ML20098D473
| ML20098D473 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 04/24/1992 |
| From: | Jeremy Dean, Harvey C HOUSTON LIGHTING & POWER CO. |
| To: | |
| References | |
| NUDOCS 9205290037 | |
| Download: ML20098D473 (29) | |
Text
_ _ - - _ _ - _ - _ - _ - _ - _ - _ _ _ - - _ _ _ - - - _ - _
$/19/92 0S523 FMS/DOCUnENT0!$!ifBUTIONCENTER(CDC) 10:03:31 i
GI S T F 1 Buf 10s T F A95NI T T AL/ A: t N04E RE ME NT STAi!DN LIVEL 2 FillPlfNT/LOCA110Nt UNC - ATIN 000 CONTRL DEE; ** NAIL DUT LIST **
STATICN ND: 463 15$00 DATE: 05/19/92 TFA G ITTAL NO: EMB53 DOCUMENT N0,/A,4 N3 N0, Unit SHEET ILV C0flE5 IN5TrJCT10N 00AP-01.00 05 1
ICN ICN0506 0
IEE&T ICN ICN0506 0
INSERI DQ4F 0.R.06 0
07 j k M o707 gw i
l l
' 0 0 0 ;^^
- o l
l\\
l 9205290037 920424
,IML PAC *,
PDR ADOCK 05000498 FACE 1
l P
.PDR
l 05525 STFECS 19 mAi 1972
^
1613:1?
CFEVAilGtr, CU?s111 K C RANCE lLhh
[
TARE Cr CONTENTS FAO: -
1 E30r 1 t
DC'UMENT #0 REV SUPPLEMEWf DOCUMENT 11TLE 0 ATE IN EffECT i
I OGAP-00.00 05 DEFINITIONS 12/21/90 00AP-01.00 0$
DRGANIZATION 12/21/?0 0QAP-01.00 05 ICN ICM0504 ORGAvilAi!0N 1/15/92 0QAP-01.00 05 ICN ICN0504 0#0AN!!A110N 5/19n2
.0 GAP-01.00 (5 ICN ICN05M ORGANIZAil0N 5/19/92 00AP-02.00 07 PROGRAM CESCRIPi10N 12/20/91 0QAP-02.00 07 !Ctl ICN0707 PROGRAM DESCRIPi10N 3/19/92 00AP-03.00 06 CONDUCT OF PLANT OPERA 110N3 12/20/91 04AP-04.00 04 QUALIFICATION, TENING & CERi!FICATION Of PERSONNEL 12/21/90 00AP-05.00 04.
MAINT, INSTALLAi!DN OF M001FICI110NS & ACilVITIES 12/21/90 0QAP-06.00 05 DESIGN & MODIFICATION CONTROL 12/21/90 OQAP-07.00 05 PROC 11REME#f 12/21/90 1
i 0QAP 08.00
'04 CONTROL & ISSUANCE OF 00CUNENTS 12/21n0 00AP49.00 05 CONTROL OF MATERIAL 12/20/91 0QAP-10.00 06 INSPECTION 12/21/90 00AP-!!.00 05 TEST CONTROL 12/21/90 L
0QAP-12.00 05 IN3fkUMENT & cal!6 tai!0N CONff0L 12/21/90 00AP-13.00_
05 DEflCIENCY CONTEDL 12/20/91 OQAP-14.00 04 RECORDS COHiFOL 12/21/90 00AP-15.00 04 QUAllii ASSURANCE AUDIT & SURVEILLANCE 12/21/90 0QAP-16.00 04 NUCLEAR FUEL MANAGCMENT 12/21/90 0QAP-17,00 04 ASME SECTION XI REPAIRS & REPLACEMENIS 12/21/90 0QAP-18.00 04 AshE SECTION XI CXAMINATION & TESTING 12/21/90 l
1 i
[
t O
!~
. -.a
_-_---__----.__x-._a__---__.-.,-..:---._,-....u-_,,,..-
sw n4 (02/90)
SOUTH iE3i S PROJECT ELECTRIC GENERATING STATION ""fablo yo*
O of Contents 9
OPERATIONS QUALITY ASSURANCE PLAN PAcr 1 or 2
TABLE OF CONTENTS 12-20-91 (Updated 5/13/92)
Chaptors Requiring NRC Approval Chapter Title of Effective Effective Chango Number Chapter Reviuion_lio Dato l{plicep.
a Definitions 5
12-21-90 1.0 Organization 5
12-21-90 QA-004 QA-006 QA-000 2.0 Program Description 7
12-20-91 QA-007 3.0 Conduct of Plant Operations 6
12-20-91 O4.0 Qualification, Training, and 4
12-21-90 Cortification of Personnel 5.0 Maintenanco, Installation of 4
12-21-90 Modifications, and Rolated Activities 6.0 Design and Hodification 5
12-21-90 Control 7.0 Procuromont 5
12-21-90 8.0 Control and Issuanco of 4
12-21-90 Documents 9.0 Control of Hatorial-5 12-20-91 10.0 Inspection 6
12-21-90 11.0 Test Control 5
1,2-21-90 12.0 Instrument and Calibration 5
12-21-90 Control 13.0 Deficiency Control 5
12-20-91 14.0 Records Control 4
12-21-90 15.0 Quality Assuranco Audit 4
12-21-90 and Surveillance
. 5fP 724 (07/90)
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION """fablo 7
O of Contento 9
OPERATIOllS QUALITY ASSURA11CE PLA!I Pact 2 or 2
LFILCTlyt TABLE OF COliTEllTS DAtt 12-20-92 Chaptors Requiring IIRC Approval
~
Chapter Title of Effectivo Effective Chango JAtmber Chantor Rnvision Ifo.
Date 110tl ag 16.0 liuclear Fuol Management 3
12-21-90 17.0 ASME Codo Section XI -
4 12-21-90 Ropairs and Replacements 18.0 ASME Codo Section XI -
4 12-21-90 Inservico Inspection and Testing O
O j
l
- n CONTROLLED Copy g
gf NAY I 91992 dffy QQ3t._g1LAE9E_MQNST rORM
- cur coe#
~
Chango No.
. O A ~ O O I,o I'bfb hlk Dat.o Originator
_(f,d, h(cto Dept. N0 der,f 3ttofdy i
Chango Description Ikleh fr> Ched. er I S., 5.1,2.2, htwe>He tekh q b oyer g
y
- ~ -
ofTerckith Ditrttrm,_ h ko (kwMer-l.0 s, 9, l. C+, /an3g,w chexei il.cf il, e.
0 l
y i
o a
MAwnter, khlene IIcco@n e iescniDe Erh access er(Alatvreed7% phyarru oidds-o a
4 o
j g[orkia fixtfantL DeIdt CI c}er I. C) Jcc bTein. S.I.7, Mich heder$1h cc ded I
a u,o o Are,A., p3,. v9 na,,hes. geme dhAch I b wha &d dop.
4 Initiating Documentation f'byGIc4\\ bcOS (no. Se vi57M ! d, fx-d TN 9.} -
/
USQE Number _ %- 66 />(o Reviewed by
/7A/ __
2/ 2 Genf Aind'ge'r, Nuclear Aneurance
/ Dafo Reviewed and Approved by
//
Group Vice Prooident, Nuclear Date Change Incorporated in Roviolon Number of tho 00AP Signaturo Date a
s.,
^
/'6
~
h /
.f g \\
j
' f' CONTROLLED COPY O'
EYl91992
- 6 v
_ _,m.
e CNT COM
/
N Chango No.
[~__OOb Date CQ G C.. L. H r3 avEY Dept.
originator Change Deocription
_9 6% CTtE' " M d # A17tti A/!^/4 TW E
) MA/Z 0 VdIU \\tN-O
- eta
.Le s r (tW LY Wa o n R t=3 p e ns 101 t. m s _c ? int Mrw d s ee, a
Noc temu Pun c an.s m s &ge, Ms rert u n u, Mencte u erw r.
C rM PTert I. O g.e V. 6~_ f % a n c,e,, pit C. I. 3 l Initlating Documentation T4r) A/SFB2. a /c
// V L M 4/A>7E Aina/c f
- TD N o c-L e74 tt. A s.s u,r.n a> e a.
I P-- <1. I 3 0 /I n s necrnJ jfSudO FOR / ^4 /t. cDvs EA> TM T7 o 4/.
USQE tiumber A
[
Reviewed by 4
_ AV C(% [ V anager, Nucicar Annurarce
[ Dgke Reviewed and Approved by
//
Group Vice President, fluc lear Date
[
of the OQAP Change Incorporated in Reviulon Number Verified by Date signature N
SIP 724 (07/90)
V-SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION
['9 g
3 t
j Chapter 1.0 L/
OPERATIONS QUALITY ASSURANCE PLAN PAGE 1 OF 8
ORGANIZATION
$$["i2-21-90 1.0 PURPOSE 1.1 The purpose of this chapter is to describe the organizational structuro as related to quality assuranco and to establish the responsibilitics of organizations for the South Texas Project Electric Generating Station (STPEGS).
2.0 SCOPE 2.1 Houston Lighting & Power Company (HL&P), as licensoo and Project Manager for itself and the other owners, has the Quality Assuranco (QA) responsibility for design, engincoring, procuromont, fabrication, modification, maintenanco, repair, inservico inspection, refueling, testing, and operation of the South Texas Project Electric Gonorating Station (STPEGS).
STP 3.0 DEFINITIONS COPY 3.1 None f
4.0 REFEREILQES NAY l 91992 4.1 Nono
./
RESPONSIBILITIES CdpENT co@9,0" 5.1 The Nuclear Group is comprised of Nuclear Generation, Nuclear Engineering, Nuclear Support, Planning / Assessment, Human Resources-Nuclear, Nuclear Licensing, and Nuclear Assuranco.
The heads of those groups report to the Group Vice President, Nuclear.
5.1.1 The Group Vico President, Nuclear, has overall responsibility for the implomontation of the Operations Quality Assuranco Program and l
approving the Operations Quality Assuranco Plan (OQAP) and revisions thoroto.
He is also responsible for enginocring, modification, and operations activities of STPEGS.
[s
7 siv 724 (o2/90)
V-SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION
,73 tC
_ chapter _L.0-J.L.
OPERATIONS QUALITY ASSURANCE PLAN Pact or ORGANIZATION IHECk om __12-El.90 5.1.2 Tho Vice Prosident, Nuclear Generation, is responsible for staffing STPEGS with qualified personnel and acquiring and coordinating the assistanco of internal and external organizations for the testing, startup, operation, modification, maintenance, and security of STPEGS.
5.1.2.1 The Plant Manager, STPEGS, has primo responsibility for the safo operation of the STPEGS.
The plant staff, under the direction of the Plant Manager, STPEGS, develops detailed proceduros and instructions for testing, operation, modification, unintenanco, i
and radiological monitoring of the STPEGS.
)
The Plant Manager, STPEGS, reports to the Vico President, Nuclear Generation.
5.1.2.2 The Managor, Nuclear Security, is responsible for the development and coordination of the accurity program, including practicos and procedures; providing security servicos; establishment and maintenance of a
physical security.
The Manager, Nuclear Security, reports to the Vice President, Nuclear Generation.
5.1.2.3 The Manager, Nuclear Training, is responsible for developing and implomonting formal training programs and curricula to support the training and certification of STPEGS personnol.
The Manager, Nuclear Training, reports to the Vice Prouident, Nuclear Generation.
O
..... - _ _ _ - - -. ~ _ ~
Sh' 724 (02/90)
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION f/[
Chapt or_i_. O _5_
OPERATIONS QUALITY ASSURANCE PLAN 3
8 ORGANIZATION uitcmt
^*
L2:21:2_0 5.1.3 Tho Vico Prosident, Nuclear Engincoring, is responsible for design engineering, pisnt
{
ongineering, nuclear engineering, purchasing, l$
material control, and design reviews for STPEGS.
In addition, the Vico President, Nuclear Engincoring, is responsiblo for nuclear fuel design, fuel acquisition, fuel management, and providos for procurement and storago of equipment, matorial, and services for STPEGS.
5.1.3.1 The Manager, Nuclear Purchasing and Materials Management, is responsiblo for the procuromont of e material, and services, quipment, including the coordination of procuromont document review; recolpt, handling and storage o
of equipment and matorials.
{
e
()
The Manager, Nuclear Purchasing and Materials Management, reports to the i
Vico President, Nuclear Engineering, l
for project direction and is matrixed to the HL&P Corporato Organization for administrativo direction.
5.1.3.2 The Managor, Plant Engineering, in responsible for providing technical support for day to day activition of plant oporations and for tho development, implomontation, and administration of the plant testing program.
The Manager, Plant Eng.
oring, reports to the Vico President, Alcar Engineering.
l i
ute 714 (07/90)
,"$V-__
i,.
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION 7-(
Chaptpr 1.0 5
OPERATIONS QUALITY ASSURANCE PLAN v
ORGANIZATION LF rtcTivt DAR 12-21-90 5.1.3.3 The Manager, Donign Engincoring is responsible for establishment and maintenance of the plant design bases and plant configuration.
Design Engineering issues plant modifications, resolvos plant nonconformancos, approves special process proceduros and supports the ASME Xi In9ervico Inspection Program.
The Manager, Design Engincoring, reports to the Vice Presidot.
Nuclear Engincoring.
5.1.3.4 The Manager, Nuclear Engincoring is responsiblo for nuclear fuel design, fuel acquisition, fuel management, probabalistic risk assessment, 7
thermal-hydraulic analysis and the
[
shift technical advisor program.
o o
The Manager, Nuclear Enginacring h
reports to the Vico President, Nuclear Engincoring.
5.1.4 The Vice President, Nuclear Support, is responsible for assuring that activities associated with the distribution of documents, the records management system, plant communications, and the administrativo computer systems are in compliance with tho OQAP.
5.1.4.1 The Gonoral Manager Information e
Resourcos, is responsiblo for providing a records management system including processing, storago, prosorvation, and ratrievability.
The General Manager, Information Resourcos, reports to the Vice Procident, Nuclear Support.
p i
r
sie 724 (02/90)
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION ffo*
Chaptor 1.0 5
OPERATIONS QUALITY ASSURANCE PLAN p
5 8
ORGANIZATIrN uncmt DATE 12-21-9Q_
5.1.5 Tho General Managor, Nuclear Assuranco, is responsible for the development, implomontation, and maintenanco of the STPEGS QA Program, making periodic reports on its offectivonoss, review of selected documents which control activities within its scope, and preparation, control, and approval of the OQAP and rovisions thornto.
The General Manager, Nuclear Assurance, has the authority to identify, initiato, recommend, or provide solutions to quality-related problems and verify the implementation and offectivonous i
of the-solutions.
This position has the independence to conduct QA/ Quality control (QC) activities without undue pressure of cost or schedule.
The General Managor, Nuclear Assurance, has the authority to stop work for cause in engineering, design, procurement, fabrication, modification, testing, and O-operations phases of the nuclear plant.
This authority in QA matters has-been granted by the Group-Vice President, Nuclear.
The QA organization's responsibilities during operation are shown in Attachment II.
The QA organization, including the inspection staff, is based upon the anticipated QA/QC involvement in operation, modification, :and maintenanco -
activities and by a survey of site QA staffs of other utilities with nuclear power plants in operation.
The position-of General Manager, Nuclear Assurance, is.on the same or higher organizational level as the highest line manager responsible for performing activities affecting quality as shown in Attachment I.
O
s m m (o?/ w E SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION lfo!'
O(,/
_, Chapter 1.0 5
OPERAiIONS QUALITY ASSURANCE PLAN 6
8 ORGANIZATION urtcmt I'"E 12-21-90 5.1.6 The Managor, Nucionr Licensing, is responsible for development of plans and procedures which implement the Emergency plan, the conduct of drills and exercises which test the 4
effectivonens of the Emergency Plan, operation h
of the Plant Access Authorization Program, and e"
for providing technical direction to ensure that STP Licensin?, activities are consistent with HL&P Licensing policy.
5.1.6.1 The Exocutivo Director NSRB is responsiblo for the management of the Nuclear Safety Review Board which conducts indopondent reviews and audits of significant activitics as dolinoated by technical specifications.
f The Executivo Director NSRB reports to i
the Manager, Licensing.
6.0 REOUIREMENTS 4e l
6.1 South Texas Project Electric Generating Station Organization 6.1.1-Attachment I dopicts the organizational structuro of the STPEGS as it relatos to the implomontation of the Oporations Quality Assuranco Plan.
The structuro reflects the reporting alignment for key positions.
7.0 DOCUMENTATION t
7.1 None 8.0 ATTACHMENTS 8.1 Attachment I - Nuclear Group - QA Functions 8.2 Attachmont II - Nuclear Assuranco Rosponsibilitics l
l s_-
l
7 e
SIP 7?* (07/90)
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION T-OPERATIOliS QUALITY ASSURAliCE PLAli
~
ORGANIZATIoli
' u r temt i
DAT 12-22.-90 ATTACllMEllT I 900-vb kva-vo 1oo Vk
" l2 8
' o p
0 Z
ad 4
W O_
Z M
O O
F g
2 i'
8 9
Z i
a e
2 4 s
=
w m
a O
3 O
~
O.
O 1_1,_11 11 ll e
e s d
l[,yl Z
ye e
D e
o 5
8 l
][
e g,a t
c s
ae z s vj
~
O J
(/h 8
a-a z
=
[
O g
9 L
C q~h h-l 0
B e
O l
3 I:
- ii
- !li
]
,a D s45 mOC4=
EE9 x2.
4E>
o23O'maH m mo42 o ggmm>4~Zo m4>4_OZ O
z9 CGst 8m snob h>CeW >L$g~e -
=
' eO
- O c,
l 1
2R 9
3 D
C C
o$ gRu>8HO*
3;9m E1c M bw I
j e
>6H a!4 aH
?
s s
s N
E t
t R
CN c
c O
Nm T
A T n n
C L.
NA u A
u R
X L
Y P
R.
m TN oM u
u C
ts s
s s
R i
N N
N N
O N
O o
Nr o
T O
D E u n
C C
I c
e A
T P
E s
R P
a T
e N
S s
s s
N O
E i
a u
C R
ECN s
A u
su R
m AR U
C e
c T
o N
s MN Me,4 S
W T r R
l Nr T
r S
L N /
m s
/
E E
A s
A N
L t IU 0
P m e
C e
x f
o n
R D
x n
R n
a n
P A
e c
o E
m.
m LC I
U N
T s 5
N Nx T
e
=
ALP e
2R AsTL i
,4
- 4<
\\
i
,i4=
' i'
'i i.
lill ll
i i
ky@
'Ds CONTROLLED COPY J
f ss IdAY I 91992 NAP C!LAfLGELJJ.QUTST FOPM
/
4ffhT C0 chango No.
Q A-DO 7 oato 3/Q94 originator C.. L.ll/// N E Y Dept. Qurit. STY d ssustarscJ Change Doncription C HrfgfL"/Z 2..O R d V'l 5 8 W 7 - D EL dT 414%M M4 S. R. '2. A un 7. 2,, D e2w r1TrncHmenorJI', c oa.so c o r>n ru-Pn aer s aepro S c).5 nnb c.9.r
.4~o Aeuomacrt M s.%2n InLtLatLng DocumentatLon WOA/6 % YGYLM L R EQ VufS T' f.Q s it c'CTsCj l4 A)
O USQE Number; A
Reviewed by N
tener ga[er, Nuclear Accurance
/ Dale
/ M-Reviewed and Ipproved by Group Vice President, Nuclear Da'te Change Incorporated in Revloton Number of the CC.N Verifled by Signature Date
STP 724 (0?/90).
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION
,7f p)
(_
Chapter 2.0 7
OPERATIONS QUALITY ASSURANCE PLAN PAGE 1 N 1 PROGRAM DESLRIPTION U rEcTm
~-
DATE f
,,1 1.O E1)JTORE l.1 The purpose of this chaptor is to define critoria and establish administrativo controls for implomontation of the Operations Quality Assurance Program for the South Texas Project Electric Generating Station (STPEGS).
2.0 S_qQ2R 2.1 The Operations Quality Assuranco Program is applicable to safoty-related material, equipment, services and activitica described in 10CFR50, Appendix B; 10CFR71, Subpart H (except design and fabrication of NRC cortified radioactive wanto shipping casks); ASME Boiler and Prosauro Vossel Codo, Soctions III and XI; and quality related areas as definod by STPEGS management in this Operations Quality Assuranco Plan (OQAP) or other program documents or proceduros.
O Quality-related areas include the Fire Protection Program, Emergency Plan, Radiological Environmental Monitoring Program, Radwasto Management Program, computer Program Verification and Control, Physical Security Program, Soismic and Environmental Equipment Qualification Programs, and Radiathn Protection Program.
3.0 DEFINITIONS
%.\\
3.1 None STP
4.0 REFERENCES
CONTROLLEO COPY 4.1 10CFR50, Appendix B
)lAY\\9}992 4.2 10CFR71, Subpart H f
o*
eg 4.4 OQAP Chapter 14.0, Records control O
O Tl E AS PROJECT ELECTRIC GEi4ERATING STATION 7[
(
Chaptor 2.0 7
OPERATIONS QUALITY ASSURANCE PLAN 2
" 14 Pact PROGRAM DESCRIPTION rs FE cTivt DATE 12 29 91 5.O REQU.IEEliHILTIE 5.1 The Operations Quality Assuranco Program consists of various documents which identify and provide the mechanism for verifying implomontation of commitments, requirements, and actions nocessary to attain quality assurance objectivos.
5.2 The OQAP is prepared to implomont tho STPEGS Operations Quality Assuranco Program.
5.2.1 The OQAP providos policios to be implomonted for tho STPEGS.
The OQAP also assigns i
responsibilities necessary for the attainment of quality assurance objectivos and the verification of conformance to established requirements.
O' 5.2.2 Attachment I providos a matrix of 10CFR50, I'
Appendix B criteria to the OQAP chaptors.
I 5.3 Establishing Policios and Goals 5.3.1 QA policios and goals for STPEGS are defined in the OQAP.
The Group Vice President, Nuclear has overall responsibility for quality assurance.
5.3.2 The General Manager, Nuclear Assuranco, is responsible for the development of the Quality Assuranco (QA) Program.
The minimum requirements established for this position are:
5.3.2.1 A bachelors degroo in science or engincoring, or an equivalent combination of education and experience.
i 5.3.2.2 Five years experience in the management of quality assuranco.
Fiftcon years experience in industry quality assuranco standards, and fodoral and stato regulatory requirements.
O l
l l
l
4 sTP n4 (02/90)
SOUTH TEXAS PROJECT ELECTdlC GENERATING STATION
['sV-O Chapter 2.0 7
OPERATIONS QUALIT'.' ASSURANCE PLAN Pact 3 or 14 PROGRAM DESCRIPTION nrtemt oATE 12-20-91 5.3.2.3 Familiarity with nuclear power generation facilitics and the related operations.
5.3.2.4 Knowledge of the industry's quality assuranco standards and regulatory requirements.
5.3.2.5 Management experienco and familiarity with HL&P corporate organizations.
5.3.3 Procedures and revisions which control quality-related work programs and activitios, performed by STPEGS organizations described in Chapter 1.0 are reviewed by QA as defined in this chaptor.
5.4 Organizational Indopondenco 5.4.1 The reporting arrangemont utilized by the NA Department ensures that those personnel charged i
with responsibility for verifying compliance j
with QA Prograr requirements have the i
organizational froodom to:
5.4.1.1 Idontify quality problems.
5.4.1.2 Initiato, recommend, or provido i
solutions.
5.4.1.3 Verify irplomontation of solutions, j
5.4.2 The reporting arrangemo'nt, as illustrated on i
Attachment I, of Chapter 1.0, is such that perconnel responsible for verifying compliance with quality requirements do not have direct resporaibility for the performance of that work I
5.4.3 The Joneral Manager, NA, providos technical and t
administrativo direction to the QA Managers in the areas of audits, surveillances, quality engineering, inspection and material testing.
([])
~l
- se ni (o2,'90)
SOUTH TEXAS PROJECT ELECTRIC GENERATING STAT!ON E
e Chapter 2.0 7
OPERATIONS QUALITY ASSURANCE PLAN PACE or 4
14
~TFECTIVE PROGRAM DESCRIPTION E
DATE 12-20-91 5.5 QA Program 5.5.1 HL&P has established the Operations QA Program for the operations phase of the STPEGS, which includes testing, operation, maintenance, refueling, inservice inspection, and modification.
The HL&P Nuclear QA Program for the operations phase requires that HL&P, its contractors, subcontractors, and vendors comply with the criteria established by 10CFR Part 50, Section 50.55a; 10CFR Part 50, Appendix A, General Design Criterion (GDC) 1; 10CFR Part 50, Appendix B, and 10CFR Part 71 Sub-Part H.
It is the intent of HL&P to comply, as defined herein, with the applicable American National Standards Institute (ANSI) N45.2 daughter standards, ANSI N18.7, and implementil.g
/N)
Regulatory Guides (RGs) as defined herein and
(-
in Updated Final Safety Analysis Report (UFSAR) i Table 3.12-1.
5.6 Delegation of QA Functions 5.6.1 During normal operations the QA Program will oo i
executed by STPEGS personnel, who may be i
assisted by subcontract personnel.
During refueling, maintenance, and inservice inspection, first-level quality control inspection and nondestructive examination (NDE) activities may be subcontracted.
- However, STPEGS will retain responsibility for the total QA Program, and STPEGS NA personnel will perform audits and surveillance (s) of
+
subcontracted QA activities.
5.6.2 shen first-level quality control inspection and NDE are perforaci by STPEGS personnel, they are qual!fied and certified in accordance with applicable codes, standards, procedures, and other regulations.
Monitoring and surveillance of the quality control and NDE activities shall l
be performed by Operations QA personnel.
O O
stP 724 (02/90) 50UTH TEXAS PROJECT ELECTRIC GENERATING STATION 7
()'
OPERATIONS QUALITY ASSURANCE PLAN Chap 3er_;L,3
~1_
PACE or 5
14 PROGRAM DESCRIPTION EFFECTIVE D*
12-10-91 5.7 Identification of Safety-Related Itema and Servic.s 5.7.1 The STPEGS QA Program described herein is applied to all activities affecting the safety-related functions of those structures, systems, and components which prevent, or mitigate the consequences of postulated accidents that could cause undue risk to the health and safety of the public.
The safety-related structures, systems, and components controlled by the QA Program are listed in UFSAR Section 3.2, along with their associated fire protection systems.
UFSAR Ssction 3.2 also identifies those quality-related structures, systems, and components (in addition to fire protection systems) which are not safety-related but to which the STPEGS Operations QA Program is e'
applied.
(
5.7.N The fire protection QA Program is part of the j
l overn?1 STPEGS Operations QA Program and is there2cre under the management control of QA.
Fire protection QA Program criteria are being implemented as part of the HL&P Operations QA Program, as defined in this OQAP.
5.7.3 Expendable or consumable items necessary for the functional performance of safety-related structures,_ systems, and components are subjected to quality assurance requirements as specified in written procedures.
These procedures include provisions for review and control in accordance with industry standards-and specifications and the safety-related function of the expendable or consumable item.,
l 5.8 Developmen of the QA Program 5.8.1 The Operations QA Program was fully implemented 90 days prior to initial fuel loading.
The QA Program shall be in effect throughout the operating life of the STPEGS.
t a
. STP 7 !4 (07/90)
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION 7
n
. ( )g Chapter 2.0 3
(
OPERATIONS QUALIT" ASSURANCE PLAN 6
OF 14 PAGE PROGRAM DESCRIPTION
$$"*12-20-91 5.9 QA Program Documents 5.9.1 The QA Program shall be implemented with documented instructions, procedures, and drawings which include appropriate quantitative and qualitative acceptance critoria for determini".; ' hat prescribed acti. itles have been satisluctorily accomplished.
Procedures shall include the cont ol of the sequence of required inspections, tests, and other l
operations when important to quality.
To change these controls, tha individual procedure must be changed and shall require the same review and approval given to the original procedure.
Such instructions, procedures, and drawings are reviewed and approved for compliance with requirements appropriate to their safety classification by individuals
}
qualified to do so.
5.9.2 Procedures
]
5.9.2.1 Procedures shall be established to implement and control activities covered by the OQAP other operating, licensing ana -mde requirements.
When more than one department or organization is involved, these procedures provide for the integration of responsibilities and activities to ensure continuity ~of activity between departments or organizations.
5.9.2.2
-Specific departments or organizations g
i shall be designated for the o
preparation and approval of each O
procedure.
Procedures which contain e
requirements for more than one department or organization require a designated procedure coordinator who is responsible for initiating reviev with affected departments or j
organizations and resolution of
. /~}
comments.
Procedures shall be
\\_/
approved by the management of the issuing department, l
7 4
sm 754 (02/90) uwam SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION y
-Q
_Chapicr_22O_
7 OPERATIONS QUALITY ASSURANCE PLAN PACE or 7
PROGRAM DESCRIPTION EF FECTIVE D^E 12-20-91 5.9.2.3 Selected procedures and revisions are reviewed by Nuclear Assurance before their issuance. The reviou attests that these procedures have been reviewed for compliance with the s.
Operations Quality Assurance Program.
O The review is documented and the
?
comments on the current procedure q:
revision will be maintained for Of verification.
5.10 Personnel 7.ndoctrination and training 5.10.1 General indoctrination and training programs shall be prov'.ded for site personnel to assure that they art knowledgeable regarding quality programs and requirements.
The training requirements for STPEGS personnel are described
(~'/
\\
in UFSAR Section 13.2.
Records shall (m-demonstrate compliance with applicable requirements.
Iorsonnel performing complex, unusual, or potentially hazardous work shall be l
instructed in spucial indoctrination or briefing sessions.
Emphasis shall be on special requirements for safety of personnel, radiation control and protection, unique features of equipment'and systems, operating constraints, and control requirements in effect during performance of work.
Where required by codes and standards, personnel are trained, qualified, and certified according to written procedures in the principles and techniques of performing specific activities.
5.10.2 Personnel performing surveillance testing i
activities shall be similarly trained in accordance with written procedures.
5.10.3 Training will be conducted in a time frame adequate to allow personnel to prepare for their job responsibilities and before commencing quality-related work.
Proficiency l
of personnel shall be maintained by retraining, reexamining, and/or recertifying in accordance
(
vith initial requirements and procedures.
i i
i
I
. STP 774 (02/90)
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION if f
_ Chapter 2.0 7
OPERATIONS QUALITY ASSURANCE PLAN g,
8 14 PROGRAM DESCRIPTION trTECmi 12-2D.91 _
5.10.4 In addition to general employee training and indoctrination described above, departmental and interdepartmental procedures provide for training of personnel who perform quality-related work.
These procedures provide for training in the principles and techniques of the activity involved and for maintenance of proficiency of personnel by retraining, re-examining, and/or recortifying to an extent commensurate with the safety significanco of the activity.
The procedures address documentation of:
5.10.4.1 Scope, objectivo, and method of implementing the training program.
5.10.4.2 Documentation of the training g
sessions including attendees, dates, i
and resn s, where appropriate.
5.11 Policies and Goald 5.11.1 It is the policy of HL&P, acting as licenseo and Project Manager for itself and the other owners of the STPEGS, to assure that the design, procurement, construction, testing, and operation of the STPEGS are in conformance with specifications, procedures, codes, and Nuclear Regulatory Commission (NRC) regulations. The responsibility of each organization supporting the STPEGS is to ensure that the requirements i
stated in this QA Program are incorporated into l
procedures. Adherence to those procedures is
-mandatory for all STPEGS organizations and l
contractors or vendors providing items or services covered by the QA Program.
5.11.2 The OQAP identifies activities and establishes I
requirements for procedures which identify, report, and verify the resolution of safety-related quality problems.
The implementing procedures call for the resolution of quality problems at the lowest possible authorized j
{g,)%
level.
However, if a dispute is encountered in the resolution of a quality problem which l
cannot be resolved at lower levels, Nuclear Assurance presents the problem to the Group Vice President, Nuclear, for resolution.
L
e-q t
STP 724 (02/90)
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION ff Chapter 2.0 7
OPERATIONS QUALITY ASSURANCE PLAN y
9 14
-PROGRAM DESCRIPTION EFFECTIVE D^*
12-20-91__
5.12 Control of Activities 5.12.1 The OQAP requires NA review and.'or approval of procedures which control _ selected activities.
These procedures shall require the use of the proper equipment, completion of prerequisites for starting an activity, and suitable environment for performing the activity.
Procedures will comply with the appropriate standards.
5.12.2 STPEGS personnel attend planning, scheduling, and status meetings affecting quality-related activities as necessary to assure' adequate QA coverage and program application exists.
5.13 Management Review 5.13.1 The implementation of the QA Program requirements shall be verified through independent 'and integral control activities.
The QA Organization, under the General Manager, NA, shall conduct audits, surveillances, and inspections of.the-operating plant and of the interfacing organizations' quality-related activities.
5.13.2 The results of the audits, surveillances, and inspection activitics are presented in a periodic report to the Group Vice President, Nuclear.
E.13.3 Assessments of-HL&P's implementation of the-i.
Operations QA Program are conducted under_the cognizance of the Puclear Safety Review Board I
and'results are transmitted to the Group Vice i
President, Nuclear for his review-and/or j
action.
O N
- s e-w
-r w
. sm n4 (02/90)
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION 7
y
(~
_Qhapter 2.0 7
OPERATIONS QUALITY ASSURANCE PLAN 10 14 PROGPAM DESCRIPTION UTECTW D^E 12-20-91 5.13.4 STPEGS may use the services of architect-enginaer firms, Nuclear Steam Supply System (NSSS) suppliers, fuel fabricators, constructors, and others which provide or augment STPEGS offorts during operations.
These organizations are required to work under a QA program to provide control of quality activities consistent with the scope of their assigned work.
The QA programs of such contractors or consultants shall be subject to review, evaluation, and acceptance by QA before initiation of activities affected by the program.
5.14 Operations Quality Assurance Plan Changes 5.14.1 HL&P is committed to maintaining the OQAP as an fN.
effective and meaningful document to provide
(')
programmatic direction on STPEGS.
Changes to the QA Program, as described in the OQAP, will be processed under 10CFR50.54(a).
When changes a e made in the OQAP to the organizational elements only,-appropriato notification will be i
made to the NRC within 30 days of implementation.
5.15 Computer Code Programs e
5.15.1 The_ development, control, and use of computer code programs which affect quality-related items will be controlled by OQAP.
Prior to use i
of a computer code program in a quality-related activity, the 'ppropriateness of the program shall be-verified.
In addition, all such programs shall be appropriately certified for use.
6.0 DOCUMENTATION 6.1 Procedures which are generated aus required by this chapter shall identify the records which are required to implement and document those activities.
The j
records shall be controlled in accordance with Reference 4.4.
6.2 Operations Quality Assurance Plan (OQAP) 1 i
STP 724 (02/90)
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION 7
Chapt _gr 2.0 7
OPERATIONS QUALITY ASSURANCE PLAN g
g 11 14_
PROGRAM DESCRIPTION urtcTwt DAE 12-20-91 7.0 ATTACliMENTS 7.1 Attachment I OQAP - 10CFR50, App. D Matrix o
?
8
(~T v
i i
t I
v
4 STP 724 (02/90)
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION
,"E O
ty Chapter _2.0 7
OPERATIONS QUALITY ASSURANCE PLAN g
l_2 14 PROGRAM DESCRIPTION trFECTIVE DAE 12-20-91 ATTACHMENT I OPERATIONS OUALITY ASSURANCE PLAN CHAPTERS 10 CFR 50 APPENDIX B CRITERIA 1.0 Organization I
2.0 Program Description II 3.0 Conduct of Plant Operations V,
XIV 4.0 Qualification, Training and II, IX Certification of Personnel 5.0 Maintenance, Installation of III, V, VIII, IX Modifications, and Related Activities 6.0 Design and Modification Control III V
7.0 Procurement IV, VIII, X, XIII, XIV, VII 8.0 Control and Issuance of Documents V, VI 9.0 Control of Material VIII, XIII, XIV, VII 10.0 Inspection X
11.0 Test Control XI 12.0 Instrument'and Calibration XII Control t
13.0 Deficiency Control XV, XVI 14.0 Records Control XVII 1
15.0 QA Audit and Surveillance XVIII 16.0 Nuclear Puol Management III, IV, VII, VIII, X,'
XIII, XIV i
- V i
S_TP 724 (02/90)
"" 8" SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION 7
Chapter 2.0 7
j OPERATIONS QUALITY ASSURANCE PLAN p
1_3 14 PROGRAM DESCRIPTION EFTECME DAE 12-LO-91 ATTACHMENT I OPERATION 9 QUALITY ASSURANCE PLAN CHAPTERS 10 CFR 50 APPENDIX B CRITERIA
'17.0 ASME Section XI Repairs and Replacerents 18.0 ASME Section XI Examination and Testing These sections do not address 10 CFR 50 Appendix B criteria, but are included in the OQAP to identify STPEGS Code and ASME Section XI commitments.
v O
STP 7I4 (02/90)
)
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION
\\
7-
\\ j Chapter 2.0 7
OPERATIONS QUALITY ASSURANCE PLAN PACE Of 14 14 i
PROGRAM DESCRIPTION EFFECTIVE D*E 12.-20-91 ATTACHMENT II DELETE THIS ATTACHMENT IN ITS ENTIRETY D(V l
l NoO t
T I
! A I ' !s,_.)
.