MONTHYEARML20217G4461999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pingp.With ML20216E7151999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pingp,Units 1 & 2. with ML20210Q4891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pingp,Units 1 & 2. with ML20209F9811999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20195G5181999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With . Page 3 in Final Rept of Incoming Submittal Was Not Included ML20206L6191999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pingp,Units 1 & 2. with ML20205N1081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pingp,Units 1 & 2. with ML20207J6951999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Prairie Island Nuclear Generating Plant ML20207L2811999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Pingp,Units 1 & 2 ML20206P7861998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Prairie Island Nuclear Generating Plant.With ML20206N2731998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20155K6301998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20154H4061998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Prairie Island Nuclear Generating Plant.With ML20153B0761998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Prairie Island Nuclear Generating Plant.With ML20236X8531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Prairie Island Nuclear Generating Plant ML20236R0771998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Prairie Island Nuclear Generating Plant ML20249A5751998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Prairie Island Nuclear Generating Plant ML20247G2921998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Prairie Island Nuclear Generating Plant ML20216C6361998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Prairie Nuclear Generating Plant Units 1 & 2 ML20216E2051998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Prairie Island Nuclear Generating Plant ML20216E2121998-01-31031 January 1998 Revised MOR for Jan 1998 for Prairie Island Nuclear Generating Plant for Unit 2 & Narrative Summary of Operating Experience ML20202E7761998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Prairie Island Nuclear Generating Plant ML20198P1541997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Prairie Island Nuclear Generating Plant,Unit 1 & 2 ML20203H4341997-11-30030 November 1997 Monthly Operating Repts for Nov 1996 for Prairie Island Nuclear Generating Plant,Unit 1 ML20199D0701997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Prairie Island Nuclear Generating Plant ML20198J7281997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20210S5911997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20217J0681997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Prairie Island Nuclear Generating Plant ML20148K3871997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20141A9581997-04-30030 April 1997 Monthly Operating Repts for April 1997 for Prairie Island Nuclear Plant ML20137T2891997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Prairie Island Nuclear Plant ML20135F6841997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Praire Island Nuclear Generating Plant ML20134L8831997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Praire Island Nuclear Generating Plant ML20133F8611996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Praire Island Nuclear Generating Plant ML20135E8811996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Prairie Island Nuclear Generating Plant ML20134L7091996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Prairie Island Nuclear Generating Plant ML20128G1741996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Prairie Island Nuclear Generating Plant ML20117N1521996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Prairie Island Nuclear Generating Plant ML20116J6451996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Prairie Island Nuclear Generating Plant ML20115A8321996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Prairie Island Nuclear Generating Plant Units 1 & 2 ML20117K5811996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Prairie Island Nuclear Generating Plant ML20111B2801996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Prairie Island Nuclear Generating Plant ML20101N8931996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Prairie Island Nuclear Generating Plant Units 1 & 2 ML20101D0671996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Praire Island Nuclear Generating Plant Units 1 & 2 ML20097D5411996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Prairie Island Units 1 & 2 ML20096E9631995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Prairie Island Nuclear Generating Plant ML20095G4371995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Prairie Island Nuclear Generating Station ML20094L7491995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Prairie Island Nuclear Generating Plant ML20098D0101995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Prairie Island Nuclear Generating Plant ML20092D0091995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Prairie Island Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G4461999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pingp.With ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20216E7151999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pingp,Units 1 & 2. with ML20211D3981999-08-24024 August 1999 Safety Evaluation Supporting Requested Actions to Licenses DPR-42 & DPR-60,respectively ML20211C2531999-08-0404 August 1999 Unit 1 ISI Summary Rept Interval 3,Period 2 Refueling Outage Dates 990425-990526 Cycle 19 971212-990526 ML20210Q4891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pingp,Units 1 & 2. with ML20211B5971999-07-31031 July 1999 Cycle 20 Voltage-Based Repair Criteria 90-Day Rept ML20209J1131999-07-15015 July 1999 Safety Evaluation of Topical Rept NSPNAD-8102,rev 7 Reload Safety Evaluation Methods for Application to PI Units. Rept Acceptable for Referencing in Prairie Island Licensing Actions ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20209F9811999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20196F4081999-06-23023 June 1999 Revised Pages 71,72 & 298 to Rev 7 of NSPNAD-8102, Prairie Island Nuclear Power Plant Reload Safety Evaluation Methods for Application to PI Units ML20195G5181999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With . Page 3 in Final Rept of Incoming Submittal Was Not Included ML20207B5931999-05-26026 May 1999 SER Accepting Licensee Proposed Alternative to ASME Code for Surface Exam (PT) of Seal Welds on Threaded Caps for Unit 1 Reactor Vessel Head Penetrations for part-length CRDMs ML20196L2501999-05-13013 May 1999 Rev 0 to PINGP Unit 1 COLR Cycle 20 ML20206L6191999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pingp,Units 1 & 2. with ML20205N1081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pingp,Units 1 & 2. with ML20205Q5101999-03-15015 March 1999 Inservice Insp Summary Rept Interval 3,Period 1 & 2 Refueling Outage Dates 981109-1229 Cycle 19,970327-981229 ML20207J6951999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Prairie Island Nuclear Generating Plant ML20202J7711999-02-0404 February 1999 Simulator Certification Rept for Prairie Island Plant Simulation Facility,1998 Annual Rept ML20202G3761999-01-31031 January 1999 Non-proprietary Rev 7 to NSPNAD-8102-NP, Prairie Island Nuclear Power Plant Reload SE Methods for Application to PI Units ML20207L2811999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Pingp,Units 1 & 2 ML20202J1731999-01-22022 January 1999 Safety Evaluation Concluding That NSP Proposed Alternative to Surface Exam Requirements of ASME BPV Code for CRD Mechanism Canopy Seal Welds Will Provide Acceptable Level of Quality & Safety ML20206P7861998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Prairie Island Nuclear Generating Plant.With ML20205H0561998-12-31031 December 1998 Northern States Power Co 1998 Annual Rept. with ML20198J6441998-12-17017 December 1998 Rev 0 to PINGP COLR Unit 2-Cycle 19 ML20206N2731998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20196D7341998-11-20020 November 1998 Third Quarter 1998 & Oct 1998 Data Rept for Prairie Island Isfsi ML20155K6301998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20154H4061998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Prairie Island Nuclear Generating Plant.With ML20202J7991998-09-30030 September 1998 Non-proprietary Version of Rev 3 to CEN-629-NP, Repair of W Series 44 & 51 SG Tubes Using Leaktight Sleeves,Final Rept ML20198P0571998-09-0303 September 1998 Rev 1 to 95T047, Back-up Compressed Air Supply for Cooling Water Strainer Backwash Valve Actuator ML20153B0761998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Prairie Island Nuclear Generating Plant.With ML20237A3961998-08-11011 August 1998 Safety Evaluation on Westinghouse Owners Group Proposed Insp Program for part-length CRDM Housing Issue.Insp Program for Type 309 Welds Inadequate from Statistical Point of View ML20237A8171998-08-0505 August 1998 SER Related to USI A-46 Program GL 87-02 Implementation for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20236X8531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Prairie Island Nuclear Generating Plant ML20236R6481998-07-15015 July 1998 Metallurgical Investigation & Root Cause Assessment of Part Length CRDM Housing Motor Tube Cracking at PINGP Unit 2 - Preliminary Summary Rept ML20236R0771998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Prairie Island Nuclear Generating Plant ML20249A5751998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Prairie Island Nuclear Generating Plant ML20247G7011998-05-31031 May 1998 Metallurgical Investigation & Root Cause Assessment of Part Length CRDM Housing Motor Tube Cracking at Prairie Island Nuclear Generating Plant,Unit 2 ML20248M0561998-05-31031 May 1998 Rev 5 to CEN-620-NP, Series 44 & 51 Design SG Tube Repair Using Tube Rerolling Technique ML20247E2671998-05-0505 May 1998 Rev 0 to Pingp,Units 1 & 2,Pressure & Temp Limits Rept (Effective Until 35 Efpy) ML20247G2921998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Prairie Island Nuclear Generating Plant ML20217M6901998-04-29029 April 1998 Safety Evaluation Accepting Methodology for Relocation of Reactor Coolant Sys P/T Limit Curves & LTOP Sys Limits Proposed by NSP for Pingp,Units 1 & 2 ML20216C6361998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Prairie Nuclear Generating Plant Units 1 & 2 ML20216H0341998-03-31031 March 1998 Cycle-19 Voltage Based TSP Alternate Repair Criteria 90-Day Rept ML20217D2041998-03-13013 March 1998 Rev 1 to 28723-A, Intake Canal Liquefaction Analysis Rept for Pingp,Welch,Mn ML20236P9801998-03-12012 March 1998 Rev 0 to 97FP02-DOC-01, Compliance Review of 10CFR50,App R, Section Iii.O RCP Lube Oil Collection Sys ML20248L3931998-03-10010 March 1998 ISI Summary Rept Interval 3,Period 1 & 2 Refueling Outage Dates 971018-971212 Cycle 18,960303-971212 ML20216D0911998-03-0606 March 1998 Rev 0 to Prairie Island Generating Plant,Units 1 & 2, Pressure & Temp Limits Rept 1999-09-30
[Table view] |
Text
Northern States Power Company 1717 Wakonade Drive East Welch, MN 55089 Telephone 612-388-1121 July 3,1996 Prairie Island Technical Specifications Section 6.7.A.3 e
a US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 Licer.se Nos. DPR-42 50-306 DPR-60 Monthly Operating Report June 1996 Attached is the Monthly Operating Report for June 1996 for the Prairie Island Nuclear Generating Plant.
O c- QJLc Michael D Wadley Plant Manager b
v Prairie Island Nuclear Generating Plant c: Regional Administrator-Ill, NRC NRR Project Manager, NRC
< NRC Resident inspector ,
State of Minnesota - Kris Sanda 4
Attachment 9607090027 960630 - -
PDR ADOCK 05000282 ' s ( 1'.
R PDR '
\ \
2 .
P"MD 7888
. NRC' MONTHLY REPORT Pe1 ,
3 oocieTNo. mas .
j uNrT PRAIRIElsLANo NO.1 l
oATE 72BB
- courtaTEo syonta ouasTAo TEUEPHONE et23ss 112145Fs 1
4 i
MUUtATIVE SUMMUtY OF OPERATING EXPERIENCE
.- c
] MONTH: JUNE 1998 l i .
Unit 1 was base loaded, this month. On the 29th at 1429 the Unit tripped because the transmission l
] '
- lines were damaged (knocked down) due to severs weather. Crwws were sont out to repair the
! transmission system. A NUE was declared at 1505 due to plant condfilons and teminatad at 1035 l I on 6/30/1996. As a result of the event both reactor coolant pumps tripped and decoy heat was I removered by natural circulation cooling. Forced circulation cooling was restored at 1953 hours0.0226 days <br />0.543 hours <br />0.00323 weeks <br />7.431165e-4 months <br />
- when 12 restor coolant pump was started. Unit one's reactor was taken critical at 2301 of the 30th 4 and is at Hot Standby waiting for the generator to be placed on-line. The plant was not able to put i . the generator on-line by the end of the month because of equipment problems.
i l This ended a continuous operating run of 117 days.
1 i
i I
i
}
i i
i .
i l
9 I
- . CURRENT CONTINUOUS OPERATING RUN OF 0 DAYS J
,,-. . ~ . -- - , , ,, ...
1
C ,
PRINTED 7/398
- NRC WONTHLY REPORT Pues 2
. DOCMET NO. 50 232 ;
1 UNrT PRAWUEISLAND NO.1 1
] DATE 7/398 COMPu!TED BY DALE DUGSTAD ,
r
- TELEPHONE 012 38511214578 AVERAGE DAILY POWER LEVEL ;
4 MlET 1 MONTH: JUNE.1996 !
i .
l M AVERAGE DAILY POWER LL' VEL W1/96 506 ;
j 6/2/96 507 6/3/96 507 6/4/96 511 i 6/5/96 510
- 6/6/96 500 6/7/96 535 6/8/96 508 6/9/96 502 i 6/10/96 501 2 6/11/96 501 6/12/96 506
' 498 6/13/96
! 8/14/96 500 ;
j 6/15/96 501 6/16/06 503 6/17/96 503 6/18/96 508 ,
6/19/96 512 6/20,96 509 l 6/21/96 511 4
6/22/96 512
! 6/23/96 511 6/24/96 514 6/25/96 512 5 6/26/96 507 6/27/96 506 6/28/96 .
506
~
- 6/29/96 299
! 6/30/96 -13 r i b
d AVERAGE LOADS ABOVE 513 MWE-NET ARE DUE TO COOLER CONDENSER CIRCUL.ATING WATER 4
.- - . - - - - _ .. . _ - . . - . - _ - = . _. . - - - . .. - - . . -
PRNiTED 7/398
. NRC' MONTHLY REPORT ' Pages
- oOCNET NO.SME2 1 UNIT PRANUEISLANo NO.1 DATE7/300
}
' couPLEtno syoALE ouo: tao
- TELEPHONE 812 3851121-@6 4
$ OPERATING DATA REPORT t .
) OPERATING STATUS i i i
- 1. UNIT NAME. PRAIRIEISLAND NO.1
- 2. REPORTING PERIOD: JUNE 1996 i
- 3. LICENSED THERMAL POWER (MWT) 1650
- 4. NAMEPLATE RATING (GROSS MWE): 593 i 5. DESIGN ELECTRICAL RATING (NET MWE): 530
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE)
- 545 7 MAXIMUM DEPENDABLE CAPACl1Y(NET MWE): 513
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 - 7) SINCE LAST REPORT, GIVE REASON:
ME
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE
- 10. REASONS FOR RESTRICTIONS, IF ANY: NONE l
THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 720 4367 197501 j 12. NUMBER OF HOURS REACTOR CRITICAL 687.5 2964.4 169323.7
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.00 5571.1
- 14. HOURS GENERATOR ON-LINE 686.5 2939.4 167632.4
! 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.00 0.00
- 16. GROSS THERME ENERGY GENERATED (MWH) 1131712 4727077 265880500
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 369840 1566320 87600030 l 18. NET ELECTRICAL ENERGY GENERATED (MWH) 347333 1470393 82444608
- 19. UNIT SERVICE FACTOR 95.3 67.3 84.8 ,
I
! 20. UNIT AVAILABILl1Y FACTOR - 95.3 67.3 84.8 l 21. UNIT CAPACITY FACTOR ( MDC NET) , 94 65.6 82.8
- 22. UNIT CAPACITY FACTOR ( DER NET) ~ 91 63.5 78.7
- 23. UNIT FORCED OUTAGE RATE . 4.7 1.1 4.6
- 24. FORCED OUTAGE HOURS 33.5 33.5 8159.4 i 25. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):
4 .N/A
- 26. IF CURRENTLY SHUTDOWN, ESTIMATED STARTUP DATE:
July 1,1996 j
s
l PRINE 7/346 NRCWONTHLY REPORT Peneo .
DoCxET NO.50 282 .
UNIT PRAIRIE ISLAND NO.1 DATE 7/3e8
- COMPLETED BY DALE DUGSTAD TELEPNONE 012-308-11214378 1
UNIT SHUTDOWNS AND POWER REDUCTIONS i
MONTH: JUNE 1M6 ,
i DATE UNIT TYPE ilOURS REASON METHOD LER NUMBER SYSTEM COMPONENT S/29/96 1 F 33.5 H 3 NOTES: Unit triped due to demaged transmission lines caused by strong winds.
d W
i i
i DPE REASON METHOD SYSTEM CODE F-FOROED A-EQUlPMENT FAILURE 1-MANUAL DRAFT lEEE STD 54CHEDULED 5 MAINTENANCE OR TEST 244ANUAL TRIP C-REFUEUNG 3. AUTO TRIP D4tEGULATORY RESTRICTION 4. CONTINUED E4PERATOR TRAINING AND 54tEDUCED LOAD COMPOM!NT CODE i UCENSE EXAMINATION MTHER IEEE STD 803A-1983 F-ADMINISTRATIVE G4PERATIONAL ERROR H4THER
i' ARC MONTHLY REPORT PRME 7/3ms
- Pepss l
! DOCNET No.SD 30s
! UNIT PRAlmElsLANO NO.2 DATE7/Ses l
COMPLETED BY DAt2 DUOsTAD TELEPHONE et2 3ss.11214378 f
l NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE 1
. MONTH: JUNE 1996
- Unit 2 was base loaded, this month. On the 29th at 1429 the Unit tripped because the
- transmission lines were damaged (knocked down) due to severs weather. Crows were sent out
- to sepair the transmission system. A NUE was declared at 1505 due to plant conditions and
! tenninated at 1035 on 6/30/96. As a result of the event, both reactor coolant pumps tripped and
- decay heat was removed by natural circulation cooling. Forced circulation cooling was restored at 2028 hours0.0235 days <br />0.563 hours <br />0.00335 weeks <br />7.71654e-4 months <br /> when 21 reactor coolant pump was restartedt Plant Operations determined to i restore Unit 1before attempting to restore Unit 2. As of the end of the month Unit 2 is still off-line.
- This ended a continuous operating run of 70 days.
i 0"
b CURRENT CONTINUOUS OPERATING RUN OF 0 DAYS
~
NRC MONTHLY REPORT PRW E W S Page6 DOCMET NO.SNMM UNIT PRAIRIE ISLAND NO.2 OATE7/388
. COMPu!TED BY DALE DUGSTAD TEUEPHCNE 01230811214378 AVERAGE DAILY POWER LEVEL a UNIT 2 ,
i MONTH: JUNE 1998 DAIE; AVERAGE DAILY POWER LEVth.
6/1/96 506 6/2/96 511 6/3/06 512 6/4/96 515 6/5/96 513 6MI/96 511 6/7/96 509 6/6/96 512 6/9/96 506 6/10/96 504 6/11/96 502 6/12/96 505 6/13/96 499 6/14/96 501 I 6/15/96 502 6/16/96 502 6/17/96 504 6/16/96 507 6/19/96 512 6/20/96 510 6/21/96 510 6/22/96 512 ;
6/23/96 511 l
' 6/24/96 514 .
l 6/25/96 509 1 6/26/96 505 )
, 6/27/96 503 6/28/96 503 t 6/29/96 296 6/30/96 -11 i
e AVERAGE LOADS ABOVE 512 MWE. NET ARE DUE TO COOLER CONDENSER CIRCULATING WATER 8
, Page 7
~ '
DoexET No.so.aos UMT PMmE ISLAND NO.2 DATE 7/398 i COMPLETED BY DALE DUG 8 TAD TELEPHONE 012 388-1121-43N, OPERATING DATA REPORT 1
i i OPERATING STATUS
- 1. UNIT NAME: PRAIRIE ISt.AND NO. 2
- 2. REPORTING PERIOD: JUNE 1996
- 3. LICENSED THERMAL POWER (MWT). 1650
, 4. NAMEPl. ATE RATING (GROSS MWE): 593
, 5. DESIGN ELECTRICAL RATING (NET MWE): 530
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 544 4 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 512
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 - 7) SINCE 1.AST REPORT, GIVE REASON:
NONE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE
- 10. REASONS FOR RESTRICTIONS, IF ANY: NONE I
l THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 720 4367 188709
- 12. NUMBER OF HOURS REACTOR CRITICAL 686.5 4279.4 167088.4
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.00 1516.1 i
- 14. HOURS GENERATOR ON-LINE 686.5 4262.1 165651.6
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.00 0.00
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1130160 6976800 263769869
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 370180 2332430 86233740
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 347962 2205131 81530795
- 19. UNIT SERVICE FACTOR 95.3 97.6 87.8
- 20. UNIT AVAILABILITY FACTOR 95.3 97.6 87.8 i
- 21. UNIT CAPACITY FACTOR ( MDC NET) 94.4 98.6 86.1
- 22. UNIT CAPACITY FACTOR ( DER NET) ' 91.2 95.3 81.5
- 23. UNIT FORCED OUTAGE RATE 4.7 2.4 2.4
- 24. FORCED OUTAGE HOURS 33.5 104.9 4089.6
- 25. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):
N/A
- 26. IF CURRENTLY SHUTDOWN, ESTIMATED STARTUP DATE:
N/A 4
s
NRC MONTHLY REPORT PRINTED MOS Page 8 DOCNETNO. A108 UMT PRAIRIE ISLAND NO.2 DATE7/308 COMPLETED BY DALE DUGSTAD TELEPHONE 01238811214376 UNIT SHUTDOWNS AND POWER REDUCTIONS MONTH: JUNE 1998 DATE UNIT TYPt! HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT 6/29/96 2 F 33.5 H 3 NOTES: UnM triped due to demoged transmission lines caused by strong winds.
I h
. l
~
l M REASON METHOD SYSTEM CODE I F-FORCED A-EQUIPMENT FAILURE 1 MANUAL DRAFTIEEE STD SSCHEDULED 8 MAINTENANCE OR TEST 244ANUAL TRIP C-REFUEUNG 3 AUTO TRIP (MtEGULATORY RESTRICTION 4-CONTINUED
, E-OPERATOR TRAINING AND !WtEDUCED LOAD COMPOfENT CODE UCENSE EXAMINATION i SCTHER IEEE STD 803A 1983 i
F-ADMIMSTRATIVE G CPERATIONAL ERROR H OTHER
.. . . - - . - - -