Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2251997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2331997-11-30030 November 1997 Corrected Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9171997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 NPL-97-0715, Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9361997-10-31031 October 1997 Revised Monthly Operating Rept for Oct 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0621, Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9311997-09-30030 September 1997 Revised Monthly Operating Rept for Sept 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0553, Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9261997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for Point Beach Nuclear Plant,Unit 2 ML20210H9531997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20210H9601997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for Point Beach Nuclear Plant,Units 1 & 2,which Provides Corrected Forced Outage Rates NPL-97-0318, Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 2 ML20141C2381997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20141C2461997-03-31031 March 1997 Corrected Operating Data Rept for Mar 1997 for Point Beach Nuclear Plant,Unit 1 ML20137P5781997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Point Beach Nuclear Plant Units 1 & 2 ML20137P5711997-02-28028 February 1997 Corrected MOR for Feb 1997 for Point Beach Nuclear Plant Unit 1 ML20135F2721997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20134J8711997-01-31031 January 1997 Monthly Operating Repts for Jan 1996 for Point Beach Nuclear Plant,Units 1 & 2 ML20135F2771997-01-31031 January 1997 Revised Monthly Operating Rept for Jan 1997 for Point Beach Nuclear Plant,Unit 2 ML20133N0601996-12-31031 December 1996 Revised MOR Rept for Dec 1996 for Point Beach Nuclear Plant, Units 1 & 2 ML20133F6471996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Point Beach Nuclear Plant,Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with ML20212D5961999-09-15015 September 1999 Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20196J4251999-06-30030 June 1999 Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 ML20196F3341999-06-22022 June 1999 Safety Evaluation for Implementation of 422V+ Fuel Assemblies at Pbnp Units 1 & 2 ML20195F9781999-06-10010 June 1999 Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1 ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With ML20196F3521999-04-30030 April 1999 Non-proprietary WCAP-14788, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power) NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with ML20207D6751999-02-22022 February 1999 Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars ML20206R9001999-01-13013 January 1999 SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-99-0091, 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with1998-12-31031 December 1998 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with ML20198C7671998-12-10010 December 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20195J5101998-11-16016 November 1998 Proposed Revs to Section 1.3 of FSAR for Pbnp QA Program ML20198J5941998-11-0303 November 1998 1998 Graded Exercise,Conducted on 981103 NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0880, Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored1998-10-21021 October 1998 Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored ML20154M9121998-10-14014 October 1998 Unit 1 Refueling 24 Repair/Replacement Summary Rept for Form NIS-2 ML20154L6751998-10-14014 October 1998 Unit 1 Refueling 24 ISI Summary Rept for Form NIS-1 NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20236Q3161998-07-10010 July 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 ML20236L6771998-07-0707 July 1998 Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20217F3131998-04-17017 April 1998 Safety Evaluation Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds,For Plant, Unit 1 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0209, Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable1998-03-30030 March 1998 Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable ML20217A8501998-03-19019 March 1998 SER Accepting Proposed Changes Submitted on 980226 by Wiep to Pbnp Final SAR Section 1.8 Which Will Impact Commitments Made in Pbnp QA Program Description.Changes Concern Approval Authority for Procedures & Interviewing Authority ML20216J0101998-03-17017 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Relief Request RR-1-18 for Plant NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198L1151998-01-0808 January 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Point Beach Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
_ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
e
= e ,
e o e e e o e e se ,
tre O N h1 O' ** 6 ** CD C y e e Z W e o e o e o e o e m
O > O N CD 5 M O O O O M ** N p e e (A ** CD O O 4 >$ & W O CD ED h f% ,
<Z >= 4 ** 4 PO CD g N&
e eW e1 * * * *
E .J N & 4 CD a CD ,
e
- 3 ON N Nb 97 m W E =* ** ** ** O N e e> 3 * *
=== N
. . - g &
W = e e E g
- tra O O g 3 O e e G. g N as N LaJ Z N er e O of O ' 2 CE: e e m P O O2 4 n g
g g =* W . e o e e e o e e g O g N e e >= >= 0 M O to O & O ** 4 4 r* v1 O O "
p . N tA eZ N CD N M N M 03 Cn CD CD a y >= L'u' C
- c. 3 e
- 4 Q MM M et CD v T "3 E et .a e * * * *
- O 5 4 4 ** f% O = 0*O 'u A N e eU M N ** y >= LaJ l Q Z E * *
- k j O LA O g e * ** W > O- MM O g Z W1 A N LaJ LA J g Q
]g i3 a Z e
- 623 2 3 W e C - <Z O a >=
0 > f"4 I e e b U ** g CL *Z Z o uJ s. ** >= g D
>=
Q g >-- LaJ e o I J <Z g
>= W J O 6L OOOO ooh MON E &
4 J W e o D LL I e o e o e o e e * =3 y <K W id 61 >= O 4 >= 0 O o t1 0 4 O CD o O ** & O O O **
. >= E ed = x 2
- v w N4 -* 0 C O & u "A" L >=
U r1 O La. I >= O b 7% W f% **4****** Q LaJ Q Q U = >= * >= O E * *
- 2 sg 6 J O Z hOh 4 y O e Z e #1 Ita N CD 4 g U W >== .-e PJ n
- 3 LaJ m o e o e o e e e E ee _J I
- W g >= Z W a a:D >= ** >= g *K ixa W4 *Z g Q Z E 2 U Q ==*
g e 3 E ** g Q
>= W1 el LA W Q. LL y sZ >=
M CD E Z <Z > g E EA Z e T W w >= q ** W D P% e.e >= >= w g >= ~3
& a ** > O ^
g Lf3 O W W a w ZZ I CA g W W
>= CD 2 a 4 2 .== I g E E e o E LaJ in _J = E I a - >= ,,,
<Z CD M s. 2 LS w ** s1 Iw 2 >= >= Z Q Lin
.J ** C4 a CH EZ **a U E E WW O O *Z
- m O O W (n ** - - EQw ZZ m **
E CD ** 2 O >= >-
- 2 >= wW g E Q O E CD EE LaJ <Z Q tZ ** >= Q UM 4 g LaJ W Q. 4& Q ZE W E LM Q *Z W GW q hk >=
W LhJ ** *e eo >= w w >= W WN LaJ E >= Eo >= eZ CK J = - LaJ > U ** D >= W 4 >* H _J
- LA O Ln r1 2E C.O LD 9 LL 3 U CT >= 64J Z >- * >= LeJ g
<1 DW 2 2 w >= > = *
- E <Z I & E W W Z Z Z g O O
>= Z su E E ** ** U >=
- Q 2 DW GZ ** ** g Q. _J eT Cw LD U U ex LA LA O Z O Z W & Ln in N g W as Q T >= Ln 2 4 4 0 W Z ** Cr 2 LaJ I W > LD Q DDWW g a U U U E in ** CL LL <3 4O E OOE c LD >=w w > = > u (S 4 O LaJ O >= s2 53 U M W >= r1 m Z E> U *Z O g W LJ)
Z W 2 x es W W I >= A U >= .,,4 2 > W LS 4E & K y O g
- A OQE Z LaJ U U 4 3 O ES 2 & E AOO Q O
>= A - W La.J ** e e-o ** LS W IZQEWWO W >= W uJ y Q >.
51 >= JJ -J 6II T 2 2 E M O >= W Z >= > U U t.D J Z U
-.J LaJ U >= *Z 4 4 3 O W T Z Q J LS 'I & th E *Z 2 >= ** 3Z u <3 W ** O =Z Z U cZ 4 3U Ln >= LA LaJ g IW s1 *1 ** La. w >= Q w Q. O ** E ** ** Q QUM O LaJ E E > O LD UJ6 .J D tas y >=
U LL E W >= N Z Z U =J >= 4 O D % >= J ** es M >= >QI , 4 O LA W L43 <1 >= LaJ LaJ O A A O LaJ <Z LaJ eZ E U LaJ CD >= >= U g 2 3 ab I g U CL A 62 .J & LaJ I LA E > E 6- ** U =Z ** ** O m y 2 sZ
>= a >= LaJ LaJ LaJ W *1 W O 4 LaJ W N 4 W x ** . 4 U U W g 2 4 LaJ LD LaJ J Q Q LLA > W LA 4 2 khJ LaJ LaJ >= > ** *Z s1 W Ji g C Q
>= E Z Q >= uJ LD >= W *d O W La I J U E es LL Q. K Z O W th d me LaJ :1 E E l' O .J M e* aY :2 LaJ >= eaJ W LaJ ** eZ 4O 2 ,4
>= >=
2 >= LO J Z D D a1 Z Z E O a _J Ln s1 O U LA. O q D E LD m Z 6% LD E E I EO LD Las >= L*n LALAW Q g I O
>= Q uJ W = *
- M U Lu LD W 61s W 4 >= La LO >= ie >=>=>=t- g LD Q.
.Z
-* ** i.L UE LO M M J sZ D E e1 3 == OO p. ee *- e-o e ** 3 Las
>=
.I Z LaJ ** =
- d. ** N >$ @ bI 4 I% O @O ** N N w N 4 b @ @ O ** N N T b 4 O == ** we *= we == we ** ** ** N C 4 04 NN 04 Q V- g g } $Q 472 b b 1 b 31 N,R ADOCK OW rDLM h v
EMEM DOCKET NO. 50-266 UNIT NAME Point Beach, Unit 1 .
DATE November 7, 1988 COMPLETED BY C. W. Krause TELEPHONE 414/221-2001 l
I AVERAGE DAILY UNIT POWER LEVEL MONTH OCTOBER 1988 l
AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL l DAY ?Ne NET DAY MWe NET DAY MWe NET 1 497 11 493 21 493 2 476 12 493 22 494 3 499 13 493 23 494 4 497 14 493 24 495 5 498 15 454 25 __
495 6 495 16 495 26 494 7 495 17 494 27 494 8 495 18 494 28 494 9 495 _
19 494 29 477 10 494 20 495 30 537 31 494 EQR-28a (04-86)
( E 0Q 1 N
6R SF .o 82 68
) B SF D co a hr t ec e de ud l
e h-d oyN4oc ~
2 5o uo~
HGF EDCBAR e e
- - - a $$oc.
s OOA tp d peeaqn ORRMEo h e m L e g fiu :
e r iir u u n i s.
Eo$$ ow rancaletp nc:s$ Mt 3 oe$
tietalem a$u
- oun
( i snctine eotsronan xnri rgnt U p a a n Ty c L N lltg r eF i I a i aR a Rc T iEvEie oi ee pn nrexns rl u os R S H
) r ait E o
r mnrgi Tr ee re te I
O U
T c s R D
( &t t( NE T O e i e W x o x .o ev M N p n p n O S l l t N a a T A i i H N n n u D
) )
s O$
R $ E. O C P T O 3 O W 65 4321M B E e E R
- - - - - t o @ O.coaa R h
O$m R ORPCAMMo 1 E terouaad 9 D hdentnn: 8 U euvtouu 8 C rciimaa T eonall I
( duut O e saiS N xL tcc S posi r lahoSa aduncm C i t r Ta I CDUD n doa ou E OANO
) ofm s LMTIC w Pe EPETK n r PL E e& H .t NT 5 4 v OT A E E eC N t. MN x x no Eu E .O h Ldfh tr i Eaoi r B b Rtrb Re Y i a i ec t f pt ct P ier ui N o I lneG rv o i
- etp - re 4 C v n S raI e 1 . e t a (yrn nA 4 m 5 m N as cc / W bB 0 e Cstt et 2 . e e -
Rhir i 2 r a 2 S Eeou o 1 K c 6
_. o Genc n - r ,7 h 6 u - t t 2 a r 0soi 0 u U c 1 fo 0 s 1 n
_. e 6 n 1 e 9 i 1 s ' 8 t
) 8 ~
1
NARRATIVE
SUMMARY
OF OPEPATING EXPERIENCE Docket No. 50-266 '
Unit Name Point Beach Unit 1 .
Date November 7, 1988 Completed By C. W. Krause Telephone 414/221-2001 Unit 1 operated at full power capacity of 495 MWe net throughout the period with no significant load reductions.
Safety-related maintenance included adjustment of the governor stop solenoid and the replacement of certain relays in the start circuit of the G01 emergency diesel generator.
e e
4 e e' ,,
e e e o e e e e se m dmMW WNPNN e eX W e e e o e e e e e o > Om4wbNon440&*
e em M 4N*MPONomWmh 4 > W wNw e eW 4 * . . N m. a. m.
E J Nn M NM M e e 3 WN N C**
W E M w m 4NW e e > 3 e * .
w U Wm4
- e a CD NWO N
& M W d e eE m m O O m
- 3 O e e4 & N 4 N W w N g E o
- E p N e op > Oh ww nNONwwNOO ee N W
- N m 4 NN W wC4P&Pm a m 3 e e4 A MN 4 T E E 4 J
b o
O U W W W MMN W E 4.
M y e su CWN W W l E E * *
- 6 > W O e eM W > OMM Q O M > W m J w Z Q Y
m Z e o m 2 W e Q m 4 Q w >
Q > Q Z e e 5 W w A 4 X .9 W 4 M > 3 A
~ W w e ex J e W .
W W J W w MCCO WNMWCE E 2 I W J W e e3 m I e * * * . e e e e 3 4 W h W L W Q 4 > W-C&C4CNNNcpon & W W W E em en 2 WN 4 momNNNw m >
Q 4 Q W 2 > Q Ww a 404 Q W A Q U eW e P= 0 E * *
- 2 L J Q Z &mM 4 o e 2 eM m NNN U W m N e W E e e e e o e o eE *e J Z W e X W mm W > 4 m W4 4 Q 2 E E U Q M e 3 EM Q N & it J
- W Q O e WA W > W W CDm WL 4 4 W M WE 24 > E m 2
- 4W w M M W D N o e > w > 3
&m M > O m m O WW a v 22 T m W W W G 2 a 4 2 a Z E 2 e e EWW J ~ E Z mm W e 4 mM n 2 G w ee 4 Iw 2 > > 2 Q m J W N*mER w m W 2 E WW O Q 4
> 4 MnW A m > M EQw Z Z E -
E ma M cW W .2 > wW E O Q Em EKW4 Q4 m WO UK 4 W W A de WZE W Em Q4W QW A >
W Wm a n Ww w w w UE WW W EQ > eE E J mmW > We 3 W sai d M W J UKW W2>>> m e MO W424 @m W E 3 4 DW 2 2 w e>m E 42 K EWW Z Z 3 Q U M EmE E w 'a u e
- Q2 3WQZ w w A J 4 O* C U U et mm O 2 0 2 W EmM E W 4 U
A Ze m244a W 3 w E2 W IW>m Q33WW g WWEm=AA4 EQ E QQ2 QO W * =' W )
m 4QW OM 44U w WW QM 7 E w u 4Q h m i 2 W E E d s.4 U ZW AUW J 3 > W LQ 4EEE C E '
= m OcE ZWUU 43 QWEEEwoQ Q Q l W A w WWm Jm M QW Z2CEWWQ W WWW Q >
U 4 W = JJJ mIE ZEWQH W ZW >UUmW 2 !
E ZQJm4mmE4 3> w 32JWUM 4443 W 4 W = Q4 2U44 30 m > mWE%W4 4w44 W Q 4 A Qw E m w oQUw cW EE >Qm UJWJ DW W Q AEE M E ZEUJWE Q3E W J"4 w h >QZ 4 O m WW4WWWOA AOW4W4E UWm>> U ,2%
3 AZE UAA A JE W ZME MEW M U4M w QWW 2
> w > WWWmd W Q K W WEEUEM JUUW Z 2 4 W@ WJQQW >4 4 4 2WWWW >=44VMO O O
> E 2QwW m>W EQ WWIJUE41 AE 2 2 A W W 4wW et EEZ OJW w EWWW WWW>4 4 Q3 > >
2W mJZ334 Z Z E Q E dm4UUWO 3 K
@ EZACEEI EQ WWW W mmW Q Z Q Z WOWWM w w u WW EmuMWWW > > > > > w m d.
W w M AGEmw w 2 4 DE 4 3M QQW
- m M w w m W Z Wm 4W44 4 QW Q3WO 2K K W Z 2 2 2 2 % w E 4 34JZQ EE m AE ZEEZ3CGZ333DDW M ,
E 4 W e e o e e o e e e e e e o e o e e e o e o e e
- w a - NMW O4Ne eow -NMW O4Nm& CaNM W O 4 Q
i O -mww w m m .e w NNNNN N e
l E
DOCKET NO. 50-301 UNIT NAME Point Beach, Unit 2
- DATE November 7, 1988 COMPLETED BY C. W. Krause TELEPHONE 414/221-2001 AVERAGE DAILY UNIT POWER LEVEL MONTH OCTOBER 1988 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 455 11 0 21 0 2 453 12 0 22 0 3 450 13 0 23 0 4 445 14 0 24 0 S 446 15 0 25 0 6 441 16 0 26 0 7 400 17 0 27 0 8 0 18 0 28 0 9 0 19 0 29 0 10 0 2G 0 30 0 31 0 t
i EQR-28a
! (04-86)
a-.,n- ,- ----.r -- - -. -,,m_-~,.,n n-w m ,n-,- - - - - - . - ----------,e-, - - - - - - -
s .-m . - , , - , , - - - - - - - - - - - - . - - - - - -- .c-, , - , - - - n ~ ,
~~
UNIT EHUTDOWN3 AND POWER 'IEDUCTION3 DOCKr'T. NC. 50-301 UNIT NAME Point Beach Unit _'
DATE November 7, 1988 REPORT MONTH MBER 1988 COMPLETED BY C. W. Krause TELEPHONE 414/221-2001 C
o U c~ ee %4 Q n C oa c o k e
-e4 h o On o Ev c.o No. Date
- yy " 'E C y Licensee Event jj 8,@ Cause & Corrective Action k
e k 2:
p-e oc 49e use Report No. mo
>, o eo ou To Prevent Rect rrence a e c oc m u E .c m
3 881008 S 576.0 C 3 88-002 ZZ 22kz2ZZ Unit shutdown for annual refueling and maintenance outage. LER 88-002 is being written to document the source range high flux trip that was received due to an electrical failure in the source range instrument preamplifier.-
See the LER for details.
F: 2 Reason:
Forced 3 Method:
- Exhibit F-Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Test 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-Ol61)
D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced Load SExhibit H-Same Source F - Administrative 6 - Other (explain)
G - Operational Error (explain)
H - Otiter (2xplain)
EQR-28B (04-87)
s ,
4 ,, ;
.. t NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE l Docket No. 50-301 I Unit Name Point Beach Unit 2 Date November 7, 1988 Completed By C. W. Krause Telephone 414/221-2001 3
Unit 2 began the period at a reduced full power of 455 MWe net due i to end-of-life Tave coastdown. The unit averaged 448 MWe net for !
the remainder of the coastdown until 1900 hours0.022 days <br />0.528 hours <br />0.00314 weeks <br />7.2295e-4 months <br /> on October 7, !
when the load reduction for Unit 2, Refueling Outage 14 commenced. [
. The unit was taken off line at 0059 hours6.828704e-4 days <br />0.0164 hours <br />9.755291e-5 weeks <br />2.24495e-5 months <br /> on October 8. At 0328 l hours of that day, a source range high flux trip was received due i to an electrical failure in the source range instrument !
preamplifier. LER 08-002 is being written to document the circumstances of the event. i In accordance with 10 CFR 50.73(a)(2)(ii), LER 88-003 will be i issued to document the results of the steam generator tube j inspections. Approximately 500 tubes will be sleeved and 23 '
j tubes plugged. t l
l A special NRC inspection was conducted concerning the ability to i close the El. 26' containment personnel hatch doors with eddy g current cables and sludge lance hoses passing through during ;
refueling operations, i i
Safety-related maintenance performed during the period includes ,
miscellaneous repairs of safety-related instrumentation found j 1 during refueling calibrations and the repair of a source range .
- detector. l 4
I i !
i<
i 1 l
) !
't I i
l h ,
i :
l i I
(
e R%consin Electnc w coms, 231 W VrCH GAN.P O BOX 2046.V'LWAUktE.w153201 g,y py, yg i
VPNPD-88-544 NRC-88-109 November 9, 1988 U. S. NUCLEAR REGULATORY COMMISSION Document Control Desk Mail Station Pl-137 i Washington, D. C. 20555 Gentlement ,
DOCKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS i
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 2, Point
! Beach Nuclear Plant, for the calendar month of October 1988.
i Very trul yours, S
C. W. Fay f(
Vice President l Nuclear Power -
l Attachments Copics to R. S. Cullen, PSCW NRC Regional Administrator, Region III :