H. B. Robinson Steam Electric Plant, Unit 2, Annual Assessment Letter (Report 05000261/2011001)
ML110630060
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 03/04/2011
From: McCree V M
Region 1 Administrator
To: Duncan R J
Carolina Power & Light Co
Shared Package
ML110630051 List:
References
IR-11-001
Download: ML110630060 (2)


Text

Inspection / Activity PlanPage 1 of 203/04/201106:53:11Report 2203/01/2011-06/30/2012UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteRobinson95002-95002 SUPPLEMENTAL INSPECTION8 2 IPSupplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Perfor9500205/31/201106/10/201195001-95001 SUPPLEMENTAL INSPECTION2 2 IPSupplemental Inspection for One or Two White Inputs in a Strategic Performance Area9500103/21/201103/25/2011PSB1-RP-RP PUBLIC RADIATION SAFETY INSP5 2 IPVerification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS2515/17905/23/201105/27/2011 2 IPOccupational Dose Assessment71124.0405/23/201105/27/2011 2 IPRadiation Monitoring Instrumentation71124.0505/23/201105/27/2011 2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0605/23/201105/27/2011 2 IPPerformance Indicator Verification7115105/23/201105/27/2011PSB1EP-EMERGENCY PREPAREDNESS EXERCISE3 2 IPExercise Evaluation711140105/23/201105/27/2011 2 IPEmergency Action Level and Emergency Plan Changes711140405/23/201105/27/2011 2 IPPerformance Indicator Verification7115105/23/201105/27/2011OL EXAM-INITIAL EXAM PREP4 2 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIESV2336311/07/201111/11/2011OL EXAM-INITIAL EXAM - WEEK 14 2 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIESV2336311/28/201112/02/2011OL EXAM-INITIAL EXAM - WEEK 24 2 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIESV2336312/05/201112/09/2011PSB1-RP-OCCUPATIONAL RP BASELINE WK13 2 IPRadiological Hazard Assessment and Exposure Controls71124.0101/23/201201/27/2012 2 IPOccupational ALARA Planning and Controls71124.0201/23/201201/27/2012 2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0301/23/201201/27/2012 2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0801/23/201201/27/2012 2 IPPerformance Indicator Verification7115101/23/201201/27/2012EB3 ISI-UNIT 2 IN-SERVICE INSPECTION1 2 IPInservice Inspection Activities - PWR7111108P01/30/201202/03/2012PSB1-RP-OCCUPATIONAL RP BASELINE WK24 2 IPRadiological Hazard Assessment and Exposure Controls71124.0102/06/201202/10/2012 2 IPOccupational ALARA Planning and Controls71124.0202/06/201202/10/2012 2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0302/06/201202/10/2012 2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0802/06/201202/10/2012 2 IPPerformance Indicator Verification7115102/06/201202/10/2012This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedure Inspection / Activity PlanPage 2 of 203/04/201106:53:11Report 2203/01/2011-06/30/2012UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteRobinsonPI&R-PROBLEM IDENTIFICATION AND RESOLUTION5 2 IPIdentification and Resolution of Problems71152B05/07/201205/11/2012 2 IPIdentification and Resolution of Problems71152B05/21/201205/25/2012PSB1EP-EMERGENCY PREPAREDNESS INSPECTION1 2 IPAlert and Notification System Testing711140205/21/201205/25/2012 2 IPEmergency Preparedness Organization Staffing and Augmentation System711140305/21/201205/25/2012 2 IPEmergency Action Level and Emergency Plan Changes711140405/21/201205/25/2012 2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140505/21/201205/25/2012 2 IPPerformance Indicator Verification7115105/21/201205/25/2012EB3 HS-TRIENNIAL HEAT SINK INSPECTION1 2 IPHeat Sink Performance7111107T06/04/201206/08/2012This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.