Change QA-026 to Rev 4 to Operations QA Plan Control & Issuance of Documents
ML20095E897
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 12/30/1994
From:
HOUSTON LIGHTING & POWER CO.
To:
Shared Package
ML20095E896 List:
References
NUDOCS 9512180201
Download: ML20095E897 (5)


Text

_ _.

. i ww wm SbuTH TEXAS PROJECT ELECTRIC GENERATINfs GTATION NUMBER REV.

NO.

TaWe of fentets 11 OPERATIONS QUALITY ASSURANCE PLAN PAGE 1 of 2 TABLE OF CONTENTS ErrECTIVE DATE 12-30-94 Chapters Requiring NRC Approval Chapter Title Effective Effective Change Number Chapter Revision Notice Revision Date No.

Definitions 5 12-21-90 1.0 Organization 7 12-30-94 QA-024 QA-025 2.0 Program Description 9 12-30-94 QA-025 3.0 Conduct of Plant Operations 6 12-20-91 4.0 Qualification, Training, and 5 12-30-94 Certification o." Personnel 5.0 Maintenance, Installation of 4 12-21-90 Modifications, and Related Activities 6.0 Design and Modification Control 6 12-18-92 i 7.0 Procurement 6 12-30-94 o N

8.0 Control and Issuance of 4 12-21-90 QA-026 ?

Documents 6 ,

9.0 Control of Material 5 12-20-91 10.0 Inspection 6 12-21-90 11.0 Test Control 5 12-21-90

..U Instrument and Calibration 5 12-21-90 Control l l

13.0 Deficiency Control 6 12-30-94 QA-025 14.0 Records Control 4 12-21-90 15.0' Quality Assurance Audit 5 12-30-94 QA-025 i and Surveillance '

l l 9512180201 951213 t

PDR ADOCK 05000498 l P PDR

STP m (02/90)

SdUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV.

NO.

Table of Contents 11 OPERATIONS QUALITY ASSURANCE PLAN Pact 2 or 2 TABLE OF CONTENTS EFFECTIVE DATE 12-30-94 Chapters Not Requiring NRC Approval Chapter Title Effective Effective Change .

Number Chapter Revision Notice Revision Date No.

16.0 Nuclear Fuel Management 5 12-30-94 17.0 ASME Code Section XI - 5 12-30-94 Repairs and Replacements

-18.0 ASME Code Section XI - 5 12-30-94 QA-025 Inservice Inspection and Testing I

i I

l

sfP 724 (02/90) i SOUTH TEXAS PRA".f'f ELECTRIC GENERATING STATION NUM8ER REV,'

NO.

auen s.o 4 OPERATIONS QUAIJTY ASSURANCE PLAN PACE i or 3 CONTROL AND ISSUANCE OF DOCUMENTS ErrECTIVE DATE 12/21/90 1.0 PURPOSE 1.1 The purpose of this chapter is to establish the

, requirements for review, approval, distribution and use l of quality-related documents such as instructions, l procedures and drawings, including changes thereto for the South Texas Project Electric Generating Station l (STPEGS),

t

! 2.0 SCOPE

! 2.1 This chapter is applicable to documents which control quality activities for the licensing, operation, testing, maintenance, and plant modification of the STPEGS. These documents include, but are not limited to, instructions; procedures; specifications; drawings; vendor manuals; status registers (such as drawing lists, equipment list); procurement documents; design documents; design change requests; as-built documents; l

non-conformance and deficiency reports; Updated Final l Safety Analysis Report and program manuals (such as OQAP, Emergency Plan, Inservice Inspection Plan, etc.).

3.0 DEFINITIONS 3.1 None

4.0 REFERENCES

4.1 OQAP Chapter 6.0, Design and Modification Control 4.2 OQAP Chapter 14.0, Records Control 5.0 REOUIREMENTS 5.1 Procedures shall be established which identify the organizations or individuals responsible for the preparation, review, approval, and issuance of quality related documents and changes thereto.

l

+

ST 724 (02/90)

' SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION NUMBER REV.

, NO.

, OuMw s.0 4 OPERATIONS QUAUTY ASSURANCE PLAN PAGE 2 of 3 CONTROL AND ISSUANCE OF DOCUMENTS ErTECTIVE DATE 12/21/90 5.2 Departments responsible for program-implementing documents shall be required to provide and assure the necessary review and approval, prior to use, for instructions, procedures, and drawings. Review and' approval assures that issued documents include proper quality and technical requirements, and are correct for their intended use. Additionally, individual departments are responsible for controlling documents generated or reviewed in the department for which the department has preparation and final approval or -

external interface responsibility.

1 5.3 Document reviews shall be performed by appropriately qualified personnel with access to pertinent background information to establish a basis for an adequate review. Nuclear Assurance shall review selected documents for quality requirements.

5.4 Procedures shall establish controlled distribution of P

documents and changes thereto including:

5.4.1 Establishing current and updated distribution lists. '

5.4.2 Personnel or organizations acknowledging receipt and insertion of controlled documents and changes thereto.

5.4.3 Controlling documents to avoid the use of outdated or inappropriate documents.

5.4.4 Establishing and maintaining master document I lists identifying the current revision of l documents. i l

5.4.5 Temporary changes to procedures.

5.5 Documents shall be available and used at work locations by individuals or organizations performing quality-related activities when required based upon the nature of the work. Clearly identified controlled copies of documents shall be available at the point of use prior to commencing activities.

l l

= . . . . . . = . - -

STP 724 (02/90) -

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION uuusta arv.

  • NO.

Chapter 8.0 4 OPERATIONS QUAljTY ASSURANCE PLAN Pact 2 or s CONTROL AND ISSUANCE OF DOCUMENTS trFECTIVE DATE 12/21/90 5.6 Revisions or changes to documents shall be reviewed and approved by the same organizations that performed the original review and approval unless other organizations are designated and have knowledge of the requirements and intent of the original document. Personnel using a document to perform quality related activities are responsible for assuring the documents being used are the correct revision prior to such use.

5.7 Procedure reviews shall be performed:

5.7.1 Following an unusual incident such as an accident, unexpected transient, significant operator error, or unusual equipment malfunction.

5.7.2 Following a plant modification to a system to 4 which a specific procedure is applicable, y s

5.8 Procedures shall be developed for the control and 9 distribution of vendor / contractor documents such as approved drawings, specifications, technical manuals and instructions.

5.9 Control of design documents is addressed in Reference 4.1.

6.O DOCUMENTATION 6.1 Procedures which are generated as required by this chapter shall identify the records which are required to implement and document those activities. The records shall be controlled in accordance with Reference 4.2.

7.0 ATTACHMENTS 7.1 None  !

!