IR 05000336/1985034

From kanterella
Jump to navigation Jump to search
Insp Rept 50-336/85-34 on 851112-15.No Noncompliance Noted. Major Areas Inspected:Nuclear Matl Control & Accounting, Including Organization & Operation,Shipping & Receiving, Storage & Internal Control
ML20138Q055
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/18/1985
From: Della Ratta A, Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20138Q054 List:
References
50-336-85-34, NUDOCS 8512270031
Download: ML20138Q055 (6)


Text

. .

.

U.S. NUCLEAR REGULATORY COMMISSION

REGION I

Report N /85-34 Docket N License N DPR-65 Licensee: Northeast Nuclear Energy Company P. O. Box 270 Hartford, Connecticut 06101 Facility Name: Millstone Nuclear Power Station, Unit 2 Inspection At: Berlin and Waterford, Connecticut Inspection Conducted: November 12-15, 1985 Date of Last Material Control and Accounting Inspection:

September 28 and 29, 1982 Type of Inspection: Unannounced Nuclear Material Control and Accounting Inspector: Mie/[

A. Della Ratta, Safeguards Inspector X2- Ae -ff date Approved by: n // /7-8[

~

7.R.Keimij,Ch , Safeguards Section date Nuclear Material afety and Safeguards Branch Inspection Summary:

Inspection on November 12-15, 1985 (Report No. 50-336/85-34)

Areas Inspected: Routine, unannounced inspection of naclear material control and accounting including: organization and operation, shipping and receiving, storage and internal control, inventory, records, reports, and management of the materials control system. The inspection involved 11 hours1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br /> onsite by an NRC regional-based inspecto Results: The licensee's procedures were adequate for the control of special nuclear material (SNM), and the records and reports were generally complete, well maintained, and available. The licensee was in compliance with NRC requirements in the areas inspecte DR ADOCK 050

-. - - . - -- - .

. .. -

.

.

.

DETAILS 1. Key Persons Contacted

  • Romberg, Station Superincendent S. Scace, Unit Superintendent
  • R. Borchert,-Assistant Reactor Engineer
  • G. Heron, Reactor Engineer, Technical
  • J. Keenan, Operations Supervisor
  • A. Cretella, NUSCO, SNM Accountant
  • J. Shediosky, NRC, Senior Resident Inspector, Millstone 1 and 2
  • Present at exit intervie . 30703 - Exit Interview The inspector met with the licensee representatives denoted in paragraph 1 on November 15, 1985, and summarized the scope and findings of the inspectio At no time during the inspection was written material provided to the licensee by the inspecto . 85102 - Nuclear Material Control and Accounting Organization and Operation

.The inspector verified through review that the licensee had main-tained written procedures for nuclear material control and accounting and that written statements of responsibility and authority had been established for those positions with responsibility for special nuclear material (SNM). The procedures were included in the licen-see's SNM Inventory Control Procedure EN-21001, Revision 6, dated May 14, 1985. The procedures were adequate for the control of SN Shipping and Receiving The inspector determined through review that the licensee had main-tained and followed procedures to assure that all'special nuclear material received or shipped was accurately accounted fo Preparation and transmittal of Nuclear Material Transaction Reports (00E/NRC Form-741) were the responsibility of the Reactor Enginee A review was performed of all DOE /NRC Forms-741's generated during the period' April 1, 1982 - September 30, 1985, to determine proper signature, timely dispatch, and accuracy of data. No discrepancies were note .- _ _ _ . _

J.--

.

c. Storage and Internal Control The inspector determined through review that the licensee was

-

maintaining and following a system of written material control and

, accounting procedures which provided for knowledge of the quantity, identity, and current location of all SNM-bearing materials within the facilit The licensee had established and was maintaining Item Control Areas (ICA's) that included the reactor cavity, new fuel storage area, spent fuel storage pool, and other areas that were appropriate for SNM contained in other than fue d. Inventory The inspector performed an inventory verification on November 15, 1985, which consisted of a piece count of the assemblies shown on the spent fuel pool map and a comparison of selected fuel' location history cards to the spent fuel pool map. Fuel bundles were located as follows:

Location Bundles Reactor Core 217 Spent Fuel Pool 448

Total Bundles _66_5_

,

i

! The licensee had conducted physical inventories as required by 10 CFR

'

70.51(d). The licensee's last physical inventory was performed October 11, 198 e. Records and Reports The inspector audited the licensee's records, reports and source data. All Material Balance Reports (DOE /NRC Form-742) submitted by the licensee, during the period April 1, 1982 - September 30, 1985, were reviewed for compliance with 10 CFR 70.53. Total uranium and U-235 fission, transmutation, plutonium production and decay records were also reviewed. No discrepancies were note Attached to this report as Exhibits I and II are summaries of the licensee's nuclear material activity for the period April 1, 1982 -

September 30, 198 .

4 Management of Materials Control System The inspector determined through review that the licensee was-maintaining a management system which provided for the revision,

implementation and enforcement of nuclear material control and accounting procedures. There was an organization structure respon-sive to the nuclear material control and accounting requirements, the license, and applicable NRC regulation .

y ,,,,-en,---,- - - - - , - - - ---~w. ~,-m- - - - - - - -

.

,

EXHIBIT I MILLSTONE NUCLEAR POWER STATION, UNIT 2 DOCKET NO. 50-336, LICENSE N0. DPR-65 Material Balance for Period: April 1, 1982 - September 30, 1985

'

Reporting Identification Symbol: XBD Reporting Unit: Grams

..

Enriched Uranium

'

Element Isotope Beginning Inventory:

(April 1, 1982) 144,198,840 2,244,832 Additions:

-Receipts: 101,814,256 3,063,222 Material to Account for: 246,013,096 5,308,054 Removals:

i Shipments: 36,605,763 1,097,083

<

Degradation to Other. Materials: 27,568,981 142,475 Fission and Transmutation: 2,896,667 1,544,030 Inventory Difference:* 32 (1)

-

Total Removals: 67,071,443 2,783,587 i

'

Ending Inventory:

(September 30,1985) 178,941,653 2,524,467 Material Accounted For: 246,013,096 5,308,054 Fission Chambers:

Serial No. 860 32 28 861 52 47 864 12 12 96 87 J

  • Due to rounding errors. ~-- - - . , ,_.-...4 _ _ _ _ ,,_m ,,.,_m_. ___ . . _ , . _..,_ __ _ _. _ - _ , ,_ ~ .y- _ _ , , _ _ , . _ _ . --

,.,

>

-.

..

EXHIBIT II MILLSTONE NUCLEAR POWER STATION, UNIT 2 DOCKET N0. 50-336, LICENSE NO. D'R-65 Material Balance for Period: April 1, 1982 - September 30, 1985 Reporting Identification Symbol: XBD Reporting Unit: Grams Plutcafva Depleted Uranium Element Isotope Element Isotope Beginning Inventory:

(April 1, 1982) 1,163,689 840,780 48,053,244 286,114 Additions:

Production: 613,371 432,174 -0- -0-From Other Materials: -0- -0- 27,568,893 142,395 Receipts: -0- -0- -0- -0-Material to Account For: 1,777,060 1,272,954 75,622,137 428,509 Removals:

Shipments: -0- -0- -0- -0-Decay: 23,137 23,137 -0- -0-Inventory Difference:* _ (1) 8 1 -0-Total Removals: 23,136 23,145 1 -0-Ending Inventory:

(September 30,1985) 1,754,924 1,249,809 75,622,136 428,509 Material Accounted For: 1,777,060 1,272,954 75,622,137 428,509 Plutonium-238 Sources:

Serial No. 55 .9 Serial No. 56 .9 .8

  • Due to rounding errors ,

J