t STP 724 (02/90)

. SOUTH TEXAG~ PROJECT ELECTRIC GENERATING STATION wwata p

_ Chapter._L 0 7 OPERATIONS QUALITY = ASSURANCE PLAN pact ' or - _ .

14_

PROGRAM DESCRIPTION EFRCDW DATE 12-2D _

1.0 EERoOSE 1.1 The purpose of this chapter is_to' define criteria and establish administrative controls'for: implementation of-the Operations' Quality Assurance Program for the South Texas Project Electric Generating Station (STPEGS).-

2.0 SQOPE l

2.1 The Operations Quality Assurance Program is applicable to safety related material, equipment, services and-activities' described in-10CFR50,_ Appendix B; ~ 10CFR71,.

Subpart H (except design and fabrication'of NRC certified radioactive waste shipping casks);- ASME:

Boiler and Pressure Vessel Code, Sections III and-X';'

and quality related araas as defined _by STPEGS '

management in this Operations-Quality Assurance Plan (OQAP)_or other program = documents or procedures' .

Quality-related areas include the Fire: Protection Program, Emergency Plan, RadiologicalLEnvironmental Monitoring Program, Radwaste Management! Program, Computer Program--Verification;and Control, Physical Security Program, Seismic and Environmental: Equipment 'Q R o

Qualification Programs, Radiation Protection-Program, o and Station Blackout (SBO) systems and equipment ,

3.O DLEEIRITl.Q1LS

7. 1 None 4.0 RKEERENCES-4.1 10CFR50,-Appendix B 4.2 10CFR71, Subpart?H' 4.3' ASME B&PV Code-4,4 OQAP Chapter-14.0, Records Control:

lQ

,o 4.5 13CFR50163, Loss-of All Alternating Current Power. O- 4 i-c -.

~O 9211180066 921110 PDR-' ADOCK 05000498 P PDR

g ., q

+

1STP 734 (02/90)

. SOUTH TEXAS PROJECT ELECTRIC GENERATING: STATION *8* 7of ,

Chapter 2.0. 7

  • OPERATIONS. QUALITY ASSURANCE, PLAN.

PAGE 2 . OF - 14

- PROGRAM DESCR'PTION trrccTivt .

DAE 12-20-91.

?

5.0 REQUIREMENTS 5.1 The Operations Quality Assurance Program consists of various documents which identify and provide the -

mechanism for verifying implementation of commitments,- q requirements, and actions'necessary to attain quality- ,

assurance objectives.

5.2 The OQAP.is_ prepared to implement the STPEGS Operations Ouality Assurance Program. -

5.2.1 The OQAP provides policies to_be implemented for the JTPEGS. The OQAP also assigns ,

responsibilities necessary'for the attainment 6

of quality assurance objectives and the

. verification of conformance toLestablished requirements.

5.2.2 Attachment-I provides a matrix of.10CFR50, Appendix B critoria toLthe OQAP chapters.-

L 5.3 Establiching Policies and-Goals' L

5.3.1 QA policies and. goals for STPEGS_are defined'in' '

- the-OQAP. The Group Vice President, Nuclear:

has_overall responsibility.forHquality.

E assurance.

f-l 5.3.2 The' General Manager, Nuclear'-Assurance, is '

responsible-for the development of the Quality -

- Assurance (QA) Program.- The minimum-requirements established.for this position are: . ,

5.3.2.1- A bachelorsidegree in science orL

engineering, or an equivalent

- combination of education and -

L experience.

5.3.2.2 Five years experience in th's management-of. quality assurance.-

Fifteen yearsiexperience.in industry

. quality assurance: standards, and.

- federal and state; regulatory; requirements.

1

.r 1 y m,w '-

A. ,

STP 734-(03/90)  !

. SOUTH,TEXA$ PROJECT ELECTHIC GENERATING STATION ""

~

i 7of '

ChapterL2.02 7 OPERATIONS ~ QUALITY ASSURANCE-PLAN-PAGE 3 OF '14i PROGRAM DESCRIPTION ErrECTIVE - _

20 =~

DATE- ,

5.3.2 3 Familiarity with nuclear power: . .

generation facilities and the related' ~;

operations.

5.3.2.4 Knowledge of the' industry's. quality?

~

assurance standards and regulatory- ,

requirements.

5.3.2.5 Management experience and familiarity With HL&P corporate organizations.:

5.3.3 Procedures and revisions which control quality--

related work programs and activities,_ performed ,

by-STPEGS organizations described;in-Chapter 1.0 are reviewed by QA as defined in this chapter.

5.4 Organizational Independence 5.4.1 The reporting arrangementfutilizediby.the NA Department ensures!that-those-personnel charged,

-with responsibility forLverifying: compliance ,

with:QA Program requirements have the organizational-freedom-:to ,

5.4.l.1 Identify quality problems.-

~

5.4.1.2 Initiate, recommend,,or provide- '

solutions'.

5.4.1.3 Verify ^ implementation ofisolutions. ,

The reporting arrangement,1as-_ illustrated on!

~

5.4.2 g _ Attachment 1I, _.of ; Chapter: 1. 0, is:cuch that

~

K personnel responsible.for verifying compliance 1 with: quality. requirements do.not-have' direct: _

responsibility forithe-performance ofnthatL vork.

The General: Manager,-NAF provides'technicalfand:-

^

5.4.3 n.;

administrative direction _to..the-!QA Managers in :o;

.theA (eas of. audits, surveillances,-EQA Revie[ws,

~

0

inspection , and materialltesting-- g..

qs.

p l-I o .

k

-5 p

12 l

- T*
( - STP 724 (03/90):

SOUTH TEXAG PROJECT ELECTRIC GENERATING STATION E Chapter 2.0- 7-W OPERATIONS QUALITY ASSURANCE PLAN PAGE 4 0F. 14 PROGRAM' DESCRIPTION EFTECTIVE .

DAE 20-91~

5.5 QA Program 5.5.1 EL&P has established the Operations QA Program for the operations phase.of.the STPEGS,twhich; includes-testing, operation, maintenance, refueling, inservice inspection, and modification.- The HL&P Nuclear QA Program for.

the operations phase requires that HL&P,- its -j contractors, subcontractors, and vendors. comply '

with the crite-ia established by 10CFR:Part:50, Section'50.55ai 10CFR'Part 50, Appendix-A,.

General Design Criterion (GDC) 1, 10CFR Part 50, Appendix B, and 10CFR Part 71 Sub-Part:H..

It is the intent of HL&P to comply,fas defined ,

herein, with the applicable American-National:

Standards Institute (ANSI) N45.2' daughter-standards, ANSI N18.7, and implementing.

Regulatory Guides'(RGs)!as defined herein and- t in Updated Final Safety l Analysis Reportg(UFSAR). H Table 3.12-1.

5.6 Delegation of QA'Punctions

~

5.6.1 During. normal operations the QA Program will be executed by STPEGS personnel,1: who may be-assisted by subcontract. personnel.1 During- '

. refueling,1mainte.;ance,cand inservice- '

i inspection, first-leval'qualityccontrol inspection'and.' nondestructive; examination 1(NDE)L activitieb may!be.subcontractedF However,. . el STPEGS will retain responsibilityyfor'the total-QA Program,{and STPEGS NA personnel 1Will perform audits and surveillance (s)'of subcontracted QA-activities.

j

-When first-level qual /ty control'inspectionLand{

5.6.2 N NDE are performed:by-STPEGS: personnel,vthey;are qualified 1and-' certified'in'accordance'with -

applicableLeodes, standards, procedures, and other. regulations. Monitoring 1and surveillance" of the e quality control'and:NDE'activitiesishalli be performed'by Operations QA personnel.

).

__ . _ , - . _ _-. ,< , , , , . , ~4 - , . ,

C L STP .724 (02/90) -  ;

. SOUTH TEXAS PROJECT ELECTRIC GENERATING STATlON E' Chapter 2.0- 7=

OPERATIONS-QUALITY ASSURANCE PLAN-PAGE 5 ' F . PROGRAM: DESCRIPTION ErFECTIVE DAE - 12-20-91

+

5.7 Identification of. Safety-Related Items and Services:- .

5.7.1 The STPEGS QA Program described herein is applied _to all activities affecting the s fety-related functions of those structures,- systems, and components which prevent,-or mitigate the consequences of postulated accidents that could cause undue risk to the health and safety of the public. The safety-related structures,__ .

systems, and components controlled;by the QA-Program ~are listed in UFSAR Section~3.2, hlong-with their associated fire protection systems.

UFSAR Section 3.2.also identifies those:

quality-related structures, systems,_and components l(in addition.to fire protection.

systems) which are not safety-related but:to which'the STPEGS Operations'QA' Program-is

  • applied.

5.7.2 The fire protection QA Program is.partLof.the overall STPEGS Operations QA" Program and is therefore-under the management. control >of-QA.

Fire protection-QA Program criteria are'being' implemented as part of the.HL&P Operations QA- ,

Program, as defined in'this OQAP._

5.7.3 Expendable or consumable' items necessary,for- .

the functional performance:of safety-related-structures,' systems, and components C a subjected to qualityfassurance requirements;as specified in written procedures.~ These procedures include provisions for review and ,

control in'accordance with industry-standardsL and. specifications ~and;the-safety-related function ofLthe expendableLor.consumablelitem. ,

5.8 Development-of'the QA Program; t

^

5.8.1 The Operations QA Program was:fullyfimplemented 90 days prior _totinitial fuelsloading.- The QA Program shall be=in effect throughout.the operating life:of the STPEGS.

Y w- ~

..e -. v.

% , a

+ Esw n4 (ca/so)-- 1

. SOUTH . TEXAS PROJECT ELECTRIC GENERATING STATION wusm p ~

J Chapter'2.0 7-OPERATIONS. QUALITY ASSURANCE PIAN PAGE 6 E 14 PROGRAM' DESCRIPTION ~- trrccTivt DNE 12-20-91 5.9 QA Program Documents 5.9.1 The QA Progran shall be implemented with documented instructions, procedures, .and! . .

drawings which include appropriate quantitative and qualitative acceptance criteria for determining that prescribed activities have been satisfactorily accomplished. . Procedures shall include the control of the sequence-of required inspections, tests,'and other operations when important to quality. To

- change these controls, the individual 1 procedure must be changed.and shall require the same review and approval given to the original procedure.. Such instructions,! procedures, and' u drawings are reviewed.andLapproved.for compliance with requirements appropriate to- '

their safety classification by-individuals qualified to do so.

5.9.2 Procedures i 5.9.2.1 . Procedures shall be-established to implement ~and control activities covered by the'OQAP other operating, licensing and code requirements.

When more than;one.departmentLor organization is involved, these-procedures provide for the

. integration offrespons~ibilities and activities-to: ensure continuity of:

activity between departments 1or organizations.  ;

g; l: 5.9.2.2 Specific departments or1 organizations no shall be. designated <forithe- 0-preparation and approvaliof'each f' H

procedure. _ Procedures whichucontain' requirements for'more than.one fff- -

i department or organization: require a l designated'procedurefcoordinator who L is. responsible.forfinitiating review.

with affected; departments' ort b' organizations:and resolutionfof L --- comments.- Procedures: shallThe .

approved by the managementcof the issuingLdepartment.

L l- .

SP 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION Chapter 2.0 E

7 OPERATIONS QUALITY ASSURANCE PLAN PAM 7 W 14 PROGRAM DESCRIPTION EFFECUVE --

DAE 12-20-91 5.9.2.3 Selected procedures and revisions are reviewed by Nuclear Assurance before their issuance. The review attosts that these procedures =have been 7 reviewed for compliance with the o Operations Quality Assurance Program. O The review is documented and the '

comments on the current procedure [$

revision will be maintained for verification.

5.10 Personnci ."ndoctrination and Training 5.10.1 Gen..tal indoctrination and training programs shall be provided for site personnel to assure that they are knowledgeable regarding quality programs and requirements. The training requiroments for STPEGS personnel are described in UFSAR Section 13.2. Records shall demonstrate compliance with applicable requirements. Personnel performing complex, unusual, or potentially hazardous work shall be instructed in special indoctrination or briefing sessions. Emphasis shall be on special requirements for safety _of personnel,_

radiation control and protection, unique features of equipment and systems, operating constraints, and control requirements in effect during performance of work. Where required by codes and standards, personnel-are trained, qualified, and certified according to written procedures-in the principles and techniques of performing specific activities.--

5.10.2 Personnel performing surveillance testing activities shall be similarly trained in accordance with written-procedures.

5.10.3 Training will be conducted in a time frame adequate to allow personnel to prepare for their job responsibilities and before commencing quality-related work. Proficiency of personnel shall be_ maintained by retraining, reexamining, and/or recertifying in accordance-with initial requirements and procedures.

pm

=

$TP 724 (03/90)'--

SOUTH TE;...J! PROJECT ELECTRIC GENERATING STATION " " -

i 7

Chapter 2'.0 1 7

, OPERATIONS QUALITY ASSURANCE: PLAN ~

PACC . . g .

OF El 14 .-

PROGRAM DESCRIPTION'- trFECTIVE dan :- 12-20-91~

5.10.4- In addition to general employee training and -

indoctrination described.above, departmentalc and interdepartmental procedures provide 1for training of-personnel-who perform; quality-related work. These procedures provide for-training-in the principles and techniques of the activity involv d and for maintenance of?

proficiency of personnel.by retraining, re-examining, and/or recertifying to an extent. '

commensurate with the' safety significanceLof the activity. The procedures address-documentation of:

5.10.4.1 Scope, objective, and method of ,

implementing the training program.:

5.10.4.2 Documentatica of1the: training -

sessions including-attendees, dates, '

and results,_where1 appropriate.-

5.11 Policies and Goals-5.11.1 It is the policy of HL&P, acting asilicensee and Project Manager for itself and-theLother'

-ownors_of_the STPEGS, to assure thatithe-design, procurement, construction, testing, and- ,

operation >of ths;STPEGS are in conformance;with

specifications,. procedures, codes,'andTNuclear-Regulatory Commission . (NRC) regulations. The .

-responsibility of.each organization-supporting the STPEGS'is toLensure that1the requirements-stated'in1 his QA. Program-areLincorporated;into' >

-procedures.~ Adherence to.those proceduresLis: +

mcndatory for all STPE"-S ; organizations and '

contractorc"or vendora providing itemsLorf services coveredJby the-QA: Program.

5.11.2 The OQAP identifies-activities"andLestablishes' requirements for procedures-whichLidentify, report,.and~verifyithenresolutionEof. safety -

related quality problems. . The~.itplementing),

procedures: call?for the---resolution'ofLquality.

problems'at thel lowest possiblefauthorized level. -However, if a~ dispute is encounterei in the resolution of -a quality:-problem whichi L cannot be resolved at lower levels, Nuclear L Assurance presents the problem to the Group:.

E -Vice President, Nuclear,1for resolution.

STP 724 (02/90)

. SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION 7 Chapter 2.0 7

~ ~ -

OPERATIONS QUALITY ASSURANCE PLAN PAZ g OF 14 PROGRAM DESCRIPTION- Errtcuvt DATE 12-20-91 5.12 Control of Activities 5.12.1 The OQAP requires NA review and/or approval of procedures which control selected activities.

These procedures shall require the use of the.

proper equipment, completion of prerequisites '

for starting an activity, and suitable environment for performing the ectivity.

Procedures will comply with the appropriate standards.

5.12.2 STPEGS personnel attend planning, scheduling, and status meetings affecting quality-related activities as necessary to assure adequate QA coverage and program application exists.

5.13 Management Review 5.13.1 The implementation of the QA Program requirements shall be verified through independent and integral control activities.

The QA Organization, under the General Manager, NA, shall conduct audits, surveillances, and inspections of the operating plant and of the -

interfacing organizations' quality-related activities.

5.13.2 The results of the audits, surveillances, and inspection activities are presented in a i periodic report to the Group Vice President, Nuclear.

5.13.3 Assessments of HL&P's implementation of the Operations QA Program are conducted under the  ;

cognizance of the Nuclear Safety Review Board and results are transmitted to the Group Vice President, Nuclear for his review and/or action.

~1

o ,

STP 724 (02s 4[_ l

'UTH TEXAS PROJECT ELECTRIC GENERATING STATION 7 Chapter 2.0 7 OPERATIONS QUALITY ASSURANCE PLAN PM;E lo 0F 14 PROGRAM DESCRIPTION trrtcTwt DAR 12-20-91 5.13.4 SIPEGS may use the services of architect-engineer firms, Nuclear Steam Supply System (NSSS) suppliers, fuel fabricators, constructors, and others which provide or augment STPEGS offorts during operations.

These organizations are required to work under a QA program to provide control of quality activities consistent with the scope of their assigned work. The QA programs of such contractors or consultants shall be subject to review, evaluation, and acceptance by OA before initiation of activities affecte? by the progren.

5.14 operations Quality Assurance Plan Changes 5.14.1 HL&P is committed to maintaining the OQAP as an offective and meaningful document to provida programmatic direction on STPEGS. Changes to the QA Program, as described in the OQAP, will be processed under 10CFR50.54(a). When changes are made in the OQAP to the organizational elements only, appropriate notification will be made to the NRC within 30 days of implementation.

D.15 Cornuter Code Programs 5.15.1 The development, control, and use o' computer code programs which= affect quality.ealated items will be controlled by OQAP. Prior to use of a computer code program in a quality-related activity, the appropriateness of the program shall be verified. In addition, al) Jach programs shal] be appropriately certified for use.

6.O ng_QLiliEXTl'RQlf 6.1 Proce.furos which are generated as required by this .

chapter shall. identify the records which are required to-implement and document those activities. The records shall be controlled in ac;ordance with Reference 4.4.

( 2 Operations - Quality Assuranca Plan (OQAP) o

STP 724 (02/90) ___

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION ff[

Chapter 2.0 7 OPERATIO!!S QUALITY ASSURANCE PLA!I PACE 11 W 14 PROL td4 DESCRIPTION Urtctnt DATE 12-20-91 7.0 ATIACHL48RTH 7.1 Attachment I OQAP - 10CFP50, App. B Matrix $0 e

T O _

Y I~

l sip 724 (02/eo) f** **

i

~

. SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION 7 Chapter 2.0 7 OPERATIONS QUALITY ASS 1'SANCE PLAN OF y4 PM3C 12 PROGRAM DESCRIPTION UTECTIVE '

DAls 12-20-91_

i ATTACHMENT I QPIRATIQl!S QUALITY ASSURANCE PLtJL_CERTIRS _10 CFR 50 APPEllDIX B CRITEE5 1.0 ?rganization I 2.0 Program Description II 3.0 Concuc'. o1' Plant Operations V, XIV 4.0 Qualification, Training and II, IX Certification of Personnel 5.0 Maintenance, Installation of III, V, VIII, IX Modifications, and Related l Activities 6.0 Design and Modification Control III 7.0 Procurement IV VIII, X, XIII, XIV, VII 8.0 Control and Issuance of Documents V, VI 9.0 Control of Matorial VIII, XIII, XIV, VII 10.0 Inspection X 11.0 Test Control XI 12.0 Instrument and Calibration XII control 13.0 Deficiency Control XV, XVI 14.0 Records Control XVII 15.0 QA Audit and Surveillance XVIII 16.0 Nuclear Fuel Management III, IV, VII, VIII, X, XIII, XIV i

, ~ ., -

sip 72o (os/so) I

. SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION TI Chapter 2.0 7 OPERATIONS QUALITY ASSURANCE PLAN PAGE 13 " 14 PROGRAM DESCRIPTION TiitcTin DATE 12-20-91 ATTACHMENT I QZEEATlQUE QUALITY ASE1@ alice PIII1 CHAPTIES 10 CFR 50 APPENDIX B CRITERIA 17.0 ASME Section XI Repairs end

  • and Testing ,

c Those sections do not address .1.0 CFR 50 Appendix B critoria, but' are included in the OQAP to identify STPEGS Codo and ASME Secticn XI commitments.

l l

STP 724 (07/90)_ _

. SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION $7-Chapter 2.0 */

OPERATIONS QUAL'ITY ASSURANCE PLAN PAGE 14 W }4 PROGRAM DESCRIPTION u rEcTwE DATE 12-20-91 ATTACHMENT II DELETE THIS ATTACHMENT o IN ITS ENTIRETY O e