ML20116J645

From kanterella
Revision as of 04:25, 16 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1996 for Prairie Island Nuclear Generating Plant
ML20116J645
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 07/31/1996
From: Richard Anderson, Dugstad D
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9608130312
Download: ML20116J645 (9)


Text

.

Northern States Power Company 1717 Wakonade Drive East Welch, MN 55083 Telephone 612-388-1121 August 5,1996 Prairie Island Technical Specifications Section 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 l PRAIRIE ISLAND NUCLEAR GENCRATING PLANT Docket Nos. 50-282 License Nos. DPR-42

%'-306 DPR-60 ,

l J

Monthly Operating Report i July 1996 I l

l Attached is the Monthly Operating Report for July 1996 for the Prairie island Nuclear Generating Plant.

t l

Roger O. Anderson Director Licensing and Management issues I c: Regional Administrator-Ill, NRC NRR Projec' c 8anager, NRC NRC Rasidm inspector State of Minnesota - Kris Sanda 1

Attachment

\'

/

9608130312 960731 PDR R ADDCK 05000282 ppg

\

. NRC MONTHLY REPORT PRINTED 0842/96 Page1 DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.1 DATE 0802/96 COMPLETED BY DALE DUGSTAD TELEPHONE 612-3881121-4376 NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE MONTH: JULY 1996 For the month of July Unit i started out with the reactor being critical at low power and the generator was off-line due to transmission line dama9e causea by the storm of June 29th.

On July 2nd at 0339 the generator was placed on line. The Unit was limited in power output due to steam generator chemistry guidelines and the transmission distribution system (waiting on repairs).

On July 4th at 2229 the Unit was able to start the ramp up to full power operations because the transmission system was repaired. The Unit was at full power operation by 0014 of July 5th.

CURRENT CONTINUOUS OPERATING RUN OF 29 OAYS

l j

PRINTED 06/02/96 NRC MONTHLY REPORT l Page 2 l l

DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.1 DATE 08/02/96 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-4376 AVERAGE DAILY POWER LEVEL UNIT 1 MONTH: JULY 1996 DATX1 AVERAGE DAILY POWER LEVEL l 07/01/96 -20 07/02/96 239 07/03/96 466 -

07/04/96 465 07/05/96 506 07/06/96 507 07/07/96 507 07/08/96 510 07/09/96 514 07/10/96 514 07/11/96 514 07/12/96 516 07/13/96 515 07/14/96 517 07/15/96 512 07/16/96 511 07/17/96 511 07/18/96 508 07/19/96 509 07/20/96 512 07/21/96 514 07/22/96 511 07/23/96 512 07/24/96 512 07/25/96 514 07/26/96 513 07/27/96 513 07/28/96 512 07/29/96 516 07/30/96 514 07/31/96 517 AVERAGE LOADS ABOVE 513 MWE-NET ARE DUE TO COOLER CONDENSER CIRCULATING WATER

l

. NRC MONTHLY REPORT PRINTED 0842/96 Page 3 DOCKET NO. 50-282 UNIT PRAIRIE ist.AND NO.1 DATE 0842/96 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-4376 OPERATING DATA REPORT OPERATING STATUS

1. UNIT NAME. PRAIRIE ISLAND NO.1
2. REPORTING PERIOD: JULY 1996
3. LICENSED THERMAL POWER (MWT) 1650
4. NAMEPLATE RATING (GROSS MWE): 593 .
5. DESIGN ELECTRICAL RATING (NET MWE): 530
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 545
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 513  ;

1

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 - 7) SINCE LAST REPORT, GIVE REASON:

NONE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE
10. REASONS FOR RESTRICTIONS, IF ANY: NONE THIS MONTH YR-TO-DATE SRM. ULATIVE
11. HOURS IN REPORTING PERIOD 744 5111 198335
12. NUMBER OF HOURS REACTOR CRITICAL 744.0 3708.4 170067.7
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.00 5571.1
14. HOURS GENERATOR ON-LINE 716.3 3655.7 168348.7
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.00 0.00
16. GROSS THERMAL ENERGY GENERATED (MWH) 1157224 5884301 267037784
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 381030 1947350 88071060
18. NET ELECTRICAL ENERGY GENERATED (MWH) 359476 1829869 82804174
19. UNIT SERVICE FACTOR 96.3 71.5 84.9
20. UNIT AVAILABILITY FACTOR 96.3 71.5 84.9
21. UNIT CAPACITY FACTOR ( MDC NET) 94.2 69.8 82.8
22. UNIT CAPACITY FACTOR ( DER NET) 91.2 67.6 78.8
23. UNIT FORCED OUTAGE RATE 3.7 1.6 4.6
24. FORCED OUTAGE HOURS 27.7 61.2 8187.1
25. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE. DATE, AND DURATION OF EACH):

l N/A

26. IF CURRENTLY SHUTDOWN, ESTIMATED STARTUP DATE-N/A i

i

[

l l

r l

l '

i l

  • l PRINTED 06/02/96

. NRC MONTHLY REPORT ,

Pape 4 j DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.1 DATE 0842/96 i l COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-4376 i

UNIT SHUTDOWNS AND POWER REDUCTIONS MONTH: .lULY 1996 DATE UNIT TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT 07/01/96 1 F 27.7 H 4 N/A N/A N/A NOTES: Continued forced outage caused by storm damage of June 29th. -

I l

i HEE A SON METHOD SYSTEM CODE l

F-FORCED A-EQUlFMENT FAILURE 1. MANUAL DRAFT lEEE STD S-SCHEDULED B4AAINTENANCE OR TEST 2-8nANU;A TRIP C-REFUEUNG MUTC TRIP D-REGULATORY RESTRICTION 4-CONTINUED E-OPERATOR TRAINING AND 5-REDUCED LOAD COMPONENT CODE UCENSE EXAMINATION 94THER IEEE STD 803A-1983 1

F-ADMINISTRATIVE G-OPERATIONAL ERROR H-OTHER

NRC MONTHLY REPORT PRINTED 08/02/96 Page 5 DOCKET NO. 5m UNIT PRAIRIE ISLAND NO. 2

. DATE 06/02/96 COMPLETED BY DALE DUGsTAD TELEPHONE 612-3881121-4376 NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE MONTH: JULY 1996 For the beginning of July Unit 2 continued in a forced outage due to transmission line damage caused by the storm of June 29th.

i The reactor was taken entical on July 1st at 1214 and the generator was placed on-line at 0020 on the 2nd. The Unit was limited in power output due to steam generator chemistry guidelines and the transmission distribution system (waiting on repairs). On July 5th at 0610 the Unit was able to start the ramp up to full power operations because the transmission system was repaired. Unit 2 was at full power operations by 1326 of the 5th.

)

)

CURRENT CONTINUOUS OPERATING RUN OF 29 DAYS

% 5

.' l

. NRC MONTHLY REPORT PRINTED 08/02MS Page 6 DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO. 2 I DATE 0802/96 COMPLETED BY DALE DUGSTAD TELEPHONE 612-386-1121-4376 AVERAGE DAILY POWER LEVEL UNIT 2 MONTH: JULY 1996 QAIEI AVERAGE DAILY POWER LEVEL 07/01/96 -16 07/02/96 116 07/03/96 221 -

07/04/96 223 07/05/96 466 07/06/96 509 07/07/96 510 07/08/96 513 07/09/96 517 07/10/96 517 07/11/96 517 07/12/96 519 07/13/96 5t's 07/14/96 520 07/15/96 515 07/16/96 515 07/17/96 514 l 07/18/90 514 i 07/19/96 513 07/20/96 515 07/21/96 518 07/22/96 513 07/23/96 516 07/24/96 517 07/25/96 517 07/26,'96 517 07/27/96 517 ,

07/28/96 517 07/29/96 520 07/30/96 518 07/31/96 521 AVERAGE LOADS ABOVE 512 MWE-NET ARE DUE TO COOLER CONDENSER CIRCULATING WATER

j

. 1 i

. NRC MONTHLY REPORT PRINTED 08/02/96 i Page 7 DOCKET NO. 50 306 UNIT PRAIRIE ISLAND NO. 2 DATE 08/02,96 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-11214376 OPERATING DATA REPORT OPERATING STATUS

1. UNIT NAME: PRAIRIE ISLAND NO. 2
2. REPORTING PERIOD: JULY 1996
3. LICENSED THERMAL POWER (MWT): 1650  !
4. NAMEPLATE RATING (GROSS MWE): 593 -

l

5. DESIGN ELECTRICAL RATING (NET MWE): 530

, 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 544 l 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 512 1 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 - 7) SINCE LAST REPORT, GIVE REASON:

NONE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
NONE
10. REASONS FOR RESTRICTIONS, IF ANY: NONE 4

THIS MONTH YR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744 5111 189453
12. NUMBER OF HOURS REACTOR CRITICAL 731.8 5011.2 167820.2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.00 1516.1 l
14. HOURS GENERATOR ON-LINE 719.7 4981.8 166371.3 ,
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.00 0.00
16. GROSS THERMAL ENERGY GENERATED (MWH) 1112820 8089620 264882689 l
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 367270 2699700 86601010 ,
18. NET ELECTRICAL ENERGY GENERATED (MWH) 346304 2551435 81877099 l
19. UNIT SERVICE FACTOR 96.7 97.5 87.8 l
20. UNIT AVAILABILITY FACTOR 96.7 97.5 87.8
21. UNIT CAPACITY FACTOR ( MDC NET) 90.9 97.5 86.2
22. UNIT CAPACIT( FACTOR ( DER NET) 87.8 94.2 81.5
23. UNIT FORCED OUTAGE RATE 3.3 2.5 2.4
24. FORCED OUTAGE HOURS 24.3 129.2 4113.9
25. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):

REFUELING AND MAINTENANCE OUTAGE starting :n JANUARY 1997

26. IF CURRENTLY SHUTDOWN, ESTIMATED STARTUP DATE:

N/A

1 4

. NIC MONTHLY REPORT PRINTE0 06/02/96 Page8 i

DOCKET NO. 50-306 i UNIT PRAIRIE ISLAND NO. 2 DATE 08/02/96 t COMPLETED BY DALE DUGSTAD TELEPHONE 612-386-1121-4376 1

4 j UNIT SHUTDOWNS AND POWER REDUCTIONS l

MONTH: JULY 1996 f

DATE UNIT TYPE FOURS REASON METHOD ifR NUMBER SYSTEM COMPONENT 07/01/96 2 F lt4.3 H 4 N/A N/A N/A l NOTES: Continued forced outage cauced by storm damage of June 29th.

I l

IrEg REASON METHOD SYSTEM CODE F-FORCED A-EQUIPMENT FAILURE 1-MANUAL DRAFT IEEE STD S-SCHEDULED B4AAINTENANCE OR TEST 2-MANUAL TRIP C-REFUEUNG 3-AUTO TRIP D-REGULATORY RESTRICTION 4-CONTINUED E-OPERATOR TRAINING AND 5 REDUCED LOAD GOMPONENT CODE UCENSE EXAMINATION 9-OTHER IEEE STD 803A-1963 F-ADMINISTRATIVE G-OPERATIONAL ERROR H-OTHER