Forwards Insp Rept 50-219/92-25 on 921215-930118 & Notice of Violation
ML20128P610
Person / Time
Site: Oyster Creek
Issue date: 02/14/1993
From: Blough A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: J. J. Barton
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20128P612 List:
References
NUDOCS 9302250021
Download: ML20128P610 (3)


See also: IR 05000219/1992025

Text

.

FEB 141993

Docket No. 50-219

Mr. John J. Barton

Vice President and Director

GPU Nuclear Corporation

Oyster Creek Nuclear Generating Station

P.O. Box 388

Forked River, New Jersey 08731

Dear Mr. Barton:

SUBJECT: NRC INSPECTION REPORT NO. 50-219/92-25

This letter transmits the report of the resident safety inspection conducted by Mr. D. Vito for

the period December 15, 1992, through January 18,1993, at the Oyster Creek Nuclear

Generating Station. The inspection consisted of document reviews, personnel interviews, and

observations of activities. Inspectors discussed the findings with you and members of your

staff after the inspection.

Inspector observations during this report period indicate that activities conduc'ed were safe

and conservative. Please note our discussion of the lack of updated Final Safety Analysis

l Report (FSAR) design information related to the torus suction strainers for the core spray

l and containment spray systems. While this issue is of low safety significance, our review

found that you had several opportunities to identify and change this discrepancy since

improvements were made in the FSAR update process in 1990. This failure to update the

FSAR is a violation of NRC requirements as specified in the enclosed Notice of Violation.

You are required to respond to this letter and should follow the instructions specified in the

j enclosed Notice when preparing your response.

l In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and

l its enclosures will be placed in the NRC Public Document Room. The responses directed by

l this letter and the enclosed Notice are not subject to the clearance procedures of the Office of

'

Management and Budget as required by the Paperwork Reduction Act of 1980, Public Law

No. 96.511.

l

l

9302250021 930214 9

PDR ADOCK 0500

G

(*}ppicvti ECORD CC?Y ji

,-

2'

.

GPU Nuclear Corporation 2

I appreciate your cooperation.

Sincerely,

r

p....-...,.,

s .. '

. .ji

A. Randolph Blough, Chief

Projects Branch No. 4

Division of Reactor Projects

Enclosures: Notice of Violation

NRC Inspection Report No. 50-219/92-25

3

cc w/encls:

M. Laggart, Manager, Corporate Licensing

P. Czaya, Acting Licensing Manager, Oyster Creek

j Public Document Room (PDR)

Local Public Document Roorn (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2)

l' NRC Resident Inspector

State of New Jersey

4

I

.

f

OFFICIAL ECORD COPY

l

.

. _ - . __ . _- - .-

.

GPU Nuclear Corporation 3

bec w/encls: '

Region 1 Docket Room (with concurrences)

DRS SALP/EB Coordinator

J. Joyner, DRSS

R. Blough, DRP

J. Rogge, DRP

V. McCree, OEDO

A. Dromerick, NRR/PD l-4

N. Dudley, SR!, Seabrook

F. Young, SRI, Three Mile Island

bec w/ Report Cover Sheet & Executive Summary Only:

C. liehl, DRP

J. Wiggins, DRP

W. l{odges, DRS

R. Cooper, DRSS

W. lanning, DRS

J. Durr, DRS

L. Bettenhausen, DRS

J. Stolz, NRR/PD l-4

D. Hokxly, EO

l

l

l

t

RI:DRP RI:DRP ") RI:DRP

D. Vito

%&r

J. Rogge R. Blough

,

  • / */93 l/4/93 2,p/93

OFFICIAL RECORD COPY