Revised Operations QA Plan, Incorporating Change Notice QA-009 for Rev 9 to Table of Contents,Rev 5 to Chapter 1.0, Page 8 & Rev 7 to Chapter 2.0,page 3ML20101F956 |
Person / Time |
---|
Site: |
South Texas |
---|
Issue date: |
06/05/1992 |
---|
From: |
HOUSTON LIGHTING & POWER CO. |
---|
To: |
|
---|
References |
---|
NUDOCS 9206250224 |
Download: ML20101F956 (5) |
|
|
---|
Category:QUALITY ASSURANCE PROGRAM
MONTHYEARML20210D4491999-07-21021 July 1999 Revised Chapters to Operations QA Plan, Including Rev 9 to Chapter 1.0, Organization & Rev 6 to Chapter 16.0, Independent Technical Review ML20196A2391999-06-15015 June 1999 Change QA-042 to Rev 13 of Operations QAP, Reflecting Current Organizational Alignment for South Texas Project & Culminating Organizational Realigment That Has Been Taking Place During Past Several Months ML20205H0321999-03-31031 March 1999 Change QA-040 to Rev 13 of Operations QA Plan ML20207D1101999-02-24024 February 1999 Change QA-039 to Rev 13 of Operations QA Plan, for STP ML20206G8451998-02-0101 February 1998 Rev 13 to Operations QA Plan ML20198A1711998-02-0101 February 1998 Change QA-038 to Rev 13 of Operations QA Plan, for South Texas Project Electric Generating Station ML20154G0741998-02-0101 February 1998 Change QA-037 to Rev 13 of STP Electric Generating Station Operations QA Plan ML20199D9481998-01-28028 January 1998 Change 034 to Rev 13 to STP Electric Generating Station Operations QA Plan ML20202C9951998-01-22022 January 1998 Change QA-034 to Rev 13 of Operations QA Plan, Resubmitted on 980128.Submittal Inadvertently Contained Marked Up Pages ML20148K8151997-06-10010 June 1997 Change QA-032 to Rev 13, Operations QA Plan ML20141K9741997-05-22022 May 1997 Finalized Graded QA Program Operations QA Plan ML20148C9461997-05-20020 May 1997 Rev 1 to 0PGP01-ZA-0304, Probabilistic Safety Assessment Risk Ranking ML20148C9401997-01-0202 January 1997 Rev 2 to 0PGP02-ZA-0003, Comprehensive Risk Mgt ML20101H9301996-03-27027 March 1996 Revised STP Electric Generating Station Operations QA Plan ML20084B1581995-05-25025 May 1995 Change QA-025 to Operations QA Plan ML20078H2921995-01-31031 January 1995 Change QA-024 to Operations QA Plan ML20113C6381994-12-30030 December 1994 Change QA-029 to Rev 11 to Operations QA Plan ML20080D0811994-12-30030 December 1994 Rev 11 to Operations QA Plan ML20095E8971994-12-30030 December 1994 Change QA-026 to Rev 4 to Operations QA Plan Control & Issuance of Documents ML20097D3591994-12-30030 December 1994 Rev 9 to Chapter 2.0, Operations QA Plan,Program Description ML20101R1181994-12-30030 December 1994 Change QA-027 to Operations QA Plan ML20097D3641994-12-30030 December 1994 Rev 6 to Chapter 7.0, Operations QA Plan,Procurement ML20076M4741994-11-0303 November 1994 Change QA-023 to Operations QA Plan ML20071H7711994-07-12012 July 1994 Change QA-022 to Operations QA Plan ML20070F2971994-07-12012 July 1994 Rev 10 to Operations QA Plan ML20069H3961994-06-0707 June 1994 Change QA-021 to Operations QA Plan ML20064G1591994-03-0303 March 1994 Operations QA Plan Change QA-018,consisting of Rev 10 to Table of Contents,Rev 5 to Chapter 13.0 & Rev 4 to Chapter 15.0 ML20045H1741993-07-0606 July 1993 Change QA-016 to Rev 6 of Operations QA Plan, Adding Position VP Nuclear Plant Support W/Responsibility for Nuclear Training & Emergency Preparedness to Chapter 1, Organization. ML20044F1531993-05-13013 May 1993 Revised QA Plan,Consisting of Rev 10 to Table of Contents, Change QA-015 to Rev 6 to Chapter 1.0,Change QA-013 to Rev 8 to Chapter 2.0,Change QA-014 to Rev 5 to Chapter 7.0 & Change QA-015 to Rev 4 to Chapter 16.0 ML20097H7831992-12-18018 December 1992 Rev 6 to Chapter 6.0, Operations QA Plan Design & Modification Control ML20126H5581992-12-18018 December 1992 Rev 6 to Chapter 1.0, Operations QA Plan Organization ML20126H5661992-12-18018 December 1992 Rev 8 to Chapter 2.0, Operations QA Plan Program Description ML20126H5471992-12-16016 December 1992 Rev 10 to Operations QA Plan ML20126B5461992-12-16016 December 1992 Rev 10 to Operations QA Plan ML20126A6741992-12-0707 December 1992 Updated Operations QA Plan Table of Contents ML20125A7951992-12-0101 December 1992 Rev 5 to Operations QA Plan Design & Modification Control ML20125D3931992-11-10010 November 1992 Revised QA Plan for South Texas Project ML20116K8781992-11-10010 November 1992 Rev 7 to Chapter 2.0 of Operations QA Plan Program Description, Consisting of Change QA-005 ML20101U8341992-07-16016 July 1992 Revised QA Plan,Consisting of Change QA-010,Rev 5 to Chapter 1.0 & Rev 9 to Table of Contents ML20101F9561992-06-0505 June 1992 Revised Operations QA Plan, Incorporating Change Notice QA-009 for Rev 9 to Table of Contents,Rev 5 to Chapter 1.0, Page 8 & Rev 7 to Chapter 2.0,page 3 ML20098D4731992-04-24024 April 1992 Revised QA Plan,Consisting of Changes QA-006 & QA-008 to Rev 5 to Chapter 1.0 & Change QA-007 to Rev 7 to Chapter 2.0 ML20091A0331992-03-17017 March 1992 Rev 9 to Chapter 2.0 of QA Program for South Texas Project Electric Generating Station.Marked-up Rev 7 Encl ML20091P4661992-01-24024 January 1992 Replacement Insert for Rev 4 to Chapter 16.0, Operations QA Plan Nuclear Fuel Mgt ML20091M6581992-01-15015 January 1992 Change QA-004 to Rev 9 to Operations QA Plan, Chapter 1.0 Entitled, Organization, Reflecting Establishment of Nuclear Engineering Dept & Defining Manager,Nuclear Engineering Responsibilities ML20094D3221991-12-20020 December 1991 Rev 5 to Chapter 13.0 of Operations QA Plan,Deficiency Control ML20091J8481991-12-20020 December 1991 Operations QA Plan Program for South Texas Station, W/Revs ML20091K5321991-12-20020 December 1991 QA Plan Change Notice QA-004 to Rev 9 of Operations QA Plan ML20094D3031991-12-20020 December 1991 Rev 7 to Chapter 2.0 of Operations QA Plan,Program Description ML20094D3091991-12-20020 December 1991 Rev 6 to Chapter 3.0 of Operations QA Plan,Conduct of Plant Operations ML20094D3181991-12-20020 December 1991 Rev 5 to Chapter 9.0 of Operations QA Plan,Control of Matl 1999-07-21
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K9441999-10-15015 October 1999 SER Accepting Util Alternative Proposed Relief Request RR-ENG-2-4 for Second 10-year ISI Interval at Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) ML20217K9151999-10-15015 October 1999 SER Authorizing Util Relief Request RR-ENG-2-3 for Second 10-year ISI Interval of Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) NOC-AE-000676, Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With ML20217D0531999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20217D0481999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 Colr ML20211P8411999-09-0909 September 1999 Safety Evaluation Supporting Alternative Proposed by Licensee to Surface Exam to Perform Boroscopic VT-1 Visual Exam of Pump Casing Welds within Pump Pits for Welds Covered by Relief Request RR-ENG-24 ML20211P7811999-09-0909 September 1999 SER Approving Second 10-year Interval Inservice Insp Program Plan Relief Request RR-ENG-2-8 (to Use Code Case N-491-2) for South Texas Project,Units 1 & 2 ML20211Q6731999-09-0909 September 1999 Safety Evaluation Accepting First 10-yr Interval ISI Program Plan Request for Relief from ASME Code Case N-498 NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With ML20212E5191999-08-31031 August 1999 Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment ML20211F4531999-08-24024 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative to Defer Partial First Period Exams of flange-to-shell Weld to Third Period & Perform Required Ultrasonic Exams,Both Manual & Automated,During Third Period ML20211F5111999-08-23023 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative Contained in Request for Relief RR-ENG-30 ML20210C9411999-07-31031 July 1999 Rev 1 to SG-99-07-002, South Tx,Unit 1 Cycle 9 Voltage- Based Repair Criteria 90-Day Rept, Jul 1999 ML20210R3631999-07-31031 July 1999 Monthly Operating Repts for July 1999 for South Tx Project, Units 1 & 2.With ML20210D9161999-07-23023 July 1999 Safety Evaluation Accepting Inservice Testing Relief Request RR-56 Re Component Cooling Water & Safety Injection Sys Containment Isolation Check Valve Closure Test Frequency ML20210D4821999-07-21021 July 1999 1RE08 ISI Summary Rept for Steam Generator Tubing of South Texas Project Electric Generating Station Unit 1 ML20210D4491999-07-21021 July 1999 Revised Chapters to Operations QA Plan, Including Rev 9 to Chapter 1.0, Organization & Rev 6 to Chapter 16.0, Independent Technical Review NOC-AE-000583, LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With1999-07-15015 July 1999 LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With ML20207H6361999-07-0808 July 1999 Safety Evaluation Approving 2nd 10 Yr Interval ISI Program Plan Request to Use ASME Section XI Code Case N-546 for Licenses NPF-76 & NPF-80,respectively ML20216D7481999-07-0707 July 1999 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1 NOC-AE-000593, Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with NOC-AE-000570, LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With1999-06-28028 June 1999 LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With ML20196G5821999-06-23023 June 1999 LER 99-S02-00:on 990601,failure to Maintain Positive Control of Vital Area Security Key Was Noted.Caused by Lack of Attention to Detail.Discussed Event with Operator Involved IAW Constructive Discipline Program ML20195J6871999-06-17017 June 1999 Safety Evaluation Supporting Proposed Alternative Contained in RR-ENG-2-5.Proposed Alternative Authorized Per 10CFR50.55a(a)(3)(i) for 2nd ISI Interval ML20196A2391999-06-15015 June 1999 Change QA-042 to Rev 13 of Operations QAP, Reflecting Current Organizational Alignment for South Texas Project & Culminating Organizational Realigment That Has Been Taking Place During Past Several Months NOC-AE-000563, Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with ML20206U5411999-05-18018 May 1999 Non-proprietary Errata Pages for Rev 2,Addendum 1 to WCAP-13699, Laser Welded Sleeves for 3/4 Inch Diamete Tube Feedring Type & W Preheater SGs Generic Sleeving Rept ML20206A7721999-04-30030 April 1999 STP Electric Generating Station Unit 1 Cycle 9 Colr NOC-AE-000543, Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with ML20205H0321999-03-31031 March 1999 Change QA-040 to Rev 13 of Operations QA Plan NOC-AE-000507, Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with ML20205A3781999-03-22022 March 1999 STP Electric Generating Station Simulator Certification Four Yr Rept for Units 1 & 2 ML20204B2711999-03-15015 March 1999 Safety Evaluation Authorizing 990201 Request to Authorize Alternative to Regulations Per 10CFR50.55a(a)(3)(i) That Would Revise Start of Second 120-month IST Interval to No Later than 011201 ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results NOC-AE-000468, Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With ML20207D1101999-02-24024 February 1999 Change QA-039 to Rev 13 of Operations QA Plan, for STP ML20203H8361999-02-17017 February 1999 Safety Evaluation Supporting Request for Relief from ASME Code Requirements for Class 3 Piping for Plant ML20202H9621999-02-0303 February 1999 SER Accepting Change to EALs Used in Classification of Emergency Conditions ML20202E8471999-01-31031 January 1999 2RE06 ISI Summary Rept for SG Tubing of STP Electric Generating Station,Unit 2 ML20216G2011999-01-31031 January 1999 City Public Svc of San Antonio Annual Rept 1998-1999 ML20199G5961999-01-31031 January 1999 Cycle 7 Voltage-Based Repair Criteria Rept for Jan 1999 ML20199K7711999-01-21021 January 1999 Safety Evaluation Accepting ISI Program Request for Relief for ASME Cose Repair Requirements for Code Class 3 Piping ML20199G8161999-01-19019 January 1999 SER Accepting Util 970707 Response to NRC 970509 RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers. NRC Finds No Significant Safety Hazards Based on Application of Util Ampacity Derating Methodology ML20199H4981999-01-11011 January 1999 2RE06 ISI Summary Rept for Welds & Component Supports of Stp,Unit 2 ML20206Q3751999-01-0404 January 1999 2RE06 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) ML20206Q3721999-01-0404 January 1999 2RE06 ISI Summary Rept for Repairs & Replacements ML20216G2171998-12-31031 December 1998 Houston Industries 1998 Annual Rept. App a 1998 Financial Statements & Us Securities & Exchange Commission Form 10-K Encl NOC-AE-000403, Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With ML20216G1521998-12-31031 December 1998 Central & South West Corp 1998 Summary Annual Rept & Securities & Exchange Commission Form 10-K ML20198M3431998-12-28028 December 1998 SER Accepting Util Request for Relief from ASME Code Repair Requirements for ASME Code Class 3 Piping for South Texas Project,Unit 2 1999-09-09
[Table view] |
Text
{{#Wiki_filter:5 1 l
l q W23 . 6/11/92 i MS/C00UdNin DIS 11150 TION CENTER (CDC) 10 21:01 l , 010R I E UI I ON T F A%r I T T AL / AC 6 N0A E 00f r.E NT
?!!?: ' L:'/EL 2 f:ECIr!ENT/LOCA110+ L'5NF: - ATIN DOC CDN1K EED. ** MIL 001 LIST ** !!AT104 FO: 493 i
IEEUE CATE: 06/11/?2 TMHm!II.'.L ic0: R03369 4
4
-4 ODCa*ENT N.//MG f0. UNIT SPECT FEV CCf!ES I N S T PJCi ' '
r 00AF < A CL 1 l li,N ICh309 0 l!EL M 004f 02.C0 J7 1 ILN ICN0709 0 INSERT l
1^
t 4
I i
J J
1 t
1 d
i 2
INSTRUCTION 5; I f0LLOW THE IN3thiCTICws AE0sE, SIGN, LATE ANO FETL$N THIS CCCUnfNT OISTRIE9)i104 TF:ANSo!TTAL/AcrNuaECCEnENT TO CC (N1002)
UITHIN 10 USEi DMS TE0$ IRE IS5UE CATE, If AsY QISTICJ3 CALL ER 7715, 4
! SIONA!URE CT RECIPIENT CATE 4
'$]FECC hML1:!LiMRiSC 5TPE6S i Rn3/0C - N100
- f. O. BCr. 287 -{ d 4 I WACSWORTH TDAS - 77483 4
-' ' 9206250224 920605 PAGE 1 F]NA FAGE g PDR ADOCK 05000498 P PDR
I l I
- DSS 25 . ETPEG5 11 AW 1992 10:2t :50 Oft ui10NS QUAL 11Y A5tVRANCE PLAN TAtLE Of CONTENTS fAGE - 1 4
\
00CK 1 i-i 4
00CUMENT NO FEV $UFPLEMENT DOCU* TENT 711tE DATE IN ;
i EffECT OQAP-00.00 05 DEf!NITIONS 12/21/90
! 00AP-01.00 05 ORGAN!!ATION 12/21/90
' 05 ICN ICN0504 ORGAN!!ATION 1/15/92 0QAP-01.00 OQAP-01.00 05 ICN ICN0506' DRGAN12A110N 5/19/92 00AP-01.00 05 ICN ICN0509 0FGANIZATION 5/19/92-4 I, 00AF-01.00 05ICNICN0509 ORGAN!ZAT10N 4/11/92 004P-02.00 07 PROGRAM DESCRIPi!0N l/20/91
. 00AP-02.00 07 ICH ICN0707 PROGnAh DE3CRIFi!DN 3/19/92
; 0QAP-02.00 07 ICN ICN0709 PROGRAM DESCRIPTION 6/11/92
! OGAP-03,00 06 CONDUCT OF FLANT DPERATIONS 12/20/91 j 00AP-04.00 04 QUALIFICATION, IRNING & CERTIFICATION OF FER30 WEL 12/21/90 1 00AP-05.00 04 MAINT, INSTALLATION OF MODIFICATIONS & ACTIVITIES 12/21/90 j 00AP-06.00 05 DESIGN & MODIf! CATION CONTPOL- 12/21/90 DQAP-07.00 05 P&OCUAEMENT 12/21/90 0QAP 08.00 04 CONTRDL & ISSUANCE OF DOCUMENTS 12/21/90 i 0QAP-09.00 05 CONif0L OF MATERIAL 12/20/91 l 00AP-10.00 06 INSFECi}0N 12/21/90 j(
2 00AF-11.00 OQAP-12.00 05 05 TEST CONTFDL IN5fPUhENT & CALIEFATION CONTROL 12/21/90 12/21/90
!g DQAP-13.00 05 DEFICIENCY CONTF.0L 12/20/91 i
! DGAF-14.00 04 RECORDS CONTTOL 12/21/90 j 09AF-15.00 04 QUAL 11Y ASSURANCE AUDIT & SUFVEILLANCE 12/21/90 s 0QAP-16.00 04 NUCLEAR FUEL MANAGEMENT 12/21/90
- 00AP-17.00 04 ASME SECTION XI REPAIRS & REPLACEMENTS - 12/21/90 d
00AP 18.00 04 AsnE SECTION XI CXAMINAi!0N & TESTING 12/21/90 l
r R
1 y
J 4.
\
s-4 4
--- 4 ,-,-.--,Le.----% . -- . ; -, _ . , ~ - , _ . , - . . . - . - - -. -, ..s._-, .--4---,.
f STP 724 (02/90)
L
\'
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION wueiable E' of Contents 9 OPERATIONS QUALITY ASSURANCE PLAN PAGE 1 Or 2 TABLE OF CONTENTS A 12-21-90 (Updated 6/5/92)
Chapters Requiring NRC Approval Chapter Title of Effective Effective Change Number Chanter Revision No. , -Date Notices Definitions 5 12-21-90 1.0 Organization 5 12-21-90 QA-004 QA-006
.QA-008-QA-009 2.0 Program Description 7 12-20-91 QA-007 QA-009 3.0 Conduct of Plant Operations 6 12-20-91 4.0 Qualification, Training, and 4 12-21-90 Certification of Personnel l
5.0 Maintenance, Installation of
. Modifications, and Related 4 12-21-90 Activities 6.0 Design and-Modification Control 5 12-21-90 7.0 Procarement 5_ 12-21-90 8.0 Control and Issuance et Documents 4 12-21-90 9.0 Control of Material 5 12-20-91 10.0 Inspection. 6 12-21-90.
11.0 Test Control 5- 12-21-90 12.0 -Instrument and Calibration 5 Contitl 12-21-90 13.0 Deficiency Control 5 12-20 14.0 Records Control 4 12-21-90 i 15.0- Quality Assurance Audit 4 12-21-90 and' Surveillance q
.. _ - _ - _ _ - - a
, !(!jlll!l l! l i . .
o o -
l
- g. -
S S T P
O 7 U 2 4
T H (0 ZDoJ, 4 DO<ZCW f r cwmeZ(m n Wm T E
/
2 9
O X 0
)
P E A R S A
T P Q I R A- O O N
o o
y gg .- e iiE g B O
S J
E C
R Q T G U A A E .
N L L I I E Z T C g A Y T 2i i A T
$E e, i d" ,
. 9 T
T A
I O
N A
S S
R I
C C U G H R E M A N E N E N C R T E lE i s A T
e, I P
$E il " I L I
N i A G N
S T
\ A
. s "u es T I
C . i O O 9 N k %1 c
r 1
U N
J O
L L
N T
R O
T Dt Rtc g Arr iT v
p g C h
a E
P== p go f1 99 t
D A2 C O
P y
1 2
2 B
t e
r 1
1 .
- 0 9
0 B , R 5
I j)
$1P 724 (02/90)
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION "" 7 N
g' _ Chapter _2.,_0 7 OPERATIONS QUALITY ASSURANCE PLAN or 1 1A PROGRAM DESCRIPTION E FTLCmL 12 20.31 _
5.3.2.3 Familiarity with nuclear power generation facilities and the re.ated operations.
5.3.2.4 Knowledge of the industry's quality assurance standards and regulatory requirements.
5.3.2.5 Management experience and familiarity with HL&P corporate organizations.
5.3.3 Proccdures and revisions which control quality-related work programs and activitics, performed by STPEGS organizations described in Chapter 1.0 are reviewed by QA as defined in this chapter.
5.4 Organizational Independence
[#'- 5.4.1 The reporting arrangement utilized by the NA Department ensures that those personnel charged with responsibility for verifying compliance with QA Program requirements have the organizational freedom to:
5.4.1.1 Identify quality problems.
5.4.1.2 Initiate, recommend, or provide solutions.
5.4.1.3 Verify implementation of solutions.
5.4.2 The reporting arrangement, as illustrated on Attachment I, of Chapter 1.0, is such that personnel responsible for verifying compliance with quality requirements do not have direct responsibility for the performance of that work.
5.4.3 The General Manager, NA, provides technical and
~~'%ss STP administrative direction to the QA Managers in the areas of audits, surveillances, QA Reviews, '
CONTROLLEO CODY inspection, and material testing. l((9 JUN 1 11992 [
\ +fS
#+%ENT cows-
_ -}}