ML20154B990

From kanterella
Revision as of 14:16, 23 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 11 to Emergency Plan & Revised Emergency Implementing Procedures,Including Rev 40 to FNP-0-EIP-008 & Rev 13 to FNP-0-EIP-026,per Administrative Procedure FNP-0-AP-4
ML20154B990
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 02/26/1986
From: Hudspeth J
ALABAMA POWER CO.
To: Mcknight J
NRC COMMISSION (OCM), NRC OFFICE OF ADMINISTRATION (ADM)
Shared Package
ML20154B995 List:
References
NUDOCS 8603040530
Download: ML20154B990 (1)


Text

- ~

J Alabama Power Company J. M. Farley Nuclear Plant P. O. Dra wer 470 Ashford, Alabama 36312 - -

Te:ephone 205 899-5156 L

AlabamaPower tm svumr w ex::, s:e February 26, 1986 s

Director, Office of Nuclear Reactor Regulation ATTN: Document Control Desk c/o Mr. Jim McKnight USNRC Washington, DC 20555

Dear Sir:

In accordance with Alabama Power Company Administrative Procedure FNP-0-AP-4, Control of Plant Documents and Records, attached are revisions to Emergency Implementing Procedures (FNP-0-EIP-008 Rev. 40, FNP-0-EIP-026 Rev. 13 and FNP Emergency Plan Rev. 11).

Please incorporate these new revisions into your files and discard the old revisions.

Enclosed is a self addressed stamped envelope and a copy of our transmittal form. Please sign and return this form to the following address:

Alabama Power Compnay Farley Nuclear Plant P.O. Box 470

-Ashford, AL 36312 ATTN: Document Control Supervisor If you should have any questions, please call me at (205) 899-5156 EXT. 422.

Sincerely, UAJ . l Jo y . Hudspeth l

JBH:rab I 1

1 cc: Larry W. Enfinger File h 8603040530 960226 jok' I PDR ADOCK 05000348 F PDR ,