PY-CEI-NRR-2356, Monthly Operating Rept for Dec 1998 for Perry Nuclear Power Plant,Unit 1.With

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1998 for Perry Nuclear Power Plant,Unit 1.With
ML20199E704
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 12/31/1998
From: Hegrat H, Johnson P
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, PY-CEI-NRR-2356, NUDOCS 9901210057
Download: ML20199E704 (3)


Text

I Pctry Nuclear Nwer Plznt ame a mm_

' _- . s,

. , 10 eom Center Roa,d z

l Nrry, Ohio 44081 i

L January 13,1999' PY-CEI/NRR-2356L United States Nuclear Regulatory Commission -

Document Control Desk -

Washington, D.C. 20555

! Perry Nuclear Power Plant ,

i Docket No. 50-440 l License No. NPF-58 Monthly Operating Report jl j

Ladies and Gentlemen:

l 4

L Attached is the December 1998 Monthly Operating Report for Perry Unit 1. Page 1 is the  !

! Operating Data Report and page 2 is the Unit Shutdowns Chart. This report is submitted in l l accordance with Technical Specification 5.6.4 and Generic Letter 97-02, " Revised Contents of i l

the Monthly Operating Report."

j i

, If you have' questions or require additional information, please contact Ms. Penny Johnson l l at (440) 280-5342.- {

i L Very truly yours, 4 Aq I. (

$ 4 l

l Henry L. Hegrat i

, - Manager-Regulatory Affairs PMJ- )

L .

l'

l. ' Attachment -

j ..

cci NRC Region III Administrator NRC Project Manager NRC Resident Inspector

! I I

h$

'ri 9901210057 981231 E t PDR ADOCK 0500044( i R PDR4[

L

_. . .. . - ,- . . . - . . . . _ - . - . . . . - - . . . . - .-.=. . _ - . - ..

OPERATING DATA REPORT  :

UNIT: Earjy DATE: 1/13/99

1. Docket: 50-440
2. Unit Name: Perry Nuclear Power Plant
3. Reporting Period: December 1998 f

- 4. Utility

Contact:

P. Johnson

5. Telephone: 440-280-5342
6. Design Electrical Rating (Net MWe): jl91
7. Maximum Dependable Capacity (Net MWe): j1gQ t

This Month Yr-to-Date Cumulative +

8. ' Hours Reactor was Critical 744.0 8.701.6 73.206.3
9. Hours Generator On-U.ne 744.0 8.684.9 71.004.3

- 10. Unit Reserve Shutdown Hours 0.0 0.0 0.0

11. Net Electrical Energy (MWeH) . 888.231 10.188.943 79.610.373 1
l

, w

. 4 s

UNIT SHUTDOWNS -

REPORT MONTH - DECEMBER 1998 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 1/13/99 CONTACT: P. Johnson TELEPHONE: (440) 280-5342 No. Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence 1 Hours 2 3

SUMMARY

Perry Unit One remained on line for the entire month of December.
1. TYPE: 2. REASON: 3. METHOD:

F: Forced A - Equipment Failure (explain) 1 - Manual S: Scheduled B - Maintenance or Test 2 - Manual Scram C - Refueling 3- Automatic Scram D - Regulatory Restriction 4 - Continuaton E - Operating Training & 5 - Other License Examination F- Administrative G - Operational Error (exp8ain)

H - Other (explain) 2