ML20101Q095

From kanterella
Revision as of 14:06, 28 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LaSalle County Station Unit 2 Fourth Refueling Outage ASME Section XI Summary Rept, of Inservice Insp
ML20101Q095
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 07/08/1992
From: Shields J
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20101Q097 List:
References
NUDOCS 9207140153
Download: ML20101Q095 (1)


Text

S 7( M'q4U.

pq

~'

j p" ' Commonwealth Edison 1400 Opus Place Downers Grove, Illinois 60515 July 8,1992 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555

Subject:

LaSalle County Station Unit 2 Inservice Inspection Summary Report NBC_RockeWoJ0374 ____.

Attached is a copy of the Commonwealth Edison Company LaSalle County Nuclear Power Station Unit 2 ISI Summary Report for the spring 1992 ASME Section -

XI Inservice inspection. This is the second period of the first ten year interval and this was LaSalle's fourth refueling outage for Unit 2. LaSalle's malling address is LaSalle County Station,2601 N. 21st Road, Marseilles, IL 61341. Unit 2 is owned and operated by Commonwealth Edison Co., whose address is One First National Plaza, P.O. Box 767, Chicago, Illinois 60690. Unit 2 has a gross generating capacity of 3323 MWth, and began commerical operation on October 19,1984.

The Unit 2 reactor vescel was supplied by Chicago Bridge and Iron, Oakbrook, Illinois. The reactor recirculation system componen'.s were supplied by General Electric, San Jose, California. All other piping examined during the fourth refueling outage was supplied by B.F. Shaw, Wilmington, Delaware.

The inspections that were performed, the conditions that were observed, and the corrective measures that were taken are contained in the attached report.

We certify that the statements made in this report are correct and that the examinations and correcilve measures taken conform to the rules of the 1980 Edition of ASME'Section XI, including the Winter 1980 Addenda.

If there are any questions or comments regarding this matter, please contact this office.

Very truly yours, I'h)

JoAnn Shields Nuclear Licensing Administrator Attachment t

cc: A. Bert Davis - Regional Administrator, Rlli D. Hills - Senior Resident inspector, LSCS I

B. Siegel - NRR Project Manager (w/o att.)

r ML. Sage, Office of Nuclear Fncility Safety -IDNS 7 [

Do$o$ ooh!74

~

PDR .

)

ZNLD/1932/16

_ __ ._ - . _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _