.. ,_ _ _ . _ . . __ . .

J.. ., a7

. 4 ..

STP 724 (02/90)

"# 8'"

SOUTH. TEXAS PROJECT ELECTRIC-GENERATING STATION 7 Chapter 9.0 5 OPERATIONS QUALITY ASSURANCE PLAN PAGE y&- 4 ,

-CONTROL OF MATERIAL un:cnw i DAE 12-20-91 1.0 PURPOSE 1.1 The purpose of this chapter is to describe requirements and assign responsibility for control of material at the-South Texas Project Electric Generating Station (STPEGS).

2.0 EgqEE 2.1 This chapter applies to identification, control and traceability of material, parts and components during .

receipt, storage, handling, issuance, installation and

, shipping activities.

3.0 DEFINITIORE

'3.1 None '

4.0 REFERENCES

4.1 ANSI N45.2.2/ Reg. Guide 1.38, Packaging, Shipping, Receiving, Storage and Handling of Items for Nuclear' .

, Power Plants .

4.2 ANSI N45.2.3/ Reg. Guide.l.39,-Housekeeping During the

. Construction-Phase of Nuclear Power Plants 4.3 OQAP Chapter 4.0, Qualification, Training and certification of Personnel

.4.4 !OQAP' Chapter 7.0, Procurement 4.5, OQAP Chapter 14.0, Records Control L, 5.0 .REOUIREMENTS l

I 5.1 Quulity-related material, equipment, and components shall be handled, stored, shipped, cleaned, and preserved.to assure that the quality of items is u

-maintained:from fabrication through-installation.

S.2 Identification and Traceability Requirements L 5.2.1 Physical identification of material (including l consumables), parts and components shall be used

! whenever possible or practical and

[ identification shall be traceable to the tw 911213 g

.bR'^a0169hDOCK0300'{8 r

.3 K c.;

I s1P 724 (02/90)-

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION E Chapter 9.0 5 OPERATIONS QUALITY ASSURANCE PLAN PMX &

2 4 CONTROL OF MATERIAL trrE0mi DAE 12-20-91 appropriate documentation such as drawings, specifications, purchase orders, manufacturing and inspection documents, deviation reports, and physical and chemical test reports.

5.2.2 Identification marking requirements include:

5.2.2.1 Where physical identification marking is used, the marking shall be clear, unambiguous and indelible and shall be applied in such a manner as not to affect the function of the iter.

5.2.2.2 Markings shall be trensferred to each part of an item whenever possible or practical when subdivided and shall not be hiddon or obliterated by surface treatment or coatings unless other rsans of identification are substituted (a.g., color coding).

5.2.2.3 Procedures'shall specify that identification be maintained, either-on-the item or on records traceable to the item,-and verified as required throughout fabrication, erection, installation, and use of the item. The ~

identification must be verified and-documented prior to release for fabrication, erection, installation and/or use of the item.

5.3 Material-Storage 5.3.1 Measures shall be established for the control of items in storage which include: storage location, storage levels, procedures which require periodic surveillance of stored items to

. verify specific protective environmental requirements, inspection results, item care and protective measures, personnel access to storage areas, and material issues.- Control of items in n storage shall comply with the intent of the requirements of Reference 4.1. Storage l84 conditions commensurate with the safety O classification of the materials will be maintained.

1

STP 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION mam p Chapter 9.0 5 OPERATIONS QUALITY ASSURANCE PLAN PAGE 0' 3 4 CONTROL OF MATERIAL EFFECTIVE DAR 12-20-91 5.3.2 Procedures shall be developed for storage of chemicals, reagents, lubricants, and othat consumable materials which will be used in conjunction with quality-related systems. Items having limited shelf or operating life shall be identified and controlled to preclude the use of expired items.

5.4 Material Handling 5.4.1 Procedures shall be developed for handling of items which, because of weight, size, rusceptibility to shock damage or other conditions, require special handling.

5.4.2 Maasures shall be established to rate and inspect hoisting and handling equipment in accordance with Reference 4.1.

5.5 Shipping 5.5.1 Measures shall be' established for the packaging, loading and transportation of itens off-site in accordance with Reference 4.1.

5.6 Housekeeping 5.6.1 Measures shall be established for housekeeping activities in the warehouse areas which include:

zone designation, environment control, work area cleanliness, fire protection, inspection, and surveillance. These measures shall meet the requirementa of Reference 4.2.

5.7 Personnel performing handling, preservation, storage, cleaning, packaging, shipping, and inspection to the requirements of this chapter shall be trained and qualified per Reference 4.3.

g :,,- _,N 4 6

rTP 724 (02/90)

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION $!-

Chapter 9.0- 5 OPERATIONS QUALITY ASSURAN; PLAN pyg 7-CONTROL OF MATERIAL EFTECME i DATE 12-20-91 1 6.0 DOCUMENTATION I 6.1 Procedures which are generated as required by this chapter shall identify the records which are required to implement and document those activities. The records shall be controlled in accordance with Reference 4.5.

7.0 -ATTACHMEHT1 7.1 None

+