IR 05000245/1985012

From kanterella
Jump to navigation Jump to search
Meeting Repts 50-245/85-12 & 50-336/85-15 on 850325.Topics Discussed:Transportation Violation & Deteriorating Transportation Program.Dept Reorganization,New Package Dose Rate Limits & Comprehensive Program Audit Proposed
ML20128B242
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 05/17/1985
From: Clemons P, Shanbaky M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20128B237 List:
References
50-245-85-12, 50-336-85-15, NUDOCS 8505240455
Download: ML20128B242 (3)


Text

--

, . . -

.

.

_

U.S. NUCLEAR REGULATORY COMMISSION REGION I-Report-Nos. -50-245/85-12-and 50-336/85-15 Docket Nos. 50-245 and 50-336

. License Nos. OPR-21 and DPR-65 Category C

. Licensee: Northeast Nuclear Energy Company P. O. Box 270 Hartford, Connecticut 06141-0270 Facility Name: Millstone Point Nuclear Power Station, Units 1 and 2 Meeting At: .NRC Region I Office, King of Prussia, Pennsylvania Meeting Conducted: March 25,~1985 NRC Personnel: / 5/'l/!IS 4. Clemons, RadiatiofySpecialist date Approved by: /ff .h M. Shsnb'aky,' Chief '~ f

_(I7/[5'

date

'

PWR Radiation Safety SEction, EPRP Branch Inspection Summary: Meeting on March 25,1985, (Report Nos. 50-245/85-12 and 50-336/85-15).

Meeting Topic: NRC requested the meeting to discuss a transportation violation and the apparent deterioration in the transportation progra Results: The licensee discussed proposed corrective action to be taken to correct the violation and other measures to be implemented to assure compliance with applicable regulation PDR ADOCK 05000245 '

G PDR:

Li

r; -

..

.~

_

'

..

DETAILS 120 Meeting Attendees:

1.1 Northeast Nuclear' Energy-Company M. Bonaca, System Manager-B. Davidson, Instrument and Control-Supervisor,' Connecticut Yankee Nuclear Power Station

.J. Ferguson, Unit Superintendent,. Connecticut Yankee Nuclear Power Station

'J. F.10peka,' Vice President, Nuclear Operations E. J. Mroczka, Station Superintendent, Millstone Nuclear Po'wer

. Station F. Sears, Vice President - Nuclear and Environmental Engineering

- NRC

.T. Murley, Regional Administrator J. Allan, Deputy Regional Administrator R. Bellamy, Chief, Emergency Preparedness and Radiological Protection Branch J. Gutierrez, Regional Counsel

'D. Holody, Enforcement Specialist P. Clemons, Radiation Specialist T. Martin,' Director, Division of Radiation Safety and Safeguards R. Nimitz, Senior Radiation Specialist M. Shanbaky, Chief, PWR Radiation Safety Section R. Starostecki, Director, Division of Reactor Projects-J. White, Senior Radiation Specialist

- Purpose of the Meeting The meeting was conducted to discuss recent transportation violations at Millstone Nuclear Power Station, and the apparent deterioration in the transportation progra .0 Meeting Summary NRC Region I Management opened the meeting by summarizing NRC concerns with reference to recent transportation violations and to the apparent-deterioration of the transportation program in the last eighteen month The licensee's Vice President-Nuclear Operations and the Station Superin-tendent informed Region-I Management of the proposed corrective action that had been taken and would be taken to correct the violation. They also identified other measures that would be implemented to improve the program such as the reorganization of the department, and the establishing l

,

b-.

~ -

..;

.-

.

'4

<

of administrative limits for minimizing package dose rates significantly-lower than regulations, develop' procedures and check list for packaging and. shipping,- and perform a comprehensive audit of the transportation

_ progra NRC~ management concluded the meeting by stating that a comprehensive inspection would be' conducted to evaluate the transportation progra .