Forwards TS Change Request 214 to Increase Allowable primary-to-secondary Leakage Rate from 0.1 to 0.2 Gpm Above Baseline Leak Rate When Increased Leakage Judged to Be Caused by Leaking Plugs or Joints
ML20198D222
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 05/13/1992
From: Broughton T
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20198D225 List:
References
C311-92-2036, NUDOCS 9205190226
Download: ML20198D222 (2)


Text

_ _ _ _ _ _ _

)' ,

FpA.- ..P E GPU Nurlear Corporat'en Ig- a

., i Qggf Post Of fice Box 480 Route 441 South

%ddletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number:

(717) 948-8005 May 13, 1992 C311-92-2036 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555

Dear Sir:

SUBJECT:

Three Mile Island Nuclear Genenting Station, Unit 1 (THI-1)

Operating Licenst No. DPR-50 Docket No. 50-289 Technical Specificaticn Change Request (TSCR) No. 214 Once Through Steam Generator (OTSG) Primary-to-Secondary Leak Rate Limit J

in accordance with 10 CFR 50.4(b)(1), TSCR No. 214 is forwarded for your approval.

The purpose of this TSCR is to request a change to license condition 2(c)(8)(2). The c.9nge increases the allowable primary-to-secondary leakage rate from.0.1 to 0.c gpm above the baseline leak rate when the increased leakage is judged to be caused-by leaking plugs or joints. Under all other conditions, the current 0.1 gpm limit would remain in effect.

  • Also enclosed is one (1) signed copy of the Certif)cate of Service for this request to the Chief Executives of the Township and County in which the facility is located, es well as the Commonwealth of Pennsylvania, Bureac of Radiation Protection.

Pursuant to 10 CFR 50.91(a)(1), we 5: ave also enclosed an analysis in support of o our determination of no significant hazards consideration. Pursuant to 10 CFR

.n@@ 50.91(b) a copy of this letter, the proposed change to the facility operating ,

-o o. license and the no significant hazards consideration analysis isave been -

$8 provideo to Mr. William P. Dornsife, the designoted representative of the

$8 Commonwealth of Pennsylvania.

EU G i o l

5- (p, m o ,

GPU Nuclear Corporation is a subs:-dsv cf Generni PubLc UtSt+s Comoiaim \

--- -_ ___-_ a

1 r

. documentControlDesk C311-92-2036 Page 2 l

It is requested that the amendment authorizing this TSCR be issued by July 30, 1992 and be effective upon issuance in order that we may be able to implement the change during the current operating cycle.

Sincerely, hbM '

T.G.Brouhiton Vic President and Director,1MI-1 P/ pip 1

Enclosures h cci Administrator, Region 1 THI Senior Resident inspector THI-l Senior Project Manager l l

l r

a t

i r

l.

I ,.

1.': . .. . , . . . . - . - . . - - - . . . . - . . . - . , - - . - _ - _ . - - . . ,