ML20091B581

From kanterella
Revision as of 18:46, 5 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Interim Rept on Protective Coatings. NRC Comments on 840419 Draft Rept Incorporated.Second Rept Will Be Issued by 840430 Addressing Each of 60 Allegations
ML20091B581
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 04/25/1984
From: Taylor J
BROOKHAVEN NATIONAL LABORATORY
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20091B572 List:
References
NUDOCS 8405300335
Download: ML20091B581 (1)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - ____ _ _ _ _ _ _ _ _ _ _

3ROOKHAVEN NATIONAL LABORATORY ASSOCIATED UNIVER$1 TIES, INC.

Upten. Long islcnd. New York 11073 (Sio)282' 7005 Cecortment of Nuclect Energy FTS c66' l April 25,1984 Mr. Eric H. Johnson U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 l

Arlington, Texas 76011

Dear Eric:

Enclosed is Brookhaven National Laboratory's (BNL) report titled " Interim Report on Protective Coatings" for Comanche Peak Steam Electric Station (CPSES).

The NRC comments in the draft report dated April 19, 1984 have been incorporat-ed. This report also includes the requested information needed to assess the l adequacy of applied coatings at CPSES.

We are currently in the process of preparing an additional report that will address each of the 60 allegations. We anticipate issuing this second report on or about April 30, 1984.

Yours truly, ..

W John Tay1 , Group Leader Plant Systems & Equipment Analysis Group ,

VL:JHT/ar cc: R. Bari

  • R. Hall l F. Hawkins (NRC Req. !!!) ,

D. Hunnicutt (NRC Reg. IV)

W. Kato H. Kouts V. Lettieri J. Oechsle h T N [ ofoN$$5 N 0