Category:INSPECTION REPORT
MONTHYEARIR 05000245/19990081999-09-14014 September 1999 Insp Repts 50-245/99-08,50-336/99-08 & 50-423/99-08 on 990615-0809.Four Violations Noted & Being Treated as Ncvs. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000423/19990071999-08-27027 August 1999 Insp Rept 50-423/99-07 on 990614-0715.Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Review of C/A Program Using IP 40500, Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems IR 05000336/19990061999-07-19019 July 1999 Insp Repts 50-336/99-06 & 50-423/99-06 on 990420-0614.Ten Violations Occurred & Being Treated as non-cited Violations. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000336/19982191999-06-10010 June 1999 Insp Rept 50-336/98-219 on 981214-18,990126-29,0208-19 & 0301-05.Noncited Violations Identified.Major Areas Inspected:Exam of Licensee Corrective Action Implementation IR 05000245/19990051999-06-0404 June 1999 Errata to Insp Repts 50-245/99-05,50-336/99-05 & 50-423/99-05,consisting of Figure 1 ML20207G1211999-06-0303 June 1999 Insp Repts 50-245/99-05,50-336/99-05 & 50-423/99-05 on 990302-0419.No Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000336/19990031999-05-10010 May 1999 Insp Rept 50-336/99-03 on 990322-26.No Violations Noted. Major Areas Inspected:Review of Actions Taken by Util to Resolve Significant Issues List Item 21,fire Protection ML20206F4601999-04-30030 April 1999 Insp Rept 50-336/99-04 on 990315-31.Violation Noted.Major Areas Inspected:Monitored Licensee Activities During Plant Transition Between Operational Modes,Both During Normal & off-normal Working Hours IR 05000245/19990021999-04-0202 April 1999 Insp Repts 50-245/99-02,50-336/99-02 & 50-423/99-02 on 990112-0301.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000336/19990011999-03-29029 March 1999 Insp Rept 50-336/99-01 on 990117-0217.Violations Noted.Major Areas Inspected:Licensee C/A Program Implementation Using Guidance of NRC IP 40500, Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems IR 05000245/19980061999-03-0101 March 1999 Insp Repts 50-245/98-06,50-336/98-06 & 50-423/98-06 on 981123-990111.No Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support IR 05000245/19982171999-01-22022 January 1999 Evaluation Repts 50-245/98-217,50-336/98-217 & 50-423/98-217 Conducted on 981026-30.Areas Evaluated:Whether NNECO Has Improved Sufficiently & Has Demonstrated Sustained Performance in Maintaining safety-conscious Work Environ IR 05000336/19980051999-01-0707 January 1999 Insp Repts 50-336/98-05 & 50-423/98-05 on 981006-1123. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000245/19982161998-11-18018 November 1998 Insp Repts 50-245/98-216,50-336/98-216 & 50-423/98-216 on 980818-1005.Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support IR 05000336/19982031998-11-0505 November 1998 Insp Rept 50-336/98-203 on 980824-0904.No Violations Noted. Major Areas Inspected:Effectiveness of Configuration Mgt Plan IR 05000336/19982131998-10-23023 October 1998 Insp Rept 50-336/98-213 on 980810-0903.Violations Noted. Major Areas Inspected:Certain Aspects of Accident Mitigation Sys IR 05000245/19982151998-10-14014 October 1998 Evaluation Repts 50-245/98-215,50-336/98-215 & 50-423/98-215 on 980824-28.Major Areas Evaluated:Whether Licensee Has Improved Sufficiently & Has Demonstrated Sustained Performance in Maintaining safety-conscious Work Environ IR 05000336/19980041998-10-0101 October 1998 Insp Rept 50-336/98-04 on 980914-18.No Violations Noted. Major Areas Inspected:Mov Program Associated with GL 89-10 IR 05000245/19982121998-09-25025 September 1998 Insp Repts 50-245/98-212,50-336/98-212 & 50-423/98-212 on 980630-0817.No Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support IR 05000423/19982111998-09-11011 September 1998 Insp Rept 50-423/98-211 on 980413-24,0511-15,27-29,0609-11 & 23-25.Violation Noted.Major Areas Inspected:Evaluation of Licensee C/As & Other ICAVP Process Activities IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000245/19982081998-08-12012 August 1998 Insp Repts 50-245/98-208,50-336/98-208 & 50-423/98-208 on 980428-0629.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000336/19982011998-08-12012 August 1998 Insp Rept 50-336/98-201 on 980413-0508.Violations Noted. Major Areas Inspected:Licensee Ability to Identify & Resolve Deficiencies Focusing,But Not Limited To,Period of CMP Implementation & ICAVP at Parsons Power Group,Inc IR 05000245/19982071998-06-19019 June 1998 Insp Repts 50-245/98-207,50-336/98-207 & 50-423/98-207 on 980301-0427.Violations Noted.Major Areas Inspected:Maint, Operations,Engineering & Plant Support IR 05000423/19970831998-06-12012 June 1998 Insp Rept 50-423/97-83 on 980413-24.Violations Noted. Major Areas Inspected:Readiness of Plant Hardware,Staff & Mgt Programs to Support Safe Restart & Continued Operation of Plant Unit 3 IR 05000423/19970821998-06-11011 June 1998 Insp Rept 50-423/97-82 on 980209-20.Violations Noted.Major Areas Inspected:Corrective Actions Processes IR 05000336/19982021998-06-11011 June 1998 Insp Rept 50-336/98-202 on 980302-0409.Violations Noted. Major Areas Inspected:Cooling Water Sys ML20248E6131998-05-26026 May 1998 Insp Repts 50-245/98-206,50-336/98-206 & 50-423/98-206 on 980101-0228.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000423/19980811998-05-22022 May 1998 Insp Rept 50-423/98-81 on 980302-31 & 0412.Violations Noted. Major Areas Inspected:Plant Support IR 05000423/19982051998-05-0808 May 1998 Insp Rept 50-423/98-205 on 980223-0306.Violations Noted. Major Areas Inspected:Corrective Action Implemention Insp IR 05000423/19980011998-05-0606 May 1998 Insp Rept 50-423/98-01 on 980223-26.Violation Noted.Major Areas Inspected:Emergency Preparedness Program,Plant Support IR 05000245/19982101998-04-21021 April 1998 Evaluation Repts 50-245/98-210,50-336/98-210 & 50-423/98-210 on 971208-12 & 980105-09.No Violations Noted.Major Areas Inspected:Status & Effectivness of Independent third-party, Oversight Program,Established to Oversee ECP Implementation IR 05000245/19970121998-04-20020 April 1998 Evaluation Repts 50-245/97-12,50-336/97-12 & 50-423/97-12 on 971208-12 & 980105-09.No Violations Noted.Major Areas Evaluated:Implementation of ECP & Employee Concerns Oversight Program at Millstone IR 05000423/19972101998-04-0303 April 1998 Insp Rept 50-423/97-210 on 980105-0206.Violations Noted. Major Areas Inspected:Effectiveness of Configuration Mgt Program,Effectiveness of Sargent & Lundy Review of Sys Objectives & Quench & Recirculation Spray Sys IR 05000245/19980801998-04-0101 April 1998 Insp Repts 50-245/98-80,50-336/98-80 & 50-423/98-80 on 980223-26.No Violation Noted.Major Areas Inspected:Status of EP Facilities,Equipment & Resources,Ep Procedures & Documentation & Staff Knowledge & Performance IR 05000423/19972091998-04-0101 April 1998 Insp Rept 50-423/97-209 on 971027-980128.Violations Noted. Major Areas Inspected:Licensee Ability to Identify & Resolve Licensing Bases Deficiencies IR 05000423/19980821998-03-27027 March 1998 Insp Rept 50-423/98-82 on 980209-27.Violations Noted.Major Areas Inspected:Millstone Unit 3 MOV Program,Including Various C/A Taken IR 05000245/19972081998-02-25025 February 1998 Insp Repts 50-245/97-208,50-336/97-208 & 50-423/97-208 on 971201-31.Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000336/19970841998-02-0909 February 1998 Insp Repts 50-336/97-84 & 50-423/97-84 on 970915-19.No Violations Noted.Major Areas Inspected:Review of post-fire Safe Shutdown Program for Unit 2 & Control of Configuration of post-fire Safe Shutdown Equipment for Unit 3 IR 05000336/19972111998-02-0909 February 1998 Insp Rept 50-336/97-211 on 970825-29,0902-05 & 1201-05.No Violations Noted.Major Areas Inspected:Evaluation of Parson Implementation of Independent CA Verification Program Audit Plan IR 05000245/19970851998-02-0606 February 1998 Insp Repts 50-245/97-85,50-336/97-85 & 50-423/97-85 on 971001-17,1120-21 & 1204-12.No Violations Noted.Major Areas Inspected:Simulator Portion of Annual Operating Tests of Licensed Operator Requalification Training Programs IR 05000245/19972071998-01-0909 January 1998 Insp Repts 50-245/97-207,50-336/97-207 & 50-423/97-207 on 971002-1130.No Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support ML20202J8191997-12-0505 December 1997 Insp Rept 50-423/97-206 on 970818-29 & 0908-19.Violations Noted.Major Areas Inspected:Licensees Configuration Mgt Plan & Emergency Core Cooling & Seal Injection Functions of Charging Sys ML20202A7071997-11-24024 November 1997 Insp Repts 50-245/97-81,50-336/97-81 & 50-423/97-81 on 970820-22.No Violations Noted.Major Areas Inspected: Licensee Emergency Response Organization During Biennial, full-participation Exercise IR 05000245/19972031997-11-21021 November 1997 Insp Repts 50-245/97-203,50-336/97-203 & 50-423/97-203 on 970722-1001.Violations Noted.Major Areas Inspected:Maint, Engineering,Plant Support & Conduct of Operations ML20210S8861997-08-29029 August 1997 Insp Repts 50-245/97-202,50-336/97-202 & 50-423/97-202 on 970520-0721.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support Re Performance in Emergency Preparedness & Control of FP Activities IR 05000245/19972021997-08-29029 August 1997 Insp Repts 50-245/97-202,50-336/97-202 & 50-423/97-202 on 970529-0721.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support,Including Emergency Preparedness Issues & Fire Protection Activities ML20141E3411997-06-24024 June 1997 Insp Repts 50-245/97-02,50-336/97-02 & 50-423/97-02 on 970311-0519.Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support ML20140C5641997-04-11011 April 1997 Insp Repts 50-245/97-01,50-336/97-01 & 50-423/97-01 on 970101-0310.Violations Noted.Major Areas Inspected:Maint, Engineering & Plant Support ML20140C0421997-03-26026 March 1997 Insp Repts 50-245/97-03,50-336/97-03 & 50-423/97-03 on 970203-07.No Violations Noted.Major Ares Inspected: Audits,Security Training,Equipment Testing & Management Support 1999-09-14
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000245/19990081999-09-14014 September 1999 Insp Repts 50-245/99-08,50-336/99-08 & 50-423/99-08 on 990615-0809.Four Violations Noted & Being Treated as Ncvs. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000423/19990071999-08-27027 August 1999 Insp Rept 50-423/99-07 on 990614-0715.Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Review of C/A Program Using IP 40500, Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems IR 05000336/19990061999-07-19019 July 1999 Insp Repts 50-336/99-06 & 50-423/99-06 on 990420-0614.Ten Violations Occurred & Being Treated as non-cited Violations. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000336/19982191999-06-10010 June 1999 Insp Rept 50-336/98-219 on 981214-18,990126-29,0208-19 & 0301-05.Noncited Violations Identified.Major Areas Inspected:Exam of Licensee Corrective Action Implementation IR 05000245/19990051999-06-0404 June 1999 Errata to Insp Repts 50-245/99-05,50-336/99-05 & 50-423/99-05,consisting of Figure 1 ML20207G1211999-06-0303 June 1999 Insp Repts 50-245/99-05,50-336/99-05 & 50-423/99-05 on 990302-0419.No Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000336/19990031999-05-10010 May 1999 Insp Rept 50-336/99-03 on 990322-26.No Violations Noted. Major Areas Inspected:Review of Actions Taken by Util to Resolve Significant Issues List Item 21,fire Protection ML20206F4601999-04-30030 April 1999 Insp Rept 50-336/99-04 on 990315-31.Violation Noted.Major Areas Inspected:Monitored Licensee Activities During Plant Transition Between Operational Modes,Both During Normal & off-normal Working Hours IR 05000245/19990021999-04-0202 April 1999 Insp Repts 50-245/99-02,50-336/99-02 & 50-423/99-02 on 990112-0301.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000336/19990011999-03-29029 March 1999 Insp Rept 50-336/99-01 on 990117-0217.Violations Noted.Major Areas Inspected:Licensee C/A Program Implementation Using Guidance of NRC IP 40500, Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems IR 05000245/19980061999-03-0101 March 1999 Insp Repts 50-245/98-06,50-336/98-06 & 50-423/98-06 on 981123-990111.No Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support IR 05000245/19982171999-01-22022 January 1999 Evaluation Repts 50-245/98-217,50-336/98-217 & 50-423/98-217 Conducted on 981026-30.Areas Evaluated:Whether NNECO Has Improved Sufficiently & Has Demonstrated Sustained Performance in Maintaining safety-conscious Work Environ IR 05000336/19980051999-01-0707 January 1999 Insp Repts 50-336/98-05 & 50-423/98-05 on 981006-1123. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000245/19982161998-11-18018 November 1998 Insp Repts 50-245/98-216,50-336/98-216 & 50-423/98-216 on 980818-1005.Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support IR 05000336/19982031998-11-0505 November 1998 Insp Rept 50-336/98-203 on 980824-0904.No Violations Noted. Major Areas Inspected:Effectiveness of Configuration Mgt Plan IR 05000336/19982131998-10-23023 October 1998 Insp Rept 50-336/98-213 on 980810-0903.Violations Noted. Major Areas Inspected:Certain Aspects of Accident Mitigation Sys IR 05000245/19982151998-10-14014 October 1998 Evaluation Repts 50-245/98-215,50-336/98-215 & 50-423/98-215 on 980824-28.Major Areas Evaluated:Whether Licensee Has Improved Sufficiently & Has Demonstrated Sustained Performance in Maintaining safety-conscious Work Environ IR 05000336/19980041998-10-0101 October 1998 Insp Rept 50-336/98-04 on 980914-18.No Violations Noted. Major Areas Inspected:Mov Program Associated with GL 89-10 IR 05000245/19982121998-09-25025 September 1998 Insp Repts 50-245/98-212,50-336/98-212 & 50-423/98-212 on 980630-0817.No Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support IR 05000423/19982111998-09-11011 September 1998 Insp Rept 50-423/98-211 on 980413-24,0511-15,27-29,0609-11 & 23-25.Violation Noted.Major Areas Inspected:Evaluation of Licensee C/As & Other ICAVP Process Activities IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000245/19982081998-08-12012 August 1998 Insp Repts 50-245/98-208,50-336/98-208 & 50-423/98-208 on 980428-0629.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000336/19982011998-08-12012 August 1998 Insp Rept 50-336/98-201 on 980413-0508.Violations Noted. Major Areas Inspected:Licensee Ability to Identify & Resolve Deficiencies Focusing,But Not Limited To,Period of CMP Implementation & ICAVP at Parsons Power Group,Inc IR 05000245/19982071998-06-19019 June 1998 Insp Repts 50-245/98-207,50-336/98-207 & 50-423/98-207 on 980301-0427.Violations Noted.Major Areas Inspected:Maint, Operations,Engineering & Plant Support IR 05000423/19970831998-06-12012 June 1998 Insp Rept 50-423/97-83 on 980413-24.Violations Noted. Major Areas Inspected:Readiness of Plant Hardware,Staff & Mgt Programs to Support Safe Restart & Continued Operation of Plant Unit 3 IR 05000423/19970821998-06-11011 June 1998 Insp Rept 50-423/97-82 on 980209-20.Violations Noted.Major Areas Inspected:Corrective Actions Processes IR 05000336/19982021998-06-11011 June 1998 Insp Rept 50-336/98-202 on 980302-0409.Violations Noted. Major Areas Inspected:Cooling Water Sys ML20248E6131998-05-26026 May 1998 Insp Repts 50-245/98-206,50-336/98-206 & 50-423/98-206 on 980101-0228.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000423/19980811998-05-22022 May 1998 Insp Rept 50-423/98-81 on 980302-31 & 0412.Violations Noted. Major Areas Inspected:Plant Support IR 05000423/19982051998-05-0808 May 1998 Insp Rept 50-423/98-205 on 980223-0306.Violations Noted. Major Areas Inspected:Corrective Action Implemention Insp IR 05000423/19980011998-05-0606 May 1998 Insp Rept 50-423/98-01 on 980223-26.Violation Noted.Major Areas Inspected:Emergency Preparedness Program,Plant Support IR 05000245/19982101998-04-21021 April 1998 Evaluation Repts 50-245/98-210,50-336/98-210 & 50-423/98-210 on 971208-12 & 980105-09.No Violations Noted.Major Areas Inspected:Status & Effectivness of Independent third-party, Oversight Program,Established to Oversee ECP Implementation IR 05000245/19970121998-04-20020 April 1998 Evaluation Repts 50-245/97-12,50-336/97-12 & 50-423/97-12 on 971208-12 & 980105-09.No Violations Noted.Major Areas Evaluated:Implementation of ECP & Employee Concerns Oversight Program at Millstone IR 05000423/19972101998-04-0303 April 1998 Insp Rept 50-423/97-210 on 980105-0206.Violations Noted. Major Areas Inspected:Effectiveness of Configuration Mgt Program,Effectiveness of Sargent & Lundy Review of Sys Objectives & Quench & Recirculation Spray Sys IR 05000245/19980801998-04-0101 April 1998 Insp Repts 50-245/98-80,50-336/98-80 & 50-423/98-80 on 980223-26.No Violation Noted.Major Areas Inspected:Status of EP Facilities,Equipment & Resources,Ep Procedures & Documentation & Staff Knowledge & Performance IR 05000423/19972091998-04-0101 April 1998 Insp Rept 50-423/97-209 on 971027-980128.Violations Noted. Major Areas Inspected:Licensee Ability to Identify & Resolve Licensing Bases Deficiencies IR 05000423/19980821998-03-27027 March 1998 Insp Rept 50-423/98-82 on 980209-27.Violations Noted.Major Areas Inspected:Millstone Unit 3 MOV Program,Including Various C/A Taken IR 05000245/19972081998-02-25025 February 1998 Insp Repts 50-245/97-208,50-336/97-208 & 50-423/97-208 on 971201-31.Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000336/19970841998-02-0909 February 1998 Insp Repts 50-336/97-84 & 50-423/97-84 on 970915-19.No Violations Noted.Major Areas Inspected:Review of post-fire Safe Shutdown Program for Unit 2 & Control of Configuration of post-fire Safe Shutdown Equipment for Unit 3 IR 05000336/19972111998-02-0909 February 1998 Insp Rept 50-336/97-211 on 970825-29,0902-05 & 1201-05.No Violations Noted.Major Areas Inspected:Evaluation of Parson Implementation of Independent CA Verification Program Audit Plan IR 05000245/19970851998-02-0606 February 1998 Insp Repts 50-245/97-85,50-336/97-85 & 50-423/97-85 on 971001-17,1120-21 & 1204-12.No Violations Noted.Major Areas Inspected:Simulator Portion of Annual Operating Tests of Licensed Operator Requalification Training Programs IR 05000245/19972071998-01-0909 January 1998 Insp Repts 50-245/97-207,50-336/97-207 & 50-423/97-207 on 971002-1130.No Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support ML20202J8191997-12-0505 December 1997 Insp Rept 50-423/97-206 on 970818-29 & 0908-19.Violations Noted.Major Areas Inspected:Licensees Configuration Mgt Plan & Emergency Core Cooling & Seal Injection Functions of Charging Sys ML20202A7071997-11-24024 November 1997 Insp Repts 50-245/97-81,50-336/97-81 & 50-423/97-81 on 970820-22.No Violations Noted.Major Areas Inspected: Licensee Emergency Response Organization During Biennial, full-participation Exercise IR 05000245/19972031997-11-21021 November 1997 Insp Repts 50-245/97-203,50-336/97-203 & 50-423/97-203 on 970722-1001.Violations Noted.Major Areas Inspected:Maint, Engineering,Plant Support & Conduct of Operations ML20210S8861997-08-29029 August 1997 Insp Repts 50-245/97-202,50-336/97-202 & 50-423/97-202 on 970520-0721.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support Re Performance in Emergency Preparedness & Control of FP Activities IR 05000245/19972021997-08-29029 August 1997 Insp Repts 50-245/97-202,50-336/97-202 & 50-423/97-202 on 970529-0721.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support,Including Emergency Preparedness Issues & Fire Protection Activities ML20141E3411997-06-24024 June 1997 Insp Repts 50-245/97-02,50-336/97-02 & 50-423/97-02 on 970311-0519.Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support ML20140C5641997-04-11011 April 1997 Insp Repts 50-245/97-01,50-336/97-01 & 50-423/97-01 on 970101-0310.Violations Noted.Major Areas Inspected:Maint, Engineering & Plant Support ML20140C0421997-03-26026 March 1997 Insp Repts 50-245/97-03,50-336/97-03 & 50-423/97-03 on 970203-07.No Violations Noted.Major Ares Inspected: Audits,Security Training,Equipment Testing & Management Support 1999-09-14
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000245/19990081999-09-14014 September 1999 Insp Repts 50-245/99-08,50-336/99-08 & 50-423/99-08 on 990615-0809.Four Violations Noted & Being Treated as Ncvs. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000423/19990071999-08-27027 August 1999 Insp Rept 50-423/99-07 on 990614-0715.Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Review of C/A Program Using IP 40500, Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems IR 05000336/19990061999-07-19019 July 1999 Insp Repts 50-336/99-06 & 50-423/99-06 on 990420-0614.Ten Violations Occurred & Being Treated as non-cited Violations. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000336/19982191999-06-10010 June 1999 Insp Rept 50-336/98-219 on 981214-18,990126-29,0208-19 & 0301-05.Noncited Violations Identified.Major Areas Inspected:Exam of Licensee Corrective Action Implementation IR 05000245/19990051999-06-0404 June 1999 Errata to Insp Repts 50-245/99-05,50-336/99-05 & 50-423/99-05,consisting of Figure 1 ML20207G1211999-06-0303 June 1999 Insp Repts 50-245/99-05,50-336/99-05 & 50-423/99-05 on 990302-0419.No Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000336/19990031999-05-10010 May 1999 Insp Rept 50-336/99-03 on 990322-26.No Violations Noted. Major Areas Inspected:Review of Actions Taken by Util to Resolve Significant Issues List Item 21,fire Protection ML20206F4601999-04-30030 April 1999 Insp Rept 50-336/99-04 on 990315-31.Violation Noted.Major Areas Inspected:Monitored Licensee Activities During Plant Transition Between Operational Modes,Both During Normal & off-normal Working Hours IR 05000245/19990021999-04-0202 April 1999 Insp Repts 50-245/99-02,50-336/99-02 & 50-423/99-02 on 990112-0301.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000336/19990011999-03-29029 March 1999 Insp Rept 50-336/99-01 on 990117-0217.Violations Noted.Major Areas Inspected:Licensee C/A Program Implementation Using Guidance of NRC IP 40500, Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems IR 05000245/19980061999-03-0101 March 1999 Insp Repts 50-245/98-06,50-336/98-06 & 50-423/98-06 on 981123-990111.No Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support IR 05000245/19982171999-01-22022 January 1999 Evaluation Repts 50-245/98-217,50-336/98-217 & 50-423/98-217 Conducted on 981026-30.Areas Evaluated:Whether NNECO Has Improved Sufficiently & Has Demonstrated Sustained Performance in Maintaining safety-conscious Work Environ IR 05000336/19980051999-01-0707 January 1999 Insp Repts 50-336/98-05 & 50-423/98-05 on 981006-1123. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000245/19982161998-11-18018 November 1998 Insp Repts 50-245/98-216,50-336/98-216 & 50-423/98-216 on 980818-1005.Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support IR 05000336/19982031998-11-0505 November 1998 Insp Rept 50-336/98-203 on 980824-0904.No Violations Noted. Major Areas Inspected:Effectiveness of Configuration Mgt Plan IR 05000336/19982131998-10-23023 October 1998 Insp Rept 50-336/98-213 on 980810-0903.Violations Noted. Major Areas Inspected:Certain Aspects of Accident Mitigation Sys IR 05000245/19982151998-10-14014 October 1998 Evaluation Repts 50-245/98-215,50-336/98-215 & 50-423/98-215 on 980824-28.Major Areas Evaluated:Whether Licensee Has Improved Sufficiently & Has Demonstrated Sustained Performance in Maintaining safety-conscious Work Environ IR 05000336/19980041998-10-0101 October 1998 Insp Rept 50-336/98-04 on 980914-18.No Violations Noted. Major Areas Inspected:Mov Program Associated with GL 89-10 IR 05000245/19982121998-09-25025 September 1998 Insp Repts 50-245/98-212,50-336/98-212 & 50-423/98-212 on 980630-0817.No Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support IR 05000423/19982111998-09-11011 September 1998 Insp Rept 50-423/98-211 on 980413-24,0511-15,27-29,0609-11 & 23-25.Violation Noted.Major Areas Inspected:Evaluation of Licensee C/As & Other ICAVP Process Activities IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000245/19982081998-08-12012 August 1998 Insp Repts 50-245/98-208,50-336/98-208 & 50-423/98-208 on 980428-0629.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000336/19982011998-08-12012 August 1998 Insp Rept 50-336/98-201 on 980413-0508.Violations Noted. Major Areas Inspected:Licensee Ability to Identify & Resolve Deficiencies Focusing,But Not Limited To,Period of CMP Implementation & ICAVP at Parsons Power Group,Inc IR 05000245/19982071998-06-19019 June 1998 Insp Repts 50-245/98-207,50-336/98-207 & 50-423/98-207 on 980301-0427.Violations Noted.Major Areas Inspected:Maint, Operations,Engineering & Plant Support IR 05000423/19970831998-06-12012 June 1998 Insp Rept 50-423/97-83 on 980413-24.Violations Noted. Major Areas Inspected:Readiness of Plant Hardware,Staff & Mgt Programs to Support Safe Restart & Continued Operation of Plant Unit 3 IR 05000423/19970821998-06-11011 June 1998 Insp Rept 50-423/97-82 on 980209-20.Violations Noted.Major Areas Inspected:Corrective Actions Processes IR 05000336/19982021998-06-11011 June 1998 Insp Rept 50-336/98-202 on 980302-0409.Violations Noted. Major Areas Inspected:Cooling Water Sys ML20248E6131998-05-26026 May 1998 Insp Repts 50-245/98-206,50-336/98-206 & 50-423/98-206 on 980101-0228.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000423/19980811998-05-22022 May 1998 Insp Rept 50-423/98-81 on 980302-31 & 0412.Violations Noted. Major Areas Inspected:Plant Support IR 05000423/19982051998-05-0808 May 1998 Insp Rept 50-423/98-205 on 980223-0306.Violations Noted. Major Areas Inspected:Corrective Action Implemention Insp IR 05000423/19980011998-05-0606 May 1998 Insp Rept 50-423/98-01 on 980223-26.Violation Noted.Major Areas Inspected:Emergency Preparedness Program,Plant Support IR 05000245/19982101998-04-21021 April 1998 Evaluation Repts 50-245/98-210,50-336/98-210 & 50-423/98-210 on 971208-12 & 980105-09.No Violations Noted.Major Areas Inspected:Status & Effectivness of Independent third-party, Oversight Program,Established to Oversee ECP Implementation IR 05000245/19970121998-04-20020 April 1998 Evaluation Repts 50-245/97-12,50-336/97-12 & 50-423/97-12 on 971208-12 & 980105-09.No Violations Noted.Major Areas Evaluated:Implementation of ECP & Employee Concerns Oversight Program at Millstone IR 05000423/19972101998-04-0303 April 1998 Insp Rept 50-423/97-210 on 980105-0206.Violations Noted. Major Areas Inspected:Effectiveness of Configuration Mgt Program,Effectiveness of Sargent & Lundy Review of Sys Objectives & Quench & Recirculation Spray Sys IR 05000245/19980801998-04-0101 April 1998 Insp Repts 50-245/98-80,50-336/98-80 & 50-423/98-80 on 980223-26.No Violation Noted.Major Areas Inspected:Status of EP Facilities,Equipment & Resources,Ep Procedures & Documentation & Staff Knowledge & Performance IR 05000423/19972091998-04-0101 April 1998 Insp Rept 50-423/97-209 on 971027-980128.Violations Noted. Major Areas Inspected:Licensee Ability to Identify & Resolve Licensing Bases Deficiencies IR 05000423/19980821998-03-27027 March 1998 Insp Rept 50-423/98-82 on 980209-27.Violations Noted.Major Areas Inspected:Millstone Unit 3 MOV Program,Including Various C/A Taken IR 05000245/19972081998-02-25025 February 1998 Insp Repts 50-245/97-208,50-336/97-208 & 50-423/97-208 on 971201-31.Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000336/19970841998-02-0909 February 1998 Insp Repts 50-336/97-84 & 50-423/97-84 on 970915-19.No Violations Noted.Major Areas Inspected:Review of post-fire Safe Shutdown Program for Unit 2 & Control of Configuration of post-fire Safe Shutdown Equipment for Unit 3 IR 05000336/19972111998-02-0909 February 1998 Insp Rept 50-336/97-211 on 970825-29,0902-05 & 1201-05.No Violations Noted.Major Areas Inspected:Evaluation of Parson Implementation of Independent CA Verification Program Audit Plan IR 05000245/19970851998-02-0606 February 1998 Insp Repts 50-245/97-85,50-336/97-85 & 50-423/97-85 on 971001-17,1120-21 & 1204-12.No Violations Noted.Major Areas Inspected:Simulator Portion of Annual Operating Tests of Licensed Operator Requalification Training Programs IR 05000245/19972071998-01-0909 January 1998 Insp Repts 50-245/97-207,50-336/97-207 & 50-423/97-207 on 971002-1130.No Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support ML20202J8191997-12-0505 December 1997 Insp Rept 50-423/97-206 on 970818-29 & 0908-19.Violations Noted.Major Areas Inspected:Licensees Configuration Mgt Plan & Emergency Core Cooling & Seal Injection Functions of Charging Sys ML20202A7071997-11-24024 November 1997 Insp Repts 50-245/97-81,50-336/97-81 & 50-423/97-81 on 970820-22.No Violations Noted.Major Areas Inspected: Licensee Emergency Response Organization During Biennial, full-participation Exercise IR 05000245/19972031997-11-21021 November 1997 Insp Repts 50-245/97-203,50-336/97-203 & 50-423/97-203 on 970722-1001.Violations Noted.Major Areas Inspected:Maint, Engineering,Plant Support & Conduct of Operations ML20210S8861997-08-29029 August 1997 Insp Repts 50-245/97-202,50-336/97-202 & 50-423/97-202 on 970520-0721.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support Re Performance in Emergency Preparedness & Control of FP Activities IR 05000245/19972021997-08-29029 August 1997 Insp Repts 50-245/97-202,50-336/97-202 & 50-423/97-202 on 970529-0721.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support,Including Emergency Preparedness Issues & Fire Protection Activities ML20141E3411997-06-24024 June 1997 Insp Repts 50-245/97-02,50-336/97-02 & 50-423/97-02 on 970311-0519.Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support ML20140C5641997-04-11011 April 1997 Insp Repts 50-245/97-01,50-336/97-01 & 50-423/97-01 on 970101-0310.Violations Noted.Major Areas Inspected:Maint, Engineering & Plant Support ML20140C0421997-03-26026 March 1997 Insp Repts 50-245/97-03,50-336/97-03 & 50-423/97-03 on 970203-07.No Violations Noted.Major Ares Inspected: Audits,Security Training,Equipment Testing & Management Support 1999-09-14
[Table view] Category:UTILITY
MONTHYEARIR 05000245/19900231990-11-15015 November 1990 Insp Repts 50-245/90-23,50-336/90-25 & 50-423/90-23 on 901001-05.No Violations Noted.Major Areas Inspected: Radiological Controls Program IR 05000423/19900191990-11-14014 November 1990 Insp Rept 50-423/90-19 on 900905-1015.Violations Noted. Major Areas Inspected:Operations,Radiological & Chemistry Controls & Security & Maint & Surveillance IR 05000213/19900831990-11-0505 November 1990 Insp Repts 50-213/90-83,50-245/90-82,50-336/90-82 & 50-423/90-83 on 900924-28.No Violations Noted.Major Areas Inspected:Licensee Timeliness for Reporting/Operability Determinations IR 05000336/19900181990-11-0505 November 1990 Insp Rept 50-336/90-18 on 900822-1001.One Cited Violation, One Noncited Violation & One Deviation Noted.Major Areas Inspected:Plant Operations,Surveillance,Maint,Previously Identified Items,Engineering/Technical Support IR 05000245/19900191990-10-26026 October 1990 Safety Insp Repts 50-245/90-19,50-336/90-21 & 50-423/90-17 on 900904-07.No Violations or Deviations Identified.Major Areas Inspected:Qa Program Implementation IR 05000213/19900821990-10-23023 October 1990 Insp Repts 50-213/90-82,50-245/90-81,50-336/90-81 & 50-423/90-82,on 901001-12.No Violations Noted.Major Areas Inspected:Licensee Occupational Radiation Protection Program Activities During Unit 1 Refueling Outage IR 05000336/19900191990-10-15015 October 1990 Insp Rept 50-336/90-19 on 900910-14.No Violations Noted. Major Areas Inspected:Open Items & Allegations from Insp Rept 50-336/89-13 IR 05000245/19900161990-10-0303 October 1990 Partially Withheld Insp Repts 50-245/90-16,50-336/90-17 & 50-423/90-16 on 900827-31.Violations Noted IR 05000423/19900101990-08-17017 August 1990 Insp Rept 50-423/90-10 on 900612-0723.Violations Noted.Major Areas Inspected:Normal & Backshift Work Periods of Plant Operations,Maint & Surveillance,Security,Engineering & Technical Support,Radiological Controls & Safety Assessment IR 05000245/19900141990-08-16016 August 1990 Insp Repts 50-245/90-14,50-336/90-15 & 50-423/90-13 on 900723-27.One Noncited Violation Noted.Major Areas Inspected:Radiological Controls IR 05000423/19900061990-08-14014 August 1990 Insp Rept 50-423/90-06 on 900604-08.No Violations or Deviations Noted.Major Areas Inspected:Training Program, Including Licensed Operator Training Program for Initial Licensing & Requalification Program for Licensed Operators IR 05000245/19900111990-08-0909 August 1990 Insp Repts 50-245/90-11,50-336/90-12 & 50-423/90-09 on 900611-15 & 25-29.No Violations Noted.Major Areas Inspected: Review of Licensee Emergency Diesel Generator Fuel Oil Program IR 05000423/19900801990-08-0202 August 1990 Insp Rept 50-423/90-80 on 900416-25.No Violations Noted. Major Areas Inspected:Development of Sufficient Procedures in Appropriate Areas to Cover Broad Spectrum of Accidents & Equipment Failures IR 05000336/19900111990-07-31031 July 1990 Insp Rept 50-336/90-11 on 900530-0711.Noncited Violations Noted.Major Areas Inspected:Plant Operations,Radiological Controls/Emergency Preparedness,Maint/Surveillance, Engineering/Technical Support & Security IR 05000245/19900131990-07-24024 July 1990 Insp Repts 50-245/90-13,50-336/90-13 & 50-423/90-11 on 900609-13.No Violations or Deviations Noted.Major Areas Inspected:Radiological Environ Monitoring Program,Including Mgt Controls,Audits & Surveillance Procedures IR 05000245/19900091990-07-20020 July 1990 Insp Rept 50-245/90-09 on 900515-0625.No Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Maint/Surveillance,Security,Engineering/Technical Support & Safety Assessment/Quality Verification IR 05000245/19900071990-07-0606 July 1990 Insp Rept 50-245/90-07 on 900403-0514.No Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Maint/Surveillance,Security,Engineering/Technical Support & Safety Assessment/Quality Verification IR 05000423/19900081990-07-0303 July 1990 Partially Withheld Insp Rept 50-423/90-08 on 900503-0611 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Maint & Surveillance,Security,Engineering & Technical Support & Safety Assessment & Quality Verification IR 05000336/19900081990-07-0202 July 1990 Insp Rept 50-336/90-08 on 900425-27.No Violations Noted. Major Areas Inspected:Results of Eddy Current Exam of Steam Generators Performed During Oct 1989,w/emphasis on Acceptable Period of Operation for Steam Generators ML20055E7991990-06-29029 June 1990 Insp Rept 50-336/90-09 on 900417-0529.Violations Noted. Major Areas Inspected:Plant Operations,Surveillance,Maint, Previously Identified Items,Engineering/Technical Support, Committee Activities,Periodic Repts,Lers & Allegations ML20055D1431990-06-20020 June 1990 Enforcement Conference Rept 50-245/90-08 on 900615.Major Areas Discussed:Findings in Insp Rept 50-245/90-08 Re Shipment of Irradiated Hardware as Radwaste to Low Level Waste Disposal Facility in Barnwell,Sc on 900507 ML20055C3161990-02-21021 February 1990 Insp Rept 50-245/89-19 on 891023-27.Unresolved Items Noted. Major Areas Inspected:Review of Selected Deviations from Rev 4 to to GE Topical Rept NEDO-31331, Emergency Procedure Guidelines & Response to NRC Bulletin 88-007,Suppl 1 IR 05000423/19890191989-09-22022 September 1989 Insp Rept 50-423/89-19 on 890828-0901.No Violations Noted. Major Areas Inspected:Radiological & non-radiological Chemistry Program Including Confirmatory Measurements, Chemistry & Lab Qa/Qc IR 05000245/19890181989-09-13013 September 1989 Insp Repts 50-245/89-18,50-336/89-18 & 50-423/89-15 on 890807-11.No Violations Noted.Major Areas Inspected:Util Compliance W/Atws Rule (10CFR50.62) & QA Annual Review, Including Procurement Program & Matl Receipt & Storage IR 05000245/19890801989-08-31031 August 1989 Insp Repts 50-245/89-80,50-336/89-80 & 50-423/89-80 on 890530-0616 & 0710-14.No Violations Noted.Major Areas Inspected:Units 1,2 & 3 Maint Program & Implementation, Review of Maint Documents & Observation of Work in Progress IR 05000336/19890161989-08-21021 August 1989 Insp Rept 50-336/89-16 on 890616-0726.Violation Noted.Major Areas Inspected:Plant Operations,Surveillance,Maint, Previously Identified Items,Committee Activities,Emergency Diesel Generator Operation & Fuel Oil Sys IR 05000423/19890131989-08-21021 August 1989 Insp Rept 50-423/89-13 on 890724-28.No Violations Noted. Major Areas Inspected:Fire Protection Prevention Program IR 05000245/19890161989-08-0202 August 1989 Insp Repts 50-245/89-16 & 50-336/89-15 on 890711-14.No Violations Noted.Major Areas Inspected:Implementation of Radiation Protection Program IR 05000423/19890111989-08-0202 August 1989 Insp Rept 50-423/89-11 on 890613-0717.No Violations Noted. Major Areas Inspected:Facility Tours of MP-3 Site,Esf Sys Walkdowns of Recirculation Spray Sys,Si Pump Cooling Sys, Turbine Driven Auxiliary Feed Pump Sys & Review of LERs IR 05000245/19890141989-07-28028 July 1989 Insp Rept 50-245/89-14 on 890616-0717.No Unsafe Conditions Noted.Major Areas Inspected:Plant Operations,Physical Security,Control Room Exercise Equipment & NRC Temporary Instruction 2513/93 IR 05000336/19890111989-07-21021 July 1989 Insp Rept 50-336/89-11 on 890505-0615.No Unsafe Conditions Noted.Major Areas Inspected:Plant Operations,Surveillance, Maint,Previously Identified Items,Allegations,Committee Activities,Licensee self-assessment & LERs IR 05000423/19890121989-07-21021 July 1989 Insp Rept 50-423/89-12 on 890626-30.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp Program,Steam Generator Eddy Current Insps & Water Chemistry Results IR 05000245/19890121989-07-19019 July 1989 Insp Rept 50-245/89-12 on 890509-0615.Major Areas Inspected: Previously Identified Items,Outage Activities,Plant Operations,Physical Security,Recirculation Pump Seal Failure Event,Reactor Scram on Low Main Condenser Vacuum & LERs IR 05000423/19890081989-07-11011 July 1989 Insp Rept 50-423/89-08 on 890515-0612.No Violations Noted. Major Areas Inspected:Plant Operations,Unresolved Item 50-423/87-12-01,previous Insp Findings,Plant Incident Repts, in-core Thimble Degradation & 10CFR50.59 Safety Evalautions IR 05000245/19890151989-07-0505 July 1989 Insp Repts 50-245/89-15,50-336/89-14 & 50-423/89-10 on 890619-23.No Violations or Deviations Noted.Major Areas Inspected:Effluent,Transportation & Solid Radwaste Programs, Including Mgt Controls,Audits,Qa & Program Implementation IR 05000245/19890131989-06-29029 June 1989 Enforcement Conference Rept 50-245/89-13 on 890621.Major Areas Discussed:Shipment of High Pressure Pump & Trailer W/ Removable External Radioactive Contamination from Licensee Reactor Site to Vendor Site in Moorestown,Nj IR 05000423/19890041989-06-28028 June 1989 Insp Rept 50-423/89-04 on 890405-0515.No Violations Noted. Major Areas Inspected:Plant Incident Repts,Reactor Scrams, Shutdown to Repair High Unidentified Leakage & Repair to Svc Water Piping & Physical Security IR 05000336/19890081989-06-20020 June 1989 Insp Rept 50-336/89-08 on 890324-0504.No Violations Noted. Major Areas Inspected:Plant Operations,Outage Activities, Surveillance,Maint,Plant Incident Repts & Allegations IR 05000245/19890081989-06-15015 June 1989 Insp Rept 50-245/89-08 on 880328-0508.No Unsafe Plant Conditions Noted.Major Areas Inspected:Plant Operations, Physical Security,Licensee Receipt Insp of New Fuel, Refueling,Plant Mods & LERs ML20245A8371989-06-0909 June 1989 Insp Rept 50-245/89-13 on 890517-18.Violations Noted Re Shipment of Package W/Removable External Radioactive Contamination in Excess of Limits & Failure to Supply Shipping Papers.Major Areas Inspected:Shipment of Pump ML20245A6781989-06-0707 June 1989 Insp Rept 50-245/89-11 on 890501-05.No Violations Noted. Major Areas Inspected:Observations,Review of Data,Licensee Response to Generic Ltr 88-01,NDE Procedures,Engineering Support & QA Involvement IR 05000245/19890101989-06-0707 June 1989 Insp Repts 50-245/89-10 & 50-336/89-12 on 890515-19.No Violations Noted.Major Areas Inspected:Fire Protection & Prevention Program,Including Program Administration & Organization & Administrative Control of Combustibles IR 05000245/19890091989-05-18018 May 1989 Insp Repts 50-245/89-09 & 50-336/89-10 on 890417-21.No Violations Noted.Major Areas Inspected:Review of Radiation Protection Activites at Unit 2 & Begining of Refueling Outage at Unit 1 IR 05000245/19890051989-05-17017 May 1989 Insp Repts 50-245/89-05 & 50-336/89-07 on 890417-21.No Violations Noted.Major Areas Inspected:Engineering Organization & Staffing,Qa,Plant Mods & Technical Training IR 05000423/19890031989-05-0303 May 1989 Insp Rept 50-423/89-03 on 890228-0404.No Violations Noted. Major Areas Inspected:Plant Operations,Status of Previous Insp Findings,Fuel Receipt & Insp,Generic Concerns About Steam Generator Tube Plugs,Esf Walkdown & LERs IR 05000245/19890041989-05-0303 May 1989 Insp Rept 50-245/89-04 on 8902214-0327.Major Areas Inspected:Previously Identified Items,Plant Operations, Physical Security,Ultrasonic Testing of Condensate Storage Tank,Maint Program Implementation & Committee Activities ML20246K0931989-04-26026 April 1989 Insp Rept 50-336/89-05 on 890211-0323.No Violations Noted. Major Areas Inspected:Outage Activities,Surveillance,Maint, Previously Identified Items,Plant Incident Repts & Allegations IR 05000245/19890061989-04-0707 April 1989 Insp Repts 50-245/89-06,50-336/89-09 & 50-423/89-06 on 890306-10.No Violations Noted.Major Areas Inspected:Review of Implementation of Radiation Protection Program at Unit 2 During Refueling Outage & Preparation of Outages for Units IR 05000245/19890071989-03-23023 March 1989 Insp Repts 50-245/89-07,50-336/89-06 & 50-423/89-07 on 890221-0303.No Violations or Deviations Noted.Major Areas Inspected:Site Observations & in-ofc Review of Data in Areas of Inservice Insp & Secondary Water Chemistry IR 05000245/19890031989-03-15015 March 1989 Insp Repts 50-245/89-03 & 50-336/89-04 on 890213-17.No Violations Noted.Major Areas Inspected:Unit 2 Refueling Outage Activities,Unit 1 Refueling Outage Preparation Activities & Station ALARA Practices 1990-08-09
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000245/19990081999-09-14014 September 1999 Insp Repts 50-245/99-08,50-336/99-08 & 50-423/99-08 on 990615-0809.Four Violations Noted & Being Treated as Ncvs. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000423/19990071999-08-27027 August 1999 Insp Rept 50-423/99-07 on 990614-0715.Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Review of C/A Program Using IP 40500, Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems IR 05000336/19990061999-07-19019 July 1999 Insp Repts 50-336/99-06 & 50-423/99-06 on 990420-0614.Ten Violations Occurred & Being Treated as non-cited Violations. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000336/19982191999-06-10010 June 1999 Insp Rept 50-336/98-219 on 981214-18,990126-29,0208-19 & 0301-05.Noncited Violations Identified.Major Areas Inspected:Exam of Licensee Corrective Action Implementation IR 05000245/19990051999-06-0404 June 1999 Errata to Insp Repts 50-245/99-05,50-336/99-05 & 50-423/99-05,consisting of Figure 1 ML20207G1211999-06-0303 June 1999 Insp Repts 50-245/99-05,50-336/99-05 & 50-423/99-05 on 990302-0419.No Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support ML20207F1521999-05-25025 May 1999 Notice of Violation from Investigation Rept 1-94-021 on 940506-960329.Violation Noted:Between 740831-910407,licensee Made Changes to Facility Described in Safety Analysis Rept for Refueling Core Offloads Without Performing Evaluation ML20196K2621999-05-24024 May 1999 EN-99-020:on 980525,notice of Violation & Exercise of Enforcement Discretion Will Be Issued to Licensee.Action Based on Severity Level III Problem Consisting of Four Individual Violations Involving Refueling Outage PNO-I-99-022, on 990509,Millstone Unit 2 Established Reactor Criticality.Nrc Staff Providing Augmented Insp Coverage of Restart Activities,Including round-the-clock Observations of Licensee Activities During Key Operational Evolutions1999-05-11011 May 1999 PNO-I-99-022:on 990509,Millstone Unit 2 Established Reactor Criticality.Nrc Staff Providing Augmented Insp Coverage of Restart Activities,Including round-the-clock Observations of Licensee Activities During Key Operational Evolutions IR 05000336/19990031999-05-10010 May 1999 Insp Rept 50-336/99-03 on 990322-26.No Violations Noted. Major Areas Inspected:Review of Actions Taken by Util to Resolve Significant Issues List Item 21,fire Protection ML20206F4601999-04-30030 April 1999 Insp Rept 50-336/99-04 on 990315-31.Violation Noted.Major Areas Inspected:Monitored Licensee Activities During Plant Transition Between Operational Modes,Both During Normal & off-normal Working Hours PNO-I-99-016, on 990406,operators Initiated Plant Cooldown from Normal Operating Pressure & Temp in Mode 3,hot Standby. Cooldown Was Necessary to Minimize Further Degradation of Bonnet Pressure Seal for Valve 2-SI-652 & to Repair Valve1999-04-0707 April 1999 PNO-I-99-016:on 990406,operators Initiated Plant Cooldown from Normal Operating Pressure & Temp in Mode 3,hot Standby. Cooldown Was Necessary to Minimize Further Degradation of Bonnet Pressure Seal for Valve 2-SI-652 & to Repair Valve ML20205M7201999-04-0606 April 1999 Notice of Violation from NRC OI Case 1-96-002 & Conclusions of Millstone Independent Review Team.Violation Noted. E Debarba,Deliberately Discriminated Against Supervisor in Performance Engineering Group at Millstone Station ML20205M7351999-04-0606 April 1999 Notice of Violation from Investigation in Case Numbers 1-96-002 & 1-97-007.Violation Noted:Licensee Discriminated Against Supervisor in Performance Engineering Group at Plant Due to Involvement in Protected Activities IR 05000245/19990021999-04-0202 April 1999 Insp Repts 50-245/99-02,50-336/99-02 & 50-423/99-02 on 990112-0301.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000336/19990011999-03-29029 March 1999 Insp Rept 50-336/99-01 on 990117-0217.Violations Noted.Major Areas Inspected:Licensee C/A Program Implementation Using Guidance of NRC IP 40500, Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems ML20205J0941999-03-12012 March 1999 Rept of Review of Millstone Units 1,2 & 3:Allegations of Discrimination in NRC Ofc of Investigations Cases 1-96-002, 1-96-007,1-97-007 & Associated Lessons Learned ML20207M1131999-03-0909 March 1999 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $88,000.Violation Noted:Employment of Two Contractor Employees Terminated in Aug 1997,in Part Because Individuals Raised Concerns Re MOV Program Manual ML20205G6161999-03-0909 March 1999 EN-99-010:on 990309,notice of Proposed Imposition of Civil Penalty in Amount of $88,000 Issued to Licensee.Action Based Upon Severity Level II Problem Involving Discrimination Against Two Contractor Employees at Millstone MOV Dept IR 05000245/19980061999-03-0101 March 1999 Insp Repts 50-245/98-06,50-336/98-06 & 50-423/98-06 on 981123-990111.No Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support PNO-I-99-006, on 990128,operators Inadvertently Reduced Spent Fuel Pool Water Level by Two Inches When Purification of Spent Fuel Pool Water Initiated.Operators Held Shift Briefing to Discuss Realigning Purification Sys1999-01-29029 January 1999 PNO-I-99-006:on 990128,operators Inadvertently Reduced Spent Fuel Pool Water Level by Two Inches When Purification of Spent Fuel Pool Water Initiated.Operators Held Shift Briefing to Discuss Realigning Purification Sys IR 05000245/19982171999-01-22022 January 1999 Evaluation Repts 50-245/98-217,50-336/98-217 & 50-423/98-217 Conducted on 981026-30.Areas Evaluated:Whether NNECO Has Improved Sufficiently & Has Demonstrated Sustained Performance in Maintaining safety-conscious Work Environ PNO-I-99-004, on 990115,carbon Dioxide Was Inadvertently Discharged Into Unit 3 Cable Spreading Room,Containing Electrical Wiring.Ambulance Reported to Site as Precautionary Measure.Licensee Assembled Event Review1999-01-20020 January 1999 PNO-I-99-004:on 990115,carbon Dioxide Was Inadvertently Discharged Into Unit 3 Cable Spreading Room,Containing Electrical Wiring.Ambulance Reported to Site as Precautionary Measure.Licensee Assembled Event Review IR 05000336/19980051999-01-0707 January 1999 Insp Repts 50-336/98-05 & 50-423/98-05 on 981006-1123. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20199C6381999-01-0707 January 1999 Notice of Violation from Insp on 981006-1123.Violation Noted:On or Before 981120,conduit 9-15,in Fire Area A-24,not Sealed & Tested in Accordance with Astme E-119,fire Endurance Test PNO-I-99-001, on 981231,Millstone Unit 2 Began Reloading Fuel Into Reactor After Extended Shutdown.Millstone Unit 3 Went Critical on 981230,after Forced Outage Due to Inadvertent MSIV Closure During Surveillance Testing at Power1999-01-0404 January 1999 PNO-I-99-001:on 981231,Millstone Unit 2 Began Reloading Fuel Into Reactor After Extended Shutdown.Millstone Unit 3 Went Critical on 981230,after Forced Outage Due to Inadvertent MSIV Closure During Surveillance Testing at Power PNO-I-98-062, on 981211,Millstone Unit 3 Tripped from 100% Reactor Power During MSIV Partial Stroke Testing.Solenoid Valve Integral to MSIV Failed to Reopen When Licensed Operator Released Test Switch1998-12-15015 December 1998 PNO-I-98-062:on 981211,Millstone Unit 3 Tripped from 100% Reactor Power During MSIV Partial Stroke Testing.Solenoid Valve Integral to MSIV Failed to Reopen When Licensed Operator Released Test Switch ML20195H6901998-11-18018 November 1998 Notice of Violation from Insp on 980818-1005.Violation Noted:Engineering Evaluations Not Performed When RCS Heatup Rate Limit Exceeded on 951217 & When RCS Cooldown Rate Limit Exceeded on Three occasions,940424,0728 & 951215 IR 05000245/19982161998-11-18018 November 1998 Insp Repts 50-245/98-216,50-336/98-216 & 50-423/98-216 on 980818-1005.Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support IR 05000336/19982031998-11-0505 November 1998 Insp Rept 50-336/98-203 on 980824-0904.No Violations Noted. Major Areas Inspected:Effectiveness of Configuration Mgt Plan ML20155B1521998-10-23023 October 1998 Notice of Violation from Insp on 980810-0903.Violation Noted:Design Basis,As Described in FSAR Chapter 14,Accident Analyses Had Not Been Correctly Translated Into Plant Procedures & Acceptance Criteria IR 05000336/19982131998-10-23023 October 1998 Insp Rept 50-336/98-213 on 980810-0903.Violations Noted. Major Areas Inspected:Certain Aspects of Accident Mitigation Sys IR 05000245/19982151998-10-14014 October 1998 Evaluation Repts 50-245/98-215,50-336/98-215 & 50-423/98-215 on 980824-28.Major Areas Evaluated:Whether Licensee Has Improved Sufficiently & Has Demonstrated Sustained Performance in Maintaining safety-conscious Work Environ IR 05000336/19980041998-10-0101 October 1998 Insp Rept 50-336/98-04 on 980914-18.No Violations Noted. Major Areas Inspected:Mov Program Associated with GL 89-10 IR 05000245/19982121998-09-25025 September 1998 Insp Repts 50-245/98-212,50-336/98-212 & 50-423/98-212 on 980630-0817.No Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support IR 05000423/19982111998-09-11011 September 1998 Insp Rept 50-423/98-211 on 980413-24,0511-15,27-29,0609-11 & 23-25.Violation Noted.Major Areas Inspected:Evaluation of Licensee C/As & Other ICAVP Process Activities ML20154D1151998-09-11011 September 1998 Notice of Violation from Insp on 980413-24-0511-15,27-29, 0609-11 & 23-25.Violation Noted:Program Implemented TS 6.8.4.a,failed to Include Provisions to Reduce Leakage from RSS Heat Exchangers to SW Sys IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support PNO-I-98-039, 980812,Millstone Unit 3 Was Shutdown to Repair Small Leak on Afws Discharge Noted.Current Leakage Does Not Exceed Regulatory Requirements & Shutdown Not Required by Tech Specs.Licensee Issued Press Release on 9808111998-08-12012 August 1998 PNO-I-98-039:980812,Millstone Unit 3 Was Shutdown to Repair Small Leak on Afws Discharge Noted.Current Leakage Does Not Exceed Regulatory Requirements & Shutdown Not Required by Tech Specs.Licensee Issued Press Release on 980811 ML20237D3041998-08-12012 August 1998 Notice of Violation from Insp on 980413-0508.Violations Noted:Two Examples Identified Where Licensee Not Performing Leakage Testing of safety-related Valves in Sys That Could Contain Highly Radioactive Fluids During Accident IR 05000245/19982081998-08-12012 August 1998 Insp Repts 50-245/98-208,50-336/98-208 & 50-423/98-208 on 980428-0629.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support ML20237B0741998-08-12012 August 1998 Notice of Violation from Insp on 980428-0629.Violation Noted:Licensee Failed to Direct Test Personnel to Close & Lock RHR Outboard Drain Valve IR 05000336/19982011998-08-12012 August 1998 Insp Rept 50-336/98-201 on 980413-0508.Violations Noted. Major Areas Inspected:Licensee Ability to Identify & Resolve Deficiencies Focusing,But Not Limited To,Period of CMP Implementation & ICAVP at Parsons Power Group,Inc PNO-I-98-026, on 980701,Millstone Unit 3 Criticality Update Made.Nrc Staff Continues to Provide Augmented Insp of Unit 3 Restart Activities,Including round-the-clock Coverage of Key Operational.Licensee Plans No Press Release1998-07-0101 July 1998 PNO-I-98-026:on 980701,Millstone Unit 3 Criticality Update Made.Nrc Staff Continues to Provide Augmented Insp of Unit 3 Restart Activities,Including round-the-clock Coverage of Key Operational.Licensee Plans No Press Release PNO-I-98-025, on 980630,unit 3 Established Reactor Criticality,However Reactor Was Shut Down When Control Room Operator Noticed Spiking Intermediate Range Monitor.Licensee Troubleshooting1998-06-30030 June 1998 PNO-I-98-025:on 980630,unit 3 Established Reactor Criticality,However Reactor Was Shut Down When Control Room Operator Noticed Spiking Intermediate Range Monitor.Licensee Troubleshooting IR 05000245/19982071998-06-19019 June 1998 Insp Repts 50-245/98-207,50-336/98-207 & 50-423/98-207 on 980301-0427.Violations Noted.Major Areas Inspected:Maint, Operations,Engineering & Plant Support ML20249C6931998-06-19019 June 1998 Notice of Violations from Combined Insp on 980301-0427. Violations Noted:Prior to 980424,instrument Min Accuracy of Wind Speed Channels Were Not Measured as Required by Table 3.3-8 of Unit 2 TS 3/4.3.3.4 IR 05000423/19970831998-06-12012 June 1998 Insp Rept 50-423/97-83 on 980413-24.Violations Noted. Major Areas Inspected:Readiness of Plant Hardware,Staff & Mgt Programs to Support Safe Restart & Continued Operation of Plant Unit 3 ML20249B0421998-06-12012 June 1998 Notice of Violations from Insp on 980413-24.Violations Noted:Only 1 RCS Loop Operable W/Plant in Mode 4 on 980407 IR 05000423/19970821998-06-11011 June 1998 Insp Rept 50-423/97-82 on 980209-20.Violations Noted.Major Areas Inspected:Corrective Actions Processes 1999-09-14
[Table view] |
Text
,
.
- .
,
U.S. NUCLEAR REGULATORY COMMISSION
REGION I
Report N /85-14 Docket N License N CPPR-113 Priority --
Category B Licensee: Northeast Nuclear Energy Company P.O. Box 270 Hartford, Connecticut 06101 Facility Name: Millstone Nuclear Power Station, Unit 3 Inspection At: Waterford, Connecticut Inspection Conducted: April 8 - 27, 1985 Inspectors: . . d 18 H. H. Nicholas, Lead Reactor /date/
En ineer Approved by: ,
- - d
. H. Bettenhause'n, Chief ' date Operations Branch, DRS
' Inspection Summary:
Inspection on April 8 - 27, 1985 (Inspection No. 50-423/85-14)
Areas Inspected: Routine, announced inspection of the preoperational test
! program including test program implementation, test procedure review and verification, test results evaluation, test witnessing; licensee action on previous inspection findings; emergency diesel generator status; witnessing of reactor coolant system cold hydrostatic test; witnessing of new fuel receipt, inspection and storage; quality assurance and quality control interface; and, tours of the facility. The inspection involved 121 hours0.0014 days <br />0.0336 hours <br />2.000661e-4 weeks <br />4.60405e-5 months <br /> on site t'y one NRC region-based inspecto Results: No items of noncompliance were identifie .
G l
- - - - _
'
..
.
DETAILS Persons Contacted-Northeast Nuclear Energy Company (NNECO)
M. Brown, I & C Supervisor C. Clement, Maintenance Supervisor J. Chunis, startup Engineer
- J. Crockett, Superintendent Unit 3 J. De Marzo, Startup Engineer A. Elms, Reactor Engineer E. Frieze, Startup Engineer M. Gelinas, Security Shift Supervisor M. Gentry, Assistant Startup Supervisor J. Hamlin, Shift Supervisor J. Harris, Startup Supervisor-N. Hulme, Startup Engineer K. Jensen,-Reactor Engineer T. Lyons, Startup Engineer N. Madden, Startup Engineer J. McConnell, Reactor Engineer D. McDaniel, Reactor Engineer D. Miller Jr. , Startup Manager E. Olson, Shift Supervisor R. Sochatello, Radiation Protection Supervisor
'
S. Sudigala, Assistant Startup Supervisor P. Weekley, Security Supervisor Northeast utilities Service Company (NUSCO)
- D. Blumenthol,-QA-Engineer R. Lefebure, Senior Project Engineer C. Mares, QA Engineer
- E. Peckham,'QA Engineer R. Victor, QA Engineer Kemper_ Insurance Incorporated (KI)
F. Arujo, ANI Inspector W. Jones, ANI Inspector
__
e ~ w m- w. -
-
-g
- -.
.
- _
,
.
Hartford Steam Boiler (HSB)
B. Braden,'ANI Lead Inspector M. Headwall, ANI Inspector T.:Hume, ANI Inspector-R. Smith; ANI Inspector L. York, ANI Inspector-
, - R.-Zoner, ANI Inspector Westinghouse Electric Corporation (WEC)
C. Barnes, NSID Mechanical Specialist F. Bowen, Startup Engineer M. Brothers, I and C Engineer C. Callaway, Startup Engineer H. Carlson, Startup Engineer R. Clark, Startup Engineer J. Dolan, Site Manager Unit 3 J. Fernandez, Fuel Site Surveillance Engineer L. Getty, EMD Pump Specialist E. Harlow, Mechanical Engineer R. Hayes, Startup Engineer R. Merritt,-PD QA J. Moore, Startup Engineer R. Smith,_Startup Engineer J. Steffes,LStartup Engineer i Combustion Engineering Corporation R. Johnson, Reactor Vessel Specialist Stone and Webster Engineering Corporation (SWEC)
R. Bradley, Startup Engineer W. Matejek, Project Advisory Engineer T. McNatt, Startup Engineer M. Potkin, Startup Engineer SWEC Engineering Support For Hydrostatic Test E. McManus -
W. Ramsden P. Reilly W. Sullivan
.
SWEC Construction Support For Hydrostatic Test C. Hale E. Jacobs
- G. Pangborn R. Thomas
'
.- .
s:1
'
-
. SWEC Field Quality Control (FQC)
A. Audoin,.FQC Inspector M. Bezanson, FQC Inspector
~B. Burdick, FQC Inspector C. Card,_FQC Inspector P. Cardinal, FQC Inspector 10. Dolan', FQC Inspector D. Evans, FQC Inspector R. Guffey, FQC Inspector N. Hommer, FQC Inspector B. Kennedy, FQC, Inspecto R. King, FQC, Inspector P. La Ferriere, FQC Inspector G.-Marsh, FQC Inspector M. Matthews, FQC Inspector G. Musik, FQC Inspector J. Montanari, FQC Inspector
.
B. Patenaude, FQC Inspector L. Peterson, FQC Inspector T. Rhenborg, FQC Inspector-M._. Sunday, FQC Inspector W._ Taylor, FQC Inspector R. Thorbjansen,- FQC Inspector G. Turner, FQC Inspector B. Welsh, FQC Inspector S. Wicknick, FQC Inspector U. S. Nuclear Regulatory Commission (USNRC)
W. Baunack, Project Engineer D.'Lipinski, Resident Inspector
- T. Rebelowski, Senior Resident Inspector
- denotes those present at exit interview on April 26, 1985 Licensee Action On Previous Inspection Findings (Closed) Inspector Following Item 423/85-02-02 Fuel Receipt and Storage Review. This item involved NRC review of Procedure OP 3211A, definition of the qualification of personnel to handle fuel, the activation of-radiation monitoring equipment in the fuel . building without remote indication in the control room, and review of projected items to be completed prior to fuel receip As noted in Pragraph 6, all of the above items have been resolved and/or completed during the issuance of the SNM License, and the receipt of the new fuel for inspection and storage including the' issuance of an approved copy of OP 3211A Revision 0, Approved April 22, 1985, titled, New Fuel Assembly and RCCA Receipt and Inspection. The inspector verified the adequate resolution of all aspects of this item. This item is close .
.
_
5 Preoperational Test Program References References for the preoperational test program are documented in Inspecton Report 50-423/85-0 .1 Test Program Impl'ementation Scope The nine areas of preoperational test program requirements are the test program; the test organization; the test program administration; document control; design changes and modifications; plant and preventive maintenance; equipment pro ection and cleanliness; test and measurement equipment; and starten staff training. These areas are examined periodicallly by NRC inspectors for implementation during the test progra Discussion In the area of test program administration, the inspector interviewed the startup test manager and his staff, to verify that they were familiar with and implementing the administration of the preoperational test progra The inspector verified, by review of 4 turnover packages, that jurisdictional controls were observed for system turnover. The inspector spot checked portions of systems and components to verify that tagging was accomplished with jurisdictional controls; reviewed turnover documentation to see that jurisdictional controls were observed prior to testing, during repairs and modifications and subsequent to testing; verified by review of test procedures and interview of test personnel that test procedures were current prior to their use, personnel involved were knowledgeable of test procedures, methods to change test procedures during a test, methods to document significant events, unusual conditions and interruptions to testing, and methods far identifying deficiencies, documenting their resolutions and documenting retesting; and, verifying that a sequenced schedule is maintained and is curren In the area of equipment protection and cleanliness the inspector verified by interview of test personnel and review of marked up drawings that system flushing had not been invalidated during preoperational testin The inspector verified by review of documentation and by interviews of chemistry personnel, that water chemistry controls and sampling requirements were being implemented for the reactor coolant and for the condensate feedwater system >
In the area of test and measurement equipment, the inspector selected six pieces of test and measurement equipment and reviewed documentation and calibration records to verify that the administrative controls had been implemented.
L
.
.
_
.
Findings Through discussions with the startup manager and members of his staff, review of records, procedures, logs, and documentation, the inspector verified that the test program administration is being adequately implemented by review of turnover packages, tagging system and documentation; that cleanliness controls and equipment protection along with proper documentation, have been adequately implemented; and, that test and measurement equipment, plus documentation have been successfully
. implemente The inspector had no further questions in these areas covered. Verification by the inspector of other listed areas of the test program will be conducted on subsequent inspection .2 Test Procedure Review and Verification Scope The test procedures listed in ATTACHMENT A were reviewed for technical and administrative adequacy and to verify that test planning satisfies regulatory guidance and licensee commitmer.t Qi}sVI 99?
The proceduret ware examined for: management re"t9w and approval; grcC6 dure ?tra.at; t!D M: > 4 eiac cett abaectives; prerequisites;-
- t;<ironmental conditions; acceptance critreia; soorte ci a curts ev$
criteria; references; initial conditions; attainment of test objectives; test performance documentation end verification; degree of detail for test instructions; restcration of system to normal after testing:
'
' identification of test personnel; evaluation of test data; independent verificaton of critical : 'rn; or parameters; and, quality control and quality assu.ance involvemen Findings The review indicated that the procedures are consistent with regulatory requirements, guidance, and licensee commitments. No discrepancies or unacceptable conditions were identified. The inspector had no further questions on these procedure .3 Test Results Evaluation Scope The completed test procedures listed in ATTACHMENT B were reviewed to verify that adequate testing was accomplished in order to satisfy regulatory guidance and licensee commitments and to ascertain whether uniform criteria were being applied in the evaluation of completed
.
'
preoperational tests in order to assure their technical and administrative adequac m ,
~'
_g
~ 7
.
Discussion
~
.
i The inspectoi. reviewed the test results and verified the licensees' $
evaluation of test.results by review of: . test-changes; test exceptions;
' test deficiencis5; "as run" copy.~of test procedure; acceptance criteria;
-
. performance verification; recording of the conduct of tests; QC inspection records; restoration of system to normal after the. test; independent
.
verification'of. critical steps or parameters; identification of personnel conducting and evaluating test data; and, verification that the test results have been approve '
,
,. . Findings ~.
.
No. discrepancies or unacceptable conditions were noted in the review of
.these procedure .4 . Test Witnessing Scope-The inspectors witnessed portions of the following tests and preparations being made for upcoming test '(1) .New Fuel Receiving Crane Test (2)~;New Fuel Handling Crane ~ Test -
'(3) New Fuel Inspection Machine Functional . Test
.(4) Fuel-Handling Machine Load Cell Monitor
~
. (5). - New Fuel Elevator (6) Spent-Fuel Bridge Crane Test
'(7) Reactor Fuel Handling Tools
-
-(S) . Fuel Building Area Radiation Monitors
. (9)1 Spent Fue1~ Pool Cooling Functional Test l- , <(10) New Fuel. Receipt, Inspection and Storage Preparations (11). Hydrostatic Test Preparation .
Discussion- '
Test witnessing by the inspectors included observations of:
/
-
Overall crew performance-L --
Use of latest, revised and approved procedure available and in use by
-
the. test personnel '
--
' Designation of one person in charge-of conducting each test or-preparation.for testin .
--- Availability of sufficient test personnel to perform each test
--
Coverage fof test prerequisites
- - -
_Use of acceptance criteria to evaluate test.results
--
Verification that plant supporting systems are in: service
--
In service; status of. calibrated special test equipment required by
.the test procedure
!
.
.-'
,,.,s,.- ,e nn- e
p'
-
.
. -
.
.
---
Adherence to the test requirements of the test procedure during the
_
test
--
Timely and corrective actions by test personnel during the performance of the test
--
QC and QA interface and' coverage of events
--
Data col,lection for final analysis by proper personnel The inspectors made independent measurements and calculations of some of the tests during their performance, including start and stop times, travel times, weight lifts, distances, limits, lengths, heights, as well as flows, temperatures and pressures, including pump curve Findings Test results observed by the inspectors indicated that acceptance criteria had been met for those portions-of the tests that had been witnessed. No items of noncompliance were identified and no unacceptable conditions were note . Emergency Diesel Generator Status Scope The emergency diesel generator sets are the vital components of the emergency-standby power supply system to Unit 3 in the event of loss of coolant accident with the loss of offsite power during operation of the Unit. During the preoperational test program it is verified that the diesel engines, or a prototype, have completed 300 successful starts and stops; the EDG sets have mechanical and electrical load tests including 22-hours at rated power and 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> at overload rating; followed by qualification testing of the EDG sets which consists of 35 successful starts and stops, loading to at least 50 percent load; and lastly, observing the performance of the EDG sets when in standby,to respond to a simulated loss of coolant accident, with and without loss of offsite powe Discussion The emergency diesel generator sets to date are still in the testing stage of the preoperation1 test prcgram with the EDG "A" set mechanical and electrical load testing complete, and the EDG "B" set with only mechanical testing complete. As documented in Inspection Report-50-423/85-10, the inspector pointed out the concern for the recurring problem of EDG fuel injection pumps seizing. After removing'all fuel injection pumps from both engines for disassembly, inspection and-reassembly, the fuel injection pumps were reinstalled on EDG "A" set in order _to have the "A" engine as a standby power back up for the RCS cold hydrostatic tes In running the EDG "A" set one of the fuel injection pumps again seized.
j-
[
_
y r w w
.
e
_
Findings The licensee and the vendors representatives are exploring this recurring problem. The resolution and subsequent testing of these engines will be a follow-up on subsequent inspections. This is Unresolved Item 423/85-14-0 . Reactor Coolant System Cold Hydrostatic Test 5.1 Introduction The test objective was to perform initial fill and hydrostatic test of the reactor coolant and associated high pressure systems. During the initial fill various piping dead legs were flushed to complete cleaning of the react)r coolant and associated high pressure system. The reactor coolant pumps were checked and then used to sweep, vent and heatup the reactor coolant system. The integrity of the reactor coolant system for strength and leaf tightness is verified at 3110 PSIG for a minimum of 10 minute .2 References Supplementary Documentation (1) RCS and Associated Systems Turnover Package 3301 (2) Stone and Webster FSK Drawings (3) Stone and Webster P & ID Drawings (4) Stone and Webster TSK Drawings (5) Vendor Equipment Instruction Books, Operating Manuals, Purchase Specifications, Vendor Drawings and Correspondenc (6) Nuclear Steam Supply System 2240.000 - 001 (7) Electronic Pressure and Differential Pressure Transmitters 2472.510 -
662 (8) Vendor Equipment Technical Manuals
--
Pressurizer Manual 6
--
Steam Generator Manual 8
--
Reactor Vessel Manual 16
> -. Reactor Coolant Pump Manual 36
--
8" Motor Operated Angle Type Globe-Valves Manual 12
--
27.5" and 29" Motor Operated Gate Valves Manual 37 (9) FSAR Section 5 (10) ASME Boiler and Pressure Vessel Code Section 3 (11) NNECO Unit 3 Flushing Reference Manual (12) General Hydrostatic Test Procedure NEU-SU-1. Detailed Test Procedure (1) .T3301-Pool, Revision 0, Approved March 18, 1985 titled, Reactor Coolant and Associated System Fill and Hydrostatic Test
-
.
7 ,
.
-
10 l E
'
5.3 Discussion (1) -The hydrostatic test consisted of filling the reactor coolant system and associated high pressure systems to their first boundary valves as. indicated on the boundary diagrams and composite drawing (2) Flushes were conducted until all areas appeared clean as evidenced by
- inspection of the flushina cloth (3) System was pressurized to 60 PSIG and a round of sweeping and venting was conducted to purge all pockets of air or gases from system (4) Initial heatup of the coolant. system was obtained by supplying heated water to the charging pumps. When all venting was completed, temperatures above 70 F, and reactor vessel head tensioned, pressure was raised to 350 PSIG and subsequent heatup was accomplished by running reactor coolant-pump (5) With the temperature of the reactor pressure vessel head and the pressurizer above 120 F; and the steam generator temperatures above
-
-150 F,'the reactor coolant system was pressurized to 500 PSI (6) With the reactor coolant temperature above minimum for boltup and tensioning of the reactor pressure vessel head, and above minimum for p.essurization, the hydrostatic test was begun with pressure plateaus of 500 PSIG, 1000 PSIG, 2250 PSIG, and a final hydrostatic test pressure at 3110 PSIG for a minimum of 10 minutes. The average temperature at these prsssure plateaus was 155 (7) After completion of'the 3110 PSIG hold for a minimum of 10 minutes, pressure was reduced to 2400 PSIG and held there until leak inspection of all welds and mechanical fittings within the test boundary was performe .4 Observations Prior to the test, the inspector verified the following:
(1) Valve positions were checke (2) Latest. drawing revisions were used in conjunction with the vcive lineup list (3) Latest boundary diagraas were in us (4) Calibrated, serialized, and dated pressure gauges of proper range had been installed with gauge number 1 having been designated as the
" Official Gauge" and gauge number 2 as the "back up" guage. Pressure gauges were also installed at the charging pumps, the hydro pump, and the backup hydrolaser pump.
M
D~ .
.
.(5)' Overpressure protection was provided by an installed pressure range and capacity. stamped, calibrated and tested, serialized relief valve with backup relief valves at the hydrolaser pump discharg (6) -Temperatures at the reactor pressure vessel, pressurizer, steam generators, reactor coolant pumps as well as the reactor coolant loops; were above the specified minimum temperatur .(7) Required supporting systems were functiona (8) All welded joints and mechanical corrections were uncovere '
(9)' A11 temporary instrumentation had been installed and calibrate (10) Communications had been established between all stations, the control room, and all inspection team (11) QA and QC provided complete coverage for the entire even .5 Crew performance The inspector observed the following:
(1) The RCS cold hydrostatic test procedure with the latest revision was available and in use by crew member (2) The minimum crew requirements had been me (3) Briefings had been conducted with the crew and the inspection team (4) All test prerequisites were me (5) Appropriate systems, as needed, were in service.
,
c (6) Special test equipment and instrum' ~ ation required by the procedure was calibrated, in service, and mi ' by test personnel .
..
(7) Testing was being performed as req d by the procedur (8) Crew actions appeared to be correct and timely during the performance of'the tes (9) All test data were collected for final analysis by the cognizant test personnel.
L
__
y *-t T- *~ 7 --*- > + - - - --
s- w-
-
.
.
.
5.6 Test Witnessing By direct observation, the inspector witnessed the following:
(1) The manning and conduct of the test at the charging pump station, hydro pump station, the backup hydrolaser pump station, control room including-the temperature, pressure and flow monitoring panels; as well as the upper and lower reactor pressure vessel head areas of the 4 steam generators, and the 4 reactor coolant pump cubicle (2) Water sampling and results for water qualit (3) System pressure at 60 PSIG and reactor pressure vessel and pressurizer temperature above.120 F while steam generator temperatures were above 150 (4) System pressure at 350 PSIG and temperature at 165 (5) System pressure at 500 PSIG and temperature at 164 (6) System pressure at 1000 PSIG and temperature at 161 (7) System pressure at 2250 PSIG and temperature at 159 (8) Reactor pressure vessel flanges, upper head area, upper area of pressurizer and hydro pump station (9) Attaining and holding pressure at 3110 PSIG with temperature at 155 F for a minimum of 10 minutes as read on the official test gauge at the top of the pressurize (10) Depressurizing to 2400 PSIG and holding for detailed inspection of all welds and mechanical joint _(11) All assembled inspection teams passing into containment and to their respective areas of inspectio (12) Accompanying inspection teams into containment and inspecting welds on' reactor pressure vessel penetrations, pressurizer, steam generators, residual heat removal system,-surge line, spray line, instrument lines and incore tube (13) Use of allowable heatup rates, cooldown rates, pressurizing rate,
depressurizing rate and maximum allowable differential pressures and differential' temperature _
.
,
_
I 5.7 Independent Measurements
'(1) . Temperature the inspector made independent measurements of temperature at the following areas; Reactor pressure vessel upper, lower at:d flange areas; steam generators flange and lower head areas; pressurizer upper, lower, and shell areas including surge line and spray line; and reactor coolant loop lines; with a portable platinum tipped hand held pyromete (2) Pressure The inspector timed the increase and decrease of pressure at the *;ctious plateaus while monitoring the "heise" official and backup pressure gauges using a hand held portable stop watc (3) Time The inspector timed rates of change of temperature increases and decreases as well as rates of change of pressure increases and
,y decreases along with timing the hold time at 3110 PSIG hydrostatic test pressur (4) Vibration The inspector made independent measurements of vibration of
'
the Reactor Coolant Pumps using a portable hand held vibration mete The calculations and measurements made by the inspector in the areas of pressure, temperature, time, vibration, flow, and rates of change in
'
parameters in addition to test results observed by the inspector, indicated.that acceptance criteria had been me '
. Findings The inspector established by records review, by independent calculations and measurements, by direct observations, and by test witnessing, that testing was conducted in accordance with approved procedures. The inspector' independently verified the acceptability of the test results, and evaluated the performance of the licensee personnel involved in the tes No items of noncompliance were identifie . New Fuel Receipt Inspection and Storage References
.EN 31068 New Fuel Inspection Machine Functional Check OP- 3211A New Fuel Assembly and RCCA Receipt and Inspecton
- 0P 3303A Spent Fuel Bridge OP 3303B New Fuel Elevator OP 3303C Fuel Transfer System
- 0P 3303D Fuel Handling Tools OP 3303G New Fuel Handling Crane OP 3303H New Fuel Receiving Crane-T3305-P Spent Fuel Pool Cooling and Purificaiton Test
.T3303-IIO2 Fuel Handling Machine Load Cell Monitor T3303-1M02 Spent Fuel Bridge Crane
- -- . -
. - . - .
.
, .
- -
T3303-1E04 New Fuel Handling Crane T3314-C1M05 Fuel Building Dampers and Valves T3314-C1M01 Fuel Building Normal Exhaust Fan T3314-C1E01 Fuel Building Normal Exhaust Fan T3305-1M03 Spent Fuel Pool Cooling and Purification Valve Tests T3305-1M02 Spent Fuel Pool Purification Pump T3305-1M01 Spent Fuel Cooling Pump T3305-II01 Spent Fuel Pool Cooling And Purification Instrumentation T3305-1E03 Spent Fuel Pool Submersible Dewatering Pump T3305-1E01 Spent Fuel Cooling Pump T3305-1E02 Spent Fuel Pool Purification Pump T3305-IF01 Fuel Pool Cooling and Purification System Flush T3303-1E09 New Fuel Inspection Station T3303-1M05 Reactor Fuel Handling Tools T3303-1E07 New Fuel Elevator T3303-1E10 Spent Fuel Bridge Crane T3303-1E05 New Fuel Receiving Crane Test T3303-P001 Fuel Transfer System Test Letter to B. J. Youngblood, NRC, from W. G. Council, NNECO, dated March 14, 1985, titled: Control of Heavy Loads NRC IE Information Notice 80-01 NRC IE Information Notice 85-12 SER.Section 9 FSAR Section 4, NNECO Unit 3 Application for Special Nuclear Materials License,_USNRC Materials License SNM-1950 dated April 16, 1985 6.1 Introduction The objective of this inspection was to ascertain whether nuclear fuel '
received at the construction site is properly accepted and safeguarded, and whether it is stored in accordance with the NRC license requirement This was accomplished by direct observation of activities and review of documentation at various times over a period of three weeks prior to the issuance of the NRC materials license and the arrival of the first shipment of nuclear fuel, and by witnessing of the first shipment of fuel, from its arrival at the main gate, to its final storage place in the spent fuel poo .2 Discussion The inspector reviewed documents in the following areas pertaining to the receipt, inspection and storage of new fuel for Unit 3, such as Nuclear Materials License, Qualifications and Training, Fire Protection, Health Physics and Radiation Protection, Physical Security, and Preoperational Testin .-
.
Documents reviewed and discussed with licensee representatives were:
(1) -Application for SNM License (2) Nuclear Materials License (3) Health Physics and Radiation Protection Procedures (4) Security Plan Procedures for Fuel Receipt and Storage (5) Training Procedures (7) Preoperational Test Procedures (8) Material Transfer Log (9) Material Accountability Log (10) Fuel Assembly Receipt and Inspection Form (11) Thimble Plug Receipt and Inspection Form (12) Spent Fuel Pool Map For Fuel Assembly Location (13) New Fuel Receiving Crane Check List (14) New Fuel Handling Crane Check List (15) New Fuel Inspection Station Check List (16) New Fuel Elevator Check List
>
'(17) Spent Fuel Bridge Check . List (18) . Visitor Control Access List Area Authorization (19) Daily Log of Access and Exposure Control (20) Radiation Survey Sheets-(21) Radiation Work Permit (22) Test Certification Reports On All Cranes Used
.(23) Shipping Container Receipt'and Inspection Sheet (24) Prerequisites and Precautions For New Fuel Receipt Under the SNM License (25) Bill of Lading, C & H Transportation Company (26) Consignment of Fuel From Westinghouse Electric Company to Northeast Utilities (27) Product Shipment Notice Westinghouse Electric Company (28) Quality Release Westinghouse Electric Company (29) Prerequisite and Initial Conditions Sign Off Sheet (30) Precautions Sign Off Sheet (31) Fuel Assembly Receipt and Inspection (32) Thimble Plug Assembly Inspection (33) Burnable Poison Assembly Inspection The inspector witnessed receipt, preparation, cleaning, inspection, and storage of 14 fuel assemblies from arrival at the fuel building truck bay
-
to storage in the spent fuel poo The activities included radiation surveys of the truck and outer. metal casks; opening of the casks; the initial survey of the two fuel assemblies in each cask; the removal, cleaning and-inspection of each fuel assembly one at a time; the final inspection and measurements at the.new fuel inspection station; and the final storage of each fuel' assembly in the spent fuel pool. The inspector observed the use of the new fuel receiving crane,'the new fuel inspection station, the new fuel handling. crane, the new fuel elevator and the spent fuel bridge including the use of the new fuel handling tool as well as the use-of the
, spent fuel handling tool.
,
-
tw *- r w , --
.
.
_
The inspector discussed with licensee representatives IE information notices 80-01 and 85-12, having to do with recent fuel handling events.
"
Discussions with the licensee representatives and review of documentation verified that the licensee had taken proper action in the area of procedures, precautions, prerequisites, and alarms and interlocks so that these events cannot occur at Millstone Unit The inspector also reviewed documentation and made observations, on a sampling basis, during this evolution, in the areas of Administration, Physical Security, Health Physics and Radiation Control, Reactor
. Engineering, Quality Assurance and Quality Control. QA and QC provided coverage for the entire fuel receipt evolutio Findings The inspector verified that receipt, inspection, cleanliness, assembly and storage, including documentation of completed fuel assemblies was accomplished in accordance with NRC license requirements. The inspector also verified that all license requirements had been implemented for new fuel receipt, inspection and storage; security controls were exercised; health physics and radiation protection controls were implemented in the areas of swipes, surveys, air monitoring, and personnel protection and dosimetry; control of the environment of the fuel storage and assembly area; verification of documentation, procedures, and records review such as fuel manufacturer, transportation, quality assurance and quality control; inspection of shipping casks; reportable events; and qualification of personnel involved in management and implementation of receipt, inspection, and storage of nuclear fuel. The inspector witnessed the evolutions and verified documentation and proper use of procedures for fuel _ movement within the fuel building and spent fuel pool location No items of noncompliance were identified and no discrepancies were noted during these inspections. The inspector will continue to observe and inspect this evolution of new fuel receipt, inspection, handling and storage on subsequent inspections until all fuel is on site. The inspector has no further questions at this tim . Quality Assurance and Quality Control Interface AS described in Paragraphs 3, 5, and 6, and as indicated in Paragraph 1, QA and QC were involved with many aspects of testing, the RCS cold hydro test, and with final fuel receipt, inspection, and storage. QA maintained assigned personnel coverage and audited the entire hydrostatic test performance. The RCS cold hydrostatic' test and the irrival of new fuel are both major milestones in the Millstone 3 preoperational test program schedual and a QA/QC interface was in evidence in each phase of the test progra _
(- -
.
, Plant Tours The inspector made several tours of the facility including the containment structure, auxiliary building, turbine building, service building, control building, emergency safety features building, emergency diesel generator rooms, battery rooms, control room, auxiliary boiler area, fuel building, circulating and service water pump house and hydrogen recombiner buildin Particular attention was given to the emergency diesel generator set problems and repair work in progress, preparations being made for the receipt of fuel and the eventual witnessing of the new fuel receipt inspection and storage; the preparations being made for the RCS hydro test and the eventual witnessing of the RCS cold hydrostatic test, and other testing and work-in progress. Items of inspection also included housekeeping, cleanliness controls, storage and protection of components, piping and systems. No items of noncompliance were observed during these tour . Unresolved Items Unresolved items are matters about which more information is required to accertain whether they are acceptable items, items of noncompliance or deviations. An unresolved item, resulting from this inspection is discussed in Paragraph . Exit Interview At the conclusion of the site inspection on April 26, 1985, an exit meeting was conducted with the licensees' senior site representatives (denoted in Paragraph 1). The findings were identified and previous inspections items were discusse At no time during this inspection was written material provided to the licensee by the inspector.
i
-
- - -
, .
..
a;
-
.
d d f-f f '
ATTACHMENT A
, iTEST PROCEDURE REVIEW
.
(1) T3314 - FP'_ Revision 0, Approved April 10, 1985
~ Control Building HVAC System 3-INR - 2001- Computer Programs (2).' Test Appendix 3J2 Revision 0, Approved 21, March 1985 Reactor Coolant System Heatup/Cooldown Rate-
. (3)~ 3-INT - 3000 Hot. Functional Testing-Appendix 3029 Revision 0, Approved April 10, 1985 Cheraistry Guidelines
,
'
(4) T3316'- BP Revision 0, Approved April 3, 1985
-
Steam Dump Controls-(5). T3315 - DA Revision 0, Approved March 25, 1985 Technical Support Center Ventilation 1(6) T3314 - AP Revision 0, Approved March 27, 1985
, Auxiliary Building HVAC System (7) T3304 - AP001 Revision 0, Approved April 6, 1985 Charging Letdown and Purification System
.
-(8). T3305 - P- Revision 0, Approved April.11, 1985 Spent' Fuel Pool Cooling Purification Test
.(9)_ T3303-P001 Revision 0, Approved April 10, 1985
' Fuel Transfer System Test-
~
'(10) T3303 - IMOS Revision 0, Approved March 20, 1985 Reactor Fuel Handling Tools (11) T3305 - IE01 Revision 0, Approved November 11, 1983 '
Spent Fuel Pool Cooling Pump 3 SFC-P1A and PIB-(12) T3305 - 1E02 Revision 0, Approved December 1, 1983
,
-Spent Fuel Pool Purificaiton Pump 3 SFC-P2A and P2B
' (13).T3305 - IE03 Revision 0, Approved January 30, 1984
-
Spent Fuel Pool Submersible-Dewatering Pump 3 SFC-P4 (14) T3305:- 1F01 Revision 0, Approved March 12, 1985 Fuel Pool Cooling and Purification System Flush (15) T3305 --IT01 Revision 0, Approved November 11, 1983 Spent Fuel, Pool Cooling and Purification Instrumentation 3 SFC
_
..
. .%
"
(16) T3305 .IM01 Revision 0, Approved November 14, 1983 Spent Fuel Cooling Pump 3 SFC-P1A and PIB
~(17) T3305 --IM02 Revision 0, Approved June 6, 1984 Spent Fuel- Pool Purification Pump 3 SFC-P2A and P2B -
(18) T3305 - IM03 Revision 0, Approved November 14, 1985 Spent Fue' Pool Cooling and Purification Valve Tests (19) T3314:--C1E01 Revision 0, Approved December 17, 1983 Fuel Building Normal Exhaust Fan 3HVR-FN9 (20) T3314 - C1M01 Revision 0, Approved August 26, 1983 Fuel Building Normal Exhaust Fan 3HVR-FN9 (21) T3314_- C1M05 Revision 0, Approved March 12, 1984 Fuel Building Dampers and Valves
'(22) T3341 - AIM 06 Revision 0, Approved May 7, 1983
'NSST/ Fuel / Waste Fire Protection Water (23) T3404 -'1I01 Revision 0, Approved March 25, 1985 Fuel Building Area Radiation Monitors (24) T3303 - IE05 Revision 0, Approved November 11, 1983 New Fuel Receiving Crane Test (25) T3303 - 1E07 Revision 0, Approved October 12, 15d4 New Fuel Elevator-(26) T3303 - 1E09 Revision 0, Approved May 12, 1984 New Fuel Inspection Station (27) T3303 - IE10 Revision 0, Approved August 10, 1984
, Spent Fuel Bridge Crane (28) Letter to B. J. Youngblood NRC, from W. G. Council NNEC0 dated
,
March 14, 1985 titled Control of Heavy Loads 1 (29) T3303 - IIO2 Revision 0, Approved April 3, 1985 Fuel Handling Machine Load Cell Monitor (30) T3303 - 1M02 Revision 1, Approved May 21, 1983 Spent Fuel Bridge Crane (31) T3303 - 1E04 Revision 0, Approved March 30, 1985 New Fuel Handling Crane
_(32)~EN 31068 Revision 0, Approved April 18, 1985
_1 New Fuel Inspection Machine Functional Check
___
u_b,
~
< ,
'
- - ,
%
I(33) OP'3211A Revision 0, Approved April 22, 1985-
-
New Fuel. Assembly-and RCCA Receipt and Inspection
~'(34) OP 3303A Revision 0,-Approved April 23, 1985 Spent- Fuel Bridge
- (35) OP 33038 Re. vision 0, Approved April 16, 1985 New Fuel Elevator (36) OP 3303C Revision 0, Approved April 23, 1985
. -
. Fuel Transfer System
~ (37) OP-33030 Revision 0, Approved April 15, 1985 Fuel-Handling Tools (38) OP 3303G Revision 0, Approved April 21, 1985 New Fuel Handling Crane
.
. (39) OP 3303H Revision 0,' Approved April 19, 1985 New Fuel Receiving Crane (40) T3346.- AP003 Revision 0, -Oraft Copy Emergency Diesel / Generator A Licensing Test (41) T3346 AP004 Revision 0, Draft Copy-Emergency Diesel Generator B
.
Licensing Test-(42) T3323 - AA001 Revision 1, Approved April 10, 1985
- Electro Hydraulic Control
,
'f, I 4
-
.
-
c;> :. .
. . -.
..
ATTACHMENT B TEST RESULTS EVALUATION (1) T3345 - BP001 ~ Revision 0, Approved March 5,'1984 Channel 1 120 VAC Vital Test Results Approved March 27,-1985 (2) T3345 - BP002 Revision 0, Approved March 5, 1984 Channel 2 120 VAC Vital Test Results Approved March 27, 1985
.(3) T3345 - BP003 Revision 0, Approved March 5, 1984
~ Channel.3- 120 VAC Vital Test Results Approved March 27, 1985 (4) T3345 - BP004 Revision 0, Approved March 5, 1984 Channel 4 120 VAC Vital Test Results Approved March 27, 1985-(5) T3345 - BP005 Revision 0, Approved May 23, 1984 Channel 5 120 VAC Non-Vital
. Test ~Results Approved March 27, 1985 (6) T3303 - 1E05 Revision 0, Approved November 11, 1983 New Fuel Receiving Crane Test Test Results Approved April 16, 1985 (7) T3303 - IIO2 Revision 0, Approved April 3, 1985 Fuel Handling Machine Load Cell Monitor Te.t Results Approved April 22, 1985 (8) T3303 - 1E04 Revision 0, Approved March 30, 1985 New Fuel Handling Crane Test Results Approved April 18, 1985
'
(9) 13303 .1M02 Revision 0,. Approved May 21, 1983 Spent Fuel Bridge Crane Test Results Approved April 18, 1985-(10) T3303 - IMOS Revision 0, Approved March 20, 1985
'
leactor Fuel Handling Tools Test Results Approved April 19, 1985
. __ . . . . .. _ . . . . . _ .. . - - , . . . . .. _ _ _
. .- .- . .- .
- . _
,
i 7 r
.
-
,
I- ,
,: . ,
.'(11) T3303 - IE07 Revision 0, Approved October 12, 1984
.New Fuel Elevator' . .
- Test Results Approved April 22, 1985 -
'
-
(12) T3303 - 1E10 Revision'0. Approved August 10, 1984
. Spent. Fuel-Bridge. Crane
=
. Test Results Approved April 18, 1985 r
f
,
.
I 4.'
- '.
i i
+ -
<
t L
p
.
R T T
!
.
-
<
t
,f s
r
'
t, f.
. =
s
.
.
t