Interim Deficiency Rept Re Relocation of Governor Lube Oil Coolers/Standby Diesel Generator.Governors Returned to Transamerica Delaval.Corrective Actions on Coolers Will Not Be Complete Until Nov 1983 for Unit 1 & Jan 1984 for Unit 2
ML20076L342
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 07/01/1983
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
RDC-45(82), NUDOCS 8307190136
Download: ML20076L342 (1)


Text

-

Tli E C L E V E L A !' D E L E C T R I C I L L U h, l u nil H G C O ni Pit u Y P.o. Box 5000 - CLEVELAND, oHlo 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLDG. - 55 PUBLIC SQUARE Serving The Best Location in the Nation MURRAY R. EDELMAN July 1, 1983 VtCE PRESIDENT NUC LE AR Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE: Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Location of Governor Lube Oil Cooler / Standby Diesel Generator

[RDC 45(82)]

Dear Mr. Keppler:

Out letter to you dated January 6, 1983, indicated that corrective actions to resolve the relocation of the Governor Lube Oil Coolers would be completed by July 1983 for Unit 1 and September 1983 for Unit 2. The governors have been returned to Transamerica DeLaval for inspection and overhaul as detailed in our letter to you dated June 14, 1983 [RDC 59(82)]. Therefore, corrective action on the Lube Oil Coolers will not be complete until November 1983 for Unit i and January 1984 for Unit 2.

Please call if there are any additional questions.

Sincere ,

m.id d -o %

Mu ray R. Edelman Vice President Nuclear Group MRE:pab cc: Mr. M. L. Gildner  !

NRC Site Office i

Director j Office of Inspection and Enforcement l

.U.S. Nuclear Regulatory Commission ~'

Washington, D.C. 20555 U.S. Nuclear Regulatory Commission c/o Document Management Branch 1 Washington, D.C. 20555 Records Center, SEE-IN Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 9307190136 830701 PDR ADOCK 05000440 S PDR

@l f

fj d