Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-245/85-28
ML20140C166
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/23/1986
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
References
NUDOCS 8601270253
Download: ML20140C166 (2)


Text

.

, JAN 2 31986 Docket No. 50-245 Northeast Nuclear Energy Company ATTN: Mr. J. F. Opeka Senior Vice President - Nuclear Engineering and Operations Group P.O. Box 270 Hartford, Connecticut 06141-0270 Gentlemen:

Subject: Inspection No. 50-245/85-28 We have received your letter dated January 3,1986, in response to our letter dated December 3, 198 Thank you for informing us of the corrective and preventive actions documented in your letter. These actions will be examined during a future inspection of your licensed progra Your cooperation with us is appreciate

Sincerely ginal bit"1ed By:

$

M pThomas T. Martin, Dir r Division of Radiation Safety and Safeguards cc:

E. J. Mroczka, Vice President, Nuclear Operations W. D. Romberg, Station Superintendent D. O. Nordquist, Manager of Quality Assurance R. T. Laudenat, Manager, Generation Facilities Licensing Gerald Garfield, Esquire i Public Document Room (PDR)

local Public Document Room (LPDR) j Nuclear Safety Information Center (NSIC)

NRC Resident Inspector State of Connecticut 9601270253 860123 PDR ADOCK 05000245 G PDR-i 0FFICIAL RECORD COPY RL MILLSTONE 85/28 - 0001. ,

01/17/86

\

.

.

o Northeast Nuclear Energy Company 2-bec:

Region I Docket Room (with concurrences)

DRP Section Chief M. McBride, RI, Pilgrim P. Swetland, SRI, Haddam Neck T. Rebelowski, DRI, Millstone 3 J. Shea, LPM, NRR

!-

!

RI:DRSS AIA) RI:DRSS 3 RI SS Weadock/rbk Shanba Bellamy 1 /11 / 8 6 1/2'#86 1/L"/86 0FFICIAL RECORD COPY- RL MILLSTONE 85/28 - 0002. /17/86

!

.

., .. -

NORTHEAST UTILITIES

'

o.n r.i on,c.. . som.n sir..i. son.n. conn.ci,cui

-

J 2i[e7ENE$iYc'co .~i P.o. Box 270

.e c=. eea wa co**= HARTFORD. CONNECTICUT 061 .-0270

'--

L t J %',C'070.7e,'c ,

, (2031 665-5000 January 3, 1986 Ibcket No. 50-245 B11941 Dr. 'Ihanas T. Martin Regional Atninistrator Region 1 U.S. Nuclear Regulatory Ccmnission 631 Park Avenue King of Prussia, PA 19406 Reference (1): Iatter, 'Ihanas T. Martin to John F. Opeka, dated December 3, 1985, Inspection Report No. 50-245/85-28 Daar Dr. Martin:

Millstone Nuclear Power Station, Unit ? Response to I&E Inspection No. 50-245/85-28 Pursuant to the provisions of Section 2.201 of the NRC's Rules of Practice, Part 2, Title 10, Code of Federal Regulations, this report is subnitted in reply to Feference (1).

Reference (1) infonned the Northeast Nuclear Energy Conpany (NNECo)

of a Severity Iavel IV violatio Violation As a result of the inspection conducted on tbvenber 5-8, 1985, and in accordance with the NRC Enforcenent Policy (10CFR2, Appendix C),

the following violation was identified:

Technical Sepcification 6.11 requires that procedures for radiation protection be established, implenented and adhered t Procedure SHP 4912, Revision 6, Section 4 requires, in part, that workers be responsible for "... reading, under-standing, initiating, and following RWP instructions".

, g,

[ .)

J;sg?[

tp 'l

, t

-

-

^U

.

1 e' '.

. -2-a Contrary to the above, on October 27, 1985, two maintenance workers entered a radiological area in violation of the requiranents listed on the controlling RWP #3344. Specifi-cally, the workers performed work in the reactor cavity without wearing respiratory protection equipnent as required by the RWP. One individual of the working party consequently sustained a limited intake of radioactive materia h is is a Severity Level IV violation (Supplement IV).

!

Response A memo has been issued to all Health Ihysics personnel which provides formal guidance on making field changes to the radiological controls specified on radiation work permits. All changes to the radiological controls listed on a radiation work permit will require the approval of the Assistant Radiation Protection Supervisor /

designee and will be documented on the radiation work permi Health Ihysics procedure SHP 4912, " Radiation ibrk Permit (bmpletion arrl Flow Control" will be revised by April 1,1986 to incorporate the above requirement Very truly yours, NORIEEAST NUCLEAR ENERGY COMPANY

, bb +-

JohnJ/. OpekaV

!

Senior Vice President

!