PY-CEI-NRR-2329, Monthly Operating Rept for Sept 1998 for Perry Nuclear Power Plant,Unit 1.With

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1998 for Perry Nuclear Power Plant,Unit 1.With
ML20154K257
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 09/30/1998
From: Hegrat H, Johnson P
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, PY-CEI-NRR-2329, NUDOCS 9810160212
Download: ML20154K257 (3)


Text

..

  • P;rry Nuct:arPower Plant to Center Road

,a m R O. Box 97 Perry, Ohio 4408t i

, l

.t

, 1 October 12,1998  !

PY-CEI/NRR-2329L '

i United States Nuclear Regulatory Commission Document Control Desk

. Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 -

License No. NPF-58 Monthly Operating Report i Ladies and Gentlemen: '

Attached is the September 1998 Monthly Operating Report for Perry Unit 1. Page 1 is the

. Operating Data Report and page 2 is the Unit Shutdowns Chart. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, " Revised Contents of

. the Monthly Operating Report."

If you have questions or require additional information, please contact Ms. Penny Johnson at (440) 280-5342.

Very truly yours, 4, .

. Henry L. fegrat -

Manager- Regulatory Affairs PMJ:s

)'

\

Attachment cc: NRC Region Ill Administrator

.NRC Project Manager g NRC Resident Inspector 7 9810160212 980930:"

PDR - ADOCK 05000440 R PDR

OPERATING i \TA REPORT UNIT: Penv DATE: 10/7/98 l 1

i

1. Docket: 50440

. . 1

2. Unit Name- Perry Nuclear Power Plant
3. Reporting Period: . September 1996

. l

4. Utility Contact- P. Johnson  !

l

5. Telephone 440-280 5342

' 6. . Design Electrical Rating (Net MWe): 11pj, 7.- Maximum Dependable Capacity (Not MWe): jigg-This Month Yr-to-Date Cumulative

8. Hours Reactor was Critical 720.0 6.492.6 70.997.3
9. _ Hours Generator On-Line 720.0 6.475.9 68.795.3
10. Unit Reserve Shutdown Hours 0.0 0.0 0.0
11. Net Electrical Energy (MWeH) 819.082 7.605.345 77.026.775 i I

1 I

I l

1

o .

t

!- UNIT SHUTDOWNS .

REPORT MONTH - SEPTEMBER 1998 ,

DOCKETNO
50-440 NAME- Pefry Nuclear Power Plant .

DATE- 10/7/98 CONTACT: P. Johnson TELEPHONE-(440) 280-5342 No. Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence 1 Hours 2 3

SUMMARY

Perry Unit One remained on une for the entire month of Septemtw. During the month of September a suspected leaking fuel bundle was identdied and sw _ _ _ :1 The unit continues to run at full power output.
1. TYPE- 2. REASON 3. MEmOD F: Forced A- Equipment Failure (explain) 1 - Manual S: Scheduled B - Maintenance or Test 2 -Manual Scratm C- RefueEng 3 - Automabc Scram D - Regulatory Restndion 4-Contmustion E -Operating Training & 5 - Other License Examinabon F- Administrative G -Operabonal Error (explain)

H-Other (explain) 2