ML20072C218

From kanterella
Jump to navigation Jump to search
Forwards Application for Tscr to Revise Content & Format of Existing TS & Analysis Applying Standards of 10CFR50.92 in Making Significant Hazards Considerations Determination
ML20072C218
Person / Time
Site: Saxton File:GPU Nuclear icon.png
Issue date: 08/08/1994
From: Hildebrand J
SAXTON NUCLEAR EXPERIMENTAL CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20072C220 List:
References
C301-94-2004, SNEC-94-0019, SNEC-94-19, NUDOCS 9408170129
Download: ML20072C218 (1)


Text

.

~

SAXTON NUCLEAR EXPERIMENTAL CORPORATION ME GENERAL P U B LIC UTILITIES SYSTEM i

SNE Jersey Central Power & Light Company Pennsylvania Electric Cornpany j

PE JC Metropoli'an Edison Cornpany MAILING ADDRESS:

August 8, 1994 1 Upper Pond Road C301-94-2004

)

SNEC-94-0019 Parsippany, NJ 07054 U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.C.

20555 Gentlemen,

Subject:

Saxton Nuclear Experimental Corporation Operating License No. DPR-4 Docket No. 50-146 Technical Specification Change Request No. 55 In accordance with 10 CFR 50.4(b)(1), enclosed is Technical Specification (TS)

Change Request (TSCR) No. 55.

The purpose of the TSCR is to revise the content and format of the existing TS to make them more consistent with the guidelines for applicable sections of ANSI /ANS 15.1 as well as include facility characterization as an activity permissible by the TS. This second item is necessary to support data collection to complete the Decommissioning Plan and ultimately license termination.

Since TSCR 55 includes the material previously comprising TSCR l

54, TSCR 54 is withdrawn.

Persuant to 10 CFR 50.91(a)(1), enclosed is an analysis applying the standards of 10 CFR 50.92 in making a significant hazards considerations determination.

Also enclosed is the Certificate of Service for this request certifying service to the chief executivas of Liberty Township and Bedford County, Pennsylvania, in which the facility is located, as well as the designated representative of the Commonwealth of Pennsylvania, Bureau of Radiation Protection.

It is requested that the amendment authorizing this TSCR be issued expeditiously and be effective upon issuance to permit facility characterization activities to proceed without delay.

160024 Sincerely, gMchd J. E. Hildebrand President WGH

Enclosures:

1)

Technical Specification Change Request No. 55 2)

Certificate of Service for Technical Specification Change i

Request No. 55 cc: Administrator, Region 1 NRC Project Engineer NRR N s224 (11-88)

NRC Project Engineer, Region I 9408170129 940808 NRC Project Scientist, Region I PDR ADOCK 05000146 goo P

PDR g