ML20093G392

From kanterella
Revision as of 19:54, 12 May 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 5 to Emergency Plan Implementing Procedure GO-EIP-111, Corporate Activation & Notification Procedures
ML20093G392
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 01/16/1984
From: Mudd C
ALABAMA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
Shared Package
ML20093G395 List:
References
NUDOCS 8407240121
Download: ML20093G392 (4)


Text

.* *a Alabama Power Company

  • . 600 North 18th street Post office Box 2641 Birraingham. Alabama 35291 Telephone 205 250-1000 L

Alabama Power the Southefrt electrc system January 16, 1984 Docket No. 50-348 Docket No. 50-364 Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

Enclosed in accordance with 10CFR50, Appendix E requirements are two copies of General Office Emergency Implementing Procedures G0-EIP-111, Rev. 5. Also enclosed is a Document Transmittal Acknowledgement Form which we request that you sign and return so that we may verify your receipt of these documents in accordance with our document control procedures. If you have any questions, please advise.

Yours very truly, C. H. Mudd, Jr.

CHMJr./KWM:aej

Enclosures:

G0-EIP-111 Receipt Acknowledgement xc: Mr. K. W. McCracken Mr. C. H. Mudd, Jr.

File A-27.9.1 o0S l y j l

l G407240121 840116 PDR ADOCK 05000348 F PDR -

I

? h .ti n l

['y..,,(yj .NucLL Ah la GUL ATonv LOMMISStuN ,

y n A9m.aiot.. o t zozs

%, .v jf July 17, 1984

    • $0*343/364 Farley s

MEMORANDUM FOR: Chief, Document Management Branch, TIDC

-FROM: Director, Division of Rules and Records, ADM

SUBJECT:

REVIEW OF UTILITY EMERGENCY PLAN DOCUMENTATION The Division of Rules and Records has reviewed the attached document and has determined that it may now be m.ade publicly available.

E

r, f~./)

//'..~,/

J. M. Felton, Division Director of Rules and Records -[

'. /

Offic: af Administration

Attachment:

As stated 1

0 W

v 5

l

~

  • f
a. ..

l *

  • l ALABAMA POWER' COMPANY NUCLEAR GENERATION DEPARTMENT GENERAL OFFICE NUCLEAR GENERATION PROCEDURES DOCUMENT TRANSMITTAL ACKNOWLEDGDENT To: Alabama Power Company 600 North 18th Street F.-0. Box 2641 Birmingham, Alabama 35291 Attention: Nuclear Generation Department Doctment Control .

B-300 Flintridge Building .

Acknowledge the' receipt of procedure / revision . [. d/M- /O ,[6 The superceded procedure was destroyed. /

Comments:

)

O e

CE YM> b&'mb[e>f I

Copy m =ber: o34 Aseissed to:

nere W \

Signature ,

1

. 1 I

.. - - - - _ _ _ _ - _ - _ _ _ _ _ _ _ - _ - _ _