PNO-V-88-036, on 880607,voters Voted on Two Measures Re Future Operations of Plant.Measure B,Which Required Immediate Shutdown of Plant,Failed to Pass.Measure C,Which Will Continue Plant Operations on Trial Basis,Passed

From kanterella
Revision as of 20:49, 14 November 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
PNO-V-88-036:on 880607,voters Voted on Two Measures Re Future Operations of Plant.Measure B,Which Required Immediate Shutdown of Plant,Failed to Pass.Measure C,Which Will Continue Plant Operations on Trial Basis,Passed
ML20155D487
Person / Time
Site: Rancho Seco
Issue date: 06/08/1988
From: Cook G, Dangelo A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
References
PNO-V-88-036, PNO-V-88-36, NUDOCS 8806150209
Download: ML20155D487 (1)