Change QA-024 to Operations QA Plan
ML20078H292
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 01/31/1995
From:
HOUSTON LIGHTING & POWER CO.
To:
Shared Package
ML20078H285 List:
References
NUDOCS 9502060143
Download: ML20078H292 (9)


Text

-

i

)

STP M4 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV.

NO.

Table of Contents 11 OPERATIONS QUAUTY ASSURANCE PLAN  !

PAGE 1 OF 2 TABLE OF CONTENTS EFFECTIVE I

DATE 12-30-94 Chapters Requiring NRC Approval Chapter Title Effective Effective Change  !

Number Chapter Revision Notice Revision Date No.

Definitions 5 12-21-90 ,

1.0 Organization 7 12-30-94 QA-024 [

2.0 Program Description 9 12-30-94 3.0 Conduct of Plant Operations 6 12-20-91  ;

4.0 Qualification, Training, and 5 12-30-94 Certification of Personnel 5.0 Maintenance, Installation of 4 12-21-90 Modifications, and Related Activities '

6.0 Design and Modification Control 6 12-18-92 7.0 Procurement 6 12-30-94 ,

4 8.0 Control and Issuance of 4 12-21-90 l Documents  !

9.0 Control of Material 5 12-20-91 10.0 Inspection 6 12-21-90 l

11.0 Test Control 5 12-21-90 12.0 Instrument and Calibration 5 12-21-90 Control 13.0 Deficiency Control 6 12-30-94 14.0 Records Control 4 12-21-90 15.0 Quality Assurance Audit 5 12-30-94 and Surveillance 9502060143 950131 gDR ADOCK 05000498 PDR

r ,

sTP 724 (02/W)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV.

NO.

Table of Contents 11 OPERATIONS QUALITY ASSURANCE PLAN PAGE 2 Of 2 TABLE Of CONTENTS EFFECTIVE DATE 12-30-94 Chapters Not Requiring NRC Approval Chapter Title Effective Effective Change Number Chapter Revision Notice Revision Date No.

16.0 Nuclear Fuel Management 5 12-30-94 17.0 ASME Code Section XI - 5 12-30-94 Repairs and Replacements 18.0_ASME Code Section XI - 5 12-30-94 Inservice Inspection and Testing

m ut (02/M SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV.

NO. i Chapter 1.0 7 OPERATIONS QUALITY ASSURANCE PLAN PAGE 1 OF 7 ORGANIZATION EFFECTIVE 1 DATE 12/30/94 i 1.0 PURPOSE i

1.1 The purpose of this chapter is to describe the organizational structure as related to quality assurance and to establish the responsibilities of  ;

organizations for the South Texas Project Electric ,

Generating Station (STPEGS). I 2.0 SCOPE t

2.1 Houston Lighting & Power Company (HL&P) , as licensee  !

and Project Manager for itself and the other owners, '

has the Quality Assurance (' Q A) responsibility for design, engineering, procurement, fabrication, modification, maintenance, repair, in-service inspection, refueling, testing, and operation of the

3.0 DEFINITIONS 3.1 None

4.0 REFERENCES

4.1 None '

5.0 RESPONSIBILITIES 5.1 The Nuclear Group is comprised of Nuclear Generation, Nuclear Engineering, Nuclear Assurance & Licensing -

(NA&L), Plant Services, and Human Resources and Access.

The heads of these groups report to the Group Vice President, Nuclear.

5.1.1 The Group Vice President, Nuclear, has-overall responsibility for the implementation of the Operations Quality Assurance Program and approving the Operations Quality Assurance Plan (OQAP) and revisions thereto.  ;

5.1.2 The Vice President, Nuclear Generation is responsible for implementing quality program  :

requirements applicable to staffing STPEGS with qualified personnel and acquiring and coordinating the assistance of internal and external organizations for the testing, operation, modification, maintenance and security functions of STPEGS.

nrazm NUMBER REY, SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NO.

Chapter 1.0 7 OPERATIONS QUALITY ASSURANCE PLAN PAGE 2 OF 7 ORGANIZATION EFFECTIVE DATE 12/30/94 5.1.2.1 The General Manager, Generation Support; Plant Manager, Unit 1; Plant Manager, Unit 2; and Manager, Nuclear Security; report to the Vice President, Nuclear Generation.

5.1.2.2 The Plant Managers have prime responsibility for the safe operations of their respective .

units. The plant staff, under the [

direction of the Plant Managers, develop detailed procedures and instructions for testing, operation, modification, maintenance, and radiological monitoring of the STPEGS.

5.1.3 The Vice President, Nuclear Engineering is responsible for implementing quality program requirements applicable to the design engineering and control, systems engineering,4 nuclear fue.ls design, acquisition and h management, and engineering support g functions.

5.1.3.1 The Manager, Design Engineering; Manager, Systems Engineering; Manager, Engineering Support; and Director, Nuclear Fuel and Analysiso l[

report to the Vice President, at Nuclear' Engineering. 9 5.1.4 The General Manager, NA&L is responsible for the development, maintenance, and independent verification of implementation of the STPEGS QA Program; making periodic reports on its effectiveness; review of selected documents which control activities within its scope; and preparation, control, and approval of the ,

OQAP and revisions thereto. '

l m m w ra SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REY.

NO.

ChMw 1.0 7 OPERATIONS QUALITY ASSURANCE PLAN PAGE 3 OF 7 ORGANIZATION EFFECTIVE DATE 12/30/94 The General Manager, NA&L is also responsible for implementing quality program requirements ,

applicable to STPEGS corrective action, '

licensing, emergency preparedness, and Independent Safety Engineering Group activities, and administration of the Nuclear ,

Safety Review Board. i The General Manager, NA&L has the authority to identify, initiate, recommend, or provide solutions to quality-related problems and verify the implementation and effectiveness of the solutions. This position has the independence to conduct QA/ Quality Control (QC) activities without undue pressure of cost or schedule.

The General Manager, NA&L, has the authority to stop work for cause. This authority in QA matters has been granted by the Group Vice President, Nuclear.

The NA&L organization's quality ,

responsibilities during operation are shown  :

in Attachment II. The QA organization, l including the inspection staff, is based upon  ;

the anticipated QA/QC involvement in operations, modification, and maintenance activities.

The position of General Manager, NA&L is on the same or higher organizational level as '

the highest line manager responsible for performing activities affecting quality as shown in Attachment I.

5.1.4.1 The Director, Quality; Manager,  :

Operating Experience; Manager,  !

Emergency Response; and Manager, I Industry Relations report to the General Manager, NA&L.

i

s

  • a me wm SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV.

N O.

. Chapter 1.0 7 OPERATIONS QUALITY ASSURANCE PLAN Pact 4 or 7 ORGANIZATION ErrECTIVE DATE 12/30/94 5.1.4.2 The NSRB administratively reports to the Manager, Industry Relations.

The NSRB functionally reports directly to and advises the Group Vice President, Nuclear.

5.1.4.3 The Director, Quality is responsible for Independent Safety Review Group activities, audits, independent assessments, surveillances, inspections and NDE examinations.

5.1.4.4 During the overview of activities performed by the NA&L organization, the Director, Quality; at his discretion; reports directly to the Group Vice President, Nuclear.

5.1.5 The General Manager, Plant Services is responsible for implementing quality program requirements applicable to nuclear training, planning and scheduling; maintenance of programs for records management, document control and information systems; and procurement and material control for STPEGS.

5.1.5.1 The Manager, Nuclear Training; Manager, Records Management and Administration; Director, Nuclear Information Systems; Manager, Plant Projects and Programs; and Director, Nuclear Purchasing and Materials Management; report to the General Manager, Plant Services.

5.1.6 The Manager, Human Resources and Access is responsible for imp 3ementing quality program requirements applicable to personnel access authorization for the protected and vital areas of STPEGS.

5.1.6.1 The Manager, Access Authorization reports to the Manager, Human Resources and Access.

a 57P *@ M/te)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV, NO.

Chapter 1.0 7 OPERATIONS QUALITY ASSURANCE PLAN PAGE 5 oF 7 ORGANIZATION EFFECTIVE DATE 12/30/94 6.0 REOUIREMENTS 6.1 The fundamental responsibility for implementing quality program requirements is assigned to all personnel performing activities affecting the safe and reliable operation of the STPEGS. These personnel and their management are responsible for implementing through approved procedures and other work documents, the quality assurance program controls described in the OQAP.

6.2 Attachment I depicts the organizational structure of the STPEGS as it relates to the implementation of the Operations Quality Assurance Plan. The structure reflects the reporting alignment for key positions.

Line organizational details and responsibilities are further described in STPEGS UFSAR Chapter 13.1.

7.O DOCUMENTATION 7.1 None 8.0 ATTACHMENTS 8.1 Attachment 1 - Nuclear Group - QA Functions 8,2 Attachment 2 - Quality Responsibilities

st1'Itt to /'m) {

  • NUMBER REV.

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION N O.

  • Chapter 1.0 7 OPERATIONS QUALITY ASSURANCE PLAN PAGE 6 OF 7 ORGANIZATION ErrECTIVE DATE 12/30/94 ATTACHMENT I i

i HOUSTON LIGHTING & POWER COMPANY  !

NUCLEAR GROUP - QA FUNCTIONS Group V.P.

Nuclear I

l i f~ {

Nuclear Plant Human Nuclear i Nuclear

~! he$'n'g Services Resources Access Generation Engineering i

1 Nuclear Access Generation 5 Nuclear Fuels & } .

Authorhation Training Support Analysis Plant Manager Industry Records Mgmt

~

c5lEn

{

Unit I Relations & Administration m ;t 1-i Plant Manager  !{ ** {

Operating Nuclear information Systems Experience

{ Unit 2 l Plant Projects -d-Nuclear l 1 Emergency - N Security -l Suppea <

Response

~

and Programs o i

- t L i 4 +

Nuclear Purchasing _ d ,

Material Mgmt J

l l

1

- , - - - - , , _1

ffP 724 (02/90) ^

. SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION WHER .

Chapter 1.0 7 OPERATIONS QUALITY ASSURANCE PLAN PACE 7 or 7 ORGANIZATION EFFECTIVE DATE 12/30/94 6

ATTACHMENT II QUALITY RESPONSIBILITIES i

AUDIT SURVEILLANCE ASSESSMENT EVALU ON y is NON-DESTRUCTIVE MATERIAL lh E ENDENT INSPECTION g EXAMINATION 'ESTING ENGINEERING GROUP REVIEW i i

n l

1 l

l 1

.