ML20069H396

From kanterella
Jump to navigation Jump to search
Change QA-021 to Operations QA Plan
ML20069H396
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 06/07/1994
From:
HOUSTON LIGHTING & POWER CO.
To:
Shared Package
ML20069H391 List:
References
NUDOCS 9406130142
Download: ML20069H396 (7)


Text

S7r 714 (02MI) .

'SOtTIE TEXAS PROJECT ELECTRIC GENERATING STATION NWM m.

NO.

TalAc of Contents 10 OPERATIONS QUALITY ASSURANCE PLAN , , , 3 gg ,

TABLE OF CONTENTS DTil*.ffVE DATTa 12-18-92 Chapters Requiring NRC Approval Chapter Title Effective Effective Change Number Chapter Revision Notice Revision Date No.

Definitions 5 12-21-90 1.0 Organization 6 12-18-92 QA-015 QA-016 QA-020 QA 022 2.0 Program Description 8 12-18-92 QA-013 3.0 Conduct of Plant Operations 6 12-20-91 4.0 Qualification, Training, and 4 12-21-90 QA-017 Certification of Personnel 5.0 Maintenance, Installation of 4 12-21-90 Modifications, and Related Activities 6.0 Design and Modification Control 6 12-18-92 7.0 Procurement 5 12-21-90 QA-014 QA-020 8.0 Control and Issuance of 4 12-21-90 Documents 9.0 Control of Material 5 12-20-91 10.0 Inspection 6 12-21-90 11.O Test Control 5 12-21-90 12.0 Instrument and Calibration 5 12-21-90 Control 13.0 Deficiency Control 5 12-20-91 QA-018 14.O Records Control 4 12-21-90 15.0 Ouality Assurance Audit 4 12-21-90 QA-038 and Surveillance 940613o142 DR 940607 ADDCK 05000498 j PDR

l mnaem NUMHDI RLy, SOUTil TEXAS PROJECT EIECllHC GENERATING STATION NO.

Table of Quitats 10 ,

l OPERATIONS QUAUTY ASSURANCE PLAN E or 2 TABLE OF CONTENTS arccrivr DATE 12-18-92 Chapters Not Requiring NRC Approval Chapter Title Effective Effective Change Number Chapter Revision Notice Revision Date No.

16.0 Nuclear Fuel Management 4 12-21-90 QA-015 QA-020  !

17.0 ASME Code Section XI - 4 12-21-90 QA-019 Repairs and Replacements 18.0 ASME Code Section XI - 4 12-21-90 Inservice Inspection and Testing l

l l

l l

e

. $1P 7N 612/'#A NUMNR REV, SOLTTH TEXAS PROJECT ELECTRIC GENERATING STATION No.

dupelO 6 OPERATIONS QUAUTY ASSURANCE PIAN PAGE 1 or 6 ORGANI7AllON im rnvc DA1E I2/I8/92 1.0 PURPOSE 1.1 The purpose of this chapter is to describe the organizational structure as related to quality assurance and to establish the responsibilities of organizations for the South Texas Project Electric generating Station (STPEGS).

2.0 SCOPE 2.1 Houston Lighting & Power Company (HL&P), as licensee and Project Manager for itself and the other owners, has the Quality Assurance (QA) responsibility for design, engineering, procurement, fabrication, modification, maintenance, repair, in-service inspection, refueling, testing, and operation of the STPEGS.

3.0 DEFINITIONS 3.1 None

4.0 REFERENCES

4.1 None 5.0 RESPONSIBILITIES O

5.1 The Nuclear Group is comprised of Nuclear Generation, j y Nuclear Engineering, Nuclear Assurance, Nuclear 0 o Licensing, Plant Services, and Human Resources and d d Access. The heads of these groups report to the Group o. c.

Vice President, Nuclear.

5.1.1 The Group Vice President, Nuclear, has overall responsibility for the implementation of the Operations Quality assurance Program and approving the Operations Quality Assurance Plan (OQAP) and revisions thereto.

He is also responsible for engineering, modification, and operations activities of STPEGS.

S.1.2 The Vice President, Nuclear Generation is responsible for staffing STPEGS with qualified personnel and acquiring and >

coordinating the assistance of internal and external orgari:ations for the tecting, operation, modification, maintenance and security of STPEGS. i l

e 4

STP 724 KD*D)

SOUTH TEXAS PROJECT ELECTIUC GENERATING STATION nuunEn m.v.

NO.

Ompa l.0 6 ,

OPERAT10NS QUAUTY ASSURANCE PIAN PAGE 2 oF 6 l ORGANIZATION U nx nVE j DNE 12/18/92 5.1.2.1 The General Manager, Generation Support; Plant Manager, Unit 1; 4 o Plant Manager, Unit 2; Manager, s N Nuclear Security; Manager, O ?

Technical Services; and Director, S R

Nuclear Generation Projects report G C' to the Vice President, Nuclear Generation.

5.1.3 The Vice President, Nuclear Engineering is responsible for design engineering, systems engineering, nuclear fuels and analysis, engineering programs, and engineering support.

O 5.1.3.1 The Manager, Design Engineering; y ]

Manager, Systems Engineering; y c Manager, Programs; Manager, R 4 Engineering Support; and Director, O cs Nuclear Fuel and Analysis report to the Vice President, Nuclear Engineering.

5.1.4 The General Manager, Nuclear Assurance is responsible for the development, implementation, and maintenance of the STPEGS w 4 OA Program, making periodic reports on its @ 2 effectiveness, review of selected documents i i which control activities within its scope, and preparation, control, and approval of the p'[,

OOAP and revisions thereto.

The General Manager, Nuclear Assurance, has the authority to identify, initiate, recommend, or provide solutions to quality-related problems and verify the implementation and effectiveness of the solutions. This position has the independence to conduct QA/ Quality Control (QC) activities without undue pressure of cost or schedule. ,

l i

1

. m m ans NUMBER RIV.

SOUTII TEXAS PROJECT ELECTRIC GENERATING STATION NO.  ;

capa l.0 6 OPERAT10NS QUAUTY ASSURANCE PIAN IwcE 3 or 6 ORGANIZATION Im rnvE DAlT, 12/18/92 The General Manager, Nuclear Assurance, has the authority to stop work for cause in engineering, design, procurement, fabrication, modification, testing, and operations phases of the nuclear plant. This authority in QA matters has been granted by the G7aup Vice President, Nuclear.

The NA organization's responsibilities during operation are shown in Attachment II. The QA organization, including the inspection staff, is based upon the anticipated QA/QC involvement in operation, modification, and maintenance activities and by a survey of i site QA staffs of other utilities with nuclear power plants in operation.

The position of General Manager, Nuclear Assurance, is on the same or higher organizational level as the highest line manager responsible for performing activities affecting quality as shown in Attachment I.

5.1.4.1 The Director, Quality Assurance; Manager, Nuclear Quality Control y ,

and Materials Testing; ~ ~

Administrator, Corrective Action; f  ?

and Administrator, Nuclear 9 v Assurance Support report to the O'C '

General Manager, Nuclear Assurance.

5.1.5 The General Manager, Nuclear Licensing is , o i responsible for STPEGS licensing, emergency 2 N l

preparedness activities, Independent Safety 7 ?

Engineering Group activities,and management 4 R of the Nuclear Safety Review Board. ' CI S.1.5.1 The Director, Independent Safety I Engineering Group and Manager, Emergency Preparedness report to the General Manager, Nuclear Licensing.

l

. ._ ~

. l l

stemaan

, l I

SOUTII TEXAS PROJECT ELECTIUC GENERATING STATION NUMBD1 RI.V.

NO.

Oupta l.0 6 OPERATIONS QUAIJTY ASSURANCE PIAN p3cc 4 or 6 ORGANIZATION Enu nVE DKIE 12/I8/92 5.1.6 The General Manager, Plant Services is responsible for nuclear training, scheduling; y maintenance of programs for records o management, document control and information k systems; and procurement and material control 4 for STPEGS.

5.1.6.1 The Manager, Nuclear Training; Manager, Records Management and Administration; Director, Nuclear Information Systems; Manager, Plant $

Projects and Programs; and o  ?

Director, Nuclear Purchasing and m R Materials Management; report to the j O General Manager, Plant Services. R O.

5.1.7 The Manager, Human Resources and Access is a responsible for personnel access i authorization for the protected and vital areas of STPEGS.

{

O, 5.1.7.1 The Manager, Access Authorization '

reports to the Manager, Human Resources and Access.

6.0 REOUIREMENTS 6.1 Attachment I depicts the organizational structure of ,

the STPEGS as it relates to the implementation of the Operations Quality Assurance Plan. The structure reflects the reporting alignment for key positions.

7.0 DOCUMENTATION 7.1 None 8.0 ATTACHMENTS 8.1 Attachment 1 - Nuclear Group - QA Functions 8.2 Attachment 2 - Nuclear Assurance Responsibilities I

e e

, $TP 724 (02/#5 NuMatn ni.v.

Sotrni TEXAS PROJECT ELECTRIC GENERKnNG STKRON NO.

diapter 1.0 6 OPDIAT10NS QUAIJT( ASSURANG PIAN PAGE 5 OF 6 ORGANIZA110N m1rnVE DA1T2 12/ItV92 ATTACHMENT I HOUSTON LIGHTING & POWER COMPANY NUCLEAR GROUP - QA FUNCTIONS Group VP, Nuclear i  ; i 1 I l'

I Nuclear Nuclear Nuclear _

Nuclear _

Plant _

lluman li Generation Engineering Assurance Licensing Services Resources Access i

Generation Quality Emergency Nuclear Access Nuclear Fuels & _ _ _ _

Support Analysis Assurance heparedness Training Authorization Plant Manages Quality Control - -

Records Mgrnt _

Design ISEG Unit I & Marl Tesung & Administration Plant Manager _ _ , _

Nucicar ._

Unit ?

I #* Informanon Systems C N

O Nuclear Correcove Plant Projects i 1 Programs -

q Secovity Acton and Prograrns Tntinical _

Nuclear Purchasing '-

Srnices Materia! Mgmt

]

O i

I!Ojc(t% -

O I

I

1 i

HP 714 (4W))

SOtrill TEXAS PROJECT EIJiCFRIC GENERKTING SrKIlON reuumm niv.

Oupter 1.0 6  ;

OPEllADONS QUAllTY ASSURANCE PIAN Pu E 6 or 6 ORGANIZATION 1merwE DATE 12/18/92 ATTACHMENT II NUCLEAR ASSURANCE RESPONSIBILITIES ~ >

B 3 %

G VENDOR DOCUMENT AUDIT SURVEILLANCE ASSESSMEN'T EVALUATlON REVIEW P

INSPECTION EXAMINATION TESTING ACTION SUPTORT l

l i

i l

J