ML20209B997
| ML20209B997 | |
| Person / Time | |
|---|---|
| Site: | Saxton File:GPU Nuclear icon.png |
| Issue date: | 06/29/1999 |
| From: | Kuehn G GENERAL PUBLIC UTILITIES CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20209C002 | List: |
| References | |
| 1920-99-20355, NUDOCS 9907080388 | |
| Download: ML20209B997 (1) | |
Text
((
l GPU Nuclear. Inc.
(.
Emergency Operations Facility (EOF)
NUCLEAR 57" l*t"*t*** D'i" Harrisburg. PA 17110 Tel 717-948-8970 Fax 717-540-4511 l
June 29,1999 1920-99-20355 l
l U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555
Dear Sir:
SUBJECT:
SAXTON NUCLEAR EXPERIMENTAL CORPORATION OPERATING LICENSE NO. DPR-4 DOCKET NO. 50-146 1998 ANNUAL REPORT In accordance with Section 3.8.2 of the Saxton Nuclear Experimental Corporation (SNEC) Technical Specifications, a written report covering the status of the Saxton Nuclear Experimental Corporation (SNEC) Facility is sttached. The report covers the period beginning January 1,1998 through December 31,1998.
If there any questions about the report please contact Dennis Kelly at (609) 971-4246.
Sincerely, l
l ngnnj3 G.A.
uehn I
Program Director, SNEC Facility l
GAK/dcr cc: NRC Project Manager NRR NRC Project Scientist, Region i I
9907080388 990629'
'~
l PDR ADOCK 05000146 R
_