ML20128K496

From kanterella
Revision as of 00:05, 8 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Application for Amend to Licenses DPR-39 & DPR-48,revising Tech Specs to Raise Enrichment Limits for Spent Fuel Pool & New Fuel Vault.Fee Paid
ML20128K496
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 07/12/1985
From: Leblond P
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20128K501 List:
References
0294K, 294K, NUDOCS 8507240154
Download: ML20128K496 (2)


Text

r ,

. Commonwealth Edison One First National Plaz', Chicago, Ittinois 7

Address Reply to: Post Office Box 767 Chicago. Illinois 60690 July 12, 1985 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Zion Nuclear Power Station Units 1 and 2 Proposed Amendment to Facility Operating License Nos DPR-39 and DPR-48 NRC Docket Nos. 50-295 and 50-304

Dear Mr. Denton:

Attachment 1 to this letter is a proposed amendment to Facility Operating License Nos. OPR-39 and DPR-48, Appendix A, Section 5.0 - Design Features. This change will raise the enrichment limits to approximately 3.7 w/o for the Spent Fuel Pool and 4.0 w/o for the New Fuel Vault. There are no changes being made to Spent Fuel Pool, New Fuel Vault, or their racks. The enrichment increases are required in order to implement 18 month operating cycles. This transition is scheduled to occur in early 1986.

A general description of the criticality analysis and its results is provided in Attachment 2. Attachment 3 to this letter is a demonstration that the amendment involves no significant hazards consideration. The proposed amendment has received On-Site and Off-Site review and approval.

Attachment 4 contains the criticality analysis performed by Westinghouse in support of this proposed amendment. These calculations predict effective multiplication factors of 0.9481 and 0.9086 for the Spent Fuel Paci and the New Fuel Vault, respectively. Both of these results are below the acceptance criteria of 0.95.

A $150.00 fee remittance is enclosed in accordance with 10 CFR 170.

As provided by 10 CFR 50.91, the State of Illinois is being notified of this amendment request by transmittal of a copy of this letter and the attachments.

8507240154 850712 PDR ADOCK 05000295 P PDR ge.' ef us C//'Cb-(p cold

r :-

o H. R. Denton .

July 12, 1985 If there are any further questions regarding this matter, please contact this office.

Three (3) signed originals and thirty-seven (37) copies of this transmittal and its attachments are hereby provided for'your review.

Very truly yours, P. C. LeBlond Nuclear Licensing Administrator im Attachments cc: NRC Resident Inspector - Zion J. Norris - ICR G. Wright - State of Ill.

BED AND SWO to bero mg this day of' li fw '

, 985 Al0h Notary Public {

l 0294K

. _.. _ . ~ _ . _ . _ . , _ _ _ . . _ . . . _ _ _ . . , . _ , , _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ , . _ _ , . . . _