REFERENCES

4.1 ASME Code Section-XI, Rules for Inservice l Inspection of Nuclear Power Plant. Components 4.2 10CFR50.55a, Codes and Standards 4.3 OQAP Chapter 4.0, Qualification, Train'ing~and

. Certification of Personnel 4.4 OQAP Chapter 14.0, Records Control 5.0 RESPONSIBILITIES 5.1 :The'Vice. President,-Nuclear Engineering is responsible -

for developing and_ implementing the inservice examination and testing-programs as required'by ASME Code Section'XI.

i 5.2 The General Manager,; Nuclear Assurance is' responsible  ;

for verifying the. implementation'of the-inservice examination and testing programs 1 through audits'and surveillances, interfacing with'the1 Authorized

. Inspection Agency,--and performance of nondestructive-  :

(ay examinations e- requested by Nuclear- Engineering.

1)

SF 724 (02/90) i SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION "8"

Chapter 18.0 E4

( OPERATIONS QUALITY ASSURANCE PLAN' PAM 2 OF 3 ASME CODE SECTION XI - INSERVICE INSPECTION AND TESTING ,( 12-21-90 6.0 REQUIREMENTS' 6.1 The-inservice examination and testing programs' consist of. plans and implementing procedures for thei examination and testing of Class 1, 2,-and 3 pressure-retaining. components and their supports-and the.

inservice testing of Class 1, 2, and;31 pumps and valves.

6 .1.1 - Examination and Testing of. Pressure Retaining Components and Component Supports 6.1.1.1 Nuclear Engineering shall"developLplans for examination and testing of Class 1, 2, and 3 components and their supports.

These plans shall prescribe :the requirements;for' nondestructive examinations and testsLand the= schedule  !

for their performance.

\

6.1.1.2 Inspection plans.(e.g.,l specifications, vendor documents, etc.)1shall:be

. developed which identify-the nature and-extent of examination 1and testing activities including the acceptance criteriL which must be net'.

6.1.1.3 -Procedures shall be developed which provide? measures forcthe performance of activities identified,in the plans.

6.1.2 Inservice Testing of PumpsEand' Valves and System Pressure-Testing 6.1.-2.1 Nuclear Engineering shall develop the Inservice Testing Program for pumps and valves and the System Pressure Testing Program. TheseLprograms shall include the requirements and-the schedule-for their performance.

6.1.3 Examination and test re'sults shall be evaluated '

by specified personnel and verified by the

,,, Authorized Nuclear Inservice Inspector.

STP 724 (02/90)

" 8'"

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION ffo?

Chapter 10.0- 4 9 OPERATIONS QUALITY ASSURANCE PLAN ASME CODE SECTION XI - INSERVICE INSPECTION PAGE 3 or 3 AND TESTING hfTE 12-21-90

) 6.1.4 Coordination of involved HL&P departments, including the use of contractors for the performance, documentation and evaluation of inservice inspection activities, shall be controlled by approved procedures.

6.1.5 When contractors are used to perform activities

} within the scope of this-section, their quality assurance program shall be approved by HL&P Nuclear Assurance.

6.1.6 Exceptions to code examination and testing requirements shall be documented in accordance with Reference 4.2.

6.1.7 Personnel performing examinations and tests '

shall be qualified as required by Reference 4.1-and Reference 4.3.

G 6.1.8 Plans and reports for-inservice examinations and tests shall be submitted to the appropriate regulatory and enforcement. authorities as required by Section XI.

7.0 DOCUMENTATION 7.1 Procedures which are generated as required by this chapter shall identify the records which are required to implement and document those activities. The records shall be controlled in accordance with Reference 4.4.

8.0 ATTACHMENTS 8.1 None O

.