Rev 7 to Chapter 2.0 of Operations QA Plan,Program Description
ML20094D303
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 12/20/1991
From:
HOUSTON LIGHTING & POWER CO.
To:
Shared Package
ML20094D290 List:
References
NUDOCS 9112200159
Download: ML20094D303 (14)


Text

. 1 STP 724 (02/90) 300TH TEXA8 PROJECT ELECTRIC GENERATING 8 TAT """ 10N Chapter 2.0 7 )

OPERATIONS QUALITY ASSURANCE PLAN a PAGE g Or

~

14  ;

PROGRAM DESCRIPTION unemt l DAK 12-20-91 i 1

i 1.0 PURPOSE '

l.1 The. purpose of this chapter is to define criteria and establish administrative controls for implementetion of i the operations Quality-Assurance Program for thu South ,

Texas Project Electric Generating Station (STPEGS). ,

2.0 SCOPE 2.1 The Operations Quality Assurance Program-is applicable to safety-related material, equipment, services and activities described in 10CFR50, Appendix Bf 20CFR71, Subpart H (except design and fabrication of NRC .  ;

certified radioactive waste chipping casks); ASME $ ,

Boiler and Pressure Vessel Code, Bections III and XII g and quality related areas as defined by STPEGS

  • l management in this operations Quality Assurance Plan (OQAP) Hor other program documents or prccedures.

Quality-related areas include-the Fire Protection "

Program, Emergency Plan, RadioloVical Environmental  ;

Monitoring Program, Radwaste Management Program, Computer Program Verification and Control, Physical Security Prcgram, Seismic and Environmental E@ipment Qualification Programs, and Radiation Protection Program. '

3.0 DEFINITIONS

  • 4.4 OQAP Chapter 14.0, Records Control 5.0 REQUIREMENTS 5.1 The Operations-Quality Asrurance Program consists of 1various documents which identify and provide the mechanism for verifying implementation of commitments, '

requirements, and actbins necessary to attain quality-assurance objectives. .,

hbk $bbhb bbb FDh b iG p

, .-- - ~ , , _ _ _ - _ _ , , _ . . . _ _ _ _ _ _ _ , _ . _ _ _ , . _ . . . _ . _ _ . _ _ _ - . _ . -

! t j s1P 724 (02/9a)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STAT!ON ** I/2 Chapter 2.0 l 7 !

OPERATIONS QUALITY ASSURANCE PLAl2 PAGE 0F 2 44 PROGRAM DESCRIPTION UTECmt  ;

DAE 12-20-91 I I

F,2 The OQAP is prepared to implement the FTPLSS Operations l Quality Assurar.ce Program.

5.2.1 The OQAP provides policies to be implemented for the STPEGS. The OQAP also assigns ,

responsibilities necesrary for the attainment  !

of quality assurance objectives and the verification of conformance to established requirements.

l 5.2.2 Attachment I provides a natrix of 10CFR50, Appendix B criteria to the OQAP chapters.

5.3 Establishing Policies and Goals 5.3.1 QA policies and goals for STPEGS are defined in l the OQAP. The Group Vice President, Nuclear has overall responsibility for quality I assurance. l 1

5.3.2 The General Manager, Nuclear Assurance, is responsible for the development of the Quality Assurance (QA) Program. The minimum r$guirements established for this position are:

5.3.1,1 A bachelors degree in science or

- qineering, or an equivalent we-51 nation of education and

r. science.

5.3.2.2 Five years experience in the management of qaality assurance.

Fifteen years experience in industry quality assurance standards, and federal and state regulatory requirements.

5.3.2.3 Familiarity with nuclear power generation facilities and the related operations.

5.3.2.4 Knowledge of the industry's quality assurance standards and regulatory requirements.

L.3.2.5 Management experience and familiarity with HL&P corporate organizations.

> =.'

CTP 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION T Chapter 2.0 7 OPERATIONS QUALITY ASSURANCE PLAN PAGE Or y4 3 ~

PROGRAM DESCRIPTION EFFECmt DAE 12-20-91 5.3.3 Procedures and revisions which control quality-related work programs and activities, performed by STPEGS organizations described in Chapter 1.0 are reviewed by QA as defined in this chapter.

5.4 Organizational Independence 5.4.1 9ho reporting arrangement utilized by the NA Department ent ares that those personnel charged with responsibility for verifying compliance with QA Program requirements have the organirational freedom to:

5.4.1.1 Identify quality problems.

5.4.1.2 Initiate, recommend, or provide solutions.

5.4.1.3 Verify implementation of solutions.

3.4.2 The reporting arrang.smant, as illustrated on Att tenu tnt I, of Chapter 1.0, is such that pen _nt.e' .rponsible for verifying compliance with quality requirements do not have direct responsibility for the performance of that work.

5.4 3 The General Manager, NA, provides technical and administrative direction to the QA Managers in the areas of audits, surveillances, quality engineering, inspection, and material testing.

5.5 QA 7cogram 5.5.1 HL&P has established the Operations QA Program for the operations phase of the STPEGS, which includes testing, operation, maintenance, refueling, inservice inspection, and modification. The HL&P Nuclear QA Program for the operations phase requires that HL&P, its contractors, subcontractors, and vendors comply with the criteria established by 10CFR Part 50, Section 50.55a; 10CFR Part 50, Appendix A, General Design Criterion (GDC) 1; 10CFR Part 50, Appendix B, and 10CFR Part 71 Sub-Part H.

It is the intent cf HL&P to comply, as defined l

1 .

STP 724 (02/90) . . _

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION fi Chapter 2.0 7 OPERATIONS QUALITY ASSURANCE PLAN PAGE Of y4 4

PROGMM DL*SCRIPTION trrtemt DAE 12-20-91 herein, with the applicable American National Standards Institute (ANSI) N45.0 daughter standards, ANSI N18.7, and implamenting Regulatory Guides.(RGs) as defined herein and in Updated Final Safety Analysis Report (UFSAR)

Table 3.12t'..

5.6 Delegation of QA Functions 5.6.1 During normal operations the QA Program will be executed by STPEGS personnel, who may be assisted by subcontract personnel. During refueling, maintenance, and inservice inspection, first-level quality control inspection and nondestructive examination (NDE)

  • activities may be subcontracted. However, STPEGS will retain responsibility for the total QA Program, and STPEGS NA personnel will perform audits and surveillance (s) of subcontracted QA activities.

5.6.2 When first-level quality control inspection and NDE are performed by STPEGS personnel, they are qualified and certified in accordance with applicable codes, standards, procedures, and other regulations. Monitoring and surveillance of the quality control and NDE activities shall be performed by Operations QA personnel.

5.7 Identification of Safety-Related Items and Services 5.7.1 The STPEGS QA Program described herein is applied to all activities affecting the safety-related functions of those structures, systems, and components which prevent, or mitigate the consequences of postulated accidents that could cause undue risk to the health and safety of the public. The safety-related structures, systems, and components controlled by the QA Program are listed in UFSAR Section 3.2, along with their associated fire protection systems.

UFSAR Section 3.2 also identifies those quality-related structures, systems, and components (in addition to fire protection systems) which are nct safety-related but to l which the STPEGS Operations QA Program is l applied.

, .s1P 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION """ @

Chapter 2,0 7 OPERATIONS QUALITY ASSURANCE PLAN PROGRAM DESCRIPTION rJrtemt DME 12-20-91__

5.7.2 The fire protection QA Program is part of the overall STPEGS Operations QA Program and is therefore under the management control of QA. I Fire protection QA Program criteria are being implemented as part of the HL&P Operations QA Program,-as defined in this OQAP.

5.7.3 Expendable or consumable items necessary for the functional performance of safety-related structures, systems, and components are  !

subjected to quality assurance requirements as specified in written procedures. These procedures include provisions for review and control in accordance with industry standards and specifications and the safety-related function of the expendable or consumable item.

5.8 Development of the QA Program 5.8.1 The Operations QA Program was fully implemented 90 days-prior to initial fuel loading. The QA_ a Program shall be in effect throughout the operating life of the STPEGS.

5.9 QA Program Documents  !

i 5.9.1 The QA Program shall be implemented with j documented instructions, procedures, and drawings which include appropriate quantitative =i and qualitative acceptance criteria for determining that prescribed activities have beet. satisfactorily accomplished. Procedures shall include the control of the sequence of required inspections, tests, and other operations when important to quality. To change these controls, the individual procedure. l must be changed and shall require the same 4 review and approval'given to the original procedure. Such instructions, procedures,-and drawings are reviewed and approved for compliance with requirements-appropriate to their safety classification by individuals qualified to do so.

,e [

STP 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION f[o?

Chanter 2.0 7 OPERATIONS QUALITY ASSURANCE PLAN Pact j W 14 PROGRAM DESCRIPTION tmcw DAW 12-20-91 5.9.2 Attachment II lists typical procedures ,

developed to implement the QA Program.

Provisions for deletions, additions and minor program changes do not permit including a complete listing of procedures.

5.9.3 Interdepartmental Procedures 5.9.3.1 Interdepartmental procedures shall be-established to implement and control activities covered by the OQAP when more than one department or organization is involved. These procedures provide for integration of responsibilities-and activities, and help to ensure continuity of activity between. departments / organizations.

5.9.3.2 Specific departments / organizations shall be designated for the preparation and approval of each procedure. Since these procedures contain requirements for more than one. department / organization, a '

designated procedure coordinator is responsible for_ initiating review with affected departments /organi-zations and resolution of comments.

5.9.3.3 Selected interdepartasntal procedures ard revisions are reviewed by Nuclear Assarance ceiore their issuance. The review attests:that-these procedures have been reviewed for compliance with the Operations Quality Assurance Program. 'The review is documented and the comments on the current-procedure revision will be maintained

[

1 for verification.

( c5.9.4 Departmental Procedures

' 5.9.4.1 Departmental procedures shall be established to implement the OQAP,

interdepartmental procedures, and other operating, licensing and code requirements. These departmental'

m ."

sTP 724 (02/00)-

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION E ChantgI_2.0 7 OPERATIONS QUALITY ASSURANCE PIAN p ,og g, 5

PROGRAM DESCRIPTION EFTECVVE U"

12.10-31.__

procedures detail specific methods for implementation.

5.9.4.2 Departmental procedures shall be approved by the management of the issuing department. The approval assures awareness of content and concurrence with the identified responsibilities.

5.9.4.3 Selected departmental procedures and revisions are reviewed by Nuclear Assurance before their issuance. The review attests that these procedures have been reviewed for compliance with the operations Quality Assurance Program. The review is documented e and the comments on the current v i procedure revision will be maintained for verification.

5.10 Personnel Indoctrination and Training 5.10.'1 General indoctrination and training programs shall be_provided for site; personnel _to assure that they are knowledgeable regarding quality programs and requirements. -The training requirements for-STPEGS. personnel are described -

in UFSAR:Section-13.2. Records shall demonstrate compliance with applicable requirements. Personnel performing complex, unusual, or potentially: hazardous work shall be instructed in_special indoctrination or briefing sessions. Emphasis shall be on special requirements for safety of personnel, radiation control and protection,.uniqpe features of equipment _and systems, operating constraints, and control requirements in effect "

during performance of work. Where required by codes and standards, personnel are trained,

_ qualified, and certified according to written-procedures in the' principles and techniques of performing specific _ activities.

5.10.2 -Personnel performing surveillance testing activities shall be similarly trained in accordance with written procedures.

4 '1 sig 724 (02/00)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION f[of Chapter _2 0 7 OPERATIONS QUALITY ASSURANCE PLAN Pact g w 14 PROGRAM DESCRIPTION trncTm DAR 12-10-91 5.10.3 Training will be conducted in a time frame adequate to allow personnel to prepare for their job responsibilities and before commencing quality-related work. Proficiency of personnel shall be maintained by retraining, reexamining, and/or recertifying in accordance with initial requirements and procedures.

5.10.4 In addition to general employee training and indoctrination described above, departmental and interdepartmental procedures provide for training of personnel who perform quality-related work. These procedures provide for training in the principles and techniques of the activity involved and for maintenance of proficiency of personnel by retraining, re-examining, and/or recertifying to an extent commensurate with the safety significance of the activity. The procedures address documentation of:

5.10.4.1 Scope, objective, and method of implementing the training program.

5.10.4.2 Documentation of the training sessions including attendees, dates, and results, where appropriate.

5.11 Policies and Goals -

5.11.1 It is the policy of HL&P, acting as licensee end Project Manager for itself and the other owners-of the STPEGS, to assure that the design, procurement, construction, testing, and operation of the STPEGS are in conformance with specifications, procedures, codes, and Nuclear Regulatory Commission (NRC) regulations. The responsibility of each organization supporting the STPEGS is to ensure that the requirements stated in this QA Program are incorporated into procedures. Adherence to those procedures is mandatory for all STPEGS organizations and contractors or vendors providing items or services covered by the QA Program.

s 1 a

=  :

STP 724 (02/90) - ., ,

7 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION OPERATIONS QUALITY ASSURANCE PLAN PAGE Of -

9 34-PROGRAM DESCRIPTION UTtcwt DAR 12-20-91 5.11.2 The OQAP identifies activities and establishes requirements for procedures which identify, report, and verify the resolution of safety-re3ated quality problems. The implementing procedures call for the resolution'of quality problems.at the lowest possible authorized level. However, if a dispute is encountered in the resolution of a quality problem which cannot be resolved at lower levels, Nucinar ,'

Assurance' presents the problem to the Group Vice President, Nuclear, for' resolution.

5.12 Control of Activities. '

F 5.12.1 The 00AP requires NA review'and/or approval of '

procedures which control selected activities.

These procedures shall require the use of the proper equipment, completion of prerequisites for starting an activity, and suitable -.

environment for performing the activity. '

Procedures will comply with the appropriate standards.

5.12.2 STPEGS' personnel attend planning scheduling, and status meetings affecting qua,lity-related

-activities as necessary to assure adequate QA coverage and program application exists.

~

5.13 Management Review _

5.13.1 'The' implementation of the QA Program requirements shall be verified through independent and-integral control activities.

The QA organization,.under the General Manager, L NA, shall conduct audits, surveillances, and inspections;of the operating-plant and of the interfacing organizationst quality-related activities.-

H -5.13.2 The results of the audits, surveillances, and' inspection-activities'are presented in a periodic report to the' Group Vice Presidant, Nuclear. '

A '. 4

~

sm 724 <o2/so) - _

SOUTH TEXAS PROJECT ELFCTRIC- GENERATING STATION "'" 7of Chapter 2.0 7 OPERATIONS QUALITY ASSURANCE PLAN-PAGE yff y&_

PROGRAM DESCRIPTION EFFECmt DAE

___ 12-20-91 5.13.3 Assessments of HL&P's implementation of the operations QA Program are conducted under the cognizance of the Nuclear Safety Review Board and results are transmitted to the Group Vice President, Nuclear for his review and/or action.

5.13.4 STPEGS may use the services of architect-engineer firms, Nuclear Steam Supply System (NSSS) suppliers, fuel fabricators, constructors, and others which provide or augment STPEGS cfforts during operations.

-These organizations are required to work under a QA program to provide control of quality.

activities consistent with the scope of their assigned work. The QA programs of such contractors or consultants shall be subject to reviaw, evaluation, and acceptance by QA before initiation of activities affected by the program.

.5.14 Operat. ions Quality Assurance Plan Changes 5.14.2 HL&P is committed to maintaining the OQAP as an effective and meaningful document to provide programmatic direction on STPEGS.. Changes to the QA Program, as described in the-OQAP, Will be processed under 10CFR50.54(a). When changes are made in the OQAP:to the organizational elements only, appropriate notification will be made to the NRC within 30 days of implementation.

5.15 Computer Code Programs 5.15.1 The development, control,'and use of computer code programs which affect quality-related items will be' controlled by OQAP. Prior to use of a computer code program in a quality-related activity, the appropriateness of the program shall be verified. In addition, all such programs shall be appropriately certified for use.

.. - .- . . . . - ~~- - . - -.-. -. _. .... . . , . - - .. . .- - . ~ - - . - - - _

STP 724 (02/90) h

  • "8" SOUTH TEXAS PROJECT ELECTRIC GENERATING STATlON _lS_

Chapto D .0 7' OP3 ATIONS QUALITY ASSURANCE PLAN .

PACE g 3

-PROGRAM DESCRIPTION Erftemt

~

DAlt gg{

-6.O DOCUME?/TATION -

6.1 -Prc :edures which are generated as required by-this chapter shall identify the records which are required to implement-and document those activities. -The i records shall be controlled.in accordance with Reference 4.4.

6.2 Operations Quality Assurance Plan (OQA*.9 7.0 ATTACHMENTS 7.1. Attachment I OQAP - 10CFR50, App. P Matrix 7.2 Attachment II-OQAP - QA Program Pocuments b

1

sTP 724 (02/90)-- _

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION 7 '

Chapter 2.0 7 OPERATIONS QUALITY ASSURANCE PLAN PACE yf y4 PROGRAM DESCRIPTION EFFECTIVE DATE 12-20-91 ATTACHMENT I OPERATIONS OUALITY ASSURANCE PIAN CHAPTERS 10 CFR 50 APPENDIX B CRITERJA

1. 0 -- Organization I 2.0 Program Description II 3.0 Conduct of Plant Operations V, XIV Qualification, Training and L

4.0 II, IX certification of Personnel 5.0 Maintenance, Installation of III, V, VIII, IX Modifications, and Related Activities 6.0 Design.and Modification Control III

.7.0 Procurement IV, VIII, X, XIII, XIV,

, VII

8. 0 - Control and Issuance of Documents V, VI 9.0 Control of Material VIII, XIII, XIV, VII 10.0 . Inspection X 11.0 Test-Control- XI

-12.0 Instrument and Calibration XII Control 13.0 Deficiency Control XV, XVI 14.0 'Reccrds Control XVII ,

~15.0 QA Audit and Surveillance XVIII 16.0 N'uclear Fuel Management III, IV,'VII, VIII, X, XIII, XIV-i

)

l l

I l

, - .s '

4-STP 724 (02/90)I

+

SOUTH-TEXAS PROJECT ELECTRIC GENERATING STATION $$

Chapter 2 2 0- 7 <

OPERATIONS QUALITY ASSURANCE PLAN PAGE g - y4-PROGRAM DESCRIPTION EFFECTWE DATE 12-20-91 17.0 ASME Section XI Repairs and

b W

4 i

1

, . - .--m . _.- -

~

,. ,?

STP 724 (C2/90) I-SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION w usta y

OPERATIONS QUALITY ASSURANCE PLAN Pc PROGRAM DESCRIPTION CTIVE gr ATTACHMENT II hl 5

3 8 I O $

n l -

k -

5 lpa e l a

8 l!! I I 18 11111 1

, __.__m- - - - - - - - - - - - - - - ' - ' - ' - - - - - - - ' - - ' " - -