l GPU Nuclear. Inc.
(.
Route 441 South NUCLEAR Post O'fice Box 480 Middletown. PA 17057-0480 Tel717-944 7621 i
February 09, 1998 6L20-98-20072 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen,
Subject:
Saxton Nuclear Experimental Corporation Operating License No. DPR-4 Docket No. 50-146 Response to the Requ 4 for Information Regarding Revision I to the Saxton Nuclear Experimental Corporation Decommissioning QualP.y Assurance Plan The purpose of this letter is to provide a response to the two questions regarding apparent undocumented changes to the Saxton Nuclear Experimental Corporation Decommissioning Quality Assurance Plan. Ifyou have any additional questions regarding this issue or other material accompanying Technical Specification Change Request 59, please contact William Heysek at (717) 948 8191.
Sincerely, W
G. A. Kuehn Jr. /
Vice President, SNEC
.-n souUUU WI41 AttJments
- 1) Response to the RAI
- 2) Saxton Nuclear Experimental Corporation Decommissioning Quality Assurance Plan, Revision I cc:
NRC Project Manager NRR-A.X. Adams Jr.
l/
NRC Project Scentist, NRR-T. F. Dragoun File 96516 9802190279 980209 u
u i
ml DR ADOCK 0500 6
~
6L20-98-20072 Page1of1 1.
Revision 1 of the Saxton Nuclear Experimental Corporation Decommissioning Quality Assurance Plan. The functional QA responsibility for the administration of a goods and services nonconformance program, and a material nonconformance program that appears in revision 0 of the plan does not appear in revision 1. Plea:e address this change to the plan.
Response: It was agt the intent of GPU Nuclear to revise the functional responsibility for the administration of a goods and services nonconformance program, and a material conconformance program that appeared in revision 0 of the plan. A word processing error resulted in the deletion of the text in question (a drail verdon of revision 0 was inadvertently used when the revision 1 changes were incorporated). A word-by-word review has been performed since the variation was identified to assure that revision I to the Saxton Nuclear Experimental Corporation Decommissioning Quality Assurance Plan, l
contains the text of revision 0 as revised by the change barred sections in revision 1. A copy of a " corrected" revision 1 is attached.
2.
Revision 1 of the Saxton Nuclear Experimental Corporation Decommissioning Quality l
Assurance Plan. Appendix A of the plan, which ic discussed in your answer to question five in your letter of May 30,1997 (C301-97-2017), appears to be missing some information in the discussion of Regulatory Guide 1.144. Please address.
Response: Information found in section 3 under the discussion regarding Regulatory Guide 1.144 was inadvertently eliminated from revision lof the plan as a result of the same error identified above. Actions taken to verify the correctness of the content of the entire plan, as described above, resulted the re-inclusion of section 3. It is as provided in the response to question five in our letter of May 30,1997 (C301.97-2017).