ML20132E886

From kanterella
Revision as of 09:49, 5 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Corrected Rev 15 to Emergency Implementing Procedure FNP-0-EIP-4, Chemistry & Environ & Health Physics Support to Emergency Plan
ML20132E886
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/30/1985
From: Hudspeth J
ALABAMA POWER CO.
To: Mcknight J
NRC OFFICE OF ADMINISTRATION (ADM)
Shared Package
ML20132E889 List:
References
NUDOCS 8508020131
Download: ML20132E886 (2)


Text

- - - - - ~

r ,, , -

v AlibIm2 Pow *.r Comp:ny J. M. Farley Nuclear Plant P. O. Drawer 470 Ashford, Alabama 36312 Telephone 205 899-5156 m

Alabama Power

' the sonnhem elwtre system July 30, 1985 Director, Office of Nuclear Reactor Regulation' ATTN: Document Control Desk c/o Jim McKnight i US Nuclear Regulatory Commission Washington, DC 20555 ,

Dear Sir:

In accordance with Alabama Power Company Administrative Procedure, FNP-0-AP-4, Control of Plant Documents and Records, attached are, corrected copies of FNP-0-EIP-4.

Please incorporate these corrected copies into your files and discard the previous copy. (See memo on tra'nsmittal)

Enclosed is a self addressed stamped envelope and a copy of our transmittal form. Please sign and return this form to the following address: ,

Alabama Power Company Farley Nuclear Plant P.O.' Drawer 470 Ashford, AL 36312 ATTN: , Document Control If you should have any questions, please call me at 205-899-5156 Ext. 422.

Sincerely, 8lL/ _

I Jbey B! Hudspeth [.

FNP Document Control JBH:rew '

cc: Larry W. Enfinger File 8508020131 850730 PDR F ADOCK 05000348 '

PDR f0 (

i

, A

! Document Transmittal Form Farley Nuclear Plant -

Production Dep;rtm:nt - Document Controi .'"- #

Alabama Power h To Date e L20anuntf Remarks:

od%D , ~~

730 6 600 Ol0AT]O ~

TRANSMITTED RETURN REQ'STED REMARKS NO. REV. COPY NO. R E V. COPY TITLE AND/OR NUMBER CPS. NO. N O. CPS. NO. N O.

F1UP-OEIP <-) 3 I5 av c61 09c INTER DEPARTMENT MEMORANDUM <

g Holders of FNP-0-EIP-4 7owu _

Ar. Farley Nuclear Plant o4Tr 7-30-85 _

cusJacT Re-issue Procedure The initial issue of FNP-0-EIP-4, Rev. 15 was incomplete. Please replace your present copy with the attached corrected copy.

SIGNED - , .

INSTRUCTIONS TO ADDRESSEE

1. Verify the documnets received ag.se with the above description.

' 2. Incorporate the transmitted documents into your files.

i 3. Documents or portions thereof preser' tty in your possessionwh'ich are superseded by the documents hereby transmitted must be clearly m

{]yed if return of st.perseded documents is requested in the above" Return Requested" column, attach the superseded documents to this form prior to t, jing it.

. 4. Sign in the space below indicating that you have completed these instructions and retum the routing copy of this form to the below address.

Alabama Power Company WHITE - ROUTING COPY P. O. Drawer 470 Ashford, At 36312 Segnature Of Addressee i YELLOW SUSPENSE COPY Attention: Document Control Supervisor orm ses souin twa pamas. oornea rs2-292s  ;