ML20091B581
| ML20091B581 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 04/25/1984 |
| From: | Taylor J BROOKHAVEN NATIONAL LABORATORY |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML20091B572 | List: |
| References | |
| NUDOCS 8405300335 | |
| Download: ML20091B581 (1) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
3ROOKHAVEN NATIONAL LABORATORY ASSOCIATED UNIVER$1 TIES, INC.
Upten. Long islcnd. New York 11073 (Sio)282' 7005 Cecortment of Nuclect Energy FTS c66' l
April 25,1984 Mr. Eric H. Johnson U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 l
Dear Eric:
Enclosed is Brookhaven National Laboratory's (BNL) report titled " Interim Report on Protective Coatings" for Comanche Peak Steam Electric Station (CPSES).
The NRC comments in the draft report dated April 19, 1984 have been incorporat-ed.
This report also includes the requested information needed to assess the l
adequacy of applied coatings at CPSES.
We are currently in the process of preparing an additional report that will address each of the 60 allegations. We anticipate issuing this second report on or about April 30, 1984.
Yours truly, W
John Tay1
, Group Leader Plant Systems & Equipment Analysis Group VL:JHT/ar cc: R. Bari R. Hall l
F. Hawkins (NRC Req. !!!)
D. Hunnicutt (NRC Reg. IV)
W. Kato H. Kouts V. Lettieri J. Oechsle h T N [ ofoN$$5 N