ML20114A292

From kanterella
Revision as of 06:22, 17 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Sept 1984
ML20114A292
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 09/30/1984
From: Harrison F
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20114A269 List:
References
NUDOCS 8501280056
Download: ML20114A292 (1)


Text

'

i .

OPERATING DATA REPORT DOCKET'NO. 050-0325 DATE 11/20/84 COMPLETED BY FRANCES HARRESON

^

TELEP' HONE (919)457-952 OPERATING STATUS

1. UNIT NAME: BRUNSWICK UNIT 1 i NOTES I I
2. REPORTING PERIOD: SEPTEMBER 84 I I
3. LICENSED THERMAL POWER (MWT): 2436 I i
4. NAMEPLATE RATING (GROSS MWE): 867.0 I i
5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I I
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 -------------------------------

I

7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, .

GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):

10 REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 720.00 6575.00 66096.00
12. NUMBER OF HOURS REACTOR CRITICAL 584.85 5818.30 42216.23
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 1647.10
14. HOURS GENERATOR ON LINE 551.25 5652.05 39740.58
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 1208819.20 13094351.62 81521646.19
17. GROSS ELEC. ENERGY GEN. (MWH) 401745.00 4352631.00 26899682.00
18. NET ELEC. ENERGY GENERATED (MWH) 388170.00 4224331.00 25838171.00
19. UNIT SERVICE FACTOR 76.56 85.96 60.13
20. UNIT AVAILA.BILITY FACTOR 76.56 85.96 60.13
21. UNIT CAP. FACTOR (USING MDC NET) 68.24 81.33 49.48
22. UNIT CAP. FACTOR (USING DER NET) 65.67 78.26 47.61
23. UNIT FORCED OUTAGE RATE 23.44 10.06 21.50
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY -------- --------

INITIAL ELECTRICITY -------- --------

COMMERCIAL OPERATION R

1.16 - 9 .

.