Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20215B835 | 10 April 1986 | Summarizes NRC 860214 Audit Meeting W/Util & Ebasco in New York City,Ny Re Comanche Peak Conduit & Conduit Support Programs.List of Attendees Encl.Highlights of Presentations Listed | Safe Shutdown |
ML20215B805 | 9 April 1986 | Responds to Request for Status of Funding on FIN A-3803, Evaluation of Selected NRC Open Items Before Plant Fuel Load,Project 1:SSER Development for Comanche Peak. Items That BNL Providing Assistance for Listed | |
ML20136F477 | 31 December 1985 | Forwards PNL-5718, Review of Tdi Diesel Generator Owners Group Engine Requalification Program,Final Rept, Technical Evaluation Rept | |
ML20212M572 | 16 December 1985 | Forwards Const Reinsp/Documentation Review.Related Info Encl | |
ML20138M186 | 17 October 1985 | Forwards PNL-5444, Review of Design & Quality Revalidation Rept for Tdi Diesel Generators at Comanche Peak Steam Electric Station Unit 1, Technical Evaluation Rept | |
ML20133A314 | 27 September 1985 | Forwards Review of Section 4.7 of Technical Evaluation Rept PNL-5600, Review of Resolution of Known Problems in Engine Components for Tdi Emergency Diesel Generators, Reflecting Views Re Crankshafts for 16-cylinder Engines | |
ML20128H737 | 27 June 1985 | Forwards Rev 1 to Review of Engine Base & Bearing Caps for Tdi DSRV-12,DSRV-16 & DSRV-20 Diesel Engines, Technical Evaluation Rept | |
ML20126E872 | 24 May 1985 | Forwards PNL-5200-3, Review of Emergency Diesel Generator Engine & Auxiliary Module Wiring & Terminations, Dtd May 1985 | |
ML20206U600 | 17 October 1984 | Handwritten Ltr Commenting on Comanche Peak Response Team Action Plan.More than One Strength of Concrete May Have Been Placed Between Jan 1976 & Feb 1977 | Earthquake |
ML20138N697 | 18 September 1984 | Forwards Repts Re Irradiation,Decontamination & DBA Testing, Per Request of Y Korobov of Carboline Co | Boric Acid Coatings |
ML20095C191 | 13 June 1984 | Forwards Draft Status Rept on Protective Coatings Allegations | Safe Shutdown Coatings Backfit |
ML20091B581 | 25 April 1984 | Forwards Interim Rept on Protective Coatings. NRC Comments on 840419 Draft Rept Incorporated.Second Rept Will Be Issued by 840430 Addressing Each of 60 Allegations | Coatings |
ML20095C196 | 24 February 1984 | Forwards IE Insp Repts 50-445/84-03 & 50-446/84-01 on 840130-0203 | |
ML20136B782 | 16 February 1984 | Forwards Allegations 18 - 33 Re Protective Coatings at Facility.Responses Should Be Available Onsite.Allegation Data Form Encl | Coatings Backfit |
ML20136B741 | 24 January 1984 | Forwards Allegations 7-17 Re Protective Coatings at Facility.Util Responses Should Be Available for Onsite Review | Coatings Backfit |
ML20136B339 | 16 January 1984 | Forwards First Six Allegations Re Protective Coatings at Facility.Written Response by Util Should Be Available During 840130 Site Visit | Coatings |
ML19351E755 | 15 December 1980 | Forwards SER Input for Sections 8.1 Through 8.3,9.5.2 Through 9.5.8,10.3,10.4.1 & 10.4.4,based on FSAR & Drawings Submitted by Applicant.Summary Table Re Unresolved Issues Encl | Safe Shutdown Slow transfer Anticipated operational occurrence Tornado Missile Emergency Lighting |
ML19347A869 | 26 September 1980 | Confirms 800925 Telcon.Review Team Will Use Unofficial Amended Environ Rept Until Docketed Amend 1 Received | |
ML19347A851 | 24 September 1980 | Forwards Questions Re Responses & Amends to Environ Rept | |
ML19344A628 | 14 August 1980 | Forwards Proposed Ltr for NRC Distribution to Us Fish & Wildlife Svc,Albuquerque,Nm & Backup Info Re Endangered Species |