Forwards Errata to Saxton Nuclear Experimental Corp Final Release Survey of Reactor Support Bldgs Rept
ML20094H255
Person / Time
Site: Saxton File:GPU Nuclear icon.png
Issue date: 03/03/1992
From: Hildebrand J
GENERAL PUBLIC UTILITIES CORP., SAXTON NUCLEAR EXPERIMENTAL CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
C301-92-0002, C301-92-2, SNEC-92-0002, SNEC-92-2, NUDOCS 9203090209
Download: ML20094H255 (6)


Text

.

uE- SAXTON NUCLEAR EXPERIMENTAL CORPORATION GENERAL P U B LIC UTILITIES SYSTEM

=

Jersey Central Power & L!ght Company d Pennsylvania Electnc ComDany PE JC . Metropositan Edison Company MAILING ADDRESS; TELEPHONE.

I Upper Pond Rd. (201) 316-7000 Parsippany, NJ 07054 .,

SNEC-92-0002 MAR 31992 C301-92-0002 U. S. Nuclear Regulatory Commission Att: Document Control Desk Washington, DC 20555 Gentlemen:

Saxton Nuclear Pacility Operating-License No. DPR-4 Docket No. 50-146 Errata for SNEC Final Release Survey of the Reactor Support Buildings Report This submittal-provides errata for the subject report, as requested by A. Adams. The following changes should be made to the subject survey report:

1. Replace page 51 with the attached page 51.
2. Replace Appendix G with the attached Appendix G.

Please contact us if you require additional information. .

Sincerely,

- @ 0' 4hsc/ f.^j J. E. Hildebrand President, SNEC Attachments JEH/EP/ pip cc: A. Adams - NRC R. Bores - NRC M. Reilly - Commonwealth of PA J. Roth - NRC S. Weiss - NRC l

9203090209 920303 I  !'

PDR ADOCK 05000146 P PDR f ERkATA.BAO

g-y, , e' A

point measurements,. minimum,~ maximum, and average-dpm/100cm 2 for  !

individual grids or survey _ blocks.

4. Removable Contamination Measurements _

The final survey results did not show any removable alpha or beta / gamma activity above the USNRC guidelines. All removablo alpha activity measurements were less than 20 dpm/100cm. d All i removable beta /gamraa activity measurements were less than 1000 dpm/100cm. 2 Greater than 99% of the smear results were less than-the minimum detectable activities for the instruments. The maximum alpha -smear was 10 dpm/100cm' and was most likely natural radioactivity. The maximum beta / gamma smear was 175 dpm/100cm.- 3 Minimum detectable concentrations averaged 7 dpm/100cm for alpha activity and 140 dpm/100cm* for beta / gamma activity. Tables-D-16 through D-17 in Appendix D contain the removable contamination measurements for individual grids or survey blocks.

5.- Gamma Exposure Rate Measurements The final survey results showed gamma exposure rates for all grids-were consistent with the guideline of 5 uR/hr above background measured at 1 meter from the surface. Measured exposure rates at meter were compared to the onsite instrument -background

~

1 .

measurements taken- for every survey. Ther onsite instrument background measurements ranged frou -4 uR/hr to 18 uR/hr. The raeasurements ranged from 0 uR/hr-to b uR/hr above background._ All onsite gamma exposure rates were within the variability of offsite background measurements-of 6 uR/hr to 22 uR/hr.

.f When exposure rate measurements were made on the outside walls and the RWST pad additional measures:were implemented to-reduce the shine f rom the surrounding soils. Soil was excavated along-the northwest wall of the RWDF building, along the north wall of-the RWDF pipe tunnel, and around the RWST pad and shielding was used to ensure that the structure being surveyed was the source of the exposure reading.

- . , - . - - - -, - - ~ . .

e 4

APPENDIX G -

DISMANTLEMENT AND DEMOLITION PROCESS 6

m

- 701 -

t DISMANTLEMENT AND DEMOLITION PROCESS Upon issuance by the USNRC of the TSCR to remove the C&A, RWDF, FDSB, and RWST pad from Technical Specification contrals, each of the structures will be readied for dismantlement. It is SNEC's intent to restore the land to its original contour such that it sill have no impact upon the U.S. Army Corps of Engineers' flowage easement. There will be no regulated demolition landfill created.

Masonry material f rcm the demolition of structures to 3 f eet below grade will be used as backfill in the RWDF basement and the yard pipe tunnel. The backfilled Rh0F basement and yard pipe tunnel will be covered with a soil cap. Construction rebar and other non-masonry materials will be removed to the extent possible from the concrete prior to its use as backfill material. Other non-masonry materials f rom the buildings such as glass and roofing, will be removed to the extent possible. Excess concrete rubble that can not be used as backfill and other non-masonry materials will be disposed oO offsite in an approved landfill or recycled.

The filled drum storage bunker is an eartqen unit with wooden criboing. The interior wall consisting of the wood cribbing will be surveyed in accordance with procedures f or release of equipment.

If the wood cribbing meets USNRC guidelines for release it will be disposed of offsite in an approved landfill. The soil behind the wood may be used in conjunction with the masonry material to backfill in the RWDF and pipe tunnel. If used in this manner, the soil will be sampled and analyzed and shown to be consistent with the environmental pathways analysis.

All applicable dismantlement and demolition permits will be setured prior to the start of work. Demolition work will be conducted in a manner to minimize any environmental impact.

02 -

4

  • (

4 Appropriate . radiological and environmental -controls will .be 'in '

place throughout the dismantlem?nt and demolition process. Several areas were identified during the final release survey that were 5 inaccessible to survey instruments. These areas will be surveyed '

and dispositioned during dismantlement and demolition. Demolition ,

hold points have been identified to allow these additional surveys .,

to occur. The USNRC will be notified of the status of-each hold ,

point after each-has been surveyed. If the hold point meets USNRC ,

release guidelines, the USNRC will be given the option to review the results before final disposition. If thu hold point is considered- to be radwaste, it will be disposed of in accordance with procedures for radvaste. These hold points include: l 2

o walls behind tne electrical breaker boxes and emergency lighting fixtures (C&A and RWDF) -

o structural 1-beams in C&A o drain pipes off of the C&A roof o floors underneath groundwater collection containers (RWDF) o ceiling hatch in the RWDF Evap. Room

, o area underneath wooden frame " bridge" in the C&A pipe

tunnel i o erea underneath groundwater collection pipes in the RWDF pipe tunnel o two pipes in RWDF Pump and Compressor doom ceiling o two pipes in RWDF Drum Shipping Room ,

l o. areas underneath any wooden-supports o several penetrations-in Yard Pipe Tunnel ceiling l

l- Radiological Controls technicians will provide- job coverage

- throughout the-dismantlement and demolition process. They will be instructed-to survey the hold points identified above as well- as any additional areas not previously surveyed that may become-accessible. If any areas / materials exceed the USNRC release l_ , - 704 -

'4--

4 4 '

Appropriate environmental monitoring will continue to be performed during the demolition process. <