Forwards LaSalle County Station Unit 1 Seventh Refueling Outage ASME Section XI Summary Rept for Isi
ML20116G683
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 08/02/1996
From: Querio R
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20116G686 List:
References
NUDOCS 9608080261
Download: ML20116G683 (2)


Text

Gimmonw calth lilmo Company 1Aalle Generatmg Nation 2601 Nortti 2ist Road Marwilies,11. 61.4 I l-9's' Tc msas 4, 6i 1

I i

i August 2,1996 '

United States Nuclear Regulatory Commission '

i Attention: Document Control Desk i Washington, D.C. 20555

Subject:

LaSalle County Station Unit 1 Inservice Inspection Summary Report

NRC Docket No. 50-373 Attached is a copy of the Commonwealth Edison Company LaSalle County Nuclear Power Station Unit 1 Inservice inspection (ISI) Summary Report for the Spring 1996 ASME Section XI Inservice inspection. This is the first  ;

period of the second ten year interval, and this was LaSalle's seventh '

refueling outage for Unit 1.

LaSalle's mailing address is: >

LaSalle County Station j 2601 N. 21st Road i Marseilles, Illinois 61341-9757 I

Unit 1 is owned and operated by Commonwealth Edison Company, whose address is:

One First National Plaza j P.O. Box 767 Chicago, Illinois 60690 Unit 1 has a gross generating capacity of 3323 MWt and began commercial Operation on January 1,1984.

Sh The Unit 1 reactor vessel was supplied by Combustion Engineering,  ;

Windsor, Connecticut. The reactor recirculation system components were supplied by General Electric, San Jose, Califomia. All other piping examined during the seventh refueling outage was supplied by B.F. Shaw, Wilmington,

Delaware.

9600080261 960802 PDR ADOCK 05000373 G PDR il i d I *nicOllt I.OllipJny i

1 l

I The inspections that were performed, the conditions that were observed, and the corrective measures that were taken are contained in the attached report.

l We certify that the statements made in this report are correct and that the examinations and corrective measures taken conform to the rules of the 1989 Edition of ASME Section XI.

if there are any questions or comments conceming this letter, please refer them to me at (815) 357-6761, extension 3600.

Respectfully, R. E. Querio Q Site Vice President i LaSalle County Station Enclosure <

cc: H.J. Miller, NRC Region 111 Administrator M. P. Huber, NRC Senior Resident inspector - LaSalle D. M. Skay, Project Manager - NRR - LaSalle  ;

F. Niziolek, Office of Nuclear Facility Safety - IDNS DCD - Licensing (Hardcopy: Electronic: )

Central File l

i l

l I